A cantilevered steel structure construction platform
By designing a sliding and retractable cantilevered steel structure construction platform, the problem of low mechanical transfer efficiency in existing technologies has been solved, achieving efficient transfer of construction machinery and improved platform stability.
Patent Information
- Application Number
- CN202521228396.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-16
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-06-16
AI Technical Summary
When existing cantilever construction platforms cover the area directly above the courtyard, mechanical transportation efficiency is low and installation and adjustment are inconvenient, making it impossible to flexibly cover the courtyard area.
A cantilevered steel structure construction platform was designed, including sliding first and second construction platforms and telescopic load-bearing linkages. The platform is extended and retracted by a drive mechanism to achieve efficient transportation of construction machinery.
It improves the vertical transport efficiency of construction machinery, enhances the load-bearing capacity and stability of the platform, and reduces equipment costs.
Smart Images

Figure CN224982598U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction equipment technology, and in particular to a cantilevered steel structure construction platform. Background Technology
[0002] During the construction of high-rise buildings and large public buildings, it is common to encounter situations where there are atriums or courtyard areas inside the building. When carrying out internal structural construction, equipment installation, or decoration work in such areas, it is necessary to build a dedicated cantilevered construction platform to provide a working surface. Traditional cantilevered construction platforms are mostly fixed or modular structures, with relatively fixed coverage area and location, resulting in poor flexibility.
[0003] When construction requires covering the area directly above the courtyard, especially when it is necessary to transport large construction machinery (such as welding machines, small hoisting equipment, material lifting equipment, etc.) directly above the courtyard for operation or to carry out vertical hoisting through the courtyard, the existing technology has obvious shortcomings such as limited coverage, low efficiency of mechanical transportation, and inconvenience in installation and adjustment.
[0004] Therefore, there is an urgent need for a cantilevered steel structure construction platform solution that can flexibly cover the courtyard area, and in particular, can efficiently position and transport construction machinery to the top of the courtyard, thereby improving the efficiency of vertical hoisting. Utility Model Content
[0005] In view of the above problems, this utility model is proposed to provide a cantilevered steel structure construction platform that overcomes or at least partially solves the above problems. It can solve the problem of low vertical transfer efficiency of large construction machinery in the existing construction process, and achieve the effect of improving the vertical transfer efficiency of large construction machinery in the construction process.
[0006] Specifically, this utility model provides a cantilevered steel structure construction platform, which includes: Mounting rack; The first construction platform is horizontally set and slidably mounted on the mounting frame in the front-to-back direction; A second construction platform is horizontally positioned and slidably mounted on the first construction platform in the front-back direction. The second construction platform is configured to slide forward out of the first construction platform. The load-bearing link is a telescopic link that can extend or retract synchronously at both ends; the load-bearing link extends along the left and right direction of the first construction platform and is disposed at the front end of the second construction platform and is fixedly connected to the second construction platform; A drive mechanism is connected to the first construction platform and the second construction platform and is used to control the first construction platform and the second construction platform to slide forward.
[0007] Optionally, the mounting bracket includes a plurality of mounting links; the mounting links extend in the front-to-back direction, and the plurality of mounting links are evenly distributed in the left-to-right direction; The installation linkage includes an outer fixed rod and an inner telescopic rod; the inner telescopic rod is slidably inserted into the outer fixed rod; the outer fixed rod is used to fix it at a preset position; the bottom front side of the first construction platform is slidably connected to the inner telescopic rod, and the rear side is slidably connected to the outer fixed rod; the bottom front side of the second construction platform is fixedly connected to the inner telescopic rod.
[0008] Optionally, the drive mechanism includes a first hydraulic push rod and a second hydraulic push rod; The first hydraulic push rod is fixedly mounted on the outer fixed rod; the hydraulic shaft of the first hydraulic push rod is fixedly connected to the first construction platform; the second hydraulic push rod is fixedly mounted on the first construction platform; the hydraulic shaft of the second hydraulic push rod is fixedly connected to the second construction platform or the inner telescopic rod.
[0009] Optionally, the bottom of the first construction platform is provided with multiple limiting clamps; the limiting clamps are fixedly installed at the bottom of the first construction platform; the limiting clamps have limiting grooves that extend through the front and rear directions; the outer fixing rod and the inner telescopic rod are both slidably installed in the limiting clamps.
[0010] Optionally, the load-bearing connecting rod includes a load-bearing sleeve rod, two load-bearing inner rods, and two third hydraulic push rods; The bearing sleeve rod is fixedly connected to the front end of the inner telescopic rod; the two bearing inner rods are slidably inserted into the bearing sleeve rod from both ends respectively; the third hydraulic push rod is fixedly mounted on the bearing sleeve rod and is fixedly connected to the bearing inner rod.
[0011] Optionally, a limiting pin is provided at one end of the inner support rod extending outward; the limiting pin is vertically arranged and detachable; the lower end of the limiting pin can extend downward outward from the inner support rod.
[0012] Optionally, the cantilevered steel structure construction platform also includes: A control console is connected to the first hydraulic push rod, the second hydraulic push rod, and the third hydraulic push rod to control the extension and retraction of the hydraulic shafts of the first hydraulic push rod, the second hydraulic push rod, and the third hydraulic push rod.
[0013] Optionally, guardrails are provided on the left and right sides of the first construction platform and on the front and left and right sides of the second construction platform.
[0014] This invention relates to a cantilevered steel structure construction platform. It comprises a first construction platform, a second construction platform, and a load-bearing connecting rod, with the first and second platforms forming a telescopic construction platform. A mounting frame is detachably and fixedly installed on the platform in the construction area, located on one side of the atrium. The forward sliding arrangement of the first and second construction platforms allows them to move towards one side of the atrium, thus expanding the area of the construction platform and ensuring that the second construction platform is at least directly above the atrium. When the second construction platform reaches the top of the atrium, construction machinery can be transferred to it, facilitating the lifting of machinery to the appropriate height by hoisting equipment. Therefore, the arrangement of the first and second construction platforms significantly improves the vertical transport efficiency of construction machinery and reduces the cost of transport equipment.
[0015] Furthermore, the left and right directions refer to the left and right directions of the front and rear directions of the first and second construction platforms. The arrangement of the load-bearing connecting rod extending in the left and right directions allows the left and right length of the load-bearing rod to be greater than the width of the atrium. Therefore, the load-bearing connecting rod lies across the top of the atrium, thereby providing support for the second construction platform and enhancing its load-bearing capacity and stability.
[0016] The above and other objects, advantages and features of this utility model will become more apparent to those skilled in the art from the following detailed description of specific embodiments of this utility model in conjunction with the accompanying drawings. Attached Figure Description
[0017] The following sections will describe some specific embodiments of the present invention in a detailed manner by way of example and not limitation, with reference to the accompanying drawings. The same reference numerals in the drawings denote the same or similar parts or components. Those skilled in the art should understand that these drawings are not necessarily drawn to scale. In the drawings: Figure 1 This is a schematic structural diagram of a cantilevered steel structure construction platform according to an embodiment of the present utility model; Figure 2 yes Figure 1 A magnified view of a section at point A in the middle; Figure 3 This is a schematic bottom view of a cantilevered steel structure construction platform according to an embodiment of the present utility model.
[0018] In the diagram: 100, mounting bracket; 110, mounting link; 111, external fixing rod; 112, internal telescopic rod; 200, first construction platform; 210, limiting clamp; 300, second construction platform; 400, load-bearing link; 410, load-bearing sleeve rod; 420, load-bearing inner rod; 421, limiting pin; 430, third hydraulic push rod; 500, drive mechanism; 510, first hydraulic push rod; 520, second hydraulic push rod. Detailed Implementation
[0019] The following reference Figures 1 to 3 This description pertains to a cantilevered steel structure construction platform according to an embodiment of the present invention. In this description, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of that feature, that is, include one or more of that feature. In the description of the present invention, "multiple" means at least two, such as two, three, etc., unless otherwise explicitly specified. When a feature "includes or contains" one or more of the features it encompasses, unless otherwise specifically described, this indicates that other features are not excluded and may be further included.
[0020] Unless otherwise expressly specified and limited, the terms "set," "install," "connect," "link," "fix," and "couple" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art should be able to understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0021] Furthermore, in the description of this embodiment, "above" or "below" the second feature can include direct contact between the first and second features, or it can include contact between the first and second features through another feature between them. That is, in the description of this embodiment, "above," "over," and "on top" of the second feature includes the first feature being directly above or diagonally above the second feature, or simply indicates that the first feature is at a higher horizontal level than the second feature. "Below," "below," or "below" of the second feature can mean the first feature is directly below or diagonally below the second feature, or simply indicates that the first feature is at a lower horizontal level than the second feature.
[0022] In the description of this embodiment, the terms "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of this utility model. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0023] Figure 1 It is a schematic structural diagram of a cantilevered steel structure construction platform, such as... Figure 1 As shown, and refer to Figures 2 to 3 This utility model embodiment provides a cantilevered steel structure construction platform, which includes a mounting frame 100, a first construction platform 200, a second construction platform 300, a load-bearing connecting rod 400, and a drive mechanism 500. The first construction platform 200 is horizontally arranged and slidably mounted on the mounting frame 100 in the front-back direction. The second construction platform 300 is horizontally arranged and slidably mounted on the first construction platform 200 in the front-back direction, and the second construction platform 300 is configured to slide out of the first construction platform 200.
[0024] The supporting link 400 is a telescopic link that can extend or retract synchronously at both ends. The supporting link 400 extends along the left-right direction of the first construction platform 200 and is located at the front end of the second construction platform 300, and is fixedly connected to it. The drive mechanism 500 is connected to the first construction platform 200 and the second construction platform 300, and is used to control the forward sliding of the first construction platform 200 and the second construction platform 300.
[0025] Specifically, the first construction platform 200 and the second construction platform 300 constitute a retractable telescopic construction platform. The mounting frame 100 is detachably and fixedly installed on the platform in the construction area, located on one side of the atrium of the construction area. The forward sliding arrangement of the first construction platform 200 and the second construction platform 300 allows them to move towards one side of the atrium, thereby expanding the area of the construction platform and ensuring that the second construction platform 300 is at least directly above the atrium. When the second construction platform 300 reaches the top of the atrium, construction machinery can be transferred to it, facilitating the lifting of the machinery to the appropriate height by construction personnel using hoisting equipment. Therefore, the arrangement of the first construction platform 200 and the second construction platform 300 significantly improves the vertical transport efficiency of construction machinery.
[0026] Furthermore, the left and right directions refer to the left and right directions of the front-to-back direction of the first construction platform 200 and the second construction platform 300. The lateral extension of the load-bearing connecting rod 400 allows its lateral length to exceed the width of the atrium. Therefore, the load-bearing connecting rod 400, positioned horizontally above the atrium, provides support to the second construction platform 300, enhancing its load-bearing capacity and stability. Furthermore, the detachable mounting frame 100 expands the applicable area of this construction platform, increasing its flexibility of use.
[0027] During operation, the mounting frame 100 is first fixed to one side of the atrium in the construction area, and the drive mechanism 500 is activated. The drive mechanism 500 first controls the two ends of the bearing connecting rod 400 to extend until the length of the bearing connecting rod 400 is greater than the width of the atrium, so that the two ends of the bearing connecting rod 400 are located on the outside of the atrium. The drive mechanism 500 drives the first construction platform 200 and the second construction platform 300 to move forward. The first construction platform 200 and the second construction platform 300 slowly open from their initial overlapping and folded state. When the second construction platform 300 moves to directly above the atrium, the drive mechanism 500 is deactivated. The construction machinery is then transported to the second construction platform 300, and then hoisted to the preset height using hoisting equipment.
[0028] In some embodiments of this utility model, such as Figure 3 As shown, the mounting frame 100 includes multiple mounting links 110; the mounting links 110 extend in the front-to-back direction, and the multiple mounting links 110 are evenly distributed in the left-to-right direction. Each mounting link 110 includes an outer fixing rod 111 and an inner telescopic rod 112. The inner telescopic rod 112 is slidably inserted into the outer fixing rod 111, which is used to fix it at a preset position. The bottom front side of the first construction platform 200 is slidably connected to the inner telescopic rod 112, and the rear side is slidably connected to the outer fixing rod 111. The bottom front side of the second construction platform 300 is fixedly connected to the inner telescopic rod 112.
[0029] Specifically, multiple mounting rods 110 form a conveyor track, which is simple in structure and easy to assemble and disassemble. The outer fixing rod 111 is used for fixation, thereby positioning the entire device. Since the front end of the inner telescopic rod 112 is fixed to the second construction platform 300, when the inner telescopic rod 112 moves forward and extends out of the outer fixing rod 111, it drives the second construction platform 300 to move forward synchronously.
[0030] In some embodiments of this utility model, such as Figure 1 and Figure 2 As shown, the drive mechanism 500 includes a first hydraulic push rod 510 and a second hydraulic push rod 520. The first hydraulic push rod 510 is fixedly mounted on the outer fixed rod 111. The hydraulic shaft of the first hydraulic push rod 510 is fixedly connected to the first construction platform 200, and the second hydraulic push rod 520 is fixedly mounted on the first construction platform 200. The hydraulic shaft of the second hydraulic push rod 520 is fixedly connected to the second construction platform 300 or the inner telescopic rod 112.
[0031] Specifically, the first hydraulic push rod 510 moves the first construction platform 200 forward and simultaneously moves the second construction platform 300 forward, thus completing the first stage of extension and retraction of the construction platform. Since the second hydraulic push rod 520 is fixed to the first construction platform 200, it can only move the second construction platform 300 forward, thereby completing the second stage of extension and retraction of the construction platform, thus achieving the purpose of expanding the construction platform.
[0032] In this embodiment, construction workers can further set up a multi-level telescopic construction platform as needed, thereby expanding the area of the construction platform and making it suitable for courtyards of different sizes.
[0033] In some embodiments of this utility model, such as Figure 3 As shown, the bottom of the first construction platform 200 is provided with multiple limiting clamps 210. The limiting clamps 210 are fixedly installed at the bottom of the first construction platform 200, and the limiting clamps 210 have limiting grooves that extend through in the front-to-back direction. The outer fixing rod 111 and the inner telescopic rod 112 are both slidably installed in the limiting clamps 210.
[0034] Specifically, the limiting clamp 210 clamps and limits the outer fixed rod 111 and the inner telescopic rod 112 through the limiting groove, so that the first construction platform 200 and the second construction platform 300 can only slide along the length direction of the outer fixed rod 111 and the inner telescopic rod 112, so as to achieve the limiting function.
[0035] In some embodiments of this utility model, such as Figure 1 and Figure 2 As shown, the bearing linkage 400 includes a bearing sleeve 410, two bearing inner rods 420, and two third hydraulic push rods 430. The bearing sleeve 410 is fixedly connected to the front end of the inner telescopic rod 112, and the two bearing inner rods 420 are slidably inserted into the bearing sleeve 410 from both ends. The third hydraulic push rods 430 are fixedly mounted on the bearing sleeve 410 and are fixedly connected to the bearing inner rods 420.
[0036] In some embodiments of this utility model, such as Figure 1 and Figure 2 As shown, a limiting pin 421 is provided at one end of the inner supporting rod 420 extending outward. The limiting pin 421 is vertically positioned and detachable, with its lower end extending downward outward from the inner supporting rod 420. Specifically, the limiting pin 421 can be inserted downward into the concrete of the construction area, increasing the friction between the inner supporting rod and its contact point, thereby preventing slippage at the end of the inner supporting rod 420 and increasing stability.
[0037] In some embodiments of this utility model, the cantilevered steel structure construction platform also includes a control console, which is connected to the first hydraulic push rod 510, the second hydraulic push rod 520 and the third hydraulic push rod 430 to control the extension and retraction of the hydraulic shafts of the first hydraulic push rod 510, the second hydraulic push rod 520 and the third hydraulic push rod 430.
[0038] In some embodiments of this utility model, such as Figure 1As shown, guardrails are provided on both sides of the first construction platform 200 and on the front and both sides of the second construction platform 300.
[0039] Therefore, those skilled in the art should recognize that although many exemplary embodiments of the present invention have been shown and described in detail herein, many other variations or modifications conforming to the principles of the present invention can be directly determined or derived from the disclosure of the present invention without departing from the spirit and scope of the present invention. Therefore, the scope of the present invention should be understood and recognized as covering all such other variations or modifications.
Claims
1. A cantilevered steel construction platform, characterized in that, include: Mounting rack; The first construction platform is horizontally set and slidably mounted on the mounting frame in the front-to-back direction; A second construction platform is horizontally positioned and slidably mounted on the first construction platform in the front-back direction. The second construction platform is configured to slide forward out of the first construction platform. The load-bearing link is a telescopic link that can extend or retract synchronously at both ends; the load-bearing link extends along the left and right direction of the first construction platform and is disposed at the front end of the second construction platform and is fixedly connected to the second construction platform; A drive mechanism is connected to the first construction platform and the second construction platform and is used to control the first construction platform and the second construction platform to slide forward.
2. The cantilevered steel structure construction platform according to claim 1, characterized in that, The mounting frame includes multiple mounting links; the mounting links extend in the front-to-back direction, and the multiple mounting links are evenly distributed in the left-to-right direction. The installation linkage includes an outer fixed rod and an inner telescopic rod; the inner telescopic rod is slidably inserted into the outer fixed rod; the outer fixed rod is used to fix it at a preset position; the bottom front side of the first construction platform is slidably connected to the inner telescopic rod, and the rear side is slidably connected to the outer fixed rod; the bottom front side of the second construction platform is fixedly connected to the inner telescopic rod.
3. The cantilevered steel structure construction platform according to claim 2, characterized in that, The drive mechanism includes a first hydraulic push rod and a second hydraulic push rod; The first hydraulic push rod is fixedly mounted on the outer fixed rod; the hydraulic shaft of the first hydraulic push rod is fixedly connected to the first construction platform; the second hydraulic push rod is fixedly mounted on the first construction platform; the hydraulic shaft of the second hydraulic push rod is fixedly connected to the second construction platform or the inner telescopic rod.
4. The cantilevered steel structure construction platform according to claim 2, characterized in that, The bottom of the first construction platform is provided with multiple limiting clamps; the limiting clamps are fixedly installed at the bottom of the first construction platform; the limiting clamps have limiting grooves that run through the front and rear directions; the outer fixing rod and the inner telescopic rod are both slidably installed in the limiting clamps.
5. The cantilevered steel structure construction platform according to claim 3, characterized in that, The load-bearing connecting rod includes a load-bearing sleeve rod, two load-bearing inner rods, and two third hydraulic push rods; The bearing sleeve rod is fixedly connected to the front end of the inner telescopic rod; the two bearing inner rods are slidably inserted into the bearing sleeve rod from both ends respectively; the third hydraulic push rod is fixedly mounted on the bearing sleeve rod and is fixedly connected to the bearing inner rod.
6. The cantilevered steel structure construction platform according to claim 5, characterized in that, One end of the inner support rod extending outward is provided with a limiting pin; the limiting pin is vertically arranged and detachable; the lower end of the limiting pin can extend downward outward from the inner support rod.
7. The cantilevered steel structure construction platform according to claim 5, characterized in that, Also includes: A control console is connected to the first hydraulic push rod, the second hydraulic push rod, and the third hydraulic push rod to control the extension and retraction of the hydraulic shafts of the first hydraulic push rod, the second hydraulic push rod, and the third hydraulic push rod.
8. The cantilevered steel structure construction platform according to claim 1, characterized in that, Guardrails are provided on both sides of the first construction platform and on the front and both sides of the second construction platform.
