System for manufacturing a concrete element and associated formwork process

The system addresses surface imperfections in concrete manufacturing by using a fixed and tensioned tarpaulin on formwork surfaces, ensuring smooth finishes and adhesive-free production for high-quality concrete elements.

FR3149334A1Inactive Publication Date: 2024-12-06PRO T CO
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
FR2023005511
Authority / Receiving Office
FR · FR
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-06-01
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing concrete manufacturing systems using protective sheets on formwork surfaces result in surface imperfections and require adhesive underlays that alter the formwork quality over time.

Method used

A system utilizing a tarpaulin fixed and tensioned onto the formwork surface using a fixing device and tensioning device, ensuring a smooth surface without adhesives, comprising a fixing bar, pressurizing members, and a tensioning tool to secure and stretch the tarpaulin.

Benefits of technology

Ensures a smooth surface condition on concrete elements by preventing surface alterations and eliminating the need for adhesives, allowing for reusable and high-quality concrete production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

System for manufacturing a concrete element and associated formwork method. System for manufacturing a concrete element comprising a formwork installation (2), including a formwork support (20) defining a formwork surface (22), and delimiting a concrete receiving volume (V). The installation includes a tarpaulin (4) for protecting the formwork surface, defining two longitudinal edges (44A) along its length and two transverse edges (42A) along its width. The system includes a fastening device (6), configured to fix the tarpaulin to the formwork support at a first transverse edge of the tarpaulin, and a tensioning device configured to exert a tensioning force on the tarpaulin at a second transverse edge opposite the first transverse edge, thus pressing the tarpaulin against the formwork surface of the formwork support. Figure for the abstract: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: System for manufacturing a concrete element and associated formwork method

[0001] The present invention relates to a system for manufacturing a concrete element comprising a formwork installation, comprising a formwork support defining a formwork surface and cheeks defining formwork surfaces projecting from the formwork surface and delimiting, with the formwork support, a volume for receiving the concrete, and a tarpaulin for protecting the formwork surface defining two lateral edges along its length and two transverse edges along its width.

[0002] The invention also relates to a formwork method associated with such a system.

[0003] During a formwork operation, the concrete is poured and then held while it sets and its hardening in the volume defined by the formwork support and the cheeks of the formwork installation. The formwork support and the cheeks define the formwork surfaces which determine the final shape and surface condition of the concrete, after hardening and formwork removal.

[0004] During a formwork stripping operation, the formwork surfaces are moved apart to release the concrete. To facilitate formwork stripping, it is important that the formwork surfaces have a surface condition that is as smooth as possible, free from roughness so as not to alter the integrity of the concrete.

[0005] To ensure that the formwork surfaces have the smoothest possible surface conditions, it is known from WO2016059193A1 to provide protective sheets on the formwork surface.

[0006] These protective sheets make it possible to obtain concrete elements with a quality surface finish, while avoiding the use of harmful and polluting oils or formwork release agents. These protective sheets can be used to create walls, floors or ceilings in vertical or horizontal formwork installations. When manufacturing large concrete elements, several sheets must be arranged to cover the entire formwork surface corresponding to the dimensions of these concrete elements. To do this, the sheets are fixed using an adhesive underlay on the formwork surface and the neighboring sheets are connected together by strips of adhesive tape.

[0007] This implementation induces two major disadvantages which are that the hardened concrete elements have lines on their surface opposite the joining strips of neighboring sheets and that the sheets must be fixed to the formwork surface by means of an adhesive undercoat over their entire surface, which then requires removing the adhesive from the formwork surface and which, in the long term, impairs the quality of the formwork surface.

[0008] The invention therefore aims to remedy these two drawbacks by providing a new system for the manufacture of a concrete element capable of ensuring a smooth surface condition of all the surfaces of the concrete elements manufactured while avoiding having adhesive or chemical products on the formwork surface.

[0009] To this end, the invention relates to a system for manufacturing a concrete element of the aforementioned type, characterized in that the system comprises a fixing device configured to fix the tarpaulin to the formwork support, at a first transverse edge of the tarpaulin and a tensioning device configured to exert on the tarpaulin, at a second transverse edge opposite the first transverse edge, a tensioning force and a pressing force of the tarpaulin onto the formwork surface of the formwork support.

[0010] Thus, the fixing system coupled with the tensioning system makes it possible to stretch and press the tarpaulin onto the formwork surface without modifying this formwork surface.

[0011] According to other advantageous aspects of the invention, the system for manufacturing a concrete element comprises one or more of the following characteristics, taken individually or in all technically possible combinations:

[0012] - The fixing device comprises a fixing bar, bearing against the first transverse edge of the tarpaulin and at least one pressure member, preferably several pressure members distributed along the length of the fixing bar, configured to pinch the first transverse edge of the tarpaulin against the formwork surface.

[0013] - Each pressurizing member comprises a tab secured to the bar of fixing and a screw mounted on the leg and resting against a surface of the formwork support opposite the formwork surface.

[0014] - The fixing bar extends across the entire width of the tarpaulin.

[0015] - The tensioning device comprises a ring fixed, preferably welded, on the second transverse edge of the tarpaulin; a tensioning tool comprising a chute intended to receive the bead of the tarpaulin, and a tension bar secured to the chute; at least one opening, preferably several openings, provided in the tension bar; at least one traction member, preferably several traction members, intended to be fixed to a fixed support.

[0016] - The traction member is engaged in the opening and exerts on it a force of traction.

[0017] - The traction member comprises a strap, equipped with an engaged terminal hook in the tension bar opening, and a tensioner.

[0018] - The tarpaulin is coated, on at least part of a surface intended to be supported against the formwork surface, an adhesive layer for bonding with the surface of formwork.

[0019] - The tarpaulin is made of reinforced PVC.

[0020] - The tarpaulin has a thickness of between 1 and 2 millimeters, preferably equal to 1.7 millimeters.

[0021] - The tarpaulin covers in one piece at least 75% of the area of ​​the formwork surface of the formwork support.

[0022] The invention also relates to a method of formwork of a concrete element by means of a system for the manufacture of a concrete element as described above, characterized in that it comprises at least the following steps: a. fix the tarpaulin to the formwork installation using the fixing device; b. stretch and press the tarpaulin onto the formwork surface using the tensioning device; c. pour the concrete into the receiving volume, in contact with the tarpaulin.

[0023] The invention will appear more clearly on reading the description which follows, given solely by way of non-limiting example, and made with reference to the drawings in which:

[0024] [Fig.l] [Fig.l] is a partial schematic representation in longitudinal section of a system for the manufacture of a concrete element according to the invention;

[0025] [Fig.2] [Fig.2] is a perspective view of a fixing device illustrated in [Fig.l];

[0026] [Fig.3] [Fig.3] is a partial schematic representation in longitudinal section of the system for the manufacture of a concrete element according to the invention, taken in a different area from that of [Fig.l];

[0027] [Fig.4] [Fig.4] is a perspective view of a tensioning device illustrated in [Fig.3] ; and

[0028] [Fig.5] [Fig.5] is a top view of the system for manufacturing a concrete element shown in Figures 1 to 4.

[0029] [Fig.l] is a schematic representation of a section in a plane PI of a first end IA of a system 1 for the manufacture of a concrete element, this system being visible in top view in [Fig.5]. [Fig.3] is a schematic representation of a section in the plane PI of a second end IB of the same system 1, the second end IB being opposite the first end IA.

[0030] The system 1 for the manufacture of a concrete element makes it possible to successively carry out a formwork operation during which the concrete is poured into a receiving volume V, then maintained during its setting and hardening in this volume V, and a formwork removal operation during which the formed concrete element is released from the system.

[0031] The system for manufacturing a concrete element comprises a formwork installation 2, a tarpaulin 4 and, at its first end 1A, a device 6 for fixing the tarpaulin 4 to the formwork installation 2 and at its second end 1B a device 8 for tensioning the tarpaulin 4 to the formwork installation 2.

[0032] The formwork installation 2 comprises a formwork support 20. The formwork support 20 defines a formwork surface 22. In the example illustrated, the formwork support 20 corresponds to a formwork table which makes it possible to horizontally manufacture a concrete element. The formwork surface 22 is the upper surface of the formwork table. The formwork surface 22 has a width equal to 4 meters and a length equal to 12.5 meters.

[0033] The dimensions of the formwork surface are not limiting. They can be different. They are generally between 2.5 and 4.5 meters for the width and between 6 and 16 meters for the length.

[0034] The formwork surface 22 is covered with a tarpaulin 4. The tarpaulin 4 is a protective tarpaulin for the formwork surface 22. In the formwork method, the tarpaulin 4 receives on an upper surface 4A the concrete necessary for the manufacture of a concrete element.

[0035] The tarpaulin 4 is of essentially flat rectangular shape and defines two transverse edges 42A and 42B perpendicular to the plane PI and two longitudinal edges 44A and 44B parallel to the plane PL. Advantageously, the tarpaulin 4 has a width of 4 meters and a length of 12.5 meters, that is to say that the tarpaulin 4 covers in a single piece the entirety, i.e. 100%, of the formwork surface 22.

[0036] The tarpaulin 4 is preferably made of reinforced PVC. In other words, the tarpaulin 4 comprises two layers of polyvinyl chloride (PVC) reinforced by one or two intermediate meshes, preferably made of polyester. The tarpaulin 4 has a thickness of between 1 millimeter and 2 millimeters. Preferably, the thickness of the tarpaulin 4 is equal to 1.7 millimeters.

[0037] The tarpaulin 4 comprises a first rod 62 fixed on the first transverse edge 42A of the tarpaulin 4 and a second rod 82 fixed on the second transverse edge 42B of the tarpaulin 4. The rods 62, 82 are cylindrical in shape. The rods 62, 82 extend over the entire length of the transverse edges 42A and 42B. Preferably the rods 62, 82 are welded to the transverse edges 42A and 42B of the tarpaulin 4.

[0038] The formwork installation 2 also comprises cheeks 24, visible in [Fig.5], projecting from the formwork surface 22 covered with the tarpaulin 4.

[0039] The cheeks 24 and the formwork surface 22 covered with the tarpaulin 4 define an interior volume V for receiving the concrete. In the example illustrated, two transverse cheeks 241 perpendicular to the plane PI and two longitudinal cheeks 242 parallel to the plane PI define a parallelepiped interior volume V in which the concrete is received. concrete. The surfaces 241A of the cheeks 241 located opposite the interior volume V define formwork surfaces. Similarly, the surfaces of the cheeks 242 located opposite the interior volume V define formwork surfaces.

[0040] Advantageously, the tarpaulin 4 positioned on the formwork surface 22 can be used for several successive formwork and formwork stripping operations. To do this, it is then necessary that the tarpaulin 4 does not move above the formwork surface 22 during the formwork and formwork stripping operations. The tarpaulin 4 must be pressed tautly onto the formwork surface 22 to remain in place during the formwork and formwork stripping operations.

[0041] In addition, the cheeks 24 are, for example, held in position on the formwork support 20 by magnetization. This holding by magnetization requires that the tarpaulin 4 be pressed against the formwork surface 22 because a film of air between the tarpaulin 4 and the formwork surface 22 could hinder, or even prevent, the magnetization of the cheeks 24 on the formwork surface 22.

[0042] To ensure the correct positioning of the tarpaulin 4 on the formwork surface 22, the system 1 for manufacturing a concrete element comprises the fixing device 6 which makes it possible to fix the tarpaulin 4 on the formwork support 20 at the first transverse edge 42A of the tarpaulin 4 and the tensioning device 8 which makes it possible to exert on the tarpaulin 4, at the second transverse edge 42B, a tensioning and pressing force of the tarpaulin 4 on the formwork surface 22 of the formwork support 20.

[0043] The fixing device 6 shown in Figures 1 and 2 comprises a fixing bar 64 and several pressure members 66 which cooperate to pinch the first transverse edge 42A of the tarpaulin 4 against the formwork surface 22.

[0044] The fixing bar 64 bears against the upper surface 4A, along the first transverse edge 42A of the tarpaulin 4. The fixing bar 64 is parallelepipedal in shape, extends over the entire length of the transverse edge 42A of the tarpaulin 4, in other words over the entire width of the tarpaulin 4, has a thickness e64 of between 5 millimeters and 15 millimeters and a width 164 of between 20 millimeters and 50 millimeters.

[0045] Each pressurizing member 66 comprises a tab 68. The tab 68 is a single-piece, U-shaped piece and defines two arms 681 and 682 facing each other. A surface 681A of the first arm 681 of the tab 68 bears on an upper surface 64A of the fixing bar 64.

[0046] Preferably, the tab 68 is integral with the fixing bar 64, for example the tab 68 is welded to the fixing bar 64 at the surfaces 681A of the tab 68 and 64A of the fixing bar 64.

[0047] The second arm 682 carries a threaded opening 682A configured to receive a screw 69. For example, as seen in [Fig.2], the threaded opening 682A may be formed by a nut 682B welded onto the second arm 682.

[0048] The screw 69 bears against a lower surface 23 of the formwork support 20, the lower surface 23 being opposite the formwork surface 22. Tightening the screw 69 against the lower surface 23 makes it possible to pinch the tarpaulin 4 against the formwork surface 22 at its first transverse edge 42A.

[0049] Advantageously, the fixing device 6 comprises several pressurizing members 66 distributed along the length of the fixing bar 64 as illustrated in [Fig.2], for example, the fixing device 6 comprises 8 pressurizing members 66. The number of pressurizing members 66 is to be adapted by the operator according to the type of formwork support 20.

[0050] The tensioning device 8 is shown in Figures 3 and 4. The tensioning device 8 comprises the rod 82 fixed on the second transverse edge 42B of the tarpaulin 4, a tensioning tool 84 and several traction members 88.

[0051] The tensioning tool 84 comprises a chute 841 configured to receive the rod 82 of the tarpaulin 4. The cooperation between the rod 82 and the chute 841 ensures that the tensioning tool 84 is secured to the tarpaulin 4. The chute 841 extends over the entire length of the rod 82.

[0052] The chute 841 has a shape complementary to that of the rod 82 which is therefore received and immobilized in the chute without the possibility of being extracted therefrom in a direction parallel to the plane PI or to the longitudinal edges 44A, 44B of the tarpaulin 4.

[0053] The chute 841 is formed on a free edge of a metal plate 842. The metal plate 842 is for example made of aluminum or steel. The free edge opposite the chute 841 of the metal plate 842 is secured to a tension bar 843.

[0054] In the example illustrated, the metal plate 842 is fixed to the tension bar 843 by means of screws 844. Any other means making it possible to secure the metal plate 842 to the tension bar 843 can be implemented without departing from the scope of the invention.

[0055] The tension bar 843 is parallelepipedal in shape and for example made of steel. The tension bar 843 extends for example over a length greater than 90% of the length of the chute 841.

[0056] Openings 86 are provided in the tension bar 843. The openings 86 are distributed evenly along the length of the tension bar 843.

[0057] Each opening 86 is configured to receive a first end of a traction member 88. A second end, opposite the first end, of the traction member 88 is fixed on a fixed support, thus the traction member 88 can exert a traction force on the corresponding opening 86.

[0058] In a variant not shown, only a portion of the openings 86 receives a traction member 88.

[0059] In the example illustrated, each traction member 88 comprises a strap 881 equipped with an end hook 882 and a tensioner 883.

[0060] In variants not shown, each traction member 88 comprises a cable or a rope equipped with a terminal hook 882 and a tensioner 883.

[0061] The terminal hook 882 is engaged in the corresponding opening 86.

[0062] The strap 881 is fixed, by an end opposite the terminal hook 882, to a fixed support, for example a foot 20A of the formwork support 20. In a variant not shown, the strap 881 is fixed to a relief projecting from the lower surface 23 of the formwork support 20.

[0063] The tensioner 883 puts under tension the strap 881 on which it is mounted. When the strap 881 is put under tension by the tensioner 883, it exerts, via the terminal hook 882 mounted at its end, a tensile force T on the tension bar 843. The tensile force T is transmitted by the chute 841 to the rod 82 of the tarpaulin 4. The tarpaulin 4, fixed at its transverse edge 42A and thus put under tension at its transverse edge 42B, is stretched on the formwork surface 22.

[0064] The tensioner 883 is for example a ratchet or a worm screw device. Any other means for tensioning the strap 881 can be implemented without departing from the scope of the invention.

[0065] In a variant not shown, the tensile force T on the tension bar 843 is produced by a helical device, such as a tie rod in the form of a threaded rod associated with a nut.

[0066] Advantageously, the use of the chute 841 and the multiple openings 86 distributed over the entire length of the tension bar 843 makes it possible to distribute the tensile force T over the entire width of the tarpaulin 4 and to have a tarpaulin 4 stretched uniformly over its entire width. This makes it possible in particular to have a high flatness of the tarpaulin 4 on the formwork surface 22 and to prevent the appearance of roughness locally on the tarpaulin 4 when it is stretched on the formwork surface 22, which could alter the surface condition of the concrete element formed in contact with the tarpaulin 4.

[0067] The tarpaulin 4 is manufactured in such a way that when it is fixed to the formwork support 20 by means of the fixing device 6 and put under tension by the tensioning device 8, it has a deformation by elongation of less than 1%.

[0068] Advantageously, the tarpaulin 4 is also coated, on at least part of its lower surface 4B, intended to bear against the formwork surface 22 and opposite its upper surface 4A, with an adhesive layer for securing it to the formwork surface 22. Preferably, the adhesive layer, not shown, takes the form of a strip which extends over the entire length of the tarpaulin 4, i.e. parallel to the longitudinal edges 44A, 44B of the tarpaulin 4 and which has a width between 1 centimeter and 5 centimeters, preferably equal to 5 centimeters.

[0069] In variants not shown, magnetic rulers or cheeks are placed along the lateral edges 44A, 44B to ensure good support against the formwork surface 22 of the lateral edges 44A, 44B, in particular during the formwork removal step.

[0070] Advantageously, the tarpaulin 4 is coated, on at least part of its upper surface 4A, with a coating layer facilitating the removal of the concrete formwork.

[0071] Advantageously, the tensioning of the tarpaulin 4 is carried out, within the system 1 for the manufacture of a concrete element, by the cooperation of the fixing device 6 and the tensioning device 8.

[0072] The tarpaulin 4 as described has an elasticity which makes it possible to ensure better sealing, thus avoiding a loss of laitance at the contact between the tarpaulin 4 and the cheeks 24 which delimit the edges of the concrete element to be manufactured and which moderates the roughness of the formwork surface 22, these two advantages thus making it possible to have a better quality of facing of the manufactured concrete elements.

[0073] Advantageously, the fixing device 6 and the tensioning device 8 adapt to all types of formwork support 20 generally used in the field of concrete element formwork.

[0074] The system 1 for the manufacture of a concrete element described above makes it possible to carry out a formwork process which will now be described.

[0075] The method of formwork of a concrete element comprises a first step which is to fix the tarpaulin 4 on the formwork installation 2. The tarpaulin 4 is unfolded on the formwork surface 22.

[0076] The tarpaulin 4 is fixed to the formwork installation 2 by means of the fixing device 6. Several pressurizing members 66 are arranged along the width of the tarpaulin 4 at its transverse edge 42A. The screw 69 of each pressurizing member 66 is tightened so that the tarpaulin 4 is fixed to the formwork installation 2.

[0077] The tarpaulin 4 is stretched and pressed against the formwork surface 22 by means of the tensioning device 8. The rod 82 arranged at the transverse edge 42B of the tarpaulin 4 is introduced into the chute 841 of the tensioning tool 84. Each opening 86 of the tensioning bar 843 receives an end hook 882 of the traction member 88. The straps 881 equipped with the end hooks 882 are fixed to a fixed support, for example the foot 20A of the formwork support 20. Each tensioner 883 of each strap 881 is adjusted so as to tension the strap 881 on which it is mounted. At the end of these fixing and pressing steps, the tarpaulin 4 is correctly positioned and stretched against the formwork surface 22.

[0078] In the case where the tarpaulin 4 comprises an adhesive securing layer on its lower surface 4B intended to rest on the formwork surface 22, the protective film of the adhesive layer is removed once the tarpaulin 4 is stretched over the formwork surface 22 and an operator applies sufficient pressure to the upper surface 4A of the tarpaulin 4 opposite the adhesive layer to correctly rest the adhesive layer on the formwork surface 22.

[0079] In a variant not shown, the adhesive layer is placed directly on the formwork surface 22. Once the tarpaulin 4 is stretched over the formwork surface 22, the protective film of the adhesive layer is removed and pressure is exerted by an operator on the upper surface 4A of the tarpaulin 4 opposite the adhesive layer to correctly press the tarpaulin 4 against the adhesive layer placed on the formwork surface 22.

[0080] The cheeks 241, 242 are placed on the upper surface 4A of the tarpaulin 4 to delimit the volume V for receiving the concrete allowing for example the manufacture of walls, floors or ceilings.

[0081] The concrete is then poured onto the upper surface 4A of the tarpaulin 4 in the receiving volume delimited by the cheeks 241, 242. The concrete is held in position while it hardens. This is the formwork cycle.

[0082] Once the concrete has hardened and consolidated, a formwork stripping process is carried out. For example, the manufactured concrete element is lifted from the formwork support 20 or the upper part of the formwork support comprising the formwork surface 22 is turned over and the concrete element is stripped under the action of gravity.

[0083] During this formwork stripping process, the tarpaulin 4 remains in position on the formwork surface 22. Once the manufactured concrete element has been stripped, the tarpaulin 4 is cleaned and can then be reused. In standard use, the tarpaulin 4 can be used for at least 50 formwork cycles.

[0084] The invention is susceptible to modifications, as envisaged in the variants mentioned below.

[0085] In a variant of the invention not shown, the formwork support is a formwork which makes it possible to manufacture, vertically, a concrete element.

[0086] In a variant of the invention not shown, the tarpaulin 4 covers in a single piece at least 75% of the area of ​​the formwork surface 22, without covering the whole of it.

[0087] In a variant of the invention not shown, the first transverse edge 42A does not include a bead.

[0088] In a variant of the invention not shown, the rod 62 and / or the rod 82 extend over only part of the length of the transverse edge 42A and / or 42B, for example 75% in order to leave at least one end of the transverse edge 42A and / or 42B free.

[0089] In variants of the invention not shown, the number and arrangement of the cheeks is different and allows the manufacture of concrete elements of various sizes and shapes. In particular, a formwork support 20 can receive a number of foils allowing the simultaneous delimitation of several concrete reception volumes to manufacture, for example, several walls simultaneously.

[0090] In a variant of the invention not shown, the screw 69 bears against the lower surface 20C of the foot 20B of the formwork support 20.

[0091] In a variant of the invention not shown, the fixing device 6 comprises only one pressurizing member 66.

[0092] In a variant of the invention not shown, the chute 841 extends over only part of the length of the rod 82, for example at least 90%.

[0093] In a variant of the invention not shown, the chute 841, the metal plate 842 and the tension bar 843 are in one piece. In another variant, the parts 842 and 843 are welded together.

[0094] In a variant of the invention not shown, the tension bar 843 extends over the entire length of the chute 841.

[0095] According to a variant of the invention not shown, the cheeks 24 define several concrete receiving volumes on the upper surface 4A of the tarpaulin 4.

[0096] According to a variant of the invention not shown, the rod 82 is in several parts. Each part of the rod 82 is tensioned by means of a respective tensioning device 8. Cutting the rod 82 into several parts makes it possible to adapt to the typology of the formwork support 20. Indeed, certain formwork supports 20 have appendages at their end opposite the second transverse edge 42B of the tarpaulin 4. Cutting the rod 82 then makes it possible to arrange the parts of the rod 82 between the appendages.

[0097] According to a variant of the invention not shown, the fixing device 6 opposite the first transverse edge 42A of the tarpaulin 4 consists of a tensioning device, for example identical or according to the same principles as the tensioning devices 8 described above.

[0098] The embodiment and the variants mentioned above can be combined with each other.

Claims

Claims

1. System (1) for manufacturing a concrete element comprising - a formwork installation (2) comprising • a formwork support (20) defining a formwork surface (22), • cheeks (24) defining formwork surfaces (241A, 242A) projecting from the formwork surface (22) and delimiting, with the formwork support, a volume (V) for receiving the concrete; - a tarpaulin (4) for protecting the formwork surface (22) defining two longitudinal edges (44A, 44B) along its length and two transverse edges (42A, 42B) along its width; characterized in that the system (1) comprises: - a fixing device (6) configured to fix the tarpaulin (4) on the formwork support (20), at a first transverse edge (42A) of the tarpaulin (4);and - a tensioning device (8) configured to exert on the tarpaulin (4), at a second transverse edge (42B) opposite the first transverse edge (42A), a tensioning and pressing force on the tarpaulin (4) on the formwork surface (22) of the formwork support (20).;

2. System according to claim 1, characterized in that the fixing device (6) comprises a fixing bar (64), bearing against the first transverse edge (42A) of the tarpaulin (4) and at least one pressurizing member (66), preferably several pressurizing members (66) distributed over the length of the fixing bar (64), configured to pinch the first transverse edge (42A) of the tarpaulin (4) against the formwork surface (22).

3. System according to claim 2, characterized in that each organ pressurizing device (66) comprises a tab (68) secured to the fixing bar (64) and a screw (69) mounted on the tab (68) and bearing against a surface (23) of the formwork support (20) opposite the formwork surface (22).

4. System according to one of claims 2 or 3, characterized in that the fixing bar (64) extends over the entire width of the tarpaulin (4).

5. System according to one of the preceding claims, characterized in that the tensioning device (8) comprises: - a rod (82) fixed, preferably welded, on the second transverse edge (42B) of the tarpaulin (4); - a tensioning tool (84) comprising: • a chute (841) intended to receive the rod (82) of the tarpaulin (4), • a tensioning bar (843) integral with the chute (841), - at least one opening (86), preferably several openings (86), formed in the tensioning bar (843); - at least one traction member (88), preferably several traction members (88), intended to be fixed on a fixed support (20A); and in that the traction member (88) is engaged in the opening (86) and exerts a tensile force (T) thereon.

6. System according to claim 5 characterized in that the traction member (88) comprises a strap (881), equipped with a terminal hook (882) engaged in the opening (86) of the tension bar (843), and a tensioner (883).

7. System according to one of the preceding claims, characterized in that the tarpaulin (4) is coated, on at least part of a surface (4B) intended to bear against the formwork surface (22), with an adhesive layer for securing it to the formwork surface (22).

8. System according to one of the preceding claims, characterized in that the tarpaulin (4) is made of reinforced PVC.

9. System according to one of the preceding claims, characterized in that the tarpaulin (4) has a thickness of between 1 and 2 millimeters, preferably equal to 1.7 millimeters.

10. System according to one of the preceding claims, characterized in that the tarpaulin (4) covers in one piece at least 75% of the formwork surface (22) of the formwork support (20).

11. Method of formwork of a concrete element by means of a system for manufacturing a concrete element (1) according to one of claims 1 to 10, characterized in that it comprises at least the following steps: a. fixing the tarpaulin (4) to the formwork installation (2) by means of the fixing device (6); b. stretch and press the tarpaulin (4) onto the formwork surface (22) using the tensioning device (8); c. pour the concrete into the receiving volume (V), in contact with the tarpaulin (4).

Citation Information

Patent Citations

  • Sheet for protecting a formwork surface, formwork installation, method of production and method of use

    WO2016059193A1

  • L-shaped wall constructional column forming die

    CN210152258U

  • Sheet tensioning mechanism of concrete retaining mold

    JP1991099804A

  • JP1992067010U

  • Formwork assembly method

    JP1992176959A