Lifting and lowering platform for assembled steel structure buildings

The lifting and lowering operation platform for assembled steel structure buildings addresses inefficiencies and safety issues by using a column system with cantilever platforms and driving mechanisms, improving construction efficiency and safety through independent control and protection.

DE202024105950U1Active Publication Date: 2024-12-05CHINA CONSTR SCI & IND WUHAN CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
DE202024105950
Authority / Receiving Office
DE · DE
Patent Type
Utility models
Current Assignee / Owner
Priority Date
2023-11-03
Filing Date
2024-10-16
Publication Date
2024-12-05
Estimated Expiration
2034-10-31

AI Technical Summary

Technical Problem

The construction of assembled steel structure buildings relies heavily on traditional scaffolding, which results in low construction efficiency and poor safety due to the use of cantilevered external frames and electric hanging baskets.

Method used

A lifting and lowering operation platform comprising a column system with support columns connected to the main steel beams, a climbing rail, and cantilever platforms equipped with a lifting and driving mechanism, enabling independent control and protection mechanisms to replace traditional scaffolding.

Benefits of technology

The platform enhances construction efficiency and safety by allowing separate construction at different locations, replacing electric hanging baskets, and ensuring stable, reliable operation with independent control and protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

Lifting and lowering platform for assembled steel structure buildings, characterized in that it comprises the following: a column system comprising: several support columns (2) arranged around the outer contour of the assembled steel structure building (1); wherein the support columns (2) are provided in a vertical direction and are rigidly connected to the main steel beams of the assembled steel structure building (1) by means of a wall fastening rod system (8); a climbing rail (3) which is provided in the longitudinal direction of the support column (2); a cantilever platform (4) which is slidably attached to the support column (2) by means of the climbing rail (3); and wherein the cantilever platform (4) is attached around the outer contour of the assembled steel structure building (1).
Need to check novelty before this filing date? Find Prior Art

Description

Technical area

[0001] The present utility model relates to the technical field of installation and construction of construction machinery for assembled buildings and, in particular, to a lifting and lowering operating platform for assembled steel structure buildings. Background technology

[0002] As the country continues to strengthen its measures to promote the transformation of the construction industry, the construction industry is moving toward industrialization, intelligence, and greening. The construction of prefabricated buildings has a better industrial foundation than traditional construction methods, and it is easier to achieve the goal of green and intelligent construction. On this basis, the vigorous development of prefabricated buildings has become an important measure for the construction industry to promote transformation and implement the "double carbon" strategy. Among them, there is great demand and a broad market in the residential sector, which has become a focus of research and development for prefabricated steel structure buildings.

[0003] In existing technology, the construction of steel-framed residential buildings still requires the use of traditional scaffolding. At the same time, most of the protective measures utilize cantilevered external frames and overhanging nets, and most of the external wall waterproofing and thermal insulation decoration projects utilize electric hanging baskets. The above-mentioned existing construction methods and tools all have problems with low economic benefits and high safety risks. Therefore, there is an urgent need for professionals in this field to develop a new hoisting and lowering operation platform suitable for steel-framed residential buildings, enabling efficient and safe construction of steel-framed residential buildings. Contents of the utility model

[0004] The purpose of this utility model is to provide a lifting and lowering operation platform for assembled steel structure buildings to solve the problems of existing technology that assembled steel structure buildings still use conventional scaffolding during the construction process, resulting in low construction efficiency and poor safety of the assembled buildings. To this end, this utility model provides a lifting and lowering operation platform for assembled steel structure buildings, comprising: a column system comprising: a plurality of support columns arranged around the outer contour of the assembled steel structure building; wherein the support columns are provided in the vertical direction and are fixedly connected to the main steel beams of the assembled steel structure building by means of a wall fastening rod system; a climbing rail provided in the longitudinal direction of the support column; a cantilever platform slidably attached to the support column by means of the climbing rail; and wherein the cantilever platform is mounted around the outer contour of the assembled steel structure building.

[0005] Optionally, the number of cantilever platforms is at least two, with the multiple cantilever platforms dividing the perimeter of the composite steel structure building into several independent lifting and lowering units.

[0006] Optionally, the cantilever platform comprises: a Bailey frame, a platform passage main body structure arranged on the Bailey frame; wherein the Bailey frame is provided with a lifting and driving mechanism, and the lifting and driving mechanism is connected to the climbing rail through a gear to raise and lower the cantilever platform.

[0007] Optionally, the climbing rail is a rack structure arranged along the longitudinal direction of the support column; the lifting and driving mechanism comprises: a gear in meshing drive connection with the rack structure and a drive motor for driving the rotation of the gear.

[0008] Optionally, the support columns are provided at intervals of 3 m to 12 m at corner positions of the external facade of the assembled steel structure building; and / or each of the cantilever platforms has a control system communicatively connected to it to control the independent raising and lowering of each of the cantilever platforms separately; and / or the support columns are further provided with a limiting mechanism on the top and bottom of the support columns, wherein the limiting mechanism is designed to limit the range of movement of the cantilever platforms.

[0009] Optionally, the support columns are firmly connected to the cross steel beams of the assembled steel structure building by the wall fixing rod system.

[0010] Optionally, each of the cantilever platforms is drive-connected to at least two of the support columns.

[0011] Optionally, it further comprises: a protective mechanism for protecting the lifting and lowering operation platform, provided on the side of the cantilever platform facing away from the assembled steel structure building; wherein the protection mechanism comprises: a suspended steel plate fixedly provided on the support column, and protective grilles attached to the suspended steel plate; wherein a plurality of protective grilles are attached to the suspended steel plate by means of a connecting member to form a protective cover for protecting the lifting and lowering operation platform.

[0012] Optionally, the lifting and lowering operating platform for assembled steel structure buildings also includes the following: a construction elevator system comprising: an elevator car and a control mechanism; wherein the elevator car is mounted on the assembled steel structure building.

[0013] Optionally, the lifting and driving mechanism further comprises: a support wheel provided on a mounting plate and a safety hook provided on a drive plate; wherein the support wheel is configured to drive the gears drivingly connected to the rack structure; wherein the safety hook is further configured to block the lowering of the cantilever platform in the event of failure of the support wheel.

[0014] Optionally, the column system further comprises: a fixed base frame provided corresponding to the cantilever platform; wherein the fixed base frame is provided with a rubber buffer, and the rubber buffer is designed to cushion the cantilever platform in the event of failure of the brakes of the lifting and drive mechanism.

[0015] Optionally, the standard sections forming the column system are welded from square tubes, and adjacent standard sections are bolted together; the standard sections are provided with the rack structure; the surface of the standard sections, with the exception of the rack structure, is hot-dip galvanized; and wherein the standard section located at the lower position of the column system is provided with a lower limit plate, and the standard section located at the upper position of the column system is provided with an upper limit plate; when the lower limit plate and the upper limit plate touch a limit switch located on the cantilever platform, the limit switch is triggered and the cantilever platform automatically stops safely at the end position of the platform.

[0016] Optionally, the wall mounting rod system includes the following: a seamless round tube with connecting nuts at both ends, a steel beam connecting plate provided on a cross steel beam and connected to the end of the seamless round tube with matching threads, and a column fitting provided on the column system and connected to the end of the seamless round tube with matching threads.

[0017] Optionally, the protection mechanism further comprises: a mast and a reinforcement frame, a tripod and a scaffold plate integrally connected to the mast; wherein the reinforcement frame comprises angle steel and square tube welded together to ensure the rigidity of the frame; wherein the tripod comprises angle steel and square tube welded together to connect the mast and the guide rails in the outer rows within the frame and ensure the rigidity of the frame; and wherein the scaffold plate comprises structured steel sheet and square tube, with a longitudinal square tube welded to the underside of the scaffold plate for attaching a tension rod;wherein the scaffold plate is designed to establish the sealing of the gap between the operating platform and the outer contour of the building at each construction stage, and the tension rod is capable of effectively adjusting the distance between the platform and the building away from the wall, thus ensuring the gap between the platform and the wall and the overall sealing of the platform;

[0018] Optionally, the cantilever platform has two Bailey plates that are joined together via a connecting frame.

[0019] The technical solution of the present utility model has the following advantages: 1. The lifting and lowering operating platform for assembled steel structure buildings provided by the present utility model includes the following: a column system comprising: a plurality of support columns arranged around the outer contour of the assembled steel structure building; wherein the support columns are provided in the vertical direction and are fixedly connected to the main steel beams of the assembled steel structure building by means of a wall fastening rod system; a climbing rail provided in the longitudinal direction of the support column; a cantilever platform slidably attached to the support column by means of the climbing rail; and wherein the cantilever platform is mounted around the outer contour of the assembled steel structure building.

[0020] In the present utility model, the hoisting and lowering platform is designed for assembled steel structure buildings. Multiple support columns are arranged around the outer contour of the assembled steel structure building, and the support columns are firmly connected to the main steel beam of the assembled steel structure building. The above arrangement can effectively replace traditional scaffolding in the construction of residential buildings with assembled steel structures. It allows construction workers to carry out construction work on the hoisting and lowering platform and solves the problem of existing conventional scaffolding requiring the use of electric hanging baskets for exterior wall waterproofing and thermal insulation decoration projects. It solves the problems of low construction efficiency and poor safety of existing assembled buildings. 2. In the lifting and lowering operation platform for assembled steel structure buildings provided by the present utility model, the number of cantilever platforms is at least two, and the plurality of cantilever platforms divide the perimeter of the assembled steel structure building into a plurality of independent lifting and lowering units.

[0021] In the present utility model, by erecting multiple cantilever platforms, the assembled steel structure building is divided into multiple independent lifting and lowering units along the outer contour, so that different locations of the assembled steel structure building can be erected separately, which in turn effectively improves the construction efficiency. 3. In the hoisting and lowering operation platform for assembled steel structure buildings provided by the present utility model, the cantilever platform comprises: a Bailey frame; a platform passage main body structure disposed on the Bailey frame; wherein the Bailey frame is provided with a hoisting and driving mechanism, and the hoisting and driving mechanism is connected to the climbing rail through a gear to hoist and lower the cantilever platform.

[0022] In the present utility model, the lifting and drive mechanism of the cantilever platform is connected to the climbing rail by a gear so that the lifting process of the cantilever platform can be carried out stably and reliably. 4. In the lifting and lowering operation platform for assembled steel structure buildings provided by the present utility model, the climbing rail is a rack structure arranged along the longitudinal direction of the support column; the lifting and driving mechanism includes a gear in meshing driving connection with the rack structure and a drive motor for driving the rotation of the gear.

[0023] In the present utility model, the drive of the cantilever platform is realized by the meshing drive structure of the above-mentioned gear and rack, and the lifting and lowering of the cantilever platform is realized by two lifting and driving mechanisms, which can effectively ensure the climbing speed of the cantilever platform. 5. In the hoisting and lowering operation platform for assembled steel structure buildings provided by the present utility model, the support columns are provided at intervals of 3 m to 12 m at corner positions of the exterior facade of the assembled steel structure building; the above-mentioned arrangement can effectively ensure the reliable and stable operation of the cantilever platform.

[0024] Each of the cantilever platforms has a communicatively connected control system to control the independent lifting and lowering of each of the cantilever platforms separately, ensuring that each cantilever platform operates independently and stably.

[0025] The support columns are further provided with a limiting mechanism on the top and bottom of the support columns, wherein the limiting mechanism is designed to limit the range of movement of the cantilever platforms, thereby preventing the cantilever platforms from moving out of the preset track. 6. In the lifting and lowering operation platform for assembled steel structure buildings provided by the present utility model, the support columns are firmly connected to the cross steel beams of the assembled steel structure building through the wall fixing rod system.

[0026] In the present utility model, the support columns are firmly connected to the cross steel beams of the assembled steel structure building through the wall fixing rod system, whereby the column system is sufficiently supported by the cross steel beams, which ensures the stability and reliability of the above-mentioned support columns. 7. The hoisting and lowering operation platform for assembled steel structure buildings provided by the present utility model further comprises: a protective mechanism for protecting the hoisting and lowering operation platform, provided on the side of the cantilever platform opposite the assembled steel structure building; the protective mechanism comprising: a suspended steel plate fixedly provided on the support column, and protective grilles attached to the suspended steel plate; a plurality of protective grilles are attached to the suspended steel plate by means of a connecting member to form a protective cover for protecting the hoisting and lowering operation platform.

[0027] In the present utility model, the cantilever platform and the assembled steel structure building can be effectively protected by the above-mentioned protection mechanism. Furthermore, the existing external protective hangers must be installed on the main structure of the building, which has a greater impact on the main structure. However, the protection mechanism in the present utility model will not affect the main structure of the building.

[0028] In the present utility model, the above-mentioned cantilever platform is used to carry out construction work such as external wall insulation and decorative integrated panels and external windows of assembled steel structure buildings, which can effectively replace traditional scaffolding and electric hanging baskets, thus improving economic benefits and construction efficiency. In addition, multiple protective nets form a protective shield to protect the lifting platform, which also effectively reduces construction safety hazards. At the same time, it provides edge protection and construction work platforms for the installation of external wall ALC strips and external wall insulation and decorative integrated panels, thus avoiding the use of other more dangerous work platforms such as electric hanging baskets for high-altitude work, and improving the safety of construction site operations. Figures

[0029] In order to more clearly illustrate the technical solutions in the specific embodiments of the present utility model or the prior art, the accompanying drawings are briefly presented below. These drawings must be used in describing the specific embodiments or the prior art. It is obvious that the accompanying drawings in the following description represent some of the embodiments of the present utility model, and that general technical personnel in the field, provided they do not perform creative work, can obtain other drawings based on the accompanying drawings. Fig. 1 shows a schematic diagram of the structure of the lifting and lowering operation platform for assembled steel structure buildings according to the present utility model; Fig. 2 shows a partially enlarged schematic representation of the climbing rail on the support column and the wall mounting rod system of the lifting and driving mechanism according to the present utility model; Fig. 3 shows a schematic representation of the relative positions of the support column, the cantilever platform and the cross steel girder according to the present utility model; Fig. 4 shows a partially enlarged schematic view of the support column and the cross steel beam according to the present utility model, which are firmly connected by the wall fixing rod system; Fig. 5 shows a schematic representation of the three-dimensional structure of the fixed base frame according to the present utility model; Fig. 6 shows a schematic representation of the three-dimensional structure of the standard section according to the present utility model; Fig. 7 shows a schematic representation of the structure of the boundary plate according to the present utility model; Fig. 8 shows a schematic diagram of the connection structure of the standard section and the cross steel beam according to the present utility model; Fig. 9 shows a schematic representation of the three-dimensional structure of the reinforcing frame according to the present utility model; Fig. 10 shows a schematic representation of the three-dimensional structure of the scaffolding plate according to the present utility model; Fig. 11 shows a schematic representation of the three-dimensional structure of the cantilever platform according to the present utility model, which consists of the Bailey plates and the connecting frame; Fig. 12 shows a side view of the lifting and lowering operation platform for assembled steel structure buildings according to the present utility model; Fig. 13 shows a schematic diagram of the installation process of the cantilever platform section according to the present utility model; Fig. 14 shows a schematic representation of the installation of the cantilever platform section in the intermediate position according to the present utility model; Fig. 15 is a schematic diagram showing the installation structure of the cantilever platform section and the column according to the present utility model; Fig. 16 is a schematic diagram showing the installation structure of the upper frame structure of the lifting and lowering operation platform according to the present utility model; Fig. 17 shows a schematic diagram of the three-dimensional structure of the lifting and lowering operation platform according to the present utility model in the phase of preparation for lifting; Fig. 18 shows a schematic diagram of the three-dimensional structure of the lifting and lowering operation platform according to the present utility model in the lifting protection phase; Fig. 19 is a schematic diagram of the three-dimensional structure of the lifting and lowering operation platform according to the present utility model, in the lifting and guarding stage for the installation of the wall fixing rod system and the standard section of the column; Fig. 20 shows a schematic representation of the installation state of the mobile distributor according to the present utility model; Fig. 21 shows a side view of the mobile distributor according to the present utility model Fig. 22 shows a schematic representation of the structure of the protective grilles according to the present utility model; Fig. 23 shows a schematic representation of the connecting element for fastening the Fig. 22 shown protective grille according to the present utility model. In the figures:

[0030] 1-Assembled steel structure building; 2-Support column; 3-Climbing rail; 4-Cantilever platform; 5-Bailey frame; 6-Platform walkway main structure; 7-Lifting and driving mechanism; 8-Wall fixing rod system; 9-Cross steel beam; 10-Protection grille; 11-Fixed base frame; 12-Rubber buffer; 13-Standard section; 14-Lower limit plate, Upper limit plate; 15-Seamless round tube; 16-Steel beam connecting plate; 17-Column fitting; 18-Bailey plate; 19-Connecting frame; 20-Mast; 21-Reinforcing frame; 22-Tripod; 23-Scaffolding plate; 24-First frame piece; 25-Second frame piece; 26-Fixed connecting frame; 27-Platform section connecting mast; 28-Connecting diagonal brace; 29-Support structure; 30-Connector; 31-Mobile distributor; 32-Sleeve; 33-Bailey truss. Specific embodiments

[0031] The technical solutions of the present utility model are described clearly and completely below in conjunction with the accompanying drawings. Obviously, the description of the embodiments represents only a portion of the embodiments of the present utility model and not all of them. Based on the embodiments of the present utility model, all other embodiments that are readily apparent to those skilled in the art without creative effort fall within the scope of the present utility model.

[0032] Furthermore, the technical features of various embodiments of the present utility model described below can be combined with each other as long as they do not contradict each other. Example 1

[0033] Documented is a lifting and lowering operating platform for assembled steel structure buildings as in Fig. 1, which includes the following: a column system comprising: a plurality of support columns 2 arranged around the outer contour of the assembled steel structure building 1; wherein the support columns 2 are provided in the vertical direction and are firmly connected to the main steel beams of the assembled steel structure building 1 by means of a wall fixing rod system 8; in order to ensure the connection strength, the support columns 2 are, as shown in the Fig. 3 and Fig. 4, are firmly connected to the cross steel beams 9 of the assembled steel structure building 1 via a wall fastening rod system 8. In the present embodiment, the support columns 2 are provided at intervals of 3 m to 12 m at corner positions of the exterior facade of the assembled steel structure building 1; the support columns in the present embodiment are further provided with a limiting mechanism on the top and bottom of the support columns 2, wherein the limiting mechanism is designed to limit the range of movement of the cantilever platforms 4. As shown in Fig. As shown in Figure 5, the column system further comprises: a fixed base frame 11 provided corresponding to the cantilever platform 4; wherein the fixed base frame 11 is provided with a rubber buffer 12, and the rubber buffer 12 is designed to cushion the cantilever platform 4 in the event of failure of the brakes of the lifting and driving mechanism 7; a climbing rail 3 provided in the longitudinal direction of the support column 2; further, the climbing rail 3 is a rack structure arranged along the longitudinal direction of the support column 2; the lifting and driving mechanism 7 comprises: a gear in meshing driving connection with the rack structure and a drive motor for driving the rotation of the gear; moreover, the lifting and driving mechanism 7 further comprises: a support wheel provided on a mounting plate and a safety hook provided on a drive plate; wherein the support wheel is configured to drive the gears in driving connection with the rack structure; wherein the safety hook is further configured to block the lowering of the cantilever platform 4 in the event of failure of the support wheel. a cantilever platform 4, which is slidably attached to the support column 2 by means of the climbing rail 3, wherein each of the cantilever platforms 4 is drive-connected to at least two of the support columns 2. And the cantilever platform 4 is attached around the outer contour of the assembled steel structure building 1. In the present embodiment, the number of cantilever platforms 4 is at least two, wherein the plurality of cantilever platforms 4 divide the perimeter of the assembled steel structure building 1 into several independent lifting and lowering units. In addition, the cantilever platform 4 in the present embodiment comprises, as shown in Fig. 1, the following: a Bailey frame 5, a platform passage main body structure 6 arranged on the Bailey frame 5; wherein the Bailey frame 5 is provided with a lifting and driving mechanism 7, and the lifting and driving mechanism 7 is connected to the climbing rail 3 through a gear to raise and lower the cantilever platform 4; a control system, wherein each of the cantilever platforms 4 has a control system communicatively connected thereto for separately controlling the independent raising and lowering of each of the cantilever platforms; a protection mechanism provided for protecting the lifting and lowering operation platform on the side of the cantilever platform 4 facing away from the assembled steel structure building 1; the protection mechanism comprising: a suspended steel plate fixedly provided on the support column 2, and protective gratings 10 attached to the suspended steel plate; as shown in Fig. 22 and Fig. As shown in Figure 23, the protective grilles 10 are attached by means of a connecting element. A plurality of protective grilles 10 form a protective cover for protecting the lifting and lowering operating platform. a construction elevator system comprising: an elevator car and a control mechanism; wherein the elevator car is installed on the assembled steel structure building 1.

[0034] In the present embodiment, the standard sections 13, as in Fig. 6, which form the column system, are welded from square tubes, and adjacent standard sections 13 are bolted together; the standard sections 13 are provided with the rack structure; the surface of the standard sections, except for the rack structure, is hot-dip galvanized; and as in Fig. 7, the standard section 13 located at the lower position of the column system is provided with a lower limit plate 14, and the standard section 13 located at the upper position of the column system is provided with an upper limit plate 14; when the lower limit plate 14 and the upper limit plate 14 contact a limit switch located on the cantilever platform 4, the limit switch is triggered and the cantilever platform 4 automatically stops safely at the end position of the platform.

[0035] In the present embodiment, the wall mounting rod system 8 comprises, as shown in Fig. 8, the following: a seamless round tube 15 with connecting nuts at both ends, a steel beam connecting plate 16 provided on a cross steel beam 9 and connected to the end of the seamless round tube 15 with matching threads, and a column fitting 17 provided on the column system and connected to the end of the seamless round tube 15 with matching threads.

[0036] To ensure the protective effect of the protection mechanism, as described in the Fig. 9, Fig. 10 and Fig. 12, the protection mechanism in the present embodiment comprises: a mast 20 and a reinforcement frame 21, a tripod 22, and a scaffold plate 23; the reinforcement frame 21 comprises angle steel and square tube welded together to ensure the rigidity of the frame; the tripod 22 comprises angle steel and square tube welded together to connect the mast 20 and the guide rails in the outer rows within the frame and ensure the rigidity of the frame; and the scaffold plate 23 comprises textured steel plate and square tube, with a longitudinal square tube welded to the underside of the scaffold plate 23 for attaching a tension rod;the scaffold plate 23 is designed to establish the sealing of the gap between the operating platform and the outer contour of the building at each construction stage, and the tension rod is capable of effectively adjusting the distance between the platform and the building away from the wall, thus ensuring the gap between the platform and the wall and the overall sealing of the platform;

[0037] In addition, as in Fig. As shown in Figure 11, the cantilever platform 4 in the present embodiment comprises two Bailey plates 18 which are joined together via a connecting frame.

[0038] The installation method of the lifting and lowering operation platform as shown in the Fig. 17 to 19, includes the following steps: S1, Positioning and assembly of the fixed base frame 11: Use a ruler to determine the center position for the construction of the fixed base frame 11 based on the position dimensions indicated in the floor plan; the double-column construction platform first determines and marks the position of the fixed base frame 11 and, based on this, determines the position of the other fixed base frame 11; S2, Installation of standard section 13 and lifting and driving mechanism 7: The initial installation steps of standard section 13 are as follows: First, install the combined structure of the fixed base frame 11 and the lifting and driving mechanism 7 at the first side position, and adjust the adjustable legs of the fixed base frame 11 to make the height and verticality of the construction platform meet the construction requirements, and ensure the flatness of the fixed base frame 11 by checking with a leveling device;

[0039] After that, use the same method to install the standard section 13 and the lifting and driving mechanism 7 at the second side position and other positions;

[0040] After that, the vertical connection work of standard section 13 is carried out. After the first two or three sections of the support column 2 and the platform section are installed and the control system is debugged, the vertical connection work of standard section 13 is carried out; S3, Installation of the cantilever platform system and the protection mechanism: Install the first piece of the cantilever platform 4 in the left side position, and install the first piece of the cantilever platform section on the left side of the lifting and driving mechanism 7 in the first side position, as shown in Fig. 13, and attach the cantilever platform section of the lifting and driving mechanism 7. When assembling the cantilever platform section, the first frame part 24 should be assembled first, then the second frame part 25, and then the fixed connecting frame 26, the platform section connecting riser 27 and the connecting diagonal brace 28 should be assembled in sequence according to the dimensions of the construction platform layout plan;

[0041] Install the first cantilever platform 4 on the right side, install the first cantilever platform section on the right side of the lifting and driving mechanism 7 on the first side, and fix the lifting and driving mechanism 7 to the cantilever platform section;

[0042] Install the cantilever platform 4 in the middle position as shown in Fig. 14, and establish a support structure 29 at the lower part of the cantilever platform section 4 in the middle position to install the next platform section; Install the fixed base frame 11, the lifting and driving mechanism assembly 7, and the cantilever platform 4 on the right side, as shown in Fig. shown. Install the fixed base frame 11 and the lifting and driving mechanism assembly 7 at the second side position. Adjust the adjustable legs of the fixed base frame 11 to ensure that the height and verticality of the construction platform meet the construction requirements, and ensure the flatness of the fixed base frame 11 by checking with a leveling device; and install the corresponding cantilever platform 4; S4, Installation of the upper frame system: Install as shown in Fig. 16, in succession the mast 27, the scaffolding plate 23, the reinforcement frame 21 and the outer protective frame with the protective grilles 10.

[0043] In the present utility model, the above-mentioned installation method of the hoisting and lowering operating platform enables stable and rapid construction, thereby realizing the high efficiency and high safety of an assembled steel structure building. This solves the problem of existing technology that traditional scaffolding is still used in the construction process of assembled steel structure buildings.

[0044] A stair construction method for an assembled steel structure building, which is used for using the lifting platform for the assembled steel structure building described in claim 1, comprising: the main structure construction phase of the assembled steel structure building and the main structure construction phase of the exterior facade of the assembled steel structure building;

[0045] The main structural construction phase of the assembled steel structure building includes the following steps: S101, Install the first steel column of the column base section and complete the basement roof structure; then install the steel columns on the 2nd to 4th floors of the assembled steel structure building and the steel beams on the 2nd floor. S102, Assemble the column system, climbing rail 3 and cantilever platform 4 of the lifting and lowering operation platform; S103, Carry out the installation of steel beams on the 3rd and 4th floors of the assembled steel structure building, and fix each support column 2 of the column system to the steel beams on the 3rd and 4th floors of the assembled steel structure building. S104, Cantilever platform 4 moves successively to the 2nd and 3rd floors of the assembled steel structure building. Cantilever platform 4 provides protection for the 2nd and 3rd floors of the assembled steel structure building, respectively, to install the floor steel rods and PC components on the 2nd and 3rd floors, and to introduce mechanical and electrical pre-embedment for concreting. S105: Fix and secure the multiple support columns 2 of the column system to the 4-story steel beams of the assembled steel structure building; drive the cantilever platform 4 to ascend to the third story and install the protective mechanism of the assembled steel structure building; Cantilever platform 4 provides protection for the 3rd and 4th floors of the assembled steel structure building and handles the installation of steel rods, PC components, and concrete pouring for the 4th floor. At the same time, the concrete core pouring for the steel columns on the 2nd to 4th floors has been completed. As in the Fig. 20 and Fig.As shown in Figure 21, this step also includes: Concreting: Three sleeves 32 are installed around the standard sections to form three connected pivot points, and Bailey trusses 33 are installed on their upper parts. The rails are laid over the Bailey trusses 33 for sliding the mobile distributor 31; among them, the height of the mobile distributor 31 is 3.333 m, the maximum working radius of the distributor's arm span is 28 m, the length of the arm end hose is 3 to 6 meters, and the specification is φ133*6 mm. By sliding the rails, the entire range of ground-level work can be covered, so that large-scale concrete pouring is carried out; S106, Installation of steel columns and beams from the 5th to 7th floors of the assembled steel structure building, including the insertion of the second structure, plastering, waterproofing, and fixing of the tower crane to the wall; This step also includes: ALC strip installation process: The construction crew stands above the construction platform, and the installation sequence is to install the wall strips at the door and window openings toward both ends in sequence. It is recommended to use the entire panel on both sides of the door opening. Wall strips without doors should be installed in sequence from one end to the other, and the bottom of the wall strips and the floor slab should be firmly connected with pipe clamps or seating mortar. For the exterior wall panels, sliding S-plates are used to connect the top to the steel beams, flexible materials are used to connect the wall panel sides to the steel columns, and adhesive mortar is used to connect the wall panels to the wall.

[0046] S107, repeat the above steps S103 to S106 until the cantilever platform 4 climbs to the top floor and the construction of the main structure of the assembled steel structure building is completed.

[0047] In addition, after the completion of the main construction phase of the assembled steel structure building, the exterior facade construction phase of the main structure of the assembled steel structure building is carried out;

[0048] The construction phase of the exterior facade of the main structure of the assembled steel structure building includes the following steps: After cleaning the surface of the ALC wall, a special release agent is applied. Then, a 15 mm thick cement mortar 1:2 is applied in two steps. Then, the waterproofing layer is built with a 5 mm thick waterproof dry-powder polymer cement mortar. Finally, the exterior wall is anchored to the structural wall with adhesive anchors. A layer of hot-dip galvanized welded wire mesh is pressed into the center and anchored to the wall with anchor bolts. The exterior wall is then finished with a decorative integrated panel in real stone colors for insulation. S201, use the cantilever platform 4 to carry out the construction of the decorative integrated external wall insulation panel on the top floor and external windows of the assembled steel structure building; The cantilever platform 4 is controlled to descend layer by layer from the upper layer, and the construction of the decorative integrated exterior wall insulation panel and exterior windows of the assembled steel structure building is carried out sequentially from the upper layer to the lower layer; In the method described above, the decorative integrated external wall insulation board at the fixing point of the support column 2 of the lifting and lowering operation platform is not created in this step; S202, control the cantilever platform 4 to move from the ground floor to the next floor below the top floor of the assembled steel structure building. The support columns 2 on the top floor are installed and removed, and the construction of decorative integrated external wall insulation panels, gas and sewer pipes is carried out at the attachment point of the next floor below the top floor of the assembled steel structure building. Then, from top to bottom, the construction of decorative integrated external wall insulation panels, gas and sewer pipes is completed at the climbing rail attachment points of each floor, thus completing the entire construction work of the assembled steel structure building.

[0049] In the present utility model, the construction method of the main structural construction phase of the above-mentioned assembled steel structure building can be realized by a hoisting and lowering operation platform. This construction method is suitable for assembled steel structure residential buildings and can effectively replace the traditional cantilever frame and cantilever net construction methods. It also eliminates the need for electric hanging baskets in most wall waterproofing and insulation decoration projects, thus solving the problems of low economic benefits and high safety risks of existing construction methods and tools.Furthermore, the column system and climbing rail in the present utility model are installed independently of the main structure of the assembled steel structure residential building and essentially do not affect the main structure, thus ensuring the safety of the main structure of the assembled steel structure building. Furthermore, the multiple cantilever platforms in this application are multiple independent lifting units, and each cantilever platform has a high lifting speed, reaching a level in 15 minutes, which has the advantage of being fast and efficient.

[0050] Of course, the specific structure of the cantilever platform 4 in this embodiment is not particularly limited. In other embodiments, the cantilever platform 4 may also be a steel structure platform other than the Bailey frame 5 or a support platform made of other materials.

[0051] Of course, the specific structure of the lifting and driving mechanism 7 in this embodiment is not particularly limited. In other embodiments, the lifting and driving mechanism 7 may also be a chain drive structure or other drive structures.

[0052] Of course, the spacing and specific position of the adjacent support columns 2 are not particularly limited in this embodiment. In other embodiments, the adjacent support columns 2 are spaced apart according to the specific conditions of the construction project.

[0053] Of course, the method for controlling the raising and lowering of the cantilever platform 4 in this embodiment is not particularly limited. In other embodiments, each cantilever platform 4 may also be controlled individually via a manual control mechanism; or it may be connected to a wireless remote control terminal to control the raising and lowering of the aforementioned cantilever platform 4 via the wireless remote control terminal.

[0054] Of course, the above-mentioned embodiments serve only as examples for clear explanation and are not intended to limit the embodiments. Other forms of changes or modifications are also possible for a person with ordinary skill in the art based on the above description. An exhaustive list of all embodiments is neither necessary nor possible. The obvious changes or modifications derived therefrom remain within the scope of protection of the present utility model.

Claims

[1] Lifting and lowering operating platform for assembled steel structure buildings, characterized by that it includes: a column system comprising: a plurality of support columns (2) arranged around the outer contour of the assembled steel structure building (1); wherein the support columns (2) are provided in the vertical direction and are fixedly connected to the main steel beams of the assembled steel structure building (1) by means of a wall fastening rod system (8); a climbing rail (3) provided in the longitudinal direction of the support column (2); a cantilever platform (4) slidably mounted on the support column (2) by means of the climbing rail (3); and wherein the cantilever platform (4) is mounted around the outer contour of the assembled steel structure building (1). [2] Lifting and lowering operating platform for composite steel structure building according to claim 1, characterized bythat the number of cantilever platforms (4) is at least two, wherein the plurality of cantilever platforms (4) divide the perimeter of the composite steel structure building (1) into a plurality of independent lifting and lowering units. [3] Lifting and lowering operating platform for assembled steel structure buildings according to claim 1, characterized by that the cantilever platform (4) comprises: a Bailey frame (5), a platform passage main body structure (6) arranged on the Bailey frame (5); wherein the Bailey frame (5) is provided with a lifting and driving mechanism (7), and the lifting and driving mechanism (7) is connected to the climbing rail (3) through a gear to raise and lower the cantilever platform (4). [4] Lifting and lowering operating platform for assembled steel structure buildings according to claim 3, characterized bythat the climbing rail (3) is a rack structure arranged along the longitudinal direction of the support column (2); wherein the lifting and drive mechanism (7) comprises: a gear in meshing drive connection with the rack structure and a drive motor for driving the rotation of the gear. [5] A lifting and lowering operating platform for an assembled steel structure building according to claim 2, characterized bythat the support columns (2) are provided at intervals of 3 m to 12 m at corner positions of the outer facade of the assembled steel structure building (1); and / or that each of the cantilever platforms (4) has a control system communicatively connected thereto for separately controlling the independent raising and lowering of each of the cantilever platforms (4); and / or that the support columns (2) are further provided with a limiting mechanism on the top and bottom of the support columns (2), wherein the limiting mechanism is designed to limit the range of movement of the cantilever platforms (4). [6] A lifting and lowering operating platform for an assembled steel structure building according to claim 1, characterized by that the support columns (2) are firmly connected to the cross steel beams (9) of the assembled steel structure building (1) by the wall fastening rod system (8). [7] A lifting and lowering operating platform for an assembled steel structure building according to claim 1, characterized by that each of the cantilever platforms (4) is drive-connected to at least two of the support columns (2). [8] Lifting and lowering operating platform for assembled steel structure buildings according to claim 1, characterized by in that it further comprises: a protection mechanism for protecting the lifting and lowering operation platform, which is provided on the side of the cantilever platform (4) facing away from the assembled steel structure building (1); wherein the protection mechanism comprises: a suspended steel plate fixedly provided on the support column (2), and protective grilles (10) attached to the suspended steel plate; wherein a plurality of protective grilles (10) are attached to the suspended steel plate by means of a connecting member (30) to form a protective cover for protecting the lifting and lowering operation platform. [9] Lifting and lowering operating platform for assembled steel structure buildings according to claim 1, characterized by that it also includes: a construction hoist system comprising: an elevator car and a control mechanism; wherein the elevator car is mounted on the assembled steel structure building (1). [10] Lifting and lowering operating platform for assembled steel structure buildings according to claim 4, characterized by that the lifting and driving mechanism (7) further comprises: a support wheel provided on a mounting plate and a safety hook provided on a drive plate; wherein the support wheel is designed to drive the gears drivingly connected to the rack structure; wherein the safety hook is further designed to block the lowering of the cantilever platform (4) in the event of failure of the support wheel. [11] Lifting and lowering operating platform for assembled steel structure buildings according to claim 4, characterized by that the column system further comprises: a fixed base frame (11) provided corresponding to the cantilever platform (4); wherein the fixed base frame (11) is provided with a rubber buffer (12), and the rubber buffer (12) is designed to cushion the cantilever platform (4) in the event of failure of the brakes of the lifting and drive mechanism (7). [12] Lifting and lowering operating platform for assembled steel structure buildings according to claim 4, characterized byin that the standard sections (13) forming the column system are welded from square tubes and adjacent standard sections (13) are bolted together; wherein the standard sections (13) are provided with the rack structure; wherein the surface of the standard sections (13), with the exception of the rack structure, is hot-dip galvanized; and wherein the standard section (13) located at the lower position of the column system is provided with a lower limit plate (14), and the standard section (13) located at the upper position of the column system is provided with an upper limit plate (14); when the lower limit plate (14) and the upper limit plate (14) touch a limit switch located on the cantilever platform (4), the limit switch is triggered and the cantilever platform (4) automatically stops safely at the end position of the platform. [13] Lifting and lowering operating platform for assembled steel structure buildings according to claim 6, characterized by that the wall mounting rod system (8) comprises: a seamless round tube (15) with connecting nuts at both ends, a steel beam connecting plate (16) provided on a cross steel beam (9) and connected to the end of the seamless round tube (15) with matching threads, and a column fitting (17) provided on the column system and connected to the end of the seamless round tube (15) with matching threads. [14] Lifting and lowering operating platform for assembled steel structure buildings Lifting and working platform for assembled steel structures according to claim 8, characterized bythat the protection mechanism further comprises: a mast (20) and a reinforcing frame (21), a tripod (22) and a scaffold plate (23) which are rigidly connected to the mast (20); wherein the reinforcing frame (21) comprises angle steel and square tubes which are welded together to ensure the rigidity of the frame; wherein the tripod (22) comprises angle steel and square tubes which are welded together to connect the mast (20) and the guide rails in the outer rows within the frame and to ensure the rigidity of the frame; and wherein the scaffold plate (23) comprises structured steel sheet and square tube, wherein a longitudinal square tube for attaching a tension rod is welded to the underside of the scaffold plate (23);wherein the scaffolding plate (23) is designed to establish the sealing of the gap between the operating platform and the outer contour of the building in each construction phase, and the tension rod is capable of effectively adjusting the distance between the platform and the building away from the wall, so that the gap between the platform and the wall and the overall sealing of the platform are ensured; [15] Lifting and lowering operating platform for assembled steel structure buildings according to claim 1, characterized by that the cantilever platform (4) has two Bailey plates (18) which are joined together via a connecting frame (19).

Citation Information

Cited By

  • External wallboard lifting and mounting device

    CN119244020A

  • Bridge reverse hoisting construction platform and construction method thereof

    CN121875191A