Method and device for insulation monitoring of a hydrogen electrolysis plant

DE102023119910B3Active Publication Date: 2024-10-02BENDER SA
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
DE102023119910
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-07-27
Publication Date
2024-10-02
Estimated Expiration
2043-07-27

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

The invention relates to a method and an electrical circuit arrangement for determining the insulation resistance of an ungrounded power supply system that supplies a hydrogen electrolysis plant with electrical energy. The basic idea of ​​the method according to the invention is to predict the insulation resistance of the ungrounded power supply system during an initial start-up process of the hydrogen electrolysis plant and thus to minimize the delay caused by the demineralization process until the actual electrolysis process is enabled for subsequent start-up processes of the electrolysis plant. In a modification of the method, the electrical conductivity and temperature of the process water are additionally provided by the demineralization plant and recorded in a plant-specific manner during the demineralization process.The present invention is a cost-effective monitoring approach with simple retrofitting capability for determining the insulation resistance of an ungrounded power supply system for supplying hydrogen electrolysis plants.
Need to check novelty before this filing date? Find Prior Art

Description

The invention relates to a method and an electrical circuit arrangement for determining an insulation resistance Riso of an ungrounded power supply system which supplies a hydrogen electrolysis plant with electrical energy. In an ungrounded power system – also known as an isolated network or IT system (isole terre) – according to the normative requirement of DIN VDE 0100 Part 100, no active conductor of the ungrounded power system may be conductively connected to earth, in order to avoid automatic shutdown of the power supply within the shutdown time specified by the norm in the first fault event. Exceptions to this are sufficiently high-resistance connections of the active conductors to earth for metrological or functional reasons, such as those known from resistance-grounded IT systems (HRG - high-resistance grounded systems). In the event of an insulation fault in an IT system, such as an earth fault or a short circuit to ground, the function of the connected electrical consumers is not impaired, since no closed circuit can form between an active conductor of the IT network and earth due to the ideally infinite insulation resistance. For the insulation resistance of the ungrounded power system – the resistance of the ungrounded power system to earth without the ohmic resistances introduced between the active conductors and earth in the IT system for metrological or functional reasons – insulation resistances of 100 ohms / volt of nominal voltage are considered non-critical, for example, according to DIN VDE 0100 Part 530. In this case, only 10 mA of fault current flows through the insulation gap into the protective conductor. The insulation resistance of the ungrounded power system must therefore be continuously monitored with a standardized insulation monitoring device (IMD). Depending on the measurement method used, for example, with a pulsed, clocked measuring current, a current insulation resistance value is determined at intervals of one IMD calculation period. A possible further fault on another active conductor would create a fault loop, and the resulting fault current, in conjunction with an overcurrent protection device, would result in the system being shut down and operational downtime. For resistance-grounded IT systems, insulation monitoring systems are available on the market which, after manual input, take into account the value of the permanently installed, non-dynamic, resistance between the neutral conductor of an IT transformer and earth when determining the insulation resistance for the IT system. This method is not suitable for non-linear or dynamically changing resistances that are present during operation and lie parallel to the insulation resistance between the active conductors and earth. In hydrogen electrolysis with PEM stack electrolyzers (proton exchange membrane electrolysis or polymer electrolyte membrane electrolysis), but potentially also in hydrogen electrolysis with alkaline electrolyzers, the power supply is primarily provided via the IT system network. The actual electrolysis process, i.e. the switching on of a DC load current that causes the electrolysis of the water, is only activated when the insulation monitoring device detects an insulation resistance that is considered non-critical for the system. Insulation monitoring systems therefore have a negative impact on the plant's economic efficiency due to the waiting time described above until the electrolysis is released. To compensate for this reduction in productivity, common operational practices include bypassing or disconnecting the monitoring system, changing the monitoring system's threshold value so that shutdown is rarely required, activating the monitoring system with a time delay until the plant is in a non-critical, steady-state operating condition, or converting an ungrounded system to a grounded system, in which even larger currents via the domestic water system are only noticed when an accident or malfunction occurs. The determination of the insulation resistance of the IT system requires special measures, especially in the case of PEM hydrogen electrolysis, since for functional reasons there is an electrolytically conductive connection between the consumption water and the active conductors of the IT system. The electrical resistance of this conductive connection of the consumption water depends, among other things, on the geometry of the water supply and the conductivity of the consumption water. For the insulation monitoring device, this functional resistance of the consumption water is measured in parallel with the insulation resistance of the insulation gap of the active conductors of the unearthed power supply system to earth, which is actually to be determined. If the functional resistance of the consumption water is lower than the required insulation resistance of the IT system, the insulation resistance value cannot be determined with sufficient accuracy using state-of-the-art measurement techniques, since the value determined by the insulation monitoring device is mainly determined by the resistance of the consumption water and therefore does not provide any information about the actual condition of the insulation gap of the IT system. Since excessive mineralization of the service water is not optimal for hydrogen electrolysis, the service water is demineralized at the beginning of the hydrogen electrolysis plant's startup, before the DC load current is released. It can take up to 30 minutes for the demineralization of the service water to become fully effective. As the effectiveness of the demineralization process of the consumption water increases, the electrical conductivity of the consumption water decreases and the functional resistance of the consumption water to earth increases. In the steady state of demineralization, the conductivity of the service water is typically so low that the value determined by the insulation monitoring device is mainly determined by the insulation resistance of the IT system and not by the functional resistance of the service water to earth. According to the state of the art, an insulation monitoring device can only determine a total insulation resistance in the form of a parallel connection from the insulation resistance value of the IT system that is actually to be determined and the functional resistance of the consumption water. The published patent application JP 2010-164 531 A describes a method for measuring the earthing insulation resistance and a coolant circuit insulation resistance of a heat-generating electrical device in which a coolant circulates. As explained above, the hydrogen electrolysis process is only activated during start-up after the demineralization process of the consumption water has achieved a sufficiently high functional resistance of the consumption water to earth. In fluctuating hydrogen electrolysis applications with frequently restarted electrolysis plants, the delayed release leads to an economically relevant loss of plant efficiency. The business objective is to be able to use the electrolysis plant productively as quickly as possible. Patent DE 10 2020 104 956 B3 describes a solution to a similar problem in which the parallel connection of the insulation resistance to be determined and the functional resistance (resistance of the cooling water / consumable water system to ground) is avoided by using the functional resistance as the coupling for the insulation monitoring system. However, this solution is very specific to the system to be monitored and difficult to integrate or retrofit into other existing electrical systems. Another problem is monitoring the DC current flow in the service water piping system during the electrolysis process. This DC current flows as a leakage current through a service water supply line and a service water outlet and must be distinguished from the DC load current required for electrolysis via the electrodes. For a single electrolyzer in a sufficiently high-impedance IT system, the DC current in the service water pipe system will be negligibly small, even with a relatively low functional resistance of the service water to earth, if a largely symmetrical system design ensures a symmetrical voltage of the active conductors to earth. On the other hand, a high DC current in the range of several amperes up to over 100 A is to be expected in the domestic water supply system if a one-sided low-resistance earth fault occurs on an active conductor of the ungrounded power system or if several electrolyzers are operated in an IT system with their own non-synchronized active power converters. The monitoring of DC (leakage) currents flowing through the consumption water connections or through the cooling water is carried out using state-of-the-art residual current monitoring devices. In the case of hydrogen electrolysis, however, the DC residual current monitoring in the consumption water pipe system is technically difficult and expensive, since the extremely large DC load currents of several 1000A have a metrological influence on the differential current measurement of the DC (leakage) current in the consumption water pipe system. The present invention is therefore based on the task of determining the insulation resistance of the ungrounded power supply system supplying the hydrogen electrolysis plant with sufficient accuracy as early as possible during the demineralization process – excluding the dynamically changing electrical resistance of the service water connected in parallel to ground. As an additional safety aspect, a possible DC current flow in the service water line system should be included in the insulation monitoring. This object is achieved in a first alternative solution by the features of the method described in claim 1. The basic idea of the method according to the invention is to predict the insulation resistance of the ungrounded power supply system - the insulation resistance of the insulation gap of the ungrounded power supply system without the additional functional, dynamically changing electrical resistances of the consumption water - during an initial start-up process of the hydrogen electrolysis plant and thus to keep the delay caused by the demineralization process until the actual electrolysis process is activated as short as possible for subsequent start-up processes of the electrolysis plant. For this purpose, an initial start-up of the hydrogen electrolysis plant is carried out, starting with a demineralization process until a steady state of demineralization of the consumption water is reached. During the demineralization process, a number of total insulation resistance values Rtoti are measured and stored at specific recording times by means of an insulation monitoring device which feeds a measuring current Imin, driven by a measuring voltage, into the unearthed power supply system. The monitoring of the unearthed power system is carried out as required using an insulation monitoring device designed in accordance with the IEC61557-8 standard, which is coupled between at least one of the active conductors of the unearthed power system and earth and superimposes a measuring voltage Um on the unearthed power system so that a measuring current Im corresponding to the insulation fault is established, the magnitude of which is typically in the µA to mA range. The insulation monitoring device measures at the recording times ti - the index i reflects the temporal sequence - a total insulation resistance value Rtoti, which is composed of the parallel connection of the insulation resistance Risode of the IT system and a functional consumption water resistance value Rwide of the consumption water prevailing at the recording time tiv. Due to their parallel connection, the respective consumption water resistance values Rw1i, Rw2i of the consumption water supply line and the consumption water discharge line can be mathematically simplified to form the functional consumption water resistance value Rwide of the consumption water. At the end of the (initial) demineralization process carried out during the initial start-up, the measuring current components Iw1, Iw2 in the consumption water pipe system are measured using highly sensitive current sensors in the steady state of demineralization. The measuring current Im flowing through the insulation monitoring device branches into a measuring current component Iiso, which flows through the insulation resistance Ris or the insulating gap of the ungrounded power system, and into parallel measuring current components Iw1, Iw2 flowing in the domestic water supply line and the domestic water discharge line. The measuring current components Iw1, Iw2 flowing through the domestic water supply line and the domestic water discharge line are recorded using highly sensitive current sensors. Furthermore, in the steady state of demineralization, the insulation resistance Riso is calculated and stored from the measuring voltage Um, the recorded measuring current components Iw1, Iw2 and the measuring current Im. The insulation resistance Ris is calculated from the known measuring voltage Um, the measuring current Im recorded in the insulation monitoring device and the measuring current components Iw1, Iw2 recorded by the highly sensitive current sensors in the consumption water pipe system. For the recording times, consumption water resistance values Rwi are then calculated from the total insulation resistance values Rtoti and the insulation resistance Riso based on the modeling of the parallel circuit formed from the consumption water resistance values Rwi and the insulation resistance Riso. After completion of the initial demineralization process, a regression curve Rw(t) is calculated for the consumption water resistance Rw. In a regression analysis method, the temporal dependence f(t)=Rw(t) of the consumption water resistance Rw is described based on the consumption water resistance values Rwi. For example, a linear regression curve Rw(t) can be determined using the least squares criterion, from which the regression value Rw(T) of the consumption water resistance Rw can be read for any given time T. As with the consumption water resistance values Rwi, the consumption water resistance Rw represents the parallel connection of the respective consumption water resistance Rw1,2 of the consumption water supply line and the consumption water discharge line. When the hydrogen electrolysis plant is restarted, in subsequent regular start-up processes, an expected insulation resistance value R'iso(T) is repeatedly calculated for a determination time T during the demineralization process that is continuous at the interval of the IMD calculation period, based on the regression value Rw(T) at the respective determination time T and the instantaneous total insulation resistance value Rtot(T) measured by means of the insulation monitoring device at the respective determination time T. Thus, during further, regular, operationally planned start-up operations during the demineralization process, a calculation of the expected insulation resistance value R'iso(T) is repeatedly performed for a determination time T that progresses according to the duration of the IMD calculation period. The expected insulation resistance value R'iso(T) is estimated based on the regression value Rw(T) derived from the regression curve Rw(t) and the instantaneous total insulation resistance value Rtot(T) measured by the insulation monitoring device. The circuit-related relationship is derived from the modeling of the parallel connection from the expected insulation resistance R'iso(T) and the consumption water resistance Rw. The hydrogen electrolysis plant is activated as soon as the expected insulation resistance value R'iso(T) exceeds a predetermined threshold value Rlim during the ongoing calculation. Due to the higher electrical conductivity of the service water at the beginning of the demineralization process, the total insulation resistance values Rtoti measured by the insulation monitoring device are initially determined by the parallel (low) service water resistance Rw. During the demineralization process, the electrical conductivity of the service water decreases, increasing the expected insulation resistance value R'iso(T) estimated for a progressive determination time T. As soon as the expected insulation resistance value R'iso(T) exceeds a predetermined threshold value Rlim during continuously repeated calculations during the demineralization process, the power supply to the hydrogen electrolysis plant is switched on. In a further advantageous embodiment, the number of recording times ti and their temporal spacing enable sufficiently accurate modeling by the regression curve. The number of acquisition times ti and their time interval are chosen during the demineralization process of the initial start-up such that mathematical modeling by a regression curve results in a sufficiently accurate and reliable estimate of the expected insulation resistance value R'iso(T). It is advantageous to calculate several temperature-adjusted regression curves Rw(t) depending on a consumption water temperature. In the case of strong temperature fluctuations of the consumption water, regression curves Rw(t) adapted to the prevailing consumption water temperature can serve as a basis for determining the regression value Rw(T). Furthermore, the object is achieved in a second alternative solution by the features of the method described in claim 4. In contrast to the first alternative solution described in claim 1, this second alternative solution differs in that during the initial start-up of the hydrogen electrolysis plant during the demineralization process, the electrical conductivity and the temperature of the consumption water are additionally provided by the demineralization plant and recorded in a plant-specific manner. Instead of the direct time dependence determined by regression analysis, a time-independent function Rw(Rtot, S, ϑ) for the consumption water resistance Rw is established using the variables total insulation resistance value Rtoti, electrical conductivity Siand temperature value ϑi, which is used in subsequent regular start-up processes for a temporally continuous determination time T to calculate an expected insulation resistance R'iso(T). Preferably, the number of recording times ti and their time interval enable a description of the consumption water resistance Rwin depending on the recorded values total insulation resistance value Rtoti, electrical conductivity Si and temperature value ϑi by a time-independent function Rw(Rtot, S, ϑ). The measurement and storage of the total insulation resistance value Rtot, the electrical conductivity Si and the temperature value ϑ are carried out at a "sampling rate" such that a sufficient number of determining equations are available to set up a system of equations from which the functional dependence Rw(Rtot, S, ϑ) of the consumption water resistance Rwhere can be derived. Preferably, the measuring current components Iw1, Iw2 are measured by the highly sensitive current sensors in the µA to mA range. Due to the negative metrological influence of the DC current and the low current intensity of the injected measuring current I, its measuring current components Iw1 and Iw2 must be detected with high sensitivity. Current sensors with flux-gate current sensors in the µA to mA range, installed directly in the domestic water supply system, are suitable for this purpose. In particular, with a pulsed, clocked measuring current Im, the amplitude difference (peak-to-peak value) of the measuring current components Iw1, Iw2 is evaluated in order to be largely independent of an absolute DC current load in the consumption water pipe system. Advantageously, a DC current IDC1, IDC2 is measured in the consumption water pipe system. In addition to determining the insulation resistance Riso, the DC current IDC1, IDC2 is monitored, which appears as a leakage current in the domestic water supply line and the domestic water discharge line of the domestic water supply system. On the one hand, it can be used to quickly check whether the DC current IDC1, IDC2 exceeds a critical value. This allows for timely detection of any hazards caused by excessively high current loads, which can occur, for example, in the case of a one-sided low-resistance earth fault on an active conductor of the DC power supply and lead to the deactivation of the affected electrolyzer. On the other hand, the DC operating point of the sensitive measurement of the measuring current components Iw1, Iw2 - preferably carried out with flux-gate sensors - can be monitored, thus enabling an error-free determination of the insulation resistance Riso. Preferably, the DC current IDC1, IDC2 in the consumption water pipe system is measured in the single-digit ampere range up to a magnitude of over 100 amperes using robust current sensors. The DC current monitor should be designed to detect DC currents in the single-digit ampere range up to over 100 A. Low-cost and robust semiconductor sensors are preferred for this purpose. Furthermore, the hydrogen electrolysis plant is only activated if the DC current IDC1, IDC2 does not exceed a predetermined value. In conjunction with the monitoring of the DC current IDC1, IDC2 in the consumption water supply line, the hydrogen electrolysis plant is only activated in the form of an AND operation if the two monitoring parameters insulation resistance Ris and DC current IDC1, IDC2 are each within a range specified by presettable (threshold) values and are therefore non-critical. The object underlying the invention is further achieved by an electrical circuit arrangement having the features described in claim 10 and by an electrical circuit arrangement having the features described in claim 11. The electrical circuit arrangements are designed to implement the method according to the invention for determining the insulation resistance Riso of an ungrounded power supply system supplying the hydrogen electrolysis plant. The claimed structural features of the inventive electrical circuit arrangements according to claims 10 and 11 carry out the method steps of the inventive methods defined in the respective corresponding claims 1 and 4. Thus, the technical effects achieved with these methods and the resulting advantages equally apply to the corresponding electrical circuit arrangements. In summary, the present invention allows a cost-effective monitoring approach with easy retrofitting possibility for the determination of the insulation resistance Riso of an ungrounded power supply system for the supply of hydrogen electrolysis plants. In particular, the methods according to the invention and the electrical circuit arrangements according to the invention that carry out these methods have the following advantageous properties in the functional interaction of their features: Standard-compliant insulation monitoring of the effectiveness of insulating distances is made possible without reducing the limit values recommended by the standards. Complex and cost-intensive sensitive residual current measurement technology in the DC load circuit can be replaced by a simpler sensitive DC current measurement in the consumption water pipe system. The cost-effective, insensitive DC current measurement in the domestic water pipe system allows monitoring of the DC operating point of the sensitive current measurement to determine the insulation resistance Risound enables the rapid detection of inadmissibly high, dangerous DC currents in the domestic water pipe system. Further advantageous design features will become apparent from the following description and the drawings, which illustrate preferred embodiments of the invention using examples. They show: Fig. 1: schematically illustrates the structure of a hydrogen electrolysis plant with insulation monitoring; Fig. 2: the hydrogen electrolysis plant from Fig. 1 with additional DC current monitoring; Fig. 3: an equivalent circuit diagram of the insulation monitoring of the hydrogen electrolysis plant; Fig. 4: a flowchart of a method according to the invention for insulation monitoring (first alternative solution); and Fig. 5: a flowchart of another method according to the invention for insulation monitoring (second alternative solution). Fig. 1 shows schematically the structure of a hydrogen electrolysis plant 2 with insulation monitoring using an example of PEM electrolysis. The hydrogen electrolysis plant 2 comprises a PEM electrolysis cell 4 with electrodes 6, 8 and with a polymer membrane 10 as well as with a consumption water supply line 12, a consumption water outlet line 14 and with outlets for the released oxygen O2 and the produced hydrogen H2. For demineralization of the consumption water H2O, the hydrogen electrolysis plant 2 has a demineralization device 16, which is arranged at the inlet of the consumption water supply line 12. For the measurement and storage of the electrical conductivity values S of the consumption water H2O and the temperature values ϑ of the consumption water H2O to be carried out in the second alternative solution, the demineralization device 16 has a conductivity measuring device 17 and a temperature measuring device 18. The electrodes 6, 8 are supplied with electrical energy by an ungrounded power supply system 20. The ungrounded power supply system 20 comprises a rectifier 22, which is fed by a three-phase power source 24 via active conductors L1, L2, L3. On the output side, the rectifier 22 is connected to the electrodes 6, 8 via the active conductors L+, L-. The ungrounded power supply system 20 has an insulation resistance Riso to earth PE. In principle, several PEM electrolysis cells 4 can also be connected to the ungrounded power supply system 20. The hydrogen electrolysis plant 2 including the demineralization device 16 with the conductivity measuring device 17 and the temperature measuring device 18 as well as the ungrounded power supply system 20 form a presupposed application environment for the present invention and are not part of the invention. According to the task, the insulation resistance Risode of the ungrounded power supply system 20 is monitored by means of an electrical circuit arrangement 30 according to the invention. The electrical circuit arrangement 30 comprises a standardized insulation monitoring device (IMD) according to the product standard IEC 61557-8, and, for each domestic water supply line 12 and domestic water discharge line 14 of each PEM electrolysis cell 4 connected to the ungrounded power supply system 20, additionally a highly sensitive current sensor 32, which is suitable for determining the measuring current components Iw1, Iw2 flowing through the domestic water resistances Rw1, Rw2 with sufficient accuracy. In this exemplary embodiment, the highly sensitive current sensors 32 are connected to the insulation monitoring device (IMD), which performs all calculations under processor control. Fig. 2 shows the hydrogen electrolysis plant 2 from Fig. 1 with additional DC current monitoring. For this purpose, a robust current sensor 34 is additionally arranged in the service water supply line 12 and the service water discharge line 14 to measure the respective DC current IDC1, IDC2. The robust current sensors 34 are also connected to the insulation monitoring device IMD for evaluating the measured DC currents IDC1, IDC2. The respective measuring current components Iw1, Iw2 superimpose a possible DC current IDC1, IDC2, which is relatively high compared to the measuring current components Iw1, Iw2. The evaluation of the amplitude difference (peak-to-peak value) of the measuring current components Iw1, Iw2 for a pulsed, clocked measuring current Im is shown in a graphical manner and not to scale, in order to perform the measurement independently of an absolute DC current load in the consumption water supply system. Fig. 3 shows an equivalent circuit diagram of the insulation monitoring of the hydrogen electrolysis plant 2 supplied by the ungrounded power supply system 20. The correct insulation resistance Riso is determined on the basis of this equivalent circuit diagram. The service water resistances Rw1, Rw2, together with the insulation resistance Ris of the ungrounded power supply system 20, form a parallel circuit. To determine the insulation resistance Ris, this parallel circuit is supplied with a measuring voltage Um by the insulation monitoring device IMD, which drives a measuring current Im, which is divided into the measuring current components Iw1, Iw2 flowing through the service water resistances Rw1, Rw2 and the measuring current component Iiso flowing through the insulation resistance Ris. Since the measuring voltage Um is known, the measuring current Im is measured internally by the insulation monitoring device IMD and the measuring current components Iw1, Iw2 are detected by the highly sensitive current sensors 32, the measuring current component Ii flowing through the insulation resistance Riso can be calculated as follows (for the embodiment considered here, n=2): The adjusted and therefore correct insulation resistance Riso is calculated as follows: Fig. 4 summarizes the inventive method sequence of the first alternative solution according to claim 1. The names of the quantities to be processed are consistently prefixed with the index i to indicate that they represent a temporal sequence of measured or calculated values. For example, the consumption water resistance Rw calculated for the recording time t is referred to as the consumption water resistance value Rw. During the initial start-up process S1, total insulation resistance values Rtoti are initially measured using the insulation monitoring device IMD during the demineralization process. In the steady state of demineralization, the measurement current components Iw1, Iw2 are measured in the domestic water pipe system 12, 14 using highly sensitive current sensors 32. Using Equation (1), the measurement current component Iiso flowing through the insulation resistance Riso can be calculated, and from this, the insulation resistance Riso is determined using Equation (2). Since the insulation resistance Riso is thus known and the total insulation resistance value Rtotig is measured, the parallel connection of the consumption water resistance Rw with the insulation resistance Risofor the sequence of the consumption water resistance values Rwi acting during the demineralization process results Based on the consumption water resistance values Rwi determined in this way, a regression curve Rw(t) for the consumption water resistance Rw is created. The initial start-up S1 is thus completed and the obtained regression curve Rw(t) can be used for further, operationally planned start-up processes S2. This is done in such a way that in the subsequent start-up processes S2 during the demineralization process, an expected insulation resistance value R'iso(T) is calculated for a continuous determination time T. The predicted value of the expected insulation resistance value R'iso(T) is calculated by taking into account the regression value Rw(T) obtained from the regression curve Rw(t) for this determination time T and the instantaneous total insulation resistance value Rtot(T) measured by the insulation monitoring device (IMD) at the respective determination time T: In this way, a statement about the expected insulation resistance value R'iso(T) can be made in subsequent demineralization processes at the earliest possible time T. As soon as the continuously calculated insulation resistance value R'iso(T) exceeds a predetermined threshold during the subsequent demineralization process, the hydrogen electrolysis plant is activated. Fig. 5 shows a flow chart of the method according to the invention for insulation monitoring according to the second alternative solution described in claim 4. In contrast to the first alternative solution shown in Fig. 4, within the initial start-up process S1 during the demineralization process, at certain recording times, in addition to the measurement and storage of the total insulation resistance value Rtoti, the electrical conductivity Sides of the consumption water and the temperature value ϑides of the consumption water are also recorded as independent functional parameters. Instead of the regression analysis Rw(t) from the first alternative solution, a time-independent function Rw(Rtot, S, ϑ) for the consumption water resistance Rw is used, from which the consumption water resistance value Rw(T) acting at the respective determination time T can be determined for subsequent start-up processes S2. The expected insulation resistance value R'iso(T), which is continuously calculated analogously to Eq. (4) using the consumption water resistance Rw(T) given by the time-independent function Rw(Rtot, S, ϑ), is then checked for exceedance of a predetermined threshold value Rlim.

Claims

Method for determining an insulation resistance Ri of an ungrounded power supply system (20) which supplies a hydrogen electrolysis plant (2) with electrical energy, comprising the method steps: initial start-up (S1) of the hydrogen electrolysis plant (2) beginning with a demineralization process until a steady state of demineralization of the consumption water is reached; during the demineralization process, at specific detection times ti, measuring and storing a number of total insulation resistance values Rtoti by means of an insulation monitoring device (IMD) which feeds a measuring current Im driven by a measuring voltage into the ungrounded power supply system (20); in the steady state of demineralization, measuring measuring current components Iw1, Iw2 in a consumption water line system (12, 14) by means of highly sensitive current sensors (32);In the steady state of demineralization, calculating and storing the insulation resistance Riso from the measuring voltage Um, the recorded measuring current components Iw1, Iw2 and the measuring current Im; for the recording times ti, calculating the consumption water resistance values Rwi from the total insulation resistance values Rtoti and the insulation resistance Riso based on a model of a parallel circuit formed from the consumption water resistance values Rwi and the insulation resistance Riso;Calculating a regression curve Rw(t) for the consumption water resistance Rw, wherein in subsequent regular start-up processes (S2) for a continuous determination time T during the demineralization process, an expected insulation resistance value R'iso(T) is calculated, based on a regression value Rw(T) at the respective determination time T and an instantaneous total insulation resistance value Rtot(T) measured by means of the insulation monitoring device (IMD) at the respective determination time T, and the hydrogen electrolysis plant (2) is switched off as soon as the expected insulation resistance value R'iso(T) exceeds a predetermined threshold value Rlim during the continuous calculation. Method according to claim 1, characterized in that the number of detection times ti and their time interval enable sufficiently accurate modeling by the regression curve Rw(t). Method according to claim 1 or 2, characterized in that several temperature-adjusted regression curves Rw(t) are calculated as a function of a consumption water temperature ϑ. Method for determining an insulation resistance Riso of an unearthed power supply system (20) which supplies a hydrogen electrolysis plant (2) with electrical energy, comprising the method steps: initial start-up (S1) of the hydrogen electrolysis plant (2) beginning with a demineralization process until a steady state of the demineralization of the consumption water is reached; during the demineralization process, at specific recording times ti, measuring and storing a number of total insulation resistance values Rtoti by means of an insulation monitoring device (IMD) which feeds a measuring current Im driven by a measuring voltage into the unearthed power supply system (20), as well as measuring and storing electrical conductivities S1 of the consumption water and temperature values ϑide of the consumption water;in the steady state of demineralization, measuring measuring current components Iw1, Iw2 in a domestic water pipe system (12, 14) by means of highly sensitive current sensors (32); in the steady state of demineralization, calculating and storing the insulation resistance Riso from the measuring voltage Um, the recorded measuring current components Iw1, Iw2 and the measuring current Im; for the recording times ti, calculating domestic water resistance values Rwi from the total insulation resistance values Rtoti and the insulation resistance Riso based on a modeling of a parallel circuit formed from the domestic water resistance values Rwi and the insulation resistance Riso;Calculating a time-independent function Rw(Rtot, S, ϑ) for the consumption water resistance Rw, wherein in subsequent regular start-up processes for a continuous determination time T during the demineralization phase, an expected insulation resistance R'iso(T) is calculated, based on the consumption water resistance Rw(T) given by the time-independent function Rw(Rtot, S, ϑ) at the respective determination time T and an instantaneous total insulation resistance value Rtot(T) measured by the insulation monitoring device (IMD) at the respective determination time T, and the hydrogen electrolysis plant (2) is switched off as soon as the expected insulation resistance R'iso(T) exceeds a predetermined threshold value Rlim during the continuous calculation; Method according to claim 4, characterized in that the number of recording times ti and their time interval enable a description of the consumption water resistance Rwin as a function of the recorded values total insulation resistance value Rtoti, electrical conductivity Si and temperature value ϑi by a time-independent function Rw(Rtot, S, ϑ). Method according to one of claims 1 to 5, characterized in that the measuring current components Iw1, Iw2 are measured by the highly sensitive current sensors in the µA to mA range. Method according to one of claims 1 to 6, characterized in that a DC current IDC1, IDC2 is measured in the consumption water line system (12, 14). Method according to claim 7, characterized in that the DC current IDC1, IDC2 in the consumption water line system (12, 14) is measured in the single-digit ampere range up to a magnitude of over 100 amperes by means of robust current sensors Method according to one of claims 1 to 8, characterized in that the hydrogen electrolysis plant (2) is only switched off if the DC current IDC1, IDC2 does not exceed a predetermined value. Electrical circuit arrangement (30) for determining an insulation resistance Riso of an unearthed power supply system (20) which supplies a hydrogen electrolysis plant (2) with electrical energy, with an insulation monitoring device (IMD) which complies with the product standard IEC 61557-8 and is designed to measure and store a number of total insulation resistance values Rtoti, which is designed to carry out the calculations described in claim 1, and with a highly sensitive current sensor (32) arranged in each of a consumption water supply line (12) and a consumption water discharge line (14). Electrical circuit arrangement (30) for determining an insulation resistance Riso of an unearthed power supply system (20) which supplies a hydrogen electrolysis plant with electrical energy, with an insulation monitoring device (IMD) which complies with the product standard IEC 61557-8 and is designed to measure and store a number of total insulation resistance values Rtoti, which is designed to carry out the calculations described in claim 4, and with a highly sensitive current sensor (32) arranged in each of a consumption water supply line (12) and a consumption water discharge line (14). Electrical circuit arrangement according to claim 10 or 11, characterized in that the highly sensitive current sensors for measuring the measuring current components Iw1, Iw2 are designed as current sensors for measurements in the µA to mA range. Electrical circuit arrangement according to one of claims 10 to 12, characterized by a robust current sensor for measuring a DC current IDC in the consumption water line system (12, 14), which is designed for measurements in the single-digit ampere range up to an order of magnitude of over 100 amperes.

Citation Information

Patent Citations

  • Monitoring device and method, as well as an extended monitoring device and method for insulation monitoring of an ungrounded electrical system with grounded liquid cooling

    DE102020104956B3

  • Method and apparatus for measuring insulation resistance of electrical apparatus

    JP2010164531A

  • JP002010164531A