Equipment control device, equipment control method and program
The equipment control device autonomously manages gate operations in irrigation canals using water level prediction and historical patterns to ensure continuity during disasters, addressing the challenge of personnel and power outages.
Patent Information
- Application Number
- JP2023051455
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-28
- Publication Date
- 2024-10-10
- Estimated Expiration
- 2043-03-28
AI Technical Summary
Existing systems face challenges in maintaining the continuity of operation of intake gates in irrigation canals and tributaries during disasters due to the lack of skilled personnel and potential power outages, leading to disruptions in water level measurement and gate control.
An equipment control device that utilizes a water level acquisition unit, prediction unit, pattern selection unit, gate control determination unit, and control unit to autonomously manage gate operations based on past water level patterns, ensuring continuity even in the absence of human intervention or power supply disruptions.
The system effectively maintains gate operation continuity by predicting water level transitions and controlling gates based on historical patterns, reducing the impact of disasters on irrigation canal management.
Smart Images

Figure 2024140355000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a technique for controlling equipment, and in particular to a technique for controlling a device for controlling a gate installed in a water flow. [Background technology]
[0002] In recent years, with the progress of global warming, water disasters such as droughts and floods are on the rise. In order to predict the occurrence of flood damage, it is necessary to measure water levels. Water level observation stations are installed to measure water levels and predict the occurrence of water disasters before they occur. However, building a water level observation station building requires a certain amount of land and high construction costs. For this reason, it is difficult to install water level observation stations in irrigation canals or tributaries, and there has been an issue of them being concentrated only on the banks of the main river.
[0003] On the other hand, flooding of residential areas due to the overflow of irrigation canals and tributaries, and the impact of droughts on agricultural crops have long been raised as issues in the management of tributaries and irrigation canals. However, the installation of water level observation stations in irrigation canals and tributaries has not progressed as expected due to the need for land and high construction costs.
[0004] Examples of technologies for dealing with flooding of irrigation channels and tributaries are disclosed in Patent Documents 1 and 2.
[0005] Patent Document 1 describes an irrigation canal monitoring system that detects dangerous irrigation canals based on transition data and flow rate data, and detects dangerous irrigation canals from captured image data around gates. The system described in Patent Document 1 detects areas at risk of flooding based on the number or importance of detected dangerous irrigation canals, and detects flooded areas and their areas from captured wide-area image data.
[0006] Patent Document 2 describes an irrigation canal monitoring device that includes a TM master station that acquires water information for multiple irrigation canals, and a server that accumulates the water information and generates a control signal to control a culvert associated with the irrigation canal. The server calculates specific water information for a specific location on the irrigation canal based on the connection relationships and an estimated schematic diagram of the irrigation canal. The server generates a control signal for a culvert associated with the specific location based on the specific water information. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] JP 2016-108827 A [Patent Document 2] JP 2017-218856 A Summary of the Invention [Problem to be solved by the invention]
[0008] In general, in order to properly open and close the intake gates using the water level measurements from a water level observation station installed near the intake gates of rivers, etc., a manager who has knowledge and experience in flow rate adjustment by opening and closing the intake gates is required. Similarly, when water level observation stations are installed near the intake gates of irrigation channels and tributaries and the intake gates are opened and closed using the water level measurements from the water level observation stations, a manager who has knowledge and experience in flow rate adjustment by opening and closing the intake gates of tributaries, etc. is required. If the number of water level observation stations for obtaining water level measurements to determine the opening and closing of the intake gates of irrigation channels and tributaries is increased, it is necessary to increase the number of managers who use the water level measurements obtained from the water level observation stations to open and close the intake gates (i.e., the operation of the intake gates). Especially in the event of a disaster, it may be necessary to open and close many intake gates in a short period of time. If there is a shortage of managers, the operation of the intake gates may be hindered. In addition, during a disaster, the power supply from the power grid operated by the power company or the like to the water level observation station may be stopped for some reason caused by the disaster. If the power supply to the water level observation station is stopped, it becomes impossible to obtain water level measurements.
[0009] The technology of Patent Document 1 is a technology for detecting flood-prone areas, flooded areas, and their areas. The technology of Patent Document 1 cannot suppress the decline in the continuity of operation of the intake gates of tributaries, etc., during a disaster. The technology of Patent Document 2 is a technology for controlling the sluice gates of irrigation channels using water information from multiple irrigation channels. The technology of Patent Document 2 can suppress the decline in the continuity of operation of the intake gates of tributaries, etc., during a disaster due to a shortage of personnel. However, the technology of Patent Document 2 cannot control the opening and closing of the sluice gates when water information cannot be obtained, for example, due to a stop in power supply to the water level observation station. In other words, the technology of Patent Document 2 cannot suppress the decline in the continuity of operation of the intake gates of tributaries, etc., during a disaster due to a stop in power supply from the power grid to the water level observation station. In other words, the technology of Patent Document 2 cannot further suppress the decline in the continuity of operation of the intake gates of tributaries, etc., during a disaster.
[0010] One object of the present disclosure is to provide an equipment control device, etc. that can further suppress a decrease in the continuity of operation of intake gates of tributaries, etc. during a disaster. [Means for solving the problem]
[0011] An equipment control device according to one embodiment of the present disclosure comprises a water level acquisition means for acquiring a trend in water level measurement values, which are values obtained by measuring the water level of a water flow; a water level prediction means for predicting a trend in water level measurement values until a predetermined time later from an actual trend, which is the trend in the acquired water level measurement values; a pattern selection means for selecting, from water level change patterns, which are trends in water level measurement values acquired in the past, a water level change pattern that is most similar to a combination of the actual trend and a predicted trend, which is the predicted trend in the water level measurement values; a gate control determination means for determining control of a gate installed in the water flow using a record of control of the gate that was performed when the selected water level change pattern was acquired; and a gate control means for controlling the gate in accordance with the determined control.
[0012] An equipment control method according to one aspect of the present disclosure acquires a trend in water level measurement values, which are values obtained by measuring the water level of a water flow, predicts a trend in the water level measurement values until a predetermined time later from the actual trend, which is the trend in the acquired water level measurement values, selects a water level change pattern, which is the trend in the water level measurement values acquired in the past, that is most similar to a combination of the actual trend and a predicted trend, which is the predicted trend in the water level measurement values, determines control of a gate installed in the water flow using a record of control of the gate that was performed when the selected water level change pattern was acquired, and controls the gate in accordance with the determined control.
[0013] A program according to one aspect of the present disclosure causes a computer to execute a water level acquisition process for acquiring a trend in water level measurement values, which are values obtained by measuring the water level of a water stream; a water level prediction process for predicting a trend in water level measurement values until a predetermined time later from an actual trend, which is the trend in the acquired water level measurement values; a pattern selection process for selecting a water level change pattern, which is a water level change pattern acquired in the past, that is most similar to a combination of the actual trend and a predicted trend, which is the predicted trend in the water level measurement values; a gate control determination process for determining control of a gate installed in the water stream using a record of control of the gate that was performed when the selected water level change pattern was acquired; and a gate control process for controlling the gate in accordance with the determined control. Effect of the Invention
[0014] The present disclosure has the effect of further suppressing a decline in the continuity of operation of intake gates of tributaries, etc. during disasters. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a diagram illustrating an example of the configuration of a facility control system according to a first embodiment of the present disclosure. [Diagram 2] FIG. 2 is a block diagram illustrating an example of a detailed configuration of the equipment control system according to the first embodiment of the present disclosure. [Figure 3A]FIG. 3A is a diagram illustrating an example of the configuration of a power supply processing unit according to the first embodiment of the present disclosure. [Figure 3B] FIG. 3B is a diagram illustrating an example of the configuration of the power supply processing unit according to the first embodiment of the present disclosure. [Figure 4A] FIG. 4A is a diagram illustrating an example of the configuration of a communication processing unit according to the first embodiment of the present disclosure. [Figure 4B] FIG. 4B is a diagram illustrating an example of the configuration of the communication processing unit according to the first embodiment of the present disclosure. [Figure 5A] FIG. 5A is a diagram illustrating an example of the configuration of a calculation processing unit according to the first embodiment of the present disclosure. [Figure 5B] FIG. 5B is a diagram illustrating an example of the configuration of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 6A] FIG. 6A is a conceptual diagram of a water level change pattern storage table and a gate control pattern storage table. [Figure 6B] FIG. 6B is a conceptual diagram of a water level change pattern storage table and a gate control pattern storage table. [Figure 7] FIG. 7 is a diagram illustrating an example of a water level measurement value record table according to the first embodiment of the present disclosure. [Figure 8A] FIG. 8A is a diagram illustrating an example of an alarm accumulation table according to the first embodiment of the present disclosure. [Figure 8B] FIG. 8B is a diagram illustrating an example of an alarm accumulation table according to the first embodiment of the present disclosure. [Figure 9A] FIG. 9A is a diagram illustrating an initial setting process of parameters according to the first embodiment of the present disclosure. [Figure 9B] FIG. 9B is a diagram illustrating an initial setting process of parameters according to the first embodiment of the present disclosure. [Figure 9C] FIG. 9C is a diagram illustrating an initial setting process of parameters according to the first embodiment of the present disclosure. [Figure 10] FIG. 10 is a diagram illustrating an initialization process of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 11A]FIG. 11A is a diagram illustrating an example of the operation of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 11B] FIG. 11B is a diagram illustrating an example of the operation of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 11C] FIG. 11C is a diagram illustrating an example of the operation of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 11D] FIG. 11D is a diagram illustrating an example of the operation of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 12] FIG. 12 is a diagram illustrating an example of the operation of the arithmetic operation monitoring process of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 13] FIG. 13 is a diagram illustrating an example of the operation of the power supply alarm monitoring process of the arithmetic processing unit 16 according to the first embodiment of the present disclosure. [Figure 14A] FIG. 14A is a diagram illustrating an example of the operation of the gate control operation monitoring process of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 14B] FIG. 14B is a diagram illustrating an example of the operation of the gate control operation monitoring process of the arithmetic processing unit according to the first embodiment of the present disclosure. [Figure 15A] FIG. 15A is a diagram illustrating an example of the operation of the communication processing unit according to the first embodiment of the present disclosure. [Figure 15B] FIG. 15B is a diagram illustrating an example of the operation of the communication processing unit according to the first embodiment of the present disclosure. [Figure 15C] FIG. 15C is a diagram illustrating an example of the operation of the communication processing unit according to the first embodiment of the present disclosure. [Figure 15D] FIG. 15D is a diagram illustrating an example of the operation of the communication processing unit according to the first embodiment of the present disclosure. [Figure 16] FIG. 16 is a diagram illustrating an example of a process for acquiring date and time information of the communication processing unit according to the first embodiment of the present disclosure. [Figure 17] FIG. 17 is a block diagram illustrating an example of the configuration of an equipment control device according to the second embodiment of the present disclosure. [Figure 18] FIG. 18 is a flowchart illustrating an example of the operation of the equipment control device according to the second embodiment of the present disclosure. [Figure 19] FIG. 19 is a flowchart illustrating an example of an alarm transmission operation of the equipment control device according to the second embodiment of the present disclosure. [Figure 20] FIG. 20 is a flowchart illustrating an example of the power supply control operation of the equipment control device according to the second embodiment of the present disclosure. [Figure 21] FIG. 21 is a block diagram illustrating an example of the configuration of an equipment control device according to a third embodiment of the present disclosure. [Figure 22] FIG. 22 is a flowchart illustrating an example of the operation of the equipment control device according to the third embodiment of the present disclosure. [Figure 23] FIG. 23 is a diagram illustrating an example of a hardware configuration of a computer capable of realizing an equipment control device according to an embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings.
[0017] <First embodiment> <Configuration> FIG. 1 is a diagram illustrating an example of the configuration of a facility control system according to a first embodiment of the present disclosure.
[0018] In the example shown in Fig. 1, the facility control system 1 of this embodiment includes three types of power generation devices that supply power (a solar panel 20, an irrigation channel generator 40 (small hydroelectric generator), and a wind power generator 30), a water level gauge 60, a gate opening and closing device 70, a wireless antenna 50, and a machine side panel 10 that performs processing to control the facility. The irrigation channel generator 40 is realized by a so-called small hydroelectric generator.
[0019] Of the three types of power generation devices, the solar panel 20 and the wind power generator 30 are mounted on a pole on which the equipment control system 1 is installed. The solar panel 20 and the wind power generator 30 generate electricity using solar light and wind power, respectively. The irrigation channel generator 40 generates electricity by utilizing the flow of a tributary or irrigation channel (i.e., a tributary) on which the equipment control system 1 is installed as hydraulic power. These power generation devices are operated in parallel. These power generation devices supply power to the machine side panel 10 and the gate opening and closing device 70.
[0020] The water level gauge 60 measures the water level of a tributary or the like, and outputs a water level measurement value that is a value indicating the water level obtained by the measurement.
[0021] The wireless antenna 50 transmits and receives data between a receiving station installed, for example, at a river management station and the equipment control system 1. Specifically, the wireless antenna 50 transmits signals indicating water level measurements, alarm information generated by the on-site panel 10, values calculated by the on-site panel 10, and the state of the on-site panel 10, and receives date and time information and the like from the receiving station.
[0022] FIG. 2 is a block diagram illustrating an example of a detailed configuration of the equipment control system 1 according to the first embodiment of the present disclosure.
[0023] 2, the machine-side panel 10 of the equipment control system 1 includes three processing units (a power supply processing unit 15, an arithmetic processing unit 16, and a communication processing unit 17), two processing units related to water level measurement and gate control (a measurement processing unit 18 and an opening / closing control unit 19), and a storage device 100. The storage device 100 stores a water level change pattern storage table 11, a gate control pattern storage table 12, a water level measurement value recording table 13, and an alarm accumulation table 14. The two control units related to water level measurement and gate control are hereinafter also referred to as two processing units located on the periphery.
[0024] Next, the three processing units will be described in detail.
[0025] The power supply processing unit 15 controls the power supplied from the three types of generators (the solar panel 20, the wind power generator 30, and the irrigation channel generator 40) shown in Fig. 1. Specifically, it receives power supplied from the three generators and controls the distribution of the received power to other processing units.
[0026] The arithmetic processing unit 16 determines gate control by performing big data analysis (e.g., pattern matching) using AI (Artificial Intelligence) technology based on the water level measurement value measured by the water level meter 60. Gate control means setting the gate open / close state (e.g., gate opening indicating the degree of gate opening relative to the fully open state) to a specified state (e.g., a specified opening). The gate opening may be expressed by the ratio of the area of the gate opening to the area of the gate opening in the previous state. Determining gate control means, for example, determining a signal that specifies the gate state and the timing of outputting the signal. In addition, the arithmetic processing unit 16 issues an alarm if a predetermined condition is satisfied in the process of determining gate control. The predetermined condition is, for example, that the water level indicated by the water level measurement value exceeds a predetermined standard. The arithmetic processing unit 16 transmits information on the determined gate control and an alarm issued in the process of calculation to the receiving station via the communication processing unit 17.
[0027] The communication processing unit 17 transmits the gate control information determined by the arithmetic processing unit 16 and the alarm issued by the arithmetic processing unit 16 to the receiving station.
[0028] Next, the two processing units located on the outer periphery will be described in detail. The measurement processing unit 18 acquires water level measurements taken by the water level gauge 60. The opening / closing control unit 19 automatically and mechanically controls the opening and closing of the gate opening / closing device 70 based on instructions from the calculation processing unit 16. In other words, the opening / closing control unit 19 controls the opening and closing of the gate opening / closing device 70 according to instructions from the calculation processing unit 16.
[0029] Here, detailed configurations of power supply processing unit 15, arithmetic processing unit 16, and communication processing unit 17 in FIG. 2 will be described with reference to FIGS. 3A, 3B, 4A, 4B, 5A, and 5B, respectively.
[0030] First, the power supply processing unit 15 will be described with reference to FIGS. 3A and 3B.
[0031] 3A and 3B are diagrams illustrating an example of the configuration of the power supply processing unit 15 according to the first embodiment of the present disclosure.
[0032] The power supply processing unit 15 receives power from three types of generators described later, rectifies the received power using an inverter 206, and then controls the supply of the rectified power to each component of the machine-side panel 10 (for example, the arithmetic processing unit 16, the communication processing unit 17, and other components). The power supply processing unit 15 includes a power generation control unit 151, a solar panel 20, a wind power generator 30, an irrigation channel generator 40, a control switch 205, and an inverter 206. The power supply processing unit 15 performs parallel operation of power generation using three types of natural energy. As described above, the power supply processing unit 15 supplies the power generated by the solar panel 20, the wind power generator 30, and the irrigation channel generator 40 to the equipment control system 1 and stores the power in the DC storage battery 208. In addition, the power supply processing unit 15 can convert the power to single-phase three-wire by the inverter 206 and distribute it, so it may supply power to the gate opening and closing device 70.
[0033] The power generation control unit 151 obtains the voltage and frequency from each of the power generation devices, and suppresses power generation by the system control unit when there is an excess power supply. Specifically, the power supply processing unit 15 operates the braking devices 304 and 403 of the wind power generator 30 and the irrigation channel generator 40 to brake power generation.
[0034] The power generation control unit 151 also monitors the alarms of each device connected to the power generation system described above by the system monitoring unit 151b. The devices connected to the power generation system described above are the solar panel 20, the wind power generator 30, the irrigation channel generator 40, the control switch 205, the inverter 206, the DC storage battery 208, and the like. The alarm refers to an abnormality in each device connected to the power generation system described above, overcharge detection by the overcharge prevention mechanism 207, and exhaustion of power capacity in the DC storage battery 208. The power generation control unit 151 sends the detected alarm information to the alarm accumulation table 14 of the storage device 100 by the alarm output unit 151c, and stores it in the storage device 100. Specifically, the power generation control unit 151 records the detected alarm information in the alarm accumulation table 14. Details of the alarm accumulation table 14 will be described later with reference to FIG. 8A and FIG. 8B. The calculation processing unit 16 immediately transmits the alarm stored in the alarm accumulation table 14 to the receiving station via the communication processing unit 17. In response to an alarm being recorded in the alarm accumulation table 14, the calculation processing unit 16 transmits the newly recorded alarm to the receiving station via the communication processing unit 17. Details of the communication processing unit 17 will be described later with reference to Figures 4A and 4B.
[0035] The power generation control unit 151 has a grid connection protection function 151d. The grid connection protection function constantly monitors the voltage and frequency supplied from the three types of generators (the solar panel 20, the wind power generator 30, and the irrigation channel generator 40) and performs power generation control to suppress overcharging. The power generation control to suppress overcharging is to suppress the amount of power generated by the generator. The method for suppressing the amount of power generated by the generator may be one of various existing methods. Furthermore, when the charge amount of the DC storage battery 208 approaches a threshold value that would cause overcharging, the power generation control unit 151 may perform a process of disconnecting the generator from the power grid by turning off the control switch 205.
[0036] Next, the communication processing unit 17 will be described with reference to FIG. 4A and FIG. 4B.
[0037] 4A and 4B are diagrams illustrating an example of the configuration of the communication processing unit 17 according to the first embodiment of the present disclosure.
[0038] The communication processing unit 17 transmits signals input from the measurement processing unit 18, the switching control unit 19, the power generation control unit 151, and the calculation processing unit 16 as a message to the processing device 502 of the receiving station. The communication processing unit 17 in Figures 4A and 4B includes a communication processing unit (main processing) 171 and a communication processing unit (sub-processing) 172. The communication processing unit (main processing) 171 includes a signal input unit 171a, a signal conversion unit 171b, a transmission message generation unit 171c, a transmission header addition unit 171d, a transmission processing unit 171g, a reception determination unit 171e, and a reception processing unit 171f.
[0039] The signal input unit 171a receives a water level meter signal representing a water level measurement value from the measurement processing unit 18. The signal input unit 171a also receives a signal from the switching control unit 19 to the gate opening / closing device 70 representing the state of the gate opening / closing device. The signal input unit 171a also receives a power generation control signal representing the state of the generator (e.g., power generation amount and operating state) and the state of the DC storage battery (e.g., remaining amount of stored electricity) from the power generation control unit 151. The signal input unit 171a also receives a calculation processing unit signal representing the state of the calculation processing unit (e.g., operating state, gate opening / closing control history, water level judgment, fault alarm, time information, etc.) from the calculation processing unit 16. The signal conversion unit 171b converts external input data and processing monitoring information such as alarms from the measurement processing unit 18, the switching control unit 19, and the power generation control unit 151 into a message format. The transmission message generation unit 171c generates a message based on the message format. The transmission header addition unit 171d adds a transmission header including at least IP header information storing an IP (Internet Protocol) address etc. and TCP (Transmission Control Protocol) header information storing a sequence number etc. to the generated electronic message. The transmission processing unit 171g further adds information necessary for wireless communication to the electronic message to which the transmission header has been added, and transmits the electronic message to which the information necessary for wireless communication has been added to the processing device 502 of the receiving station via the communication line 501.
[0040] Furthermore, the communication processing unit (main processing) 171 receives a message receipt response from the processing device 502 and performs reception determination. The communication processing unit (sub-processing) 172 includes a date and time information acquisition unit 172b and a date and time information management unit 172a. The communication processing unit (sub-processing) 172 acquires date and time information from the processing device 502 of the receiving station.
[0041] Next, the arithmetic processing unit 16 will be described with reference to FIG. 5A and FIG. 5B.
[0042] 5A and 5B are diagrams illustrating an example of the configuration of the arithmetic processing unit 16 according to the first embodiment of the present disclosure.
[0043] The calculation processing unit 16 executes calculations to determine gate control based on the water level measurement values obtained from the measurement processing unit 18, and transmits a signal representing the determined gate control to the opening / closing control unit 19.
[0044] 5A and 5B includes a calculation processing unit (main processing) 161 and a calculation processing unit (sub-processing) 162. The calculation processing unit (main processing) 161 includes a water level measurement value recording processing unit 161a, a water level transition modeling unit 161b, a water level change pattern matching unit 161c, a water level change pattern determination unit 161d, a flood / drought alarm generation unit 161e, a water level alarm recording processing unit 161f, a gate control pattern recognition unit 161g, a gate control pattern matching unit 161h, a gate control signal generation unit 161i, and a gate control signal output unit 161j.
[0045] The water level measurement value recording processing unit 161 a records the water level measurement value input from the measurement processing unit 18 in the water level measurement value recording table 13 .
[0046] The water level transition modeling unit 161b expands the water level measurement values during the modeling water level accumulation period in a storage area (for example, memory), and performs modeling of the water level change pattern based on the water level measurement values during the modeling water level accumulation period. The modeling water level accumulation period is, for example, a period from a predetermined time before the time when the latest water level measurement value is obtained to the time when the latest water level measurement value is obtained. In the description of this embodiment, modeling of the water level change pattern means predicting the transition of the water level measurement value from the time when the latest water level measurement value is obtained until a predetermined time later (for example, 30 minutes later). The water level transition modeling unit 161b predicts the transition of the water level measurement value from the time when the latest water level measurement value is obtained until a predetermined time later, using the transition of the water level measurement value during the modeling water level accumulation period. A method in which the water level transition modeling unit 161b predicts the transition of the water level prediction value will be described later.
[0047] The water level transition modeling unit 161b fits a curve to the transition of the water level measurement value obtained during the modeling water level accumulation period, for example. In other words, the water level transition modeling unit 161b estimates the parameters of a formula expressing the water level measurement value using variables and parameters indicating the elapsed time from an appropriately determined timing, using the transition of the water level measurement value obtained during the modeling water level accumulation period. The water level transition modeling unit 161b predicts the transition of the water level measurement value from the latest water level measurement value until a predetermined time after it is obtained, using the formula represented by the estimated parameters and the above-mentioned variables (i.e., the obtained formula). In other words, the water level transition modeling unit 161b calculates a predicted value of the water level from the latest water level measurement value until a predetermined time after it is obtained, using the obtained formula.
[0048] The water level transition modeling unit 161b predicts the water level after a specified time has elapsed, for example, from the transition of the water level measurement value and the transition of the amount of precipitation. In the prediction, the transition of the water level measurement value may be predicted using a water level prediction model previously trained using any machine learning method. The water level transition modeling unit 161b may predict the transition of the water level measurement value using a water level prediction model previously trained using any machine learning method, which predicts the water level at a specified time interval until a specified time has elapsed, for example, from the transition of the water level measurement value and the transition of the amount of precipitation. Specifically, the water level transition modeling unit 161b predicts the water level measurement value for each specified time from the acquisition of the latest water level measurement value to a specified time after the acquisition of the latest water level measurement value using the above-mentioned water level prediction model, from the transition of the water level measurement value during the modeling water level accumulation period and the transition of the amount of precipitation. The water level transition modeling unit 161b regards the transition of the predicted value of the water level for each specified time from the acquisition of the latest water level measurement value to a specified time after the acquisition of the latest water level measurement value as the predicted transition of the water level measurement value.
[0049] The water level transition modeling unit 161b may use other methods to predict the transition of the predicted water level value from when the latest water level measurement value is obtained until a predetermined time later.
[0050] The water level change pattern storage table 11 records water level change patterns when the water level changed and the gate was opened or closed in the past. The water level change patterns stored in the water level change pattern storage table 11 will be explained in detail later. The water level change patterns recorded in the water level change pattern storage table 11 are referred to as recorded water level change patterns.
[0051] The water level change pattern matching unit 161c calls the water level change pattern in the water level change pattern storage table 11 and executes a process of matching the recorded water level change pattern with the water level change pattern generated by the water level transition modeling unit 161b. This matching is, for example, to identify the most similar part between the recorded water level change pattern and the water level change pattern generated by the water level transition modeling unit 161b. Specifically, the water level change pattern matching unit 161c calculates the similarity between the recorded water level change pattern and the generated water level change pattern in the overlapping part while changing the overlapping part between the recorded water level change pattern and the generated water level change pattern. The overlapping part refers to a range in which water level measurement values are obtained in both the recorded water level change pattern and the generated water level change pattern when it is assumed that the timing of any water level measurement value of the recorded water level change pattern and the timing of the last water level measurement value of the generated water level change pattern match. The similarity is, for example, the average of the absolute values of the differences between the water level measurement values of the recorded water level change pattern and the generated water level change pattern in the overlapping part. The similarity may be, for example, the average of the squares of the differences between the water level measurement values of the recorded water level change pattern and the water level measurement values of the generated water level change pattern in the overlapping portion. In these examples, the smaller the similarity value, the more similar the two are. In other words, the smaller the similarity value, the higher the degree of similarity. The similarity may also be other values.
[0052] The water level change pattern determination unit 161d determines whether there is a similar pattern based on the result of the comparison, and selects a key water level change pattern from the similar patterns. Specifically, the water level change pattern determination unit 161d extracts, from the called water level change patterns, a water level change pattern whose degree of similarity with the generated water level change pattern is higher than a predetermined standard as a similar pattern. If the similarity is one of the above-mentioned examples of similarity, the smaller the similarity, the higher the similarity. In this case, the water level change pattern determination unit 161d extracts, as a similar pattern, a called water level change pattern whose similarity is lower than a predetermined threshold. For example, the water level change pattern determination unit 161d selects the similar pattern with the highest degree of similarity as the key water level change pattern.
[0053] The flood / drought alarm generating unit 161e judges whether a flood or drought has occurred based on the water level change pattern, and generates an alarm when a flood or drought has occurred. The water level alarm recording processing unit 161f records the generated alarm in the alarm accumulation table 14.
[0054] The gate control history is recorded in the gate control pattern storage table 12. The gate control history is a record of the opening and closing of the gate when a change in the water level measurement value occurs, which is represented by the water level change pattern recorded in the water level change pattern storage table 11. Specifically, the gate control history includes information on the timing when the gate was opened if the gate was opened, and includes information on the timing when the gate was closed if the gate was closed. The timing included in the gate control history is associated with the timing at which the water level measurement value was obtained in the water level change pattern recorded in the water level change pattern storage table 11. In other words, the gate control history is recorded so that the timing at which the gate was opened and closed can be identified in the transition of the water level measurement value represented by the recorded water level change pattern.
[0055] The gate control pattern collation unit 161h calls up the gate control history in the gate control pattern storage table 12, and collates it with the gate control history using the water level change pattern selected by the water level change pattern determination unit 161d as a key.
[0056] Specifically, the gate control pattern recognition unit 161g calls the key associated with the recorded water level change pattern. In other words, the gate control pattern recognition unit 161g calls the key indicating the water level change pattern from the storage area, and if the key exists there, passes the key to the gate control pattern matching unit 161h. On the other hand, if the key does not exist, the subsequent processes from the gate control pattern matching unit 161h to the gate control signal output unit 161j are skipped.
[0057] Hereinafter, the selected water level change pattern will be referred to as a selected water level change pattern, and the water level change pattern generated by the water level transition modeling unit 161b will be referred to as a generated water level change pattern.
[0058] The gate control pattern collation unit 161h calls up a gate control pattern having the same key from the gate control pattern storage table based on the key associated with the selected water level change pattern.
[0059] Specifically, the gate control pattern matching unit 161h, for example, assumes that a change in the water level measurement value indicated by the selected water level change pattern occurs so that the selected water level change pattern is most similar to the generated water level change pattern, and based on a key previously assigned to the selected water level change pattern, calls up a gate control pattern having the same key from the gate control pattern storage table. Note that, as described above, the gate control history associated with the recorded water level change pattern stored in the water level change pattern storage table is a control history that records the content of the gate control performed when the transition in the water level measurement value indicated by the recorded water level change pattern occurs, and the timing of execution.
[0060] The gate control pattern matching unit 161h, for example, determines the gate control and timing to be performed based on the gate control pattern matching the key as the gate control and timing to be executed. That is, the gate control pattern matching unit 161h determines the control action determined as the gate control to be executed and the execution time, assuming that a change in the water level measurement value indicated by the selected water level change pattern occurs. Note that, if the last gate control performed before the time when the latest water level measurement value was obtained is the same as the first gate control performed after the time when the latest water level measurement value was obtained, the gate control pattern matching unit 161h may exclude the first gate control from the gate control to be executed.
[0061] The arithmetic processing unit (sub-processing) 162 includes a arithmetic processing operation monitoring unit 162a, an operation alarm recording processing unit 162b, a power supply alarm receiving processing unit 162c, a arithmetic processing stop determination unit 162d, a arithmetic processing stop processing unit 162e, a gate control operation monitoring unit 162f, and an operation alarm recording processing unit 162g.
[0062] The calculation processing unit (sub-processing) 162 mainly executes the process of generating various alarms.
[0063] Here, the four tables stored in storage device 100 of FIG. 2 will be described with reference to FIGS. 6A, 6B, 7, 8A and 8B.
[0064] 6A and 6B are conceptual diagrams of the water level change pattern storage table 11 and the gate control pattern storage table 12. The water level change pattern storage table 11 and the gate control pattern storage table 12 are used by the calculation processing unit for matching and determining water level change patterns, and for recognizing and matching gate control patterns.
[0065] In the water level change pattern storage table 11, characteristic water level changes are extracted in specified time units from previously collected past water level change data (i.e., data showing the transition of water level measurement values) and patterned (e.g., Samples 1 to 4) and water level change patterns are recorded as data elements. The water level change patterns stored in the water level change pattern storage table 11 may be associated with a pattern identifier (e.g., Sample 1, etc.). The pattern identifier is an identifier that specifies the water level change pattern.
[0066] The gate control pattern storage table 12 records, as data elements, the history of past gate controls (i.e., the above-mentioned gate control history) that were performed when a water level change occurred that was represented by the water level change pattern stored in the water level change pattern storage table 11. The gate control history is associated with the water level change pattern, and is stored in the gate control pattern storage table 12 using a pattern identifier (e.g., Sample1) as a key. In other words, the gate control history stored in the gate control pattern storage table 12 is associated with the pattern identifier of the water level change pattern when the gate represented by the gate control history was controlled. Furthermore, the timing of the gate control that is recorded in the gate control history stored in the gate control pattern storage table 12 is associated with the timing in the water level change pattern when the gate control represented by the gate control history was controlled. The gate control history includes, for example, information representing the control of the gate that is recorded in the gate control history, and information on the elapsed time from the start time of the water level change pattern when the gate represented by the gate control history was controlled, at the timing when the gate control was performed. The gate control may be, for example, a control to open the gate or a control to close the gate. The gate control history may include one or more combinations of information representing the gate control that was performed and timing information when the gate control was performed.
[0067] 2 compares the current water level change pattern with the contents of the water level change pattern storage table 11, and searches for a water level change pattern similar to the predicted water level change pattern. After that, the calculation processing unit 16 compares the matched water level change pattern (i.e., the water level change pattern most similar to the predicted water level change pattern) with the contents of the gate control pattern storage table 12 as described above, thereby determining the gate operation.
[0068] Next, the data elements (record format) of the water level measurement value record table 13 will be described with reference to FIG.
[0069] FIG. 7 is a diagram illustrating an example of the water level measurement value record table 13 according to the first embodiment of the present disclosure.
[0070] The water level measurement value recording table 13 stores the progress of the water level measurement value recorded in chronological order, with five data elements, namely, the measurement point number P13a, the measurement point name P13b, the measurement date P13c, the measurement time P13d, and the water level measurement value P13e, as one record. The recording process is carried out at regular intervals. In other words, the water level measurement value at regular intervals is recorded in the water level measurement value recording table 13.
[0071] The data elements (record format) of the alarm accumulation table 14 will be described with reference to FIGS. 8A and 8B.
[0072] 8A and 8B are diagrams illustrating an example of the alarm accumulation table 14 according to the first embodiment of the present disclosure.
[0073] The alarm accumulation table 14 chronologically stores alarm information collected and judged by the equipment control system 1. The alarm accumulation table 14 includes ten data elements as one record: a measurement point number P14a, a measurement point name P14b, an alarm type P14c, an alarm occurrence date P14d, an alarm occurrence time P14e, a transmission status P14f, a last transmission date P14g, a last transmission time P14h, a transmission status P14i, and additional information P14j such as an alarm message. The recording process of the alarm information is performed each time an alarm occurs. In other words, each time an alarm occurs, the alarm information of the alarm that has occurred is recorded in the alarm accumulation table 14.
[0074] (operation) The equipment control system 1 according to the first embodiment of the present disclosure includes a communication processing unit 17 that communicates with the outside, and a memory device 100 that stores a water level change pattern storage table 11, a gate control pattern storage table 12, a water level measurement value recording table 13, and an alarm accumulation table 14, as shown in FIG. 2.
[0075] Therefore, in order to realize access between the arithmetic processing unit 16 and the storage device 100 and to operate the communication processing unit 17, it is necessary to input pre-specified parameters as initial settings. This process is shown in Figures 9A, 9B, and 9C.
[0076] 9A, 9B, and 9C are diagrams illustrating the initial setting process of parameters according to the first embodiment of the present disclosure.
[0077] In this embodiment, parameters are set for the arithmetic processing unit 16 as shown in Fig. 9A and Fig. 9B. First, a person who performs initial settings, such as an administrator of the equipment control system 1 (hereinafter, referred to as a setter), manually sets the "measurement point number" and the "measurement point name" (step S1001). The arithmetic processing unit 16 receives the "measurement point number" and the "measurement point name" that have been manually set. The arithmetic processing unit 16 sets the measurement point number and the measurement point name in the recording area of the arithmetic processing unit 16 (step S1002). The values set here are used as the values of the measurement point number P13a and the measurement point name P13b in Fig. 7, and the values of the measurement point number P14a and the measurement point name P14b in Fig. 8A and Fig. 8B. Next, the setter manually sets the "flood danger water level" and the "flood warning water level" (step S1003). The arithmetic processing unit 16 receives the "flood danger water level" and the "flood warning water level" that are manually set. The arithmetic processing unit 16 sets the flood danger water level and the flood warning water level in the recording area of the arithmetic processing unit 16 (step 1004). The values set here are used in the judgment process (step S1218) of FIG. 11B. Next, the arithmetic processing unit 16 receives the parameters for accessing the storage device 100 that are manually set (steps S1005 to S1012). Specific examples of the parameters for accessing the storage device 100 include the name of the database to be accessed, a login ID (identifier) for authentication, and a password. Specifically, the person who sets the database manually sets the database name and authentication account required for connection to the "water level change pattern storage table" (step S1005). In this embodiment, this "water level change pattern storage table" is the water level change pattern storage table 11. The arithmetic processing unit 16 receives the manually set database name and authentication account required for connection to the "water level change pattern storage table". The arithmetic processing unit 16 sets the database name and authentication account required for connection to the "water level change pattern storage table" in the memory area of the arithmetic processing unit 16 (step S1006). The setting person manually sets the database name and authentication account required for connection to the "gate control pattern storage table" (step S1007).In this embodiment, this "gate control pattern storage table" is the gate control pattern storage table 12. The calculation processing unit 16 receives the database name and authentication account required for connection to the "gate control pattern storage table" that are manually set. The calculation processing unit 16 sets the database name and authentication account required for connection to the "gate control pattern storage table" in the storage area of the calculation processing unit 16 (step S1008). The setter manually sets the database name and authentication account required for connection to the "water level measurement value recording table" (step S1009). In this embodiment, this "water level measurement value recording table" is the water level measurement value recording table 13. The calculation processing unit 16 receives the database name and authentication account required for connection to the "water level measurement value recording table" that are manually set. The calculation processing unit 16 sets the database name and authentication account required for connection to the "water level measurement value recording table" in the storage area of the calculation processing unit 16 (step S1010). The setting person manually sets the database name and authentication account required for connection to the "alarm accumulation table" (step S1011). In this embodiment, this "alarm accumulation table" is the alarm accumulation table 14. The calculation processing unit 16 receives the manually set database name and authentication account required for connection to the "alarm accumulation table". The calculation processing unit 16 sets the database name and authentication account required for connection to the "alarm accumulation table" in the storage area of the calculation processing unit 16 (step S1012). Next, as shown in FIG. 9C, the communication processing unit 17 receives the manually set parameters for communicating with the receiving station of FIG. 4A and FIG. 4B (steps S1013 to S1016). Specific examples of the parameters for communicating with the receiving station include the local station network settings (IP address, etc.), the receiving station's destination IP address, authentication login ID, password, NTP (Network Time Protocol) server address, and time synchronization update frequency. The time synchronization update frequency indicates the frequency with which the time is synchronized, that is, the frequency with which information indicating the time from the NTP server for synchronizing the time is updated.Specifically, the setting person manually sets parameters ((1) local station network settings, (2) destination IP address of the receiving station, (3) account for connection with the receiving station) for communicating with the processing device of the receiving station (step S1013). The communication processing unit 17 receives parameters ((1) local station network settings, (2) destination IP address of the receiving station, (3) account for connection with the receiving station) for communicating with the processing device of the receiving station. The communication processing unit 17 sets the parameters ((1) local station network settings, (2) destination IP address of the receiving station, (3) account for connection with the receiving station) for communicating with the processing device of the receiving station in a storage area of the communication processing unit 17 (step S1014). Next, the setting person manually sets an NTP server address and a time synchronization update frequency for acquiring date and time information (step S1015). The communication processing unit 17 receives an NTP server address and a time synchronization update frequency for acquiring date and time information. The communication processing unit 17 sets the NTP server address and the time synchronization update frequency for acquiring date and time information in a storage area of the communication processing unit 17 (step S1016).
[0078] Furthermore, the arithmetic processing unit 16 performs an initialization process for initializing the storage area of the arithmetic processing unit 16, assuming recovery from a failure or intentional power restart, as shown in FIG.
[0079] FIG. 10 is a diagram illustrating an initialization process of the arithmetic processing unit 16 according to the first embodiment of the present disclosure.
[0080] First, the arithmetic processing unit 16 initializes the storage area of the date and time information (step S1101). The arithmetic processing unit 16 then acquires the latest date and time information (step S1102). The arithmetic processing unit 16 sets the value obtained in step S1102 in the date and time information storage area of the arithmetic processing unit 16 (step S1103). Next, the arithmetic processing unit 16 initializes the storage area for storing the water level measurement value (step S1104). The arithmetic processing unit 16 then initializes the measurement processing unit (step S1105). In addition, the arithmetic processing unit 16 initializes the pattern storage areas of the water level change pattern matching unit 161c and the gate control pattern matching unit 161h so as not to be affected by unnecessary pattern data read in the past (step S1106). Similarly, the arithmetic processing unit 16 also initializes the storage areas of the flood / drought alarm generating unit 161e and the water level alarm recording processing unit 161f (step S1107). Finally, the calculation processing unit 16 initializes the switching control unit 19 (step S1108), and ends the initialization process.
[0081] In this embodiment, big data analysis is performed using AI technology on data that accumulates past trends in water level measurements of tributaries and irrigation channels and patterns of water level changes, and the water levels measured using pattern matching techniques are compared with the analysis results, making it possible to control the opening and closing of gates based on the results.
[0082] Big data here refers to (1) water level change data linked to past accumulated precipitation, and (2) past gate control history operated by skilled craftsmen involved in gate control. This is the AI technology described in this embodiment that creates patterns using AI methods for big data analysis and assigns a "key" to the obtained water level change pattern as a value that associates the gate control history implemented at that time.
[0083] The training data obtained as a result of the big data analysis is stored in a water level change pattern storage table 11 and a gate control pattern storage table 12.
[0084] Next, water level prediction will be described. In this embodiment, modeling is first performed based on the current water level obtained from the measurement processing unit 18, and the water level change pattern for the next specified period (for example, 30 minutes) is predicted from the modeling result. At this time, the water level change pattern storage table 11 is referenced as a reference.
[0085] Thereafter, based on the key (pattern identifier) assigned to the derived "predicted water level change pattern", a gate opening / closing control pattern is called from the gate control pattern storage table 12, and gate opening / closing control is determined.
[0086] 11A, 11B, 11C, and 11D are diagrams illustrating an example of the operation of the arithmetic processing unit 16 according to the first embodiment of the present disclosure. A detailed flow of the above-mentioned main processing executed in the arithmetic processing unit 16 will be described using FIG. 11A, FIG. 11B, FIG. 11C, and FIG. 11D.
[0087] First, the arithmetic processing unit 16 judges whether or not the start is the first start, which is a trigger for starting the operation (step S1201). If the result of the judgment is Yes, that is, if the start is the first start (Yes in step S1201), the arithmetic processing unit 16 executes the subroutine shown in FIG. 9A to FIG. 9C, that is, the "initial parameter setting process" (step S1202). In this case, the arithmetic processing unit 16 executes the "initialization process" which is the subroutine shown in FIG. 10 after performing the initial setting by the initial parameter setting process (step S1203). If the result of the judgment in the process of step S1201 is No, that is, if the start is not the first start (No in step S1201), the arithmetic processing unit 16 skips the process of step S1202 and executes the process of step S1203.
[0088] Next, the water level measurement value recording processing unit 161a sets a preset water level accumulation period for modeling to a variable h (step S1204). This variable h specifies the number of times to repeat the modeling preparation process in the subsequent stage. In addition, by executing the modeling preparation process (steps S1205 to S1210), the water level change (i.e., the transition of the water level measurement value) within the modeling water level accumulation period (for example, the period during which h records are made) is recorded.
[0089] Specifically, assuming that the modeling preparation process is executed once per second, the water level measurement value recording processing unit 161a assigns 600 to the variable h when modeling for 10 minutes is executed (step S1204). In the description of the embodiment of the present disclosure, the value of the variable represents a default value that is set in advance in the equipment control device. The water level measurement value recording processing unit 161a acquires the water level measurement value from the measurement processing unit 18 (step S1206). The water level measurement value recording processing unit 161a records the acquired water level measurement value in the water level measurement value recording table 13 (step S1207). The water level measurement value recording processing unit 161a records the acquired water level measurement value in the storage area of the water level transition modeling unit 161b (step S1208). The water level measurement value recording processing unit 161a assigns a value obtained by subtracting 1 from the value of the variable h to the variable h (step S1209). The water level measurement value record processing unit 161a repeats the processes from step S1206 to step S1209 until the value of the variable h becomes 0. As a result, the water level measurement value record processing unit 161a repeats the processes from step S1206 to step S1208 h times. This ends the modeling preparation process (step S1210). Note that the processes from step S1205 to step S1210 are the modeling preparation process.
[0090] After the modeling preparation process is completed, the water level transition modeling unit 161b creates a graph showing a water level change pattern based on the water level measurement values expanded in the memory area (step S1211). After that, the water level change pattern matching unit 161c performs pattern matching to match the water level change pattern acquired by the process of step S1211 with past characteristic water level change patterns stored in the water level change pattern storage table 11 (step S1212). Examples of past characteristic water level change patterns stored in the water level change pattern storage table 11 are Samples 1 to 4 shown in Figures 6A and 6B.
[0091] The water level change pattern determination unit 161d determines whether there is a similar pattern in the result of the comparison (step S1214). If the result of the determination is No, that is, if there is no similar pattern in the result of the comparison (No in step S1214), there is no precedent and processing cannot be performed, so the water level change pattern determination unit 161d generates record information of an operation alarm (step S1215). The water level change pattern determination unit 161d writes the information to the alarm accumulation table 14 (step S1216). The calculation processing unit 16 skips the processes from step S1217 to step S1236 and ends the process.
[0092] If the result of the judgment in step S1214 is Yes, that is, if a similar pattern exists in the result of the comparison (Yes in step S1214), the water-level change pattern judgment unit 161d stores the identifier of the matched water-level change pattern as a "key" in the memory area of the gate control pattern recognition unit 161g (step S1217). The identifier of the water-level change pattern is, for example, Sample1 in Figures 6A and 6B.
[0093] Next, the flood / drought alarm generating unit 161e executes the processes of steps S1218 to S1223, and makes an alarm determination based on the acquired water level measurement value.
[0094] Specifically, if the water level measurement value exceeds the flood danger water level or the flood warning water level (Yes in step S1218), the flood / drought alarm generation unit 161e generates an alarm. In other words, the flood / drought alarm generation unit 161e generates record information of an operation alarm indicating that the water level measurement value exceeds the flood danger water level or the flood warning water level (step S1219). Then, the water level alarm record processing unit 161f writes the generated record information of the operation alarm into the alarm accumulation table 14 (step S1220). If the water level measurement value does not exceed the flood danger water level or the flood warning water level (No in step S1218), the operations of steps S1219 and S1220 are not performed.
[0095] As a result of the comparison of the water level change pattern, if the water level change pattern matches a pattern indicating a sign of flooding within one hour (Yes in step S1221), the flood / drought alarm generating unit 161e generates an alarm. In other words, the flood / drought alarm generating unit 161e generates record information of an operation alarm indicating that the water level change pattern matches a pattern indicating a sign of flooding within one hour (step S1222). The water level alarm record processing unit 161f writes the generated record information of the operation alarm to the alarm accumulation table 14 (step S1223). As a result of the comparison of the water level change pattern, if the water level change pattern does not match a pattern indicating a sign of flooding within one hour (No in step S1221), the operations of steps S1222 and S1223 are not performed. Note that the above-mentioned "one hour" is an example. The operations of steps S1222 and S1223 may be performed when the water level change pattern matches a pattern indicating a sign of flooding within a predetermined time.
[0096] Next, the calculation processing unit 16 performs a process of associating the water level change pattern with the gate control history and determining the gate opening / closing control method. Specifically, first, the gate control pattern matching unit 161h reads the identifier (i.e., key) of the water level change pattern from the storage area of the gate control pattern recognition unit 161g (step S1224). The gate control pattern matching unit 161h judges whether or not the key exists in the storage area (step S1225). If the result of the judgment is No, that is, if the key does not exist in the storage area (No in step S1225), there is no precedent and the gate opening / closing control cannot be determined, so the calculation processing unit 16 skips the operations of steps S1226 to S1235 and ends the process. If the result of the judgment in step S1225 is Yes, that is, if the key exists in the storage area (Yes in step S1225), the gate control pattern matching unit 161h connects to the gate control pattern storage table 12 (step S1227). Then. The gate control pattern matching unit 161h performs matching between the key and the gate control pattern (step S1226). Then, the gate control signal generating unit 161i reads the gate control pattern having the matching key from the gate control pattern storage table 12 (step S1228). The gate control signal generating unit 161i generates a gate control signal based on the read gate control pattern (step S1229). Finally, the gate control signal output unit 161j executes the automatic gate control process of steps S1230 to S1236 based on the control signal generated in the process of S1229 (steps S1230 to S1236).
[0097] Specifically, the gate control signal output unit 161j sets "variable i=False" as the gate control completion flag (step S1230). In other words, the gate control signal output unit 161j sets a value representing False as the value of the variable i used as the gate control completion flag. When the value of the variable i is a value representing False, the variable i represents that the gate control has not been completed. When the value of the variable i is a value representing True, the variable i represents that the gate control has been completed. The value representing False and the value representing True are mutually different and predetermined values.
[0098] Then, the gate control signal output unit 161j starts gate control processing and continues until the value of the variable i becomes a value representing True (step S1231). The gate control signal output unit 161j first transmits a gate control signal to the opening / closing control unit (step S1232). Next, the calculation processing unit 16 executes gate control operation monitoring processing (step S1233). The gate control operation monitoring processing will be described in detail later. If the gate control is not completed (No in step S1234), that is, if the transmission of all the gate control signals generated in step S1229 is not completed, the calculation processing unit 16 repeats the operations from step S1232 onwards. If the gate control is completed (Yes in step S1234), that is, if the transmission of all the gate control signals generated in step S1229 is completed, the gate control signal output unit 161j sets a gate control completion flag "variable i=True" (step S1235). That is, the gate control signal output unit 161j sets a value indicating True as the value of the variable i indicating the gate control completion flag. As a result, the gate control signal output unit 161j ends the gate control process (step S1236).
[0099] In addition to the main processing described using Figures 11A, 11B, 11C, and 11D, the calculation processing unit 16 of this embodiment performs three monitoring processes (calculation operation monitoring process, power supply alarm monitoring process, and gate control operation monitoring process) as sub-processes. These processes will be described in detail below.
[0100] FIG. 12 is a diagram showing an example of the operation of the calculation operation monitoring process of the calculation processing unit according to the first embodiment of the present disclosure. In the following, a flow of the calculation processing unit 16 performing the calculation operation monitoring process will be described with reference to FIG. 12. The calculation processing operation monitoring unit 162a sets a preset operation monitoring period to a variable a (step S1301). The calculation processing unit 162a starts the calculation operation monitoring process (step S1302). The calculation processing unit 16 repeatedly executes the processes of steps S1303 to S1307 while the variable "calculation processing stop" is False. First, as the process of step S1303, it is confirmed whether the operation has stopped in the calculation processing unit 16 (main processing) (step S1303). If the operation has stopped (Yes in step S1304), the operation alarm recording processing unit 162b generates record information of an operation alarm indicating that the operation of the main processing has stopped (step S1305). The operation alarm record processing unit 162b writes information to the alarm accumulation table 14 (step S1306). The information written to the alarm accumulation table 14 is the record information of the operation alarm generated in step S1305. The arithmetic processing operation monitoring unit 162a refers to the internal clock and waits for the period determined in the variable a to come (step S1307). If the operation is not stopped as a result of the check in step S1303 (No in step S1304), the arithmetic processing operation monitoring unit 162a skips the processes of steps S1305 and S1306 and performs the process of step S1307. If "arithmetic processing stop" becomes True, the arithmetic processing operation monitoring unit 162a ends the arithmetic operation monitoring process (step S1308). As described later, the value of "arithmetic processing stop" is set to True when, for example, a power supply alarm occurs in the power supply alarm monitoring process.
[0101] FIG. 13 is a diagram illustrating an example of the operation of the power supply alarm monitoring process of the calculation processing unit 16 according to the first embodiment of the present disclosure. A flow of the calculation processing unit 16 performing the power supply alarm monitoring process will be described with reference to FIG. 13. The power supply alarm reception processing unit 162c sets a preset power supply alarm reception cycle to a variable b (step S1401). In other words, the power supply alarm reception processing unit 162c sets a value representing the power supply alarm reception cycle to the value of the variable b. Thereafter, the power supply alarm reception processing unit 162c starts the power supply alarm monitoring process (step S1402). The calculation processing unit 16 repeatedly executes the processes of steps S1403 to S1407 while the value of the variable "calculation process stop" is False.
[0102] First, the power supply alarm receiving processing unit 162c reads the power supply alarm from the power supply processing unit 15 (step S1403). The calculation processing stop determining unit 162d checks whether a power supply alarm has occurred (S1404). If the result of the determination is Yes, that is, if a power supply alarm has occurred (Yes in step S1404), the calculation processing stop processing unit 162e generates record information of an operation alarm indicating that a power supply alarm has occurred (step S1405). The calculation processing stop processing unit 162e writes information to the alarm accumulation table 14 (step S1406). The information written to the alarm accumulation table 14 in step S1406 is the record information of the operation alarm generated in step S1405. Furthermore, the calculation processing stop processing unit 162e controls the calculation stop of the calculation processing unit 16 (step S1407). Specifically, for example, the calculation processing stop processing unit 162e sets the value of the variable "calculation processing stop" to a value indicating "True". After executing the process of step S1407, the calculation processing stop processing unit 162e waits for the cycle defined in the variable b to come (step S1408). If the determination result of the process of step S1404 is No, that is, if a power supply alarm has not occurred (No in step S1404), the calculation processing unit 16 skips the processes of steps S1405 to S1407 and performs the process of step S1408. If "calculation processing stop" becomes True, the calculation processing unit 16 ends the calculation operation monitoring process (step S1409).
[0103] 14A and 14B are diagrams illustrating an example of the operation of the gate control operation monitoring process of the arithmetic processing unit 16 according to the first embodiment of the present disclosure. A flow of the gate control operation monitoring process performed by the arithmetic processing unit 16 will be described with reference to FIG. 14A and FIG. 14B.
[0104] The gate control operation monitoring unit 162f sets a preset gate control operation monitoring period to the variable c (step S1501). In other words, the gate control operation monitoring unit 162f sets a value representing the preset gate control operation monitoring period as the value of the variable c. The gate control operation monitoring unit 162f acquires an input / output state of a gate control signal from the arithmetic processing unit 16 (step S1502). The gate control operation monitoring unit 162f uses the acquired input / output state of the gate control signal to determine whether the gate control signal can be output (step S1503). If the acquired input / output state of the gate control signal indicates that the gate control signal can be output, the gate control operation monitoring unit 162f determines that the gate control signal can be output. If the acquired input / output state of the gate control signal does not indicate that the gate control signal can be output, the gate control operation monitoring unit 162f determines that the gate control signal cannot be output.
[0105] If the result of the determination is No, that is, if the gate control signal cannot be output (No in step S1503), the operation alarm recording processing unit 162g generates record information of an operation alarm indicating that the gate control signal cannot be output (step S1504). The operation alarm recording processing unit 162g writes information to the alarm accumulation table 14 (step S1505). The information written to the alarm accumulation table 14 in step S1505 is the record information of the operation alarm generated in step S1504. Next, the gate control operation monitoring unit 162f resets the gate control signal output unit 161j (step S1506). The operation of the gate control operation monitoring process of the arithmetic processing unit 16 proceeds to the operation of step S1507 after the operation of step S1506.
[0106] If the result of the determination in step S1503 is Yes, that is, if the gate control signal has been output (Yes in step S1503), the arithmetic processing unit 16 skips the processes in steps S1504 to S1506, and performs the process in step S1507.
[0107] In the process of step S1507, the gate control operation monitoring unit 162f judges whether there is a response to the output of the gate control signal from the switching control unit 19. If the result of the judgment is No, that is, if there is no response from the switching control unit 19 to the output gate control signal (No in step S1507), the operation alarm recording processing unit 162g generates record information of an operation alarm indicating that there is no response to the gate control signal (step S1508). The operation alarm recording processing unit 162g writes information to the alarm accumulation table 14 (step S1509). The information written to the alarm accumulation table 14 in step S1509 is the record information of the operation alarm generated in step S1508. The gate control operation monitoring unit 162f instructs the gate control signal output unit 161j to transmit a reset signal to the switching control unit 19 (step S1510). After the operation of step S1510, the gate control operation monitoring unit 162f refers to the internal clock and puts the process on hold until the cycle defined in the variable c comes (step S1511).
[0108] If the determination result of the processing in step S1507 is No, that is, if there is a response from opening / closing control unit 19 to the output gate control signal (Yes in step S1507), calculation processing unit 16 skips the processing in steps S1508 to S1510 and performs the processing in step S1511.
[0109] 15A, 15B, 15C, and 15D are diagrams showing an example of the operation of the communication processing unit 17 according to the first embodiment of the present disclosure. In the following, the processing in the communication processing unit 17 included in the equipment control system 1 of this embodiment together with the calculation processing unit 16 will be described with reference to FIG. 15A, 15B, 15C, and 15D. When communicating with the receiving station, the communication processing unit 17 checks whether the contents of the message have normally reached the destination (steps S1614 to S1624). For this reason, the reception determination unit 171e sets the number of retransmissions when it is determined that the message has not arrived to a variable d (step S1601). In other words, the reception determination unit 171e sets the number of retransmissions as the value of the variable d. Furthermore, the reception determination unit 171e sets a reception response timeout value indicating the time (for example, the length of time expressed in seconds) to wait for a reception response from the receiving station after transmitting the message to a variable e (step S1602). In other words, the reception determination unit 171e sets the reception response timeout value as the value of the variable e. Also, in order to avoid retransmission (erroneous transmission) of previously transmitted message contents, the communication processing unit 17 initializes the storage areas of the signal conversion unit 171b, the transmission message generation unit 171c, and the date and time information management unit 172a (step S1603). For example, the signal conversion unit 171b initializes the storage area of the signal conversion unit 171b. The transmission message generation unit 171c initializes the storage area of the transmission message generation unit 171c. The date and time information management unit 172a initializes the storage area of the date and time information management unit 172a.
[0110] Next, the signal input unit 171a acquires the water level measurement value from the measurement processing unit 18 (step S1604). The signal conversion unit 171b formats the acquired information of the water level measurement value in terms of character code, number of digits, etc., and stores the information in a memory area of the transmission message generation unit 171c (step S1605).
[0111] The signal input unit 171a acquires gate opening / closing information from the opening / closing control unit 19 (step S1606). The gate opening / closing information includes, for example, the gate opening degree, the opening / closing torque, and a full opening / closing notification. The signal conversion unit 171b formats the gate opening / closing information into character codes, the number of digits, and the like, and stores the information in a memory area of the transmission message generation unit 171c (step S1607).
[0112] The signal input unit 171a acquires information on power supply from the power generation control unit 151 (step S1608). The information on power supply includes, for example, the amount of power generated by each generator, the remaining amount of power stored in the DC storage battery, and the operating state of each generator. The signal conversion unit 171b formats the information on power supply into character codes, the number of digits, and the like, and stores the information in a memory area of the transmission message generation unit 171c (step S1609).
[0113] The signal input unit 171a acquires information related to the operation from the calculation processing unit 16 (step S1610). The information related to the operation includes, for example, the operating state, the gate opening / closing control history, the water level determination, the fault alarm, and the time information. The signal conversion unit 171b performs formatting of the information related to the operation such as character code and number of digits, and stores the information in the memory area of the transmission message generation unit 171c (step S1611).
[0114] After the transmission message generating unit 171c generates a message from the information stored in the memory area of the transmission message generating unit 171c, the transmission header adding unit 171d adds a transmission header for communicating with the processing device 502 of the receiving station to the message (step S1612). The transmission header is, for example, an IP header or a TCP header. The transmission processing unit 171g transmits the message to the receiving station, specifically, to the processing device of the receiving station (step S1613).
[0115] The communications processing unit 17 performs a process when a message has arrived at the receiving station and a process when a message has not yet arrived at the receiving station by performing a message retransmission process from step S1614 to step S1621. The communications processing unit 17 repeats the operations from step S1615 to step S1620 and the operations from step S1621 to step S1623 until the value of the variable d becomes 0.
[0116] In the message retransmission process, the reception determination unit 171e determines whether the message has arrived at the receiving station based on whether a message receipt response has been received from the receiving station. In step S1615, the reception determination unit 171e determines whether the reception processing unit 171f has received a message receipt response from the receiving station (step S1615).
[0117] If the reception processing unit 171f has not received a message receipt response (No in step S1615), the reception determination unit 171e determines whether the time elapsed since the message was sent is within the range of the variable e (step S1616). In other words, the reception determination unit 171e determines whether the time elapsed since the message was sent is equal to or less than the time indicated by the value of the variable e. If the time elapsed since the message was sent is equal to or less than the time indicated by the value of the variable e, the reception determination unit 171e determines that the time elapsed since the message was sent is within the range of the variable e. If the time elapsed since the message was sent is longer than the time indicated by the value of the variable e, the reception determination unit 171e determines that the time elapsed since the message was sent is not within the range of the variable e. If the time elapsed since the message was sent is within the range of the variable e (Yes in step S1616), the operation of the reception determination unit 171e returns to step S1615.
[0118] If the time that has elapsed since the transmission of the message is not within the range of the variable e (No in step S1616), that is, if the message receipt response is not received within the time indicated by the variable e, the reception determination unit 171e generates record information of an operation alarm (step S1617). The record information of the operation alarm generated in step S1617 is, for example, record information of an operation alarm indicating that the message has not arrived at the receiving station. The reception determination unit 171e writes information into the alarm accumulation table 14 (step S1618). The information written into the alarm accumulation table 14 in step S1618 is undelivered alarm information, that is, the above-mentioned record information of an operation alarm indicating that the message has not arrived at the receiving station. Then, the transmission processing unit 171g transmits the message again to the receiving station (step S1619). After transmitting the message, the transmission processing unit 171g subtracts 1 from the number of retransmissions indicated by the variable d (step S1620). That is, the transmission processor 171g substitutes the value obtained by subtracting 1 from the value of the variable d for the variable d.
[0119] When the message receipt response is received from the receiving station within the specified time, that is, when the reception processing unit 171f receives the message receipt response (Yes in step S1615), the reception determination unit 171e generates record information of an operation alarm (normal transmission completion) (step S1621). In other words, the reception determination unit 171e generates record information of an operation alarm indicating that the transmission of the message has been completed normally. The reception determination unit 171e writes the information to the alarm accumulation table 14 (step S1622). That is, the reception determination unit 171e writes the record information of an operation alarm indicating that the transmission of the message has been completed normally to the alarm accumulation table 14. The reception determination unit 171e assigns "0" to the variable d (step S1623). In other words, the reception determination unit 171e sets the value of the variable d to "0". The condition for leaving the loop of the message retransmission process is "variable d=0", that is, the value of the variable d being 0. The communications processing unit 17 ends the message resending process (step S1624).
[0120] The communication processing unit 17 also performs a secondary process of acquiring date and time information from the receiving station.
[0121] Fig. 16 is a diagram illustrating an example of a process of acquiring date and time information of the communication processing unit 17 according to the first embodiment of the present disclosure. A process flow of the communication processing unit 17 acquiring date and time information will be described with reference to Fig. 16. When acquiring date and time information via a network, a protocol called NTP (Network Time Protocol) is generally used. In addition, a parent device (a server that distributes time information) when acquiring date and time information using NTP is called an NTP server.
[0122] The date and time information management unit 172a first sets the value of the IP address of the NTP server as the value of variable f, and the value of the frequency of acquiring date and time information (hereinafter also referred to as the time synchronization update frequency) as the value of variable g. In other words, the date and time information management unit 172a sets the value of the address of the NTP server and the value of the time synchronization update frequency, which are determined in advance, to variables f and g, respectively (step S1701). Next, the communication processing unit 17 acquires date and time information by the date and time information update process shown in steps S1702 to S1706. The communication processing unit 17 repeats the operations from step S1703 to step S1705 until the above-mentioned variable "arithmetic processing stop" reaches the state of "arithmetic processing stop=True", that is, until the value of the variable "arithmetic processing stop" reaches a value indicating True.
[0123] Specifically, the date and time information acquisition unit 172b acquires time information from the NTP server determined by the variable f (step S1703). The time information represents the time that has elapsed since a specific time on a specific date. In other words, the time information acquired in step S1703 is information representing the date and time. Therefore, this time information can be rephrased as date and time information. The NTP server determined by the variable f is the NTP server to which the IP address represented by the value of the variable f is assigned.
[0124] The date and time information management unit 172a corrects the internal clock (i.e., system timer) based on the acquired time information (step S1704). The date and time information acquisition unit 172b refers to the internal clock and waits for the cycle defined in variable g to arrive (step S1705). The cycle defined in variable g is a cycle of a length of time represented by the value of variable g. In other words, the date and time information acquisition unit 172b waits until the time elapsed since the most recent acquisition of time information reaches the time indicated by the value of variable g.
[0125] Here, the system timer refers to a mechanism that is incorporated in a board for operating the arithmetic processing unit 16, the communication processing unit 17, and the power supply processing unit 15 in the first embodiment of the present disclosure, and that controls the operating frequency and time management. Such a mechanism is generally composed of components centered around a crystal oscillator. Note that a crystal oscillator generates frequency errors with temperature changes and the passage of time, and therefore the system timer has a characteristic that the time information it holds becomes inaccurate. Therefore, the communication processing unit 17 repeatedly performs a process of correcting the date and time information (i.e., the operations from step S1703 to step S1705) at a period determined by the variable g. When the value of the variable "arithmetic processing stop" is a value indicating True, the communication processing unit 17 ends the date and time information update process (step S1706).
[0126] <Effects> This embodiment has the effect of further suppressing a decrease in the continuity of operation of intake gates (i.e., gates) of tributaries, etc., during a disaster.
[0127] The reason is as follows. The water level transition modeling unit 161b models the water level change pattern based on the water level measurement value during the modeling water level accumulation period. The water level change pattern matching unit 161c executes a process of matching the water level change pattern in the water level change pattern storage table 11 with the water level change pattern generated by the water level transition modeling unit 161b. The gate control pattern matching unit 161h calculates the gate control performed when the transition of the water level measurement value represented by the selected water level change pattern occurred, and the gate control corresponding to the timing of the gate control. The gate control signal generating unit 161i generates a signal to perform the calculated gate control at the calculated time of the gate control. This is because the gate control signal output unit 161j controls the gate by outputting the generated signal. As a result, the gate operation can be continued even when a situation occurs in which workers cannot approach the gate, and the gate operation can be continued even when communication between the machine-side panel 10 and the receiving station is interrupted.
[0128] <Second embodiment> Next, a second embodiment of the present disclosure will be described in detail with reference to the drawings. The second embodiment is an embodiment that illustrates the first embodiment.
[0129] <Configuration> FIG. 17 is a block diagram showing an example of the configuration of an equipment control device according to a second embodiment of the present disclosure. In the example shown in FIG. 17, the equipment control device 10B of this embodiment includes a water level acquisition unit 1011, a water level prediction unit 1012, a pattern selection unit 1013, a gate control determination unit 1014, a gate control unit 1015, a pattern storage unit 1016, a power supply processing unit 1017, a rechargeable battery 1017A, an abnormality detection unit 1018, and a communication unit 1019. The equipment control device 10B corresponds to the machine-side panel 10 of the first embodiment. In other words, the equipment control device 10B is a device that typically represents the machine-side panel 10 of the first embodiment. In the following description, each unit included in the equipment control device 10B of this embodiment and the components of the first embodiment corresponding to each unit included in the equipment control device 10B of this embodiment will be described. Each unit (i.e., component) included in the equipment control device 10B of this embodiment has the function of the component of the first embodiment corresponding to that component.
[0130] The water level acquisition unit 1011, the water level prediction unit 1012, the pattern selection unit 1013, the gate control determination unit 1014, the gate control unit 1015 and the abnormality detection unit 1018 correspond to the calculation processing unit 16, the measurement processing unit 18 and the opening / closing control unit 19 of the first embodiment. The pattern storage unit 1016 corresponds to the storage device 100 of the first embodiment. The power supply processing unit 1017 corresponds to the power supply processing unit 15 of the first embodiment. The rechargeable battery 1017A corresponds to the overcharge prevention mechanism 207 and the DC storage battery 208 of the first embodiment. The communication unit 1019 corresponds to the communication processing unit 17 of the first embodiment.
[0131] The equipment control device 10B is connected to multiple types of power generation devices that generate power using natural energy, such as a solar panel 20, a wind power generator 30, and an irrigation channel generator 40, and receives power from these generators. The equipment control device 10B is further connected to a wireless antenna 50, and communicates with a receiving station via the communication processing unit 17 and the wireless antenna 50. The equipment control device 10B is connected to a water level gauge 60, and receives a signal indicating the water level measured by the water level gauge 60. The equipment control device 10B is connected to a gate opening / closing device 70 that controls the opening and closing of a gate, and controls the opening and closing of the gate by controlling the gate opening / closing device 70.
[0132] <Water level acquisition part 1011> The water level acquisition unit 1011 acquires a transition of a water level measurement value, which is a value obtained by measuring the water level of the water flow. The water level acquisition unit 1011 may acquire the transition of the water level measurement value, for example, by acquiring a water level measurement value at predetermined time intervals. The water level acquisition unit 1011 converts, for example, a signal representing the water level measured by the water level gauge 60 into a water level measurement value, which is a value representing the measured water level. The water level acquisition unit 1011 corresponds to the water level measurement value recording processing unit 161a and the measurement processing unit 18 of the first embodiment.
[0133] <Water Level Prediction Unit 1012> The water level prediction unit 1012 predicts the transition of the water level measurement value until a predetermined time from the actual transition, which is the transition of the acquired water level measurement value. The water level prediction unit 1012 corresponds to the water level transition modeling unit 161b in the first embodiment.
[0134] <Pattern Selection Section 1013> The pattern selection unit 1013 selects the water level change pattern that is most similar to the combination of the actual measurement transition and the predicted transition, which is the transition of the predicted water level measurement value, from the water level change patterns that are the transition of the water level measurement value acquired in the past. The pattern selection unit 1013 corresponds to the water level change pattern matching unit 161c and the water level change pattern determination unit 161d of the first embodiment.
[0135] <Gate control determination unit 1014> The gate control determination unit 1014 determines the gate control using the record of the control of the gate installed in the water flow performed when the selected water level change pattern was acquired. Specifically, the gate control determination unit 1014 determines the gate control so that the same control as the control indicated by the record is performed when the selected water level change pattern is acquired. The gate control determination unit 1014 corresponds to the gate control pattern recognition unit 161g and the gate control pattern matching unit 161h of the first embodiment.
[0136] <Gate control unit 1015> The gate control unit 1015 controls the gate in accordance with the determined control. The gate control unit 1015 corresponds to the gate control signal generation unit 161i, the gate control signal output unit 161j, and the opening / closing control unit 19 in the first embodiment.
[0137] <Pattern Storage Unit 1016> The pattern storage unit 1016 stores water level change patterns and records of gate controls associated with each water level change pattern.
[0138] <Power supply processing unit 1017> The power supply processing unit 1017 uses the amount of power supplied from multiple types of power generation devices that generate power using natural energy to determine the device to supply power from the rechargeable battery 1017A and the power generation device. For example, when the amount of power supplied from the power generation device is greater than a predetermined power supply amount, the power supply processing unit 1017 charges the rechargeable battery 1017A using the power supplied from the power generation device, and when the amount of power supplied from the power generation device is less than the predetermined power supply amount, the power supply processing unit 1017 determines the rechargeable battery 1017A as the device to supply power. As described above, the power supply processing unit 1017 corresponds to the power supply processing unit 15 of the first embodiment.
[0139] <Rechargeable battery 1017A> The rechargeable battery 1017A is a rechargeable battery that accumulates power. The rechargeable battery 1017A corresponds to the overcharge prevention mechanism 207 that prevents overcharging of the DC storage battery 208, and the DC storage battery 208 that accumulates power. In other words, the rechargeable battery 1017A is realized by the overcharge prevention mechanism 207 and the DC storage battery 208.
[0140] <Abnormality detection unit 1018> The abnormality detection unit 1018 detects an abnormality in at least one of the water level measurement value and the state of the equipment control device. The abnormality detection unit 1018 corresponds to the flood / drought alarm generation unit 161e, the water level alarm recording processing unit 161f, the calculation processing operation monitoring unit 162a, the operation alarm recording processing unit 162b, the power supply alarm reception processing unit 162c, the calculation processing stop determination unit 162d, the calculation processing stop processing unit 162e, the gate control operation monitoring unit 162f, and the operation alarm recording processing unit 162g in the first embodiment.
[0141] <Communications Department 1019> When an abnormality is detected, the communication unit 1019 transmits an alarm notifying the abnormality to a notification destination. As described above, the communication unit 1019 of the present embodiment corresponds to the communication processing unit 17 of the first embodiment. The communication unit 1019 has the functions of the communication processing unit 17 of the first embodiment (in other words, the functions of the components included in the communication processing unit 17 of the first embodiment).
[0142] <Operation> FIG. 18 is a flowchart showing an example of the operation of the equipment control device 10B according to the second embodiment of the present disclosure. In the example shown in FIG. 18, the water level acquisition unit 1011 acquires the transition of the water level measurement value (step S11). Next, the water level prediction unit 1012 predicts the transition of the water level measurement value until a predetermined time from the transition of the acquired water level measurement value (step S12). Next, the pattern selection unit 1013 selects a water level change pattern that is most similar to a combination of the acquired transition of the water level measurement value and the predicted transition of the water level measurement value from the water level change patterns acquired in the past (step S13). Next, the gate control determination unit 1014 determines the control of the gate using the record of the gate control performed when the selected water level change pattern was acquired (step S14). Then, the gate control unit 1015 controls the gate according to the determined control (step S15).
[0143] FIG. 19 is a flowchart showing an example of an alarm transmission operation of the equipment control device 10B according to the second embodiment of the present disclosure. In the example shown in FIG. 19, the abnormality detection unit 1018 detects an abnormality (step S21). If an abnormality is not detected (No in step S22), the equipment control device 10B ends the operation shown in FIG. 19. If an abnormality is detected (Yes in step S22), the abnormality detection unit 1018 generates alarm information indicating the detected abnormality (step S23). Then, the communication unit 1019 transmits the alarm information to, for example, a receiving station (step S24). The equipment control device 10B repeats the operation shown in FIG. 19, for example, at predetermined time intervals.
[0144] FIG. 20 is a flowchart showing an example of the operation of the power supply control of the equipment control device 10B according to the second embodiment of the present disclosure. In the example shown in FIG. 20, first, the power supply processing unit 1017 judges the amount of power supply from a plurality of power generation devices (step S31). If the amount of power supply is equal to or greater than a predetermined value (Yes in step S32), that is, if the total amount of power supply from the power generation devices is equal to or greater than a predetermined value, the power supply processing unit 1017 uses the power supplied from the power generation devices to charge the rechargeable battery 1017A (step S33). If the amount of power supply is not equal to or greater than a predetermined value (No in step S32), that is, if the total amount of power supply from the power generation devices is smaller than a predetermined value, the power supply processing unit 1017 supplies power from the rechargeable battery 1017A to the equipment control device 10B (step S34). The equipment control device 10B repeats the operation shown in FIG. 20 at predetermined intervals, for example. This predetermined time may be different from the predetermined time in the description of FIG. 19.
[0145] The equipment control device 10B performs the operation shown in FIG. 18, the operation shown in FIG. 19, and the operation shown in FIG. 20 in parallel.
[0146] <Effects> This embodiment has an effect of further suppressing the deterioration of the continuity of the operation of the intake gate (i.e., the gate) of the tributary or the like during a disaster. This is because the pattern selection unit 1013 selects a water level change pattern that is most similar to a combination of an actual measurement transition and a predicted transition, which is a predicted transition of the water level measurement value, from the water level change patterns that are the transitions of the water level measurement values acquired in the past. Then, the gate control determination unit 1014 determines the control of the gate using a record of the control of the gate installed in the water flow that was performed when the selected water level change pattern was acquired. Furthermore, the gate control unit 1015 controls the gate according to the determined control. As a result, the operation of the gate can be continued even when a situation occurs in which workers or the like cannot approach the gate, and the operation of the gate can be continued even when communication between the equipment control device 10B and the receiving station is interrupted.
[0147] <Third embodiment> Hereinafter, the third embodiment of the present disclosure will be described in detail with reference to the drawings.
[0148] <Configuration> 21 is a block diagram showing an example of the configuration of an equipment control device according to a third embodiment of the present disclosure. In the example shown in FIG. 21, the equipment control device 10A according to the present embodiment includes a water level acquisition unit 1011, a water level prediction unit 1012, a pattern selection unit 1013, a gate control determination unit 1014, and a gate control unit 1015.
[0149] The water level acquisition unit 1011 acquires the transition of the water level measurement value, which is a value obtained by measuring the water level of the water stream. The water level prediction unit 1012 predicts the transition of the water level measurement value until a predetermined time from the actual transition, which is the transition of the acquired water level measurement value. The pattern selection unit 1013 selects the water level change pattern, which is the transition of the water level measurement value acquired in the past, that is the most similar to the combination of the actual transition and the predicted transition, which is the predicted transition of the water level measurement value. The gate control determination unit 1014 determines the control of the gate using a record of the control of the gate installed in the water stream that was performed when the selected water level change pattern was acquired. The gate control unit 1015 controls the gate according to the determined control.
[0150] <Operation> FIG. 22 is a flowchart showing an example of the operation of the equipment control device 10A according to the third embodiment of the present disclosure. In the example shown in FIG. 22, the water level acquisition unit 1011 acquires the transition of the water level measurement value (step S11). Next, the water level prediction unit 1012 predicts the transition of the water level measurement value until a predetermined time from the transition of the acquired water level measurement value (step S12). Next, the pattern selection unit 1013 selects a water level change pattern that is most similar to a combination of the acquired transition of the water level measurement value and the predicted transition of the water level measurement value from the water level change patterns acquired in the past (step S13). Next, the gate control determination unit 1014 determines the control of the gate using the record of the gate control performed when the selected water level change pattern was acquired (step S14). Then, the gate control unit 1015 controls the gate according to the determined control (step S15).
[0151] <Effects> This embodiment has the same effects as the second embodiment, for the same reasons as those for the effects of the second embodiment.
[0152] <Other embodiments> The equipment control device according to the embodiment of the present disclosure can be realized by a computer including a memory into which a program read from a storage medium is loaded and a processor that executes the program. The equipment control device according to the embodiment of the present disclosure can also be realized by dedicated hardware. The equipment control device according to the embodiment of the present disclosure can also be realized by a combination of the above-mentioned computer and dedicated hardware.
[0153] FIG. 23 is a diagram illustrating an example of a hardware configuration of a computer 10000 that can realize an equipment control device according to an embodiment of the present disclosure. In the example illustrated in FIG. 23, the computer 10000 includes a processor 10001, a memory 10002, a storage device 10003, and an I / O (Input / Output) interface 10004. The computer 10000 can also access a storage medium 10005. The memory 10002 and the storage device 10003 are, for example, storage devices such as a RAM (Random Access Memory) and a hard disk. The storage medium 10005 is, for example, a storage device such as a RAM or a hard disk, a ROM (Read Only Memory), or a portable storage medium. The storage device 10003 may be the storage medium 10005. The processor 10001 can read and write data and programs from and to the memory 10002 and the storage device 10003. The processor 10001 can access, for example, a receiving station, a water level gauge, a gate opening and closing device, etc. via the I / O interface 10004. The processor 10001 can access a storage medium 10005. The storage medium 10005 stores a program that causes the computer 10000 to operate as an equipment control device according to an embodiment of the present disclosure.
[0154] The processor 10001 loads a program stored in the storage medium 10005, which causes the computer 10000 to operate as an equipment control device according to an embodiment of the present disclosure, into the memory 10002. Then, the processor 10001 executes the program loaded into the memory 10002, causing the computer 10000 to operate as the equipment control device according to an embodiment of the present disclosure.
[0155] The power supply processing unit 15, the arithmetic processing unit 16, the communication processing unit 17, the measurement processing unit 18, the switching control unit 19, and the elements (i.e., units) included in these units can be realized, for example, by a processor 10001 that executes a program loaded into a memory 10002. The memory area of the arithmetic processing unit 16 and the storage device 100 can be realized by the memory 10002 and the storage device 10003 such as a hard disk device included in the computer 10000. The power supply processing unit 15, the arithmetic processing unit 16, the communication processing unit 17, the measurement processing unit 18, the switching control unit 19, and the elements (i.e., units) included in these units and part or all of the storage device 100 can be realized by a dedicated circuit that realizes the function of each unit.
[0156] The water level acquisition unit 1011, the water level prediction unit 1012, the pattern selection unit 1013, the gate control determination unit 1014, the gate control unit 1015, the power supply processing unit 1017, the abnormality detection unit 1018, and the communication unit 1019 can be realized, for example, by a processor 10001 that executes a program loaded in a memory 10002. The pattern storage unit 1016 can be realized by the memory 10002 included in the computer 10000 or a storage device 10003 such as a hard disk device. Some or all of the water level acquisition unit 1011, water level prediction unit 1012, pattern selection unit 1013, gate control determination unit 1014, gate control unit 1015, pattern memory unit 1016, power supply processing unit 1017, abnormality detection unit 1018, and communication unit 1019 can be realized by dedicated circuits that realize the functions of each unit.
[0157] Furthermore, some or all of the above-described embodiments can be described as, but are not limited to, the following supplementary notes.
[0158] (Appendix 1) A water level acquisition means for acquiring a transition of a water level measurement value, which is a value obtained by measuring the water level of a water flow; a water level prediction means for predicting a transition of the water level measurement value until a predetermined time later from an actual transition, which is a transition of the acquired water level measurement value; a pattern selection means for selecting, from water level change patterns, which are the transitions of water level measurement values acquired in the past, the water level change pattern that is most similar to a combination of the actual transition and a predicted transition, which is the transition of the predicted water level measurement value; A gate control determination means for determining control of a gate installed in the water flow using a record of control of the gate performed when the selected water level change pattern was acquired; a gate control means for controlling the gate in accordance with the determined control; An equipment control device comprising:
[0159] (Appendix 2) Rechargeable battery and a power supply processing means for determining a device to supply power from the rechargeable battery and the power generation device by using the amount of power supplied from a plurality of types of power generation devices that generate power using natural energy; The equipment control device according to claim 1, comprising:
[0160] (Appendix 3) The power supply processing means, when the amount of power supplied from the power generation device is greater than a predetermined power supply amount, charges the rechargeable battery using the power supplied from the power generation device, and, when the amount of power supplied from the power generation device is less than the predetermined power supply amount, determines the rechargeable battery as the device that supplies power. 3. An equipment control device as described in appended claim 2.
[0161] (Appendix 4) The gate control determination means determines, when the selected water level change pattern is acquired, control of the gate so that the same control as the control indicated by the record is performed at a timing corresponding to the timing at which the control was performed. 3. An equipment control device according to claim 1 or 2.
[0162] (Appendix 5) An abnormality detection means for detecting an abnormality in at least one of the water level measurement value and the state of the equipment control device; a communication means for transmitting an alarm notifying a destination of the abnormality when the abnormality is detected; 3. The equipment control device according to claim 1 or 2, comprising:
[0163] (Appendix 6) Obtain the trend of the water level measurement value, which is the value obtained by measuring the water level of the water flow, A transition of the water level measurement value until a predetermined time later is predicted from an actual transition, which is a transition of the acquired water level measurement value; selecting a water level change pattern that is most similar to a combination of the actual measurement transition and a predicted transition, which is a predicted transition of the water level measurement value, from water level change patterns that are transitions of water level measurement values acquired in the past; determining control of a gate installed in the water flow using a record of the control of the gate when the selected water level change pattern was obtained; controlling the gate in accordance with the determined control. Equipment control methods.
[0164] (Appendix 7) determining a device to be powered from the rechargeable battery and the power generation device using the amounts of power supplied from the plurality of types of power generation devices that generate power using natural energy; 7. An equipment control method as described in claim 6.
[0165] (Appendix 8) When the amount of power supplied from the power generation device is greater than a predetermined power supply amount, the rechargeable battery is charged using the power supplied from the power generation device, and when the amount of power supplied from the power generation device is less than the predetermined power supply amount, the rechargeable battery is determined as the device that supplies power. 8. The equipment control method according to claim 7.
[0166] (Appendix 9) When the selected water level change pattern is acquired, control of the gate is determined so that the same control as the control is performed at a timing corresponding to the timing at which the control indicated by the record was performed. 8. The equipment control method according to claim 6 or 7.
[0167] (Appendix 10) Detecting an abnormality in at least one of the water level measurement value and the state of a device operating according to the equipment control method; When the abnormality is detected, an alarm notifying the abnormality is sent to a notification destination. 8. The equipment control method according to claim 6 or 7.
[0168] (Appendix 11) A water level acquisition process for acquiring a transition of a water level measurement value, which is a value obtained by measuring the water level of the water flow; A water level prediction process for predicting a transition of the water level measurement value until a predetermined time from an actual transition, which is a transition of the acquired water level measurement value; A pattern selection process for selecting, from water level change patterns, which are the transitions of water level measurement values acquired in the past, a water level change pattern that is most similar to a combination of the actual transition and a predicted transition, which is the transition of the predicted water level measurement value; A gate control determination process that determines control of a gate installed in the water flow using a record of control of the gate that was performed when the selected water level change pattern was acquired; a gate control process for controlling the gate according to the determined control; A program that causes a computer to execute the following.
[0169] (Appendix 12) A power supply process that uses the amount of power supplied from a plurality of types of power generation devices that generate power using natural energy to determine a device to supply power from among a rechargeable battery and the power generation devices connected to the computer. 12. The program according to claim 11, which causes the computer to execute the above steps.
[0170] (Appendix 13) When the amount of power supplied from the power generation device is greater than a predetermined power supply amount, the power supply process charges the rechargeable battery using the power supply from the power generation device, and when the amount of power supplied from the power generation device is less than the predetermined power supply amount, the power supply process determines the rechargeable battery as the device that supplies power. 13. The program according to claim 12.
[0171] (Appendix 14) The gate control determination process determines the gate control so that the same control as the control indicated by the record is performed at a timing corresponding to the timing at which the control was performed when the selected water level change pattern is acquired. 13. The program according to claim 11 or 12.
[0172] (Appendix 15) an abnormality detection process for detecting an abnormality in at least one of the water level measurement value and the state of the computer; a communication process for transmitting an alarm notifying a destination of the abnormality when the abnormality is detected; 13. The program according to claim 11 or 12, which causes the computer to execute the above steps.
[0173] Although the present disclosure has been described above with reference to the embodiments, the present disclosure is not limited to the above embodiments. Various modifications that can be understood by a person skilled in the art can be made to the configuration and details of the present disclosure within the scope of the present disclosure. [Explanation of symbols]
[0174] 1 Facility control system 10 Machine side panel 10A Equipment control device 10B Equipment control device 11 Water level change pattern storage table 12 Gate control pattern storage table 13 Water level measurement record table 14 Alarm Accumulation Table 15 Power supply processing section 16 Processing unit 17 Communication processing section 17A rechargeable battery 18 Measurement processing section 19 Opening and closing control section 20. Solar Panels 30 Wind Turbine Generator 40 Waterway Generator 50 Radio Antenna 60 Water level gauge 70 Gate opening and closing device 100 storage device 151 Power generation control unit 151d Grid connection protection function 161 Processing section (main processing) 161a Water level measurement value recording processing unit 161b Water Level Transition Modeling Section 161c Water level change pattern matching unit 161d Water level change pattern determination unit 161e Flood / Drought Alarm Generation Unit 161f Water level alarm recording processing unit 161g Gate control pattern recognition unit 161h Gate control pattern matching unit 161i Gate control signal generator 161j Gate control signal output section 162 Processing unit (sub-processing) 162a Calculation processing operation monitoring unit 162b Motion alarm recording processing unit 162c Power supply alarm receiving processing unit 162d Calculation processing stop determination unit 162e Calculation processing stop processing unit 162f Gate control operation monitoring unit 162g Motion alarm recording processing section 171 Communication processing unit (main processing) 171a Signal input section 171b Signal conversion unit 171c Transmission message generation unit 171d Transmission header addition part 171e Reception determination unit 171f Receiving processing unit 171g Transmission processing unit 172 Communication processing unit (sub-processing) 172a Date and time information management department 172b Date and time information acquisition section 205 Control Switch 206 Inverter 207 Overcharge prevention mechanism 208 DC Battery 304 Brake equipment 403 Brake equipment 501 Communication lines 502 Processing equipment 1011 Water level acquisition part 1012 Water Level Forecasting Department 1013 Pattern Selection Section 1014 Gate control decision unit 1015 Gate control section 1016 Pattern memory section 1017 Power supply processing section 1017A Rechargeable Battery 1018 Abnormality detection unit 1019 Communications Department 10000 Computers 10001 Processor 10002 Memory 10003 Storage device 10004 I / O Interface 10005 Storage medium
Claims
1. A water level acquisition means for acquiring a transition of a water level measurement value, which is a value obtained by measuring the water level of a water flow; a water level prediction means for predicting a transition of the water level measurement value until a predetermined time later from an actual transition, which is a transition of the acquired water level measurement value; a pattern selection means for selecting, from water level change patterns, which are the transitions of water level measurement values acquired in the past, the water level change pattern that is most similar to a combination of the actual transition and a predicted transition, which is the transition of the predicted water level measurement value; A gate control determination means for determining control of a gate installed in the water flow using a record of control of the gate performed when the selected water level change pattern was acquired; a gate control means for controlling the gate in accordance with the determined control; An equipment control device comprising:
2. Rechargeable battery and a power supply processing means for determining a device to supply power from the rechargeable battery and the power generation device by using the amount of power supplied from a plurality of types of power generation devices that generate power using natural energy; The equipment control device according to claim 1 .
3. The power supply processing means, when the amount of power supplied from the power generation device is greater than a predetermined power supply amount, charges the rechargeable battery using the power supplied from the power generation device, and, when the amount of power supplied from the power generation device is less than the predetermined power supply amount, determines the rechargeable battery as the device that supplies power. The equipment control device according to claim 2 .
4. The gate control determination means determines, when the selected water level change pattern is acquired, control of the gate so that the same control as the control indicated by the record is performed at a timing corresponding to the timing at which the control was performed. The facility control device according to claim 1 or 2.
5. An abnormality detection means for detecting an abnormality in at least one of the water level measurement value and the state of the equipment control device; a communication means for transmitting an alarm notifying a destination of the abnormality when the abnormality is detected; The equipment control device according to claim 1 or 2, further comprising:
6. Obtain the trend of the water level measurement value, which is the value obtained by measuring the water level of the water flow, A transition of the water level measurement value until a predetermined time later is predicted from an actual transition, which is a transition of the acquired water level measurement value; selecting a water level change pattern that is most similar to a combination of the actual measurement transition and a predicted transition, which is a transition of the predicted water level measurement value, from water level change patterns that are transitions of the water level measurement values acquired in the past; determining control of a gate installed in the water stream using a record of control of the gate when the selected water level change pattern was obtained; controlling the gate in accordance with the determined control. Equipment control methods.
7. determining a device to be powered from the rechargeable battery and the power generation device using the amounts of power supplied from the plurality of types of power generation devices that generate power using natural energy; The facility control method according to claim 6.
8. When the amount of power supplied from the power generation device is greater than a predetermined power supply amount, the rechargeable battery is charged using the power supplied from the power generation device, and when the amount of power supplied from the power generation device is less than the predetermined power supply amount, the rechargeable battery is determined as the device that supplies power. The facility control method according to claim 7.
9. When the selected water level change pattern is acquired, control of the gate is determined so that the same control as the control indicated by the record is performed at a timing corresponding to the timing at which the control was performed. The facility control method according to claim 6 or 7.
10. A water level acquisition process for acquiring a transition of a water level measurement value, which is a value obtained by measuring the water level of the water flow; A water level prediction process for predicting a transition of the water level measurement value until a predetermined time from an actual transition, which is a transition of the acquired water level measurement value; A pattern selection process for selecting, from water level change patterns, which are the transitions of water level measurement values acquired in the past, a water level change pattern that is most similar to a combination of the actual transition and a predicted transition, which is the transition of the predicted water level measurement value; A gate control determination process that determines control of a gate installed in the water flow using a record of control of the gate that was performed when the selected water level change pattern was acquired; a gate control process for controlling the gate according to the determined control; A program that causes a computer to execute the following.
Citation Information
Patent Citations
Water intake control method and device
JP2012127073A
Irrigation channel monitoring server and irrigation channel monitoring system
JP2016108827A
Irrigation channel monitoring device
JP2017218856A
Monitoring devices
JP3240233U