Cofferdam structure

The innovative cofferdam structure assembles water cutoff members around a bridge pier, reducing construction time and costs by eliminating underwater work through staged assembly and connection, enhancing efficiency and reusability.

JP2024150351APending Publication Date: 2024-10-23KOUCHI MARUTAKA

Patent Information

Application Number
JP2023063729
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-10
Publication Date
2024-10-23

AI Technical Summary

Technical Problem

Existing cofferdam construction methods using steel sheet piles and steel pipe sheet piles are lengthy and costly, requiring significant underwater work and complicating the construction process, especially in areas with varying water levels.

Method used

A temporary cofferdam structure composed of water cutoff members, including a lowermost closing member with a triangular cross-section and upper closing members, is assembled on the water surface and submerged in stages, eliminating the need for continuous underwater work by using hanging means to connect and lower the frames around a bridge pier.

Benefits of technology

The method significantly reduces construction time, lowers costs, and enhances work efficiency by minimizing underwater operations and allowing for reusable components.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024150351000001_ABST
    Figure 2024150351000001_ABST
Patent Text Reader

Abstract

To provide a cofferdam structure that requires almost no underwater work, improves work efficiency, shortens a construction period, and reduces costs.SOLUTION: In a cofferdam structure 1 constructed around a bridge pier P, a water-stopping closure member includes an upper stage closure member 3 formed of a flat-plate like rectangular panel 10, and a lowest stage closure member 2 having a triangular protrusion 11 in cross section along a lower side of the rectangular panel 10. The plurality of lowest stage closure members 2 are connected so as to surround the bridge pier to form a lowest stage cofferdam frame body 22, which is lowered to a predetermined depth by hanging means 4. A new cofferdam frame body 23 is assembled by connecting the plurality of upper stage closure members 3 on the lowest stage cofferdam frame body 22, which is lowered together with the lowest stage cofferdam frame body 22 to a predetermined depth by the hanging means 4. And sequentially, a new cofferdam frame body 23 is assembled by connecting the plurality of upper stage closure members 3 on the cofferdam frame body 23 located below, and the lowest stage cofferdam frame body 22 is submerged to a predetermined depth, to construct the cofferdam structure.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a temporary cofferdam structure constructed around a bridge pier. [Background technology]

[0002] In the past, when carrying out repair work or earthquake-resistance reinforcement work on bridge piers that are installed underwater in rivers, the sea, etc., a temporary cofferdam structure was constructed around the pier using steel sheet piles or steel pipe sheet piles, and a work space was created by draining the water and soil between this temporary cofferdam structure and the pier.

[0003] However, the construction method of building temporary cofferdam structures using steel sheet piles, steel pipe sheet piles, etc. requires a very long construction period and huge construction costs, so there was a demand for shortening the construction period and reducing the construction costs.

[0004] Accordingly, various temporary cofferdam construction methods using steel panels or liner plates have been disclosed (see, for example, Patent Document 1). The construction method of a temporary cofferdam structure described in Patent Document 1 is a construction method for constructing a cylindrical temporary cofferdam structure around a bridge pier, and is characterized in that a ring-shaped work platform is provided around the entire circumference of the required height of the bridge pier, the outer periphery of this platform can be separated by a required length from the outer edge toward the center, the platform from which the outer periphery has been separated fits inside the temporary cofferdam structure and is of a size that allows the temporary cofferdam structure to pass through, the temporary cofferdam structure is constructed on the platform, and after construction, the outer periphery is separated, and the temporary cofferdam structure passes through and is lowered over the platform to be fixed to the foundation of the pier.

[0005] According to the temporary cofferdam construction method described in Patent Document 1, the divided structures related to the temporary cofferdam structure can be fabricated in sequence in a stable position on a platform above the water, and the platform can be passed through and lowered to be fixed onto the footing of the pier or onto the divided structures already installed underwater. Therefore, it is described that the amount of work done underwater by divers is reduced, and the equipment for fabricating the divided structures can be transported only to the platform above the water, and the unloading is also done horizontally, shortening the work time. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent No. 4625532 Summary of the Invention [Problem to be solved by the invention]

[0007] It is believed that the construction method of the temporary cofferdam structure described in Patent Document 1 will enable shorter construction time and lower costs compared to conventional construction methods that construct temporary cofferdam structures using steel sheet piles, steel pipe sheet piles, etc. In addition, since the divided structures can be fabricated on a platform and there is less underwater work, it is believed that the construction method will enable improved work efficiency and lower costs compared to conventional temporary cofferdam construction methods that use steel panels and liner plates.

[0008] However, in the construction method of the temporary cofferdam structure described in the above Patent Document 1, it is necessary to cut off the outer periphery of the platform each time a divided structure manufactured on the platform passes through and is lowered. Therefore, it is not possible to continuously manufacture, pass through, and lower the divided structure, making the work complicated.

[0009] Also, as shown in Fig. 2b of Patent Document 1, equipment is transported from an equipment barge or a work barge to a platform installed on a pier. However, at sites where water levels vary due to tides, such as coastal areas, a difference in height occurs between the platform and the equipment barge, making it impossible to ensure the uniformity of the work yard.

[0010] Furthermore, the divided structures fabricated on the platform must be fixed onto the divided structures already installed in the water after the platform has been passed through and lowered, which requires underwater work each time.

[0011] In view of the above problems, the inventors of the present application conducted extensive research to provide a temporary cofferdam structure that requires little underwater work, improves work efficiency, shortens construction time, and reduces costs, and as a result, they arrived at the present invention. [Means for solving the problem]

[0012] In other words, the present invention is a temporary cut-off structure constructed by connecting a plurality of water-stopping cut-off members around a bridge pier, the water-stopping cut-off members including a cut-off member formed of a flat rectangular panel and a lowest-stage cut-off member having a protruding portion having a triangular cross-sectional shape along the lower edge of the rectangular panel, and the plurality of the lowest-stage cut-off members are connected to surround the bridge pier to form a lowest-stage temporary cut-off frame body, the lowest-stage temporary cut-off frame body is suspended by a hanging means and lowered to a predetermined depth, a plurality of the cut-off members are connected on top of the lowest-stage temporary cut-off frame body to assemble a new temporary cut-off frame body, which is lowered together with the lowest-stage temporary cut-off frame body to the predetermined depth by the hanging means, and successively, a plurality of the cut-off members are connected on top of the temporary cut-off frame body located below to assemble a new temporary cut-off frame body, which is lowered together with the lowest-stage temporary cut-off frame body to the predetermined depth by the hanging means, and the lowest-stage temporary cut-off frame body is submerged to the predetermined depth, thereby constructing the temporary cut-off structure to surround the bridge pier. Effect of the Invention

[0013] The temporary cut-off structure of the present invention can be easily constructed by connecting water-stopping cut-off components to assemble a temporary cut-off frame body, and then successively hanging the assembled temporary cut-off frame body and sinking it to a predetermined depth, thereby dramatically improving work efficiency and enabling a significant shortening of construction time and reduction in costs.

[0014] In addition, the upper temporary cofferdam frame body is assembled by hanging the lower temporary cofferdam frame body assembled above the water surface and submerging it to a specified depth, so there is no need to connect the temporary cofferdam frame bodies underwater, which significantly reduces the amount of underwater work, lightens the burden on workers, and improves work efficiency.

[0015] Furthermore, the watertight cut-off member used in the temporary cut-off structure of the present invention can be reused, which contributes to reducing costs. [Brief description of the drawings]

[0016] [Figure 1] FIG. 2 is a schematic front view showing a construction state of a temporary cofferdam structure according to one embodiment of the present invention. [Diagram 2] 4A to 4C are three-view diagrams of a bottom shutoff member according to the embodiment. [Diagram 3] 4A to 4C are three-view diagrams of an upper shutoff member according to the embodiment. [Figure 4] FIG. 2 is a plan view of the temporary cut-off structure according to the embodiment. [Diagram 5] FIG. 2 is a schematic explanatory diagram showing a construction procedure of the temporary cofferdam structure of the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of the temporary cofferdam structure of the present invention will be described in detail with reference to the drawings. Fig. 1 is a schematic front view showing a construction state of a temporary cofferdam structure 1 according to one embodiment of the present invention, Fig. 4 is a schematic plan view of the temporary cofferdam structure 1, and Fig. 5 is a schematic explanatory diagram showing a construction procedure of the temporary cofferdam structure of this embodiment.

[0018] The present invention is a temporary closure structure 1 constructed by connecting multiple watertight closure members around a pier P. First, the multiple watertight closure members in this embodiment are composed of an upper closure member 3 and a lowermost closure member 2.

[0019] The upper-stage closing member 3 according to this embodiment is formed of a flat rectangular panel 10, as shown in FIG. 3. An upper hanger 12 and an engagement protrusion 13 are provided on the upper surface of the rectangular panel 10 forming the upper-stage closing member 3, and a plurality of bolt holes 14 are formed therein. In addition, as shown in the front view of FIG. 3(b), a plurality of bolt holes 15 are also formed on the rear side edge of the rectangular panel 10. Furthermore, a side hanger 16 for suspending the upper-stage closing member 3 is provided on the rear side of the rectangular panel 10, and a waterproof rubber plate 17 is provided on the upper surface and rear side edge of the rectangular panel 10. Although not shown in FIG. 3, a plurality of bolt holes similar to the bolt holes 14 formed on the upper surface of the rectangular panel 10 are formed on the lower surface of the rectangular panel 10, and an engagement recess into which the engagement protrusion 13 provided on the upper-stage closing member 3 located below can be inserted is formed.

[0020] The lowest stage closing member 2 according to this embodiment is mainly formed of a flat rectangular panel 10, as in the above-mentioned upper stage closing member 3, but is characterized by having a triangular protrusion 11 in cross section along the lower side of the rectangular panel 10, as shown in FIG. 2. The other configuration is the same as that of the above-mentioned upper stage closing member 3, and an upper hanger 12 and an engagement protrusion 13 are arranged on the upper surface of the rectangular panel 10 forming the lowest stage closing member 2, and a plurality of bolt holes 14 are formed. In addition, as shown in the front view of FIG. 2(b), a plurality of bolt holes 15 are also formed on the side edge of the back side of the rectangular panel 10. Furthermore, a side hanger 16 for hanging the lowest stage closing member 2 is arranged on the back side of the rectangular panel 10 relating to the lowest stage closing member 2, and a waterproof rubber plate 17 is also arranged on the upper surface and the back side edge of the rectangular panel 10. In addition, a protrusion 11 is provided below the rectangular panel 10 associated with the lowest stage closure member 2, and since a watertight closure member is not connected to the underside of the lowest stage closure member 2, no bolt holes or engagement recesses are formed in the protrusion 11.

[0021] The temporary cut-off structure 1 of this embodiment is constructed around a pier P by connecting multiple waterstop cut-off members, including the lowest cut-off member 2 and the upper cut-off member 3. First, as shown in Fig. 5(a), the lowest cut-off member 2 associated with the waterstop cut-off members is suspended above the water surface around the pier P by a hanging means 4. In this embodiment, as shown in Fig. 4, the pier P is surrounded by four lowest cut-off members 2, and the lowest cut-off members 2 are connected together with bolts to form a lowest temporary cut-off frame body 22.

[0022] 5(b), the lowest temporary cofferdam frame 22 is suspended by the suspension means 4 and lowered to a predetermined depth in the water W, more specifically, until the upper surfaces of the lowest cofferdam members 2 constituting the lowest temporary cofferdam frame 22 are exposed above the water surface, and a temporary cofferdam frame 23 is assembled on the upper side of the lowest temporary cofferdam frame 22 by connecting a plurality of upper cofferdam members 3 related to the water-stopping cofferdam members to the top of the lowest temporary cofferdam frame 22. The assembly of the temporary cofferdam frame 23 on the upper side of the lowest temporary cofferdam frame 22 can be easily performed by connecting the lowest and upper cofferdam members 2 and 3 constituting the lowest temporary cofferdam frame 22 with bolts, and by connecting adjacent upper cofferdam members 3 with bolts.

[0023] In Fig. 5(a), when the lowest-stage cofferdam member 2 for constructing the lowest-stage temporary cofferdam frame 22 is suspended, the suspension means 4 is attached to the upper hanger 12 of the lowest-stage cofferdam member 2. However, when the lowest-stage cofferdam member 2 is connected to assemble the lowest-stage temporary cofferdam frame 22 and the lowest-stage temporary cofferdam frame 22 is lowered to a predetermined depth, it is preferable to suspend the suspension means 4 by attaching it to the side hanger 16 arranged on the back side of the lowest-stage cofferdam member 2. By changing the suspension position by the suspension means 4 from the top surface to the back surface, after the lowest-stage temporary cofferdam frame 22 is lowered, the work of connecting the upper-stage cofferdam member 3 to the top surface of the lowest-stage cofferdam member 2 can be started immediately. In addition, the suspension position can be changed at a position higher than the water surface, which improves workability.

[0024] Then, after the temporary cofferdam frame body 23 has been assembled on top of the lowest temporary cofferdam frame body 22, the lowest temporary cofferdam frame body 22 and the temporary cofferdam frame body 23 are lowered by the hanging means 4 to a predetermined depth, specifically, until the upper surface of the upper cofferdam member 3 that constitutes the temporary cofferdam frame body 23 is exposed above the water surface.A new temporary cofferdam frame body 23 is then assembled by connecting multiple upper cofferdam members 3 on top of the temporary cofferdam frame body 23 located below, and then it is further lowered by the hanging means 4 to a predetermined depth, as shown in Figure 5(c).

[0025] Finally, the lowest temporary cofferdam frame body 22 and the temporary cofferdam frame body 23 are lowered to a predetermined depth by the hanging means 4, and as shown in Figure 5(d), the lowest temporary cofferdam frame body 22 is submerged to a predetermined depth, in this embodiment to the water bottom 6 below the excavation section 5, thereby constructing a temporary cofferdam structure 1 in which the lowest temporary cofferdam frame body 22 and the temporary cofferdam frame body 23 are connected to surround the pier P. After the temporary cofferdam structure 1 of this embodiment has been constructed around the pier P, a work space can be formed by draining the water and soil from inside the temporary cofferdam structure 1.

[0026] As described above, with the temporary cut-off structure 1 of this embodiment, the water-stopping cut-off members (the lowest cut-off member 2 and the upper cut-off member 3) are connected to sequentially assemble the lowest temporary cut-off frame body 22 and the temporary cut-off frame body 23, and the assembled lowest temporary cut-off frame body 22 and temporary cut-off frame body 23 are then hung and submerged to a predetermined depth, thereby easily constructing the temporary cut-off structure 1, significantly improving work efficiency and enabling a significant shortening of construction time and reduction in costs.

[0027] In addition, the assembly of the upper temporary cofferdam frame body 23 is carried out by hanging the lowermost temporary cofferdam frame body 22 or temporary cofferdam frame body 23 assembled above the water surface and submerging it to a specified depth, so there is no need to connect the temporary cofferdam frame body 23 underwater, which allows for a significant reduction in underwater work, a lighter burden on workers, and improved work efficiency.

[0028] Furthermore, the water-stopping cut-off members (the lowermost cut-off member 2 and the upper cut-off member 3) used in the temporary cut-off structure 1 of this embodiment can be reused, which contributes to reducing costs.

[0029] Although the temporary cofferdam structure according to the embodiment of the present invention has been described in detail above, it should not be understood that this substantially limits the technical idea of ​​the present invention. The present invention can be implemented with appropriate improvements, modifications, or additions based on the ingenuity and ingenuity of those skilled in the art, without departing from the gist of the present invention. [Explanation of symbols]

[0030] 1: Temporary cofferdam structure 2: Bottommost cutoff member (water-stopping cutoff member) 3: Upper cut-off member (water-stopping cut-off member) 4: Hanging means 10: Rectangular panel 11:Protrusion 12: Upper hanging handle 13: Engagement protrusion 14,15:Bolt holes 16: Side hanging handle 17: Water-resistant rubber plate 22: Bottom temporary closing frame 23: Temporary closing frame

Claims

[Claim 1] A temporary cofferdam structure constructed by connecting a plurality of water-stopping cofferdam members around a bridge pier, The watertight cut-off member includes an upper cut-off member formed of a flat rectangular panel, and a lowermost cut-off member having a triangular protrusion in cross section along the lower side of the rectangular panel, A plurality of the lowest stage closing members are connected to surround the pier to form a lowest stage temporary closing frame body, The lowermost temporary cofferdam frame is suspended by a suspension means and lowered to a predetermined depth, a plurality of upper-stage closing members are connected to the lowermost temporary closing frame body to assemble a new temporary closing frame body, and the new temporary closing frame body is lowered together with the lowermost temporary closing frame body to a predetermined depth by the hanging means; Sequentially, a new temporary cofferdam frame is assembled on the temporary cofferdam frame located below by connecting the plurality of upper cofferdam members, and the new temporary cofferdam frame is lowered together with the lowermost temporary cofferdam frame to a predetermined depth by the hanging means; A temporary cofferdam structure characterized in that the lowermost temporary cofferdam frame is constructed to surround the pier by sinking it to a predetermined depth.

Citation Information

Patent Citations

  • Construction method for temporary cofferdam structures around bridge piers and the platform used for such construction.

    JP4625532B1

Cited By

  • Staged cofferdam design scheme

    CN120683874A