A power engineering construction pipeline
By employing a multi-layered sealing structure and anti-slip design in the socket and spigot sections of power engineering construction pipelines, the problem of poor sealing performance is solved, achieving efficient sealing and stable connection, avoiding corrosion and aging caused by water vapor intrusion, and ensuring the safety of the power system.
Patent Information
- Application Number
- CN202522186000.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-16
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-16
AI Technical Summary
Poor sealing performance at the connection points of existing power engineering construction pipelines leads to water and air intrusion, causing corrosion and aging of the inner wall of the pipeline and power cables, affecting insulation performance and threatening the stable operation of the power system.
It adopts a multi-seal structure with socket and spigot sections, including sealing grooves, stepped platforms, sealing gaskets, anti-slip grooves and serrated protrusions, forming a dual sealing system in the radial and end faces, and ensuring the stability of the connection through the interlocking structure of anti-slip grooves and anti-slip protrusions.
It effectively blocks the intrusion of silt, groundwater and moisture, improves sealing performance, prevents corrosion of the inner wall of the pipeline and aging of power cables, and ensures the long-term stable operation of the power system.
Smart Images

Figure CN224987032U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of power engineering technology, specifically to a power engineering construction pipeline. Background Technology
[0002] In power engineering construction, cable laying relies on construction ducts as a protective carrier, and these ducts typically require multiple splices to meet varying laying length requirements. Connections are the weakest points in the duct system; their efficiency directly impacts construction progress, while their sealing performance determines whether the cable can be protected from external influences such as soil moisture, rainwater, and corrosive media. If the seal at the connection fails, moisture infiltration can lead to aging of the cable insulation, short circuits, and power outages. Furthermore, if the connection is not securely fixed, soil subsidence or external impacts can easily cause duct misalignment, disrupting the cable laying path. Therefore, reliable clamping and sealing at duct connections are crucial for the safety of power engineering projects.
[0003] Currently, the connection methods for pipelines in power engineering construction are mainly divided into two categories: one is flange connection, which uses bolts to fix the flanges of adjacent pipelines and uses sealing rings between flanges to achieve sealing; the other is simple socket connection, which inserts the socket end of the previous pipeline directly into the socket end of the next pipeline. In some cases, sealing tape is wrapped around the interface or clips are added to assist in fixing. Flange connection is mostly used in high-pressure and large-diameter pipeline scenarios, while simple socket connection is widely used in the conventional construction of medium and low-pressure and small-diameter pipelines.
[0004] In power engineering construction, to ensure the laying and connection of long-distance cables, it is often necessary to connect multiple sections of pipeline sequentially. Currently, the plug-in connection method is commonly used between adjacent pipelines. Although this method can achieve rapid connection and has a certain structural strength, its waterproof and dustproof sealing performance often has hidden dangers. Since the gaps at the connection are directly exposed to the outside of the pipeline, under complex working conditions such as direct burial, trench, or dampness, external mud, sand, groundwater, and even moisture can easily penetrate into the pipeline through these gaps. This may lead to mud and sand accumulation, water and moisture penetration, etc., resulting in corrosion and aging of the inner wall of the pipeline and power cables, and may cause serious electrical faults such as decreased insulation performance and short circuits, directly threatening the long-term stable operation of the power system and the safety of power transmission. Therefore, we urgently need a new type of pipeline for power engineering construction to solve the above problems. Utility Model Content
[0005] This utility model provides a power engineering construction pipeline. Through the cooperation of the sealing part in the socket section and the abutting part in the spigot section, a good seal is achieved while a stable position is formed. This solves the problem mentioned in the background art, where poor sealing results in water vapor and other substances entering the pipeline, causing corrosion and aging of the pipeline inner wall and power cables, and leading to a decline in insulation performance.
[0006] This utility model provides the following technical solution: A power engineering construction pipeline includes a pipe body, which is mainly composed of a socket section and a spigot section. The socket section is located at one end of the pipe body and has a sealing part for sealing. The spigot section is located at the other end of the pipe body and has a mating part that matches the sealing part.
[0007] As a preferred technical solution of this utility model, the sealing part includes a sealing groove formed on the inner wall of the socket section for placing the sealing ring. The number of the sealing grooves is at least two sets, and the distance between the two sets of sealing grooves is in the range of 5mm-8mm.
[0008] As a preferred embodiment of this utility model, the depth ratio of the two sets of sealing grooves is 2:1.
[0009] As a preferred technical solution of this utility model, the inner wall of the socket section is integrally formed with a stepped platform for improving sealing. The stepped end face of the stepped platform is provided with an opening groove for placing a sealing gasket. A gasket for sealing is fixedly installed on the stepped platform.
[0010] As a preferred technical solution of this utility model, at least two sets of anti-slip grooves for connection are equidistantly provided on the outer wall of the socket section, and serrated protrusions for interlocking are provided in the anti-slip grooves.
[0011] As a preferred technical solution of this utility model, the abutting part includes a first sealing protrusion fixedly installed in the insertion section. When the first sealing protrusion abuts against the sealing groove, a first sealing area is formed.
[0012] As a preferred technical solution of this utility model, the insertion section is integrally formed with a stepped protrusion that matches the stepped platform, and a second sealing protrusion is fixedly installed on the stepped end face of the stepped protrusion. When the second sealing protrusion abuts against the opening groove, a second sealing area is formed.
[0013] As a preferred technical solution of this utility model, the outer wall of the socket section is integrally formed with a sleeve ring, and an anti-slip protrusion matching the anti-slip groove is fixedly installed on the sleeve ring. When the anti-slip protrusion is located in the anti-slip groove, the surface of the anti-slip protrusion and the serrated protrusion bite together to form an anti-slip area.
[0014] Compared with the prior art, this utility model provides a power engineering construction pipeline, which has the following beneficial effects: 1. In the pipeline construction of this power project, by setting a sealing groove in the socket section, cooperating with the first sealing protrusion in the spigot section, and adapting the stepped platform, opening groove, gasket of the socket section to the stepped protrusion and the second sealing protrusion of the spigot section, a dual sealing system of radial + end face is constructed. This can not only avoid the risk of single seal failure, but also completely block the path of mud, groundwater and moisture intrusion from the connection gap, thus solving the problem of poor sealing performance of existing pipelines.
[0015] 2. In the pipeline construction of this power project, the anti-slip grooves and serrated protrusions on the outer wall of the socket section, together with the anti-slip protrusions on the socket section's connecting ring, form a multi-point anti-slip interlocking structure. This can effectively prevent axial displacement or slippage of the pipeline due to soil compression or construction vibration after connection, ensuring the firmness and straightness of the connection during long-distance laying, and avoiding the risk of seal failure due to loose connection.
[0016] The parts of this device not covered herein are the same as or can be implemented using existing technologies. Through the synergistic design of multiple sealing and anti-slip positioning, this utility model significantly improves the sealing performance and structural stability of pipe connections. It can effectively prevent corrosion and aging of the inner wall of pipes and power cables caused by siltation and moisture penetration, eliminate electrical faults such as reduced insulation performance and short circuits, and ensure the long-term stable operation of the power system and the safety of power transmission. Attached Figure Description
[0017] To more clearly illustrate the specific embodiments of this utility model or the technical solutions in the prior art, the accompanying drawings used in the description of the specific embodiments or the prior art will be briefly introduced below. In all the drawings, the elements or parts are not necessarily drawn to actual scale.
[0018] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a partial cross-sectional view of the present invention. Figure 3 This utility model Figure 2 Enlarged structural diagram at point A in the middle; Figure 4 This utility model Figure 2 Enlarged structural diagram at point B; Figure 5 This is a schematic diagram of the combined structure of the socket section and the spigot section of this utility model.
[0019] In the diagram: 1. Pipe body; 2. Socket section; 3. Spiral section; 4. Sealing groove; 5. Stepped platform; 6. Opening groove; 7. Gasket; 8. Anti-slip groove; 9. Serrated protrusion; 10. First sealing protrusion; 11. Stepped protrusion; 12. Second sealing protrusion; 13. Connecting ring; 14. Anti-slip protrusion. Detailed Implementation
[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model. Example
[0021] Reference Figures 1-5 A power engineering construction pipeline includes a pipe body 1, which is mainly composed of a socket section 2 and a spigot section 3.
[0022] Here, pipe body 1 is made of high-strength PVC material, which is corrosion-resistant and impact-resistant, and is suitable for direct burial.
[0023] The socket section 2 is located at the end of the pipe body 1, and a sealing part for sealing is provided in the socket section 2. The sealing part includes a sealing groove 4 formed on the inner wall of the socket section 2 for placing a sealing ring. There are at least two sets of sealing grooves 4, and the distance between the two sets of sealing grooves 4 is 5mm-8mm. The groove depth ratio of the two sets of sealing grooves 4 is 2:1.
[0024] Here, the first sealing groove 4 is 3mm deep and 4mm wide, with a U-shaped cross-section and a wall roughness ≤0.4μm; it has an internal EPDM rubber sealing ring, primarily resisting external ultraviolet radiation and soil corrosion. The second sealing groove 4 is 6mm deep and 7mm wide, with a U-shaped cross-section; it has an internal fluororubber sealing ring with a cross-sectional diameter of 5mm, a hardness of 65±5 Shore A, and a 0.5mm wide 45° sealing lip on the outer periphery, primarily preventing the intrusion of high-pressure groundwater.
[0025] Furthermore, the gap between the two sets of sealing grooves 4 is preferably 5mm. At this distance, the two sets of sealing rings are prevented from overlapping, thereby further improving the sealing effect.
[0026] Furthermore, multiple sets of sealing grooves 4, in conjunction with sealing rings, can form multiple radial seals, avoiding the risk of leakage caused by the failure of a single seal; the spacing of 5mm-8mm ensures the independence of each set of seals while avoiding structural redundancy that increases pipeline costs; the 2:1 groove depth ratio results in different compression amounts of the sealing rings in different sealing grooves 4, forming a gradient sealing effect, further improving waterproof and dustproof performance, and even if one set of sealing rings wears out, the other set can still maintain an effective seal.
[0027] In other embodiments, the number of sealing grooves 4 can be increased by one. The sealing groove 4 has a groove depth of 4mm and a groove width of 5mm, and has a U-shaped cross section. The bottom of the groove is provided with a 0.5mm wide guide groove to prevent liquid accumulation. It has a built-in nitrile rubber sealing ring with a cross-sectional diameter of 4mm and a hardness of 62±5ShoreA to cope with oil, acid and alkaline media in the soil.
[0028] The inner wall of the socket section 2 is integrally formed with a stepped platform 5 for improving the seal. The stepped end face of the stepped platform 5 is provided with an opening groove 6 for placing a sealing gasket. A gasket 7 for sealing is fixedly installed on the stepped platform 5.
[0029] Here, the step diameter of the stepped platform 5 decreases from the inside to the outside, the cross section of the opening groove 6 is V-shaped, and the opening groove 6 is filled with a EPDM sealing gasket. This sealing gasket has strong weather resistance and is suitable for humid environments. The gasket 7 is a silicone gasket, which has good sealing performance and wear resistance.
[0030] Furthermore, the stepped platform 5 and the stepped protrusion 11 of the spigot section 3 are adapted to achieve precise positioning during pipe docking, avoiding misalignment of the sealing structure due to docking offset and ensuring the effectiveness of the seal; the sealing gasket in the opening groove 6 abuts against the second sealing protrusion 12 to form an end face seal, forming a radial + end face double sealing system with the first seal, effectively blocking the path of mud and moisture intrusion from radial gaps and end face gaps; the gasket 7 fills the gaps on the surface of the stepped platform 5, further preventing moisture from penetrating from the tiny gaps on the platform and strengthening the sealing effect.
[0031] The outer wall of the socket section 2 is provided with at least two sets of anti-slip grooves 8 for connection at equal intervals, and the anti-slip grooves 8 are provided with serrated protrusions 9 for interlocking.
[0032] Here, the anti-slip groove 8 is 10mm long, 2mm wide and 1mm deep, and the serrated protrusion 9 is used to enhance the engagement with the anti-slip protrusion 14 on the insertion section 3.
[0033] The spigot section 3 is located at another port of the pipe body 1, and the spigot section 3 is provided with a mating part that matches the sealing part. The mating part includes a first sealing protrusion 10 fixedly installed in the spigot section 3. When the first sealing protrusion 10 abuts against the sealing groove 4, a first sealing area is formed.
[0034] Here, the first sealing protrusion 10 is adapted to the size of the sealing groove 4.
[0035] The insertion section 3 has an integrally formed stepped protrusion 11 that matches the stepped platform 5. A second sealing protrusion 12 is fixedly installed on the stepped end face of the stepped protrusion 11. When the second sealing protrusion 12 abuts against the opening groove 6, a second sealing area is formed.
[0036] Here, the stepped protrusion 11 is perfectly matched with the stepped platform 5 in size to ensure coaxiality during docking; the second sealing protrusion 12 is an annular protrusion with a height that matches the depth of the opening groove 6, and can compress the sealing gasket to form an effective seal when pressed.
[0037] Here, when the first sealing protrusion 10 abuts against the sealing ring inside the sealing groove 4, the sealing ring undergoes elastic deformation, fully filling the gap between the sealing groove 4 and the first sealing protrusion 10, forming a tight first sealing area that directly blocks the radial intrusion of external mud, sand, and groundwater. When the second sealing protrusion 12 abuts against the sealing gasket of the opening groove 6, the sealing gasket is compressed and deformed, filling the gap between the second sealing protrusion 12 and the opening groove 6, forming a second sealing area. This second sealing area works in conjunction with the first sealing area to significantly improve the overall sealing level.
[0038] The outer wall of the insertion section 3 is integrally formed with a sleeve ring 13. An anti-slip protrusion 14 matching the anti-slip groove 8 is fixedly installed on the sleeve ring 13. When the anti-slip protrusion 14 is located in the anti-slip groove 8, the surface of the anti-slip protrusion 14 and the serrated protrusion 9 bite together to form an anti-slip area.
[0039] Here, the socket ring 13 and the insertion section 3 are integrally formed. The width of the socket ring 13 is adapted to the width of the outer wall of the socket section 2. The anti-slip protrusion 14 is a strip-shaped protrusion, which is fixedly installed on the inner wall of the socket ring 13. The size of the anti-slip protrusion 14 is adapted to the anti-slip groove 8, and the surface is provided with teeth that match the serrated protrusion 9 to ensure a firm engagement.
[0040] Furthermore, at least two sets of anti-slip grooves 8 are equidistantly provided on the outer wall of the socket section 2. Together with the anti-slip protrusions 14 of the sleeve ring 13, they can form multi-point anti-slip positioning, avoiding axial displacement caused by soil compression and construction vibration after pipe connection, and ensuring the straightness of pipe connection during long-distance laying. The serrated protrusions 9 in the anti-slip grooves 8 and the anti-slip protrusions 14 engage with each other, which can significantly enhance the engagement strength of the two, prevent the anti-slip protrusions 14 from slipping out of the anti-slip grooves 8, and improve the firmness of the connection structure. The sleeve ring 13 is integrally formed with the spigot section 3, which can improve the structural strength, prevent the sleeve ring 13 from falling off, and ensure the long-term stability of the anti-slip effect.
[0041] In this invention, a spigot section 3 of a pipe is inserted into a socket section 2 of another pipe. At this time, the first sealing protrusion 10 is inserted into the sealing groove 4 and abuts against the sealing ring to form a first sealing area; the stepped protrusion 11 fits against the stepped platform 5; the second sealing protrusion 12 is inserted into the opening groove 6 and abuts against the sealing gasket to form a second sealing area; the sleeve ring 13 is located on the outer wall of the socket section 2; the anti-slip protrusion 14 is inserted into the anti-slip groove 8 and engages with the serrated protrusion 9 to form an anti-slip area. Through the above structural cooperation, a high sealing and high firm connection of the pipe is achieved.
[0042] Components not described in detail in this article are existing technologies.
[0043] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this utility model, and not to limit it. Although this utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some of the technical features. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of this utility model.
Claims
1. An electric power construction conduit, characterized by, The tube includes a pipe body (1), which is mainly composed of a socket section (2) and a spigot section (3). The socket section (2) is located at the end of the pipe body (1), and a sealing part for sealing is provided inside the socket section (2). The spigot section (3) is located at the other end of the pipe body (1), and a mating part matching the sealing part is provided on the spigot section (3). The inner wall of the socket section (2) is integrally formed with a stepped platform (5) for improving sealing. The stepped end face of the stepped platform (5) is provided with an opening groove (6) for placing a sealing gasket. A gasket (7) for sealing is fixedly installed on the stepped platform (5).
2. A power engineering construction conduit according to claim 1, characterized in that The sealing part includes a sealing groove (4) formed on the inner wall of the socket section (2) for placing a sealing ring. The number of the sealing grooves (4) is at least two sets, and the distance between the two sets of sealing grooves (4) is in the range of 5mm-8mm.
3. A power engineering construction conduit according to claim 2, characterised in that, The depth ratio of the two sets of sealing grooves (4) is 2:
1.
4. The power engineering construction conduit according to claim 1, characterized in that, At least two sets of anti-slip grooves (8) for connection are provided at equal intervals on the outer wall of the socket section (2), and the anti-slip grooves (8) are provided with serrated protrusions (9) for interlocking.
5. The power engineering construction conduit according to claim 1, characterized in that The abutting part includes a first sealing protrusion (10) fixedly installed on the insertion section (3). When the first sealing protrusion (10) abuts against the sealing groove (4), a first sealing area is formed.
6. A power engineering construction conduit according to claim 5, characterised in that, The insertion section (3) is integrally formed with a stepped protrusion (11) that matches the stepped platform (5). A second sealing protrusion (12) is fixedly installed on the stepped end face of the stepped protrusion (11). When the second sealing protrusion (12) abuts against the opening groove (6), a second sealing area is formed.
7. A power engineering construction conduit according to claim 6, characterised in that, The outer wall of the insertion section (3) is integrally formed with a sleeve ring (13). The sleeve ring (13) is fixedly installed with an anti-slip protrusion (14) that matches the anti-slip groove (8). When the anti-slip protrusion (14) is located in the anti-slip groove (8), the surface of the anti-slip protrusion (14) and the serrated protrusion (9) bite together to form an anti-slip area.