A formwork-free column foundation structure for steel structure factory sheds
By adopting precast concrete pipes and anchor bolts, the prefabricated steel structure factory shed column foundation can be constructed without formwork, solving the problems of construction progress and elevation control, and improving construction efficiency and structural stability.
Patent Information
- Application Number
- CN202522482495.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-24
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-24
AI Technical Summary
The existing prefabricated steel structure factory sheds require formwork installation and two pours for column foundation construction, which affects the construction progress and makes it difficult to accurately control the elevation, thus failing to meet the needs of rapid construction.
Precast concrete pipes are used to replace traditional formwork, combined with anchor bolts and shear groove structures to achieve formwork-free construction of column foundations. The upper and lower layers of concrete are poured in one go, and the elevation is adjusted by a secondary grouting layer. Nuts and gaskets are used to ensure a stable connection.
This enabled rapid construction of the column foundation, improved construction efficiency and quality, ensured the stability and load-bearing performance of the structure, eliminated local stress concentration, and enhanced overall safety.
Smart Images

Figure CN224982229U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of prefabricated steel structure factory sheds, specifically a formwork-free column foundation structure for steel structure factory sheds. Background Technology
[0002] With the continuous improvement of my country's modern industrial system, prefabricated steel structure factory sheds have become the mainstream choice for building types in various fields due to their advantages such as high strength, light weight, spacious interior space, recyclability, and environmental friendliness. This also aligns with the national policies of green building and sustainable development. As an important component of prefabricated steel structure factory sheds, the column foundation is currently mainly a concrete independent foundation structure. The columns are pre-embedded in the foundation using embedded parts, forming a reliable, stable, and effective structural connection between the columns and the foundation, allowing them to jointly bear and transmit various loads from above.
[0003] Then, the construction process of the aforementioned basic structure requires formwork installation and tie rod reinforcement, and the upper and lower layers of concrete need to be poured twice, affecting the construction progress. Furthermore, for scenarios with strict requirements for controlling the bottom elevation of the steel columns, the existing basic structure is no longer sufficient for rapid construction. Therefore, it is necessary to further modify the column foundation structure to enable it to have adjustable elevation, structural stability, and faster construction progress. Summary of the Invention
[0004] The purpose of this utility model is to address the problems existing in the prior art by providing a formwork-free column foundation structure for steel structure factory sheds. This formwork-free column foundation structure for steel structure factory sheds is reasonably designed, convenient to construct, safe and sturdy. It uses precast concrete pipes to replace traditional formwork, enabling the upper and lower layers of concrete to be poured at once, and making it easy to control the column foundation elevation, effectively improving construction efficiency and foundation construction quality.
[0005] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A formwork-free column foundation structure for steel structure factory sheds includes foundation concrete, column components, and connecting structures. The column components include steel columns and column base plates. The steel columns are vertically welded to the top surface of the column base plates, and stiffening plates are welded between the steel columns and the column base plates. The foundation concrete consists of upper step concrete, lower step concrete, precast concrete pipes, and a secondary grouting layer. The precast concrete pipes are square hollow precast concrete components, prefabricated in a factory using molds. The lower end of the precast concrete pipe is embedded in the lower step concrete, and the upper step concrete is poured inside the precast concrete pipe. The secondary grouting layer is poured between the column base plates and the upper step concrete. The connecting structures are embedded in the upper step concrete to connect the foundation concrete and column components into a whole. The process involves a precast concrete pipe passing through both the upper and lower step concrete sections. The top of the precast concrete pipe is flush with the top surface of the upper step concrete, and the bottom of the precast concrete pipe is flush with the bottom surface of the lower step concrete. Both upper and lower step concrete sections are cast in one continuous pour. The lower step concrete outside the precast concrete pipe is poured in a full-groove manner, while the upper step concrete inside the precast concrete pipe is poured in one continuous pour using the precast concrete pipe instead of wooden formwork. The secondary grouting layer is located above the upper step concrete and is applied after the column foundation elevation has been adjusted. The concrete grade of the precast concrete pipe should be consistent with that of the upper and lower step concrete. Column installation can only proceed after the strength grades of the upper and lower step concrete reach 80% of their design strength grades.
[0006] A further preferred embodiment includes: a shear groove pre-embedded in the top surface of the upper stepped concrete; and shear blocks matching the shear groove are fixedly installed on the bottom surface of the column base plate. The shear blocks are inserted into the shear groove to improve the shear strength of the column foundation. During column installation, the shear blocks are placed into the shear groove, and then a secondary grouting layer is poured.
[0007] A further preferred embodiment: The connection structure includes anchor bolts, washers, and nuts. The lower end of the anchor bolt is pre-embedded in the upper step concrete, and the upper end of the anchor bolt has threads and protrudes from the top surface of the secondary grouting layer. Washers and nuts are installed on the anchor bolts in the following order from bottom to top: nut, washer, washer, nut, and nut. The column base plate has screw holes for the anchor bolts, and the column base plate is located between two washers. That is, the anchor bolts are pre-embedded during the pouring of the upper step concrete. The exposed part of the anchor bolt needs to be threaded, with three nuts and two washers at the threaded part. The lower part of the column base plate has one nut and one washer, and the upper part has two nuts and one washer. After the anchor bolts are processed and manufactured, the threaded surface should be coated with grease to prevent thread corrosion. During the pre-embedding of anchor bolts, steel structure professionals must provide on-site guidance and record the embedding deviations so that corresponding adjustments can be made when cutting beam and column components.
[0008] The formworkless column foundation structure used in this steel structure factory shed utilizes nuts at the bottom of the column base plate to adjust the elevation and verticality of the steel columns. Two nuts above the column base plate effectively resist loosening of the threads caused by vibration, impact, or wind load. The anchor bolt connection between the nuts and washers should meet the specified torque requirements. After the column components are installed, aligned, and positioned, the column base plate is tightened to the nuts to prevent loosening. Then, secondary grouting is performed under the column base plate to form a secondary grout layer, and the compactness of the secondary grout below the column base plate is checked.
[0009] The formwork-free column foundation structure used in this steel structure factory shed has the following advantages: Traditional foundation construction uses formwork and tie rods for concrete pouring. This steel structure factory shed uses a formwork-free column foundation structure, replacing traditional formwork with precast concrete pipes. The construction process eliminates the need for formwork installation and dismantling, allowing for simultaneous pouring of the upper and lower layers of concrete for the column foundation, effectively improving the efficiency and quality of foundation concrete construction. Furthermore, this formwork-free column foundation structure facilitates control of the column foundation elevation, ensuring a tight fit between the column base plate and the foundation cap surface across the entire cross-section. This uniform contact ensures that the superstructure load is effectively distributed and transferred to the foundation, significantly improving the structural performance, eliminating localized stress concentration, and thus enhancing the overall structural safety and reliability. Attached Figure Description
[0010] Figure 1 This is a structural diagram of the formwork-free column foundation structure used in this steel structure factory shed. Figure 2 A schematic diagram of the structural relationships of the foundation concrete; Figure 3 A partial cross-sectional schematic diagram of the connection structure embedded in the concrete of the upper step; Figure 4 This is a structural schematic diagram of the column components; The component names corresponding to the serial numbers in the diagram are: 1. Foundation concrete, 101. Upper step concrete, 102. Lower step concrete, 103. Precast concrete pipe, 104. Secondary grouting layer; 2. Column components, 201. Steel column, 202. Stiffening plate, 203. Column base plate, 204. Shear block; 3. Connection structure, 301. Anchor bolt, 302. Washer, 303. Nut, 304. Shear groove. Detailed Implementation
[0011] To provide a more detailed description of this utility model, the following description is provided in conjunction with the embodiments and accompanying drawings.
[0012] Example 1
[0013] like Figures 1-4As shown, a formwork-free column foundation structure for a steel structure factory shed includes a foundation concrete 1, column components 2, and a connecting structure 3. The foundation concrete 1 consists of an upper step concrete 101, a lower step concrete 102, a precast concrete pipe 103, and a secondary grouting layer 104. The column components 2 are divided into a steel column 201, a stiffening plate 202, a column base plate 203, and a shear block 204. The connecting structure 3 connects the foundation concrete 1 and the column components 2 into a whole. The connecting structure 3 mainly consists of anchor bolts 301, washers 302, nuts 303, and shear grooves 304.
[0014] like Figures 2-3 As shown, in the foundation concrete 1 structure, the precast concrete pipe 103 is a square hollow precast concrete component, which is prefabricated in the factory using molds. The precast concrete pipe 103 passes through the upper step concrete 101 and the lower step concrete 102. The top of the precast concrete pipe 103 is flush with the top surface of the upper step concrete 101, and the bottom of the precast concrete pipe 103 is flush with the bottom surface of the lower step concrete 102. The upper step concrete 101 and the lower step concrete 102 are cast in one go. The lower step concrete 102 outside the precast concrete pipe 103 is poured in a full groove, while the upper step concrete 101 inside the precast concrete pipe 103 is poured in one go to the top using the precast concrete pipe 103 instead of wooden formwork. The secondary grouting layer 104 is located above the upper step concrete 101 and uses high-strength non-shrink grout as the grouting material. The secondary grouting layer 104 is grouted after the elevation of the column component 2 is adjusted.
[0015] Please see Figure 4 The column component 2 is required to be pre-assembled in the factory. The bottom of the steel column 201 is a column base plate 203. Several stiffening plates 202 are provided between the steel column 201 and the column base plate 203, and the three are connected by welding. Below the column base plate 203, there are shear blocks 204 that match the shear groove 304.
[0016] Please see Figure 3 In the connection structure 3, the anchor bolt 301 is the main connection structure between the foundation concrete 1 and the column component 2. The anchor bolt 301 is pre-embedded in time when the upper step concrete 101 is poured. The exposed part of the anchor bolt 301 needs to be threaded, with a thread length of 20cm. The threaded part is equipped with three nuts 303 and two washers 302, that is, the lower part of the column base plate 203 has one nut 303 and one washer 302, and the upper part has two nuts 303 and one washer 302. During the column installation process, the shear block 204 is inserted into the shear groove 304 and wrapped with a secondary grouting layer 104 to improve the shear strength of the column foundation.
[0017] The concrete grade of the precast concrete pipe 103 should be consistent with that of the upper step concrete 101 and the lower step concrete 102. The column component 2 can only be installed after the strength grade of the upper step concrete 101 and the lower step concrete 102 reaches 80% of the design strength grade.
[0018] In this embodiment, it is further preferred that the anchor bolt 301 is a Q235 anchor bolt, and the thread surface should be coated with grease after processing to prevent thread corrosion. When the anchor bolt 301 is pre-embedded, it must be under the on-site guidance of steel structure professionals, and the embedding deviation must be recorded so that corresponding adjustments can be made when cutting beam and column components.
[0019] In this embodiment, a further preferred embodiment utilizes nuts 303 under the column base plate 203 to adjust the elevation and verticality of the steel column 201. The nuts 303 on the column base plate 203 effectively resist thread loosening caused by vibration, impact, or wind load. The connection between the three nuts 303 and the two washers 302 should meet the specified torque requirements. The bolt nominal diameter is M27, performance grade is 10.9, and the preload should be ≥290kN.
[0020] In this embodiment, a further preferred method is to: after the column component 2 is installed, corrected, and positioned, lock the column base plate 203 with the nut 303 to prevent loosening, perform secondary grouting under the column base plate 203 to form a secondary grouting layer 104, and check the compactness of the secondary grouting below the column base plate 203.
[0021] The technology described in this application has been applied in a prefabricated steel reinforcement processing plant for the substructure of a high-speed bridge. The prefabricated steel reinforcement processing plant measures 102×29.2m, with a 6m spacing between the columns. The columns are made of H400×200×6×10 steel, the column foundation has a base of 1.2×1.2m, and the precast concrete pipe 103 is 0.6×0.6m with a wall thickness of 10cm.
[0022] The above description is not intended to limit the present utility model, nor is the present utility model limited to the above examples. Any changes, modifications, additions or substitutions made by those skilled in the art within the scope of the present utility model should be protected by the present utility model.
Claims
1. A form-free column foundation structure for a steel structure factory shed, comprising foundation concrete (1), column member (2) and connecting structure (3); the column member (2) comprises a steel column (201) and a column base bottom plate (203), the steel column (201) is vertically welded on the top surface of the column base bottom plate (203), and a stiffening plate (202) is further welded between the steel column (201) and the column base bottom plate (203); characterized in that, The foundation concrete (1) consists of an upper step concrete (101), a lower step concrete (102), a precast concrete pipe (103), and a secondary grouting layer (104). The lower end of the precast concrete pipe (103) is embedded in the lower step concrete (102), and the upper step concrete (101) is poured into the precast concrete pipe (103). The connecting structure (3) is embedded in the upper step concrete (101) to connect the foundation concrete (1) and the column component (2) into a whole. The secondary grouting layer (104) is poured between the column base plate (203) and the upper step concrete (101).
2. The steel building shed column foundation structure of claim 1, wherein The upper step concrete (101) has a shear groove (304) embedded in its top surface, and the bottom surface of the column base plate (203) is fixedly provided with a shear block (204) that matches the shear groove (304), and the shear block (204) is inserted into the shear groove (304).
3. The steel mill building column foundation structure of claim 1, wherein The connection structure (3) includes an anchor bolt (301), a washer (302) and a nut (303). The lower end of the anchor bolt (301) is embedded in the upper step concrete (101). The upper end of the anchor bolt (301) is provided with threads and exposed on the top surface of the secondary grouting layer (104). The washer (302) and the nut (303) are installed on the anchor bolt (301). The installation sequence of the washer (302) and the nut (303) on the anchor bolt (301) is to install the nut, washer, washer, nut and nut from bottom to top. The column base plate (203) is provided with screw holes for the anchor bolt (301) to pass through. The column base plate (203) is located between two washers (302).