A hose assembly inspection tool

By designing a multifunctional hose assembly inspection tool, efficient inspection of multiple hose assemblies and rapid marking of damaged areas are achieved, solving the problems of low inspection efficiency and difficulty in locating damaged areas in existing technologies, and improving inspection efficiency and accuracy.

CN224985038UActive Publication Date: 2026-11-17SUZHOU YIQUN AUTOMOTIVE CHECKING FIXTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522441438.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-18
Publication Date
2026-11-17
Estimated Expiration
2035-11-18

AI Technical Summary

Technical Problem

Existing testing equipment can only test one hose assembly at a time, resulting in low testing efficiency and difficulty in accurately locating the damaged area.

Method used

A hose assembly inspection tool was designed, which can simultaneously inspect multiple hose assemblies and quickly locate the damage point using an ultrasonic gas leak detector and a smoke generator. Gas leaks are detected by a pressure sensor, the ultrasonic detector accurately locates the damage location, and the smoke marks small damage points.

Benefits of technology

It enables efficient detection of multiple hose assemblies and rapid marking of damaged areas, improving detection efficiency, reducing the difficulty of manual marking, and enhancing the accuracy and efficiency of detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224985038U_ABST
    Figure CN224985038U_ABST
Patent Text Reader

Abstract

This utility model relates to the field of testing equipment technology and discloses a hose assembly inspection tool, including a first threaded rod rotatably mounted on the rear end of both inner walls of the body via bearings; a sliding rod fixedly mounted on the front end of both inner walls of the body; a first nut threaded onto the first threaded rod; a slider slidably mounted around the sliding rod; a second threaded rod rotatably mounted on the lower end face of the rear end of the slider via bearings; a second nut threaded onto the second threaded rod; an ultrasonic gas leak detector fixedly connected to the lower end face of the second nut; a smoke generator fixedly mounted on one front end of one outer wall of the body; a second support block fixedly mounted on one inner wall of the body; and three first electrically controlled valves mounted on the other side of the outer wall of the second support block. This utility model allows the device to simultaneously inspect multiple hose assemblies and quickly alert workers to any damage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of testing equipment technology, and in particular to a hose assembly inspection tool. Background Technology

[0002] Hose assemblies mainly consist of flexible hoses, connectors, and clamps. The flexible hoses utilize different inner, reinforcing, and outer layer materials depending on the application, while connectors are typically made of metal or engineering plastics. They are commonly used in powertrain systems, transmission systems, and air conditioning systems. Hose assembly inspection fixtures are crucial for ensuring production efficiency and controlling costs, and have become an indispensable standard component of modern automotive large-scale, high-quality, and high-efficiency manufacturing systems.

[0003] However, existing inspection devices typically only have two connectors, allowing for the inspection of only one hose assembly at a time, resulting in low inspection efficiency. While efficiency can be improved by purchasing more equipment, this significantly increases costs. Furthermore, existing technology requires workers to manually mark damaged areas with paint pens after detection. If the damage is very small, it is difficult for workers to locate it visually.

[0004] Therefore, this application provides a hose assembly inspection tool to solve the problems mentioned in the background art. Utility Model Content

[0005] The purpose of this invention is to address the shortcomings of existing technologies by proposing a hose assembly inspection tool. This device can simultaneously inspect multiple hose assemblies and quickly alert workers to any damage.

[0006] To achieve the above objectives, the present invention provides the following technical solution:

[0007] A hose assembly inspection fixture includes a body and a first support block. A first threaded rod is rotatably mounted on the inner walls of both sides of the body near the rear end via bearings. A sliding rod is fixedly mounted on the inner walls of both sides of the body near the front end. A first nut is threaded onto the first threaded rod. A slider is slidably mounted around the sliding rod. A second threaded rod is rotatably mounted on the lower end face of the slider via bearings. A second nut is threaded onto the second threaded rod. An ultrasonic gas leak detector is fixedly connected to the lower end face of the second nut. A smoke generator is fixedly mounted on one side of the outer wall of the body near the front end. A second support block is fixedly mounted on one side of the inner wall of the body. Three first electrically controlled valves are installed on the other side of the outer wall of the second support block. A first flange connecting pipe is fixedly connected to the other end of each of the three first electrically controlled valves. A pressure sensor is fixedly mounted on the lower end of the inner wall of each of the three first flange connecting pipes. Three second electrically controlled valves are installed on one side of the outer wall of the first support block. A second flange connecting pipe is fixedly connected to one end of each of the three second electrically controlled valves.

[0008] Furthermore, a first motor is fixedly installed on the rear end of the upper end face of one side of the outer wall, and the output end of the first motor passes through one side of the outer wall and is fixedly connected to one end of the first threaded rod.

[0009] Furthermore, a second motor is fixedly connected to the lower end face of the first nut, and the output end of the second motor is fixedly connected to the rear end of the second threaded rod.

[0010] Furthermore, an air intake pipe is fixedly connected to the lower end face of the second support block, and the air intake pipe is fixedly connected to three first electrically controlled valves respectively.

[0011] Furthermore, an air compressor is fixedly installed on one side of the outer wall of the machine body near the rear end, and one end of the air inlet pipe passes through one side of the outer wall of the machine body and is fixedly connected to the air compressor and the air outlet of the smoke generator respectively.

[0012] Furthermore, a hydraulic rod is fixedly installed on the lower end face of the other side of the outer wall of the machine body. The sliding end of the hydraulic rod passes through the other side of the outer wall of the machine body and is fixedly connected to the other side of the outer wall of the first support block. The first support block is slidably installed inside the machine body.

[0013] Furthermore, a vent hose is fixedly connected to the lower end of the first support block, one end of which is fixedly connected to three second electrically controlled valves, and a smoke pipe is fixedly connected to the lower front end of the other side of the outer wall of the machine body. The smoke pipe and the vent hose are fixedly connected, and an exhaust fan is installed at the connection point.

[0014] This utility model has the following beneficial effects:

[0015] 1. This utility model proposes a hose assembly inspection tool. When using this device, three hose assemblies can be connected to three horizontally parallel first flange connecting pipes and three second flange connecting pipes, respectively. The three first electrically controlled valves and the air compressor are activated via the control panel to fill the three hose assemblies with compressed gas. Data from the air pressure sensor is used to determine if there is any damage. If damage is found, the first and second motors are activated via the control panel to move the ultrasonic gas leak detector to the upper part of the damaged hose assembly, where the approximate location of the damage is detected. The assembly can then be removed, and the damaged area marked.

[0016] 2. The present invention proposes a hose assembly inspection tool. When using this device, if the hose assembly is removed and the damaged part is too small to be found by the naked eye, the hose assembly can be reinstalled. Then, the first electric control valve and smoke generator on one side are activated to fill the hose with smoke, and the location where the smoke comes out is marked. Attached Figure Description

[0017] Figure 1 This is an overall isometric schematic diagram of the present invention;

[0018] Figure 2 This is a bottom view of the overall design of this utility model;

[0019] Figure 3 This is a top view of the overall internal structure of this utility model;

[0020] Figure 4 This is a schematic cross-sectional view of the overall structure of this utility model.

[0021] Legend:

[0022] 1. Body; 2. First motor; 3. First threaded rod; 4. Slide rod; 5. Slider; 6. Air compressor; 7. Smoke generator; 8. First electrically controlled valve; 9. First flange connecting pipe; 10. First support block; 11. Second electrically controlled valve; 12. Second flange connecting pipe; 13. Outlet hose; 14. Inlet pipe; 15. Second support block; 16. Pressure sensor; 17. Smoke pipe; 18. Exhaust fan; 19. Hydraulic rod; 20. First nut; 21. Second motor; 22. Second nut; 23. Second threaded rod; 24. Ultrasonic gas leak detector. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0024] Reference Figure 1 — Figure 4 This utility model provides an embodiment of a hose assembly inspection tool, comprising a body 1 and a first support block 10. A first threaded rod 3 is rotatably mounted on the inner walls of both sides of the body 1 near the rear end via bearings. A sliding rod 4 is fixedly mounted on the inner walls of both sides of the body 1 near the front end. A first nut 20 is threadedly fitted onto the first threaded rod 3. A slider 5 is slidably mounted around the sliding rod 4. A second threaded rod 23 is rotatably mounted on the lower end face of the rear end of the slider 5 via bearings. A second nut 22 is threadedly fitted onto the second threaded rod 23. An ultrasonic gas... The body leakage detector 24 has a smoke generator 7 fixedly installed on one side of the outer wall of the body 1 near the front end. A second support block 15 is fixedly installed on the inner wall of one side of the body 1. Three first solenoid valves 8 are installed on the other side of the outer wall of the second support block 15. The other end of each of the three first solenoid valves 8 is fixedly connected to a first flange connecting pipe 9. A pressure sensor 16 is fixedly installed on the lower end of the inner wall of each of the three first flange connecting pipes 9. Three second solenoid valves 11 are installed on one side of the outer wall of the first support block 10. One end of each of the three second solenoid valves 11 is fixedly connected to a second flange connecting pipe 12.

[0025] Specifically, when using this device, first connect the exhaust fan 18 to the air purifier. Then, open the observation door at the front of the device and connect the three hose assemblies to the horizontally parallel first flange connecting pipe 9 and second flange connecting pipe 12, respectively. Then close the observation door. Start the air compressor 6 and the three first electrically controlled valves 8 through the control panel to fill the three hose assemblies with compressed gas. Then, close the three first electrically controlled valves 8 through the control panel. The three pressure sensors 16 will monitor the air pressure inside the three hoses in real time and display it on the control panel. If a pressure drop occurs due to a rupture, the second motor 21 can be started to drive the second threaded rod 23 to rotate. The second threaded rod 23 engages with the second nut 22, causing the second nut 22 to move linearly back and forth, moving the ultrasonic gas leak detector 24 to the upper end of the ruptured hose assembly. Then, start the first motor 2 to drive the first threaded rod 3 to rotate. The first threaded rod 3 engages with the first nut 20, causing the first nut 20 to move horizontally in a straight line, allowing the ultrasonic gas leak detector 24 to detect the hose assembly. Once the approximate location is detected, it will be displayed on the control panel. By opening the three second electronic control valves 11 and the exhaust fan 18 through the control panel, the air inside the hose assembly is drawn into the air purifier. Remove the hose assembly, inspect for any damage, and mark it with a paint pen. If the damage is too small, the hose assembly can be reinstalled. Then, activate the connected first electronic control valve 8 and the smoke generator 7 to continuously fill the unit with smoke. Once smoke emerges from the damage, it can be marked directly. During the inspection process, the exhaust fan 18 can also be activated to extract the smoke from inside the unit 1.

[0026] Reference Figure 1 — Figure 3 The inner walls on both sides of the body 1 are provided with a first threaded rod 3 that is rotatably mounted on the rear end via bearings. The inner walls on both sides of the body 1 are provided with a slide rod 4 that is fixedly mounted on the front end. The first threaded rod 3 is threadedly fitted with a first nut 20. A slider 5 is slidably mounted around the slide rod 4. The lower end face of the rear end of the slider 5 is provided with a second threaded rod 23 that is rotatably mounted on the rear end via bearings. The second threaded rod 23 is threadedly fitted with a second nut 22. An ultrasonic gas leak detector 24 is fixedly connected to the lower end face of the second nut 22. The upper end face of one side of the outer wall is fixedly mounted with a first motor 2. The output end of the first motor 2 passes through one side of the outer wall and is fixedly connected to one end of the first threaded rod 3. The lower end face of the first nut 20 is fixedly connected with a second motor 21. The output end of the second motor 21 is fixedly connected to the rear end of the second threaded rod 23.

[0027] Specifically, the first motor 2 drives the first threaded rod 3 to rotate, and the first threaded rod 3 is threadedly engaged with the first nut 20, thereby causing the first nut 20 to move laterally. The second motor 21 drives the second threaded rod 23 to rotate, and the second threaded rod 23 is threadedly engaged with the second nut 22, thereby causing the second nut 22 to move linearly back and forth. The approximate location can be detected by the ultrasonic gas leak detector 24. The sliding rod 4 keeps the second threaded rod 23 parallel.

[0028] Reference Figure 1 , Figure 2 , Figure 4 A smoke generator 7 is fixedly installed on one side of the outer wall of the machine body 1 near the front end. A second support block 15 is fixedly installed on the inner wall of one side of the machine body 1. Three first electric control valves 8 are installed on the other side of the outer wall of the second support block 15. The other ends of the three first electric control valves 8 are fixedly connected to first flange connecting pipes 9. Pressure sensors 16 are fixedly installed on the lower end of the inner wall of the three first flange connecting pipes 9. Three second electric control valves 11 are installed on one side of the outer wall of the first support block 10. One end of the three second electric control valves 11 is fixedly connected to second flange connecting pipes 12. An air inlet pipe 14 is fixedly connected to the lower end face of the second support block 15. The air inlet pipe 14 is fixedly connected to the three first electric control valves 8 respectively. A smoke generator 7 is fixed on one side of the outer wall of the machine body 1 near the rear end. An air compressor 6 is provided. One end of the air inlet pipe 14 passes through one side of the outer wall of the body 1 and is fixedly connected to the air compressor 6 and the air outlet of the smoke generator 7 respectively. A hydraulic rod 19 is fixedly installed on the lower end face of the other side of the outer wall of the body 1. The sliding end of the hydraulic rod 19 passes through the other side of the outer wall of the body 1 and is fixedly connected to the other side of the outer wall of the first support block 10. The first support block 10 is slidably installed inside the body 1. An air outlet hose 13 is fixedly connected to the lower end of the first support block 10. One end of the air outlet hose 13 is fixedly connected to three second electric control valves 11 respectively. A smoke pipe 17 is fixedly connected to the lower front end of the other side of the outer wall of the body 1. The smoke pipe 17 and the air outlet hose 13 are fixedly connected, and an exhaust fan 18 is installed at the connection.

[0029] Specifically, smoke generator 7 continuously generates smoke. Three first electrically controlled valves 8 are secured by the second support block 15. Three second electrically controlled valves 11 are secured by the first support block 10. Compressed gas enters the hose assembly through the three first electrically controlled valves 8. Compressed air is discharged from the hose assembly through the three second electrically controlled valves 11. Three hose assemblies are connected through three first flange connecting pipes 9 and three second flange connecting pipes 12. Compressed air is continuously generated by air compressor 6. Smoke inside the unit 1 or inside the hose assembly is extracted by exhaust fan 18. The air pressure inside the hose assembly can be detected in real time by air pressure sensor 16. The first support block 10 is slidable by hydraulic rod 19, allowing for the adaptation of hose assemblies of different lengths.

[0030] Working Principle: When using this device, first connect the exhaust fan 18 to the air purifier. Then, open the observation door and connect the three hose assemblies to the three horizontally parallel first flange connecting pipes 9 and three second flange connecting pipes 12, respectively. Next, start the air compressor 6 and the three first electrically controlled valves 8 via the control panel to fill the three hose assemblies with compressed gas. Use the three pressure sensors 16 to determine if the hose assemblies are damaged. If damaged, start the first motor 2 and the second motor 21 via the control panel to drive the ultrasonic gas leak detector 24 for further inspection of the damaged hose assembly. Then remove the assembly and mark the damaged area. If the damage is not visible to the naked eye, reinstall the damaged hose assembly, start the smoke generator 7, and mark the area where smoke is emitted.

[0031] Finally, it should be noted that the above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A hose assembly inspection tool, comprising a body (1) and a first support block (10), characterized in that: The inner walls on both sides of the machine body (1) are provided with a first threaded rod (3) rotatably mounted on the rear end via bearings. The inner walls on both sides of the machine body (1) are provided with a sliding rod (4) fixedly mounted on the front end. The first threaded rod (3) is threadedly fitted with a first nut (20). A slider (5) is slidably mounted around the sliding rod (4). A second threaded rod (23) is rotatably mounted on the lower end face of the slider (5) via bearings. The second threaded rod (23) is threadedly fitted with a second nut (22). An ultrasonic gas leak detector (24) is fixedly connected to the lower end face of the second nut (22). The outer wall of the machine body (1) is... A smoke generator (7) is fixedly installed on the front side of the body (1). A second support block (15) is fixedly installed on the inner wall of one side of the body (1). Three first electric control valves (8) are installed on the other side of the outer wall of the second support block (15). The other end of each of the three first electric control valves (8) is fixedly connected to a first flange connecting pipe (9). A pressure sensor (16) is fixedly installed on the lower end of the inner wall of each of the three first flange connecting pipes (9). Three second electric control valves (11) are installed on one side of the outer wall of the first support block (10). One end of each of the three second electric control valves (11) is fixedly connected to a second flange connecting pipe (12).

2. The hose assembly inspection tool according to claim 1, characterized in that: A first motor (2) is fixedly installed on the rear end of the upper end face of one side of the outer wall. The output end of the first motor (2) passes through one side of the outer wall and is fixedly connected to one end of the first threaded rod (3).

3. The hose assembly inspection tool according to claim 1, characterized in that: The lower end face of the first nut (20) is fixedly connected to the second motor (21), and the output end of the second motor (21) is fixedly connected to the rear end of the second threaded rod (23).

4. A hose assembly inspection tool according to claim 1, characterized in that: The lower end face of the second support block (15) is fixedly connected to an air inlet pipe (14), which is fixedly connected to three first electric control valves (8).

5. A hose assembly inspection tool according to claim 4, characterized in that: An air compressor (6) is fixedly installed on one side of the outer wall of the body (1) near the rear end. One end of the air inlet pipe (14) passes through one side of the outer wall of the body (1) and is fixedly connected to the air compressor (6) and the air outlet of the smoke generator (7).

6. A hose assembly inspection tool according to claim 1, characterized in that: A hydraulic rod (19) is fixedly installed on the lower end face of the other side of the outer wall of the machine body (1). The sliding end of the hydraulic rod (19) passes through the other side of the outer wall of the machine body (1) and is fixedly connected to the other side of the outer wall of the first support block (10). The first support block (10) is slidably installed inside the machine body (1).

7. A hose assembly inspection tool according to claim 1, characterized in that: The lower end of the first support block (10) is fixedly connected to an air outlet hose (13). One end of the air outlet hose (13) is fixedly connected to three second electric control valves (11). The lower end of the outer wall of the body (1) is fixedly connected to a smoke pipe (17). The smoke pipe (17) and the air outlet hose (13) are fixedly connected and an exhaust fan (18) is installed at the connection.