Method and apparatus for analyzing casting plan, and program, casting method and casting product using the analysis method
The method and apparatus for analyzing casting plans through liquid column modeling and equation formulation enable rapid verification of countless designs, addressing the inefficiencies of conventional methods by deriving optimal solutions for casting plans, especially for complex shapes.
Patent Information
- Application Number
- JP2023067420
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Conventional casting methods for large and complex parts require extensive trial and error through simulations, limiting the verification of designs to a few to at most ten plans due to time constraints.
A method and apparatus for analyzing casting plans by creating a liquid column model, formulating equations of motion and continuity, and calculating inflow displacement, time, and pressure of molten metal to quickly verify countless designs, including the orientation of products and inlet positions.
Significantly reduces analysis time, enabling quick verification of basic design parts and derivation of optimal solutions for casting plans, even for unconventional shapes, by selecting the optimal inlet from multiple candidates.
Smart Images

Figure 2024153490000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an analysis method and an analysis device for calculating the inflow displacement and inflow time of molten metal into a mold space in a casting plan, as well as the pressure of the molten metal and the mold space, and a program, a casting method, and a casting using the analysis method. [Background technology]
[0002] In recent years, there has been an increasing trend for casting to be applied to large parts and parts with complex shapes, which has created a need to design casting methods with ideas not found in conventional powertrain parts.
[0003] Conventionally, the design of casting methods such as gates, runners and risers was done based on the designer's experience and intuition, or by reusing previous products with similar shapes, and the design was then confirmed by casting simulations using flow analysis and solidification analysis (for example, Non-Patent Document 1). [Prior art documents] [Non-patent literature]
[0004] [Non-Patent Document 1] Hiroyuki Nomura, Kazuhiko Terashima, Koji Keijima, "Prediction of Die Casting Molten Metal Flow by Three-Dimensional Simulation", Casting, Vol. 63, No. 5 (1991), p. 425-p. 430 Summary of the Invention [Problem to be solved by the invention]
[0005] However, in the conventional method of repeatedly designing a casting plan and verifying it through a casting simulation, it takes time to perform the casting simulation to obtain an optimal solution with minimal defects, so it is only possible to verify a few plans or at most a dozen plans.
[0006] The present invention has been made in consideration of the above circumstances, and provides a casting plan analysis method and analysis device, which enable verification of an infinite number of plans by quickly verifying the basic design parts of a casting plan, and which can easily derive an optimal solution for the casting plan design even for products with unprecedented shapes, as well as a program, a casting method, and a casting using the analysis method. [Means for solving the problem]
[0007] In order to solve the above problems, the present invention provides an analysis method in which a liquid column model of the product shape is created, an equation of motion is formulated by comparing the water pressure at the branching part of the liquid column model, a casting plan is added, and an equation of continuity at the branching part and the junction of the liquid column model, as well as an equation for the agreement between the volume of the liquid column and the total amount of molten metal, are solved simultaneously with the equation of motion to calculate the inflow displacement and inflow time of the molten metal in the mold space, as well as the pressure of the molten metal and the mold space for the casting plan.
[0008] The analysis method can select at least one optimal inlet from a plurality of candidate inlets for injecting the molten metal into the mold for target values of displacement and pressure of the molten metal or mold gas at any point in the mold space.
[0009] The present invention also provides an analysis device comprising an arithmetic processing device and a storage device, wherein the arithmetic processing device executes the following steps in a program stored in the storage device: create a liquid column model of a product shape; add a casting plan; formulate an equation of motion by comparing the water pressure at a branching portion of the liquid column model; and simultaneously solve, with the equation of motion, an equation of continuity at the branching portion and the junction of the liquid column model, as well as an equation for the agreement between the volume of the liquid column and the total amount of molten metal, thereby calculating the inflow displacement and inflow time of the molten metal in the in-mold space, and the pressure of the molten metal and the in-mold space, for the casting plan.
[0010] In the analysis device, the calculation processing device can cause the program to execute the following: selecting at least one optimal inlet from a plurality of candidate inlets for injecting the molten metal into the mold for target values of displacement and pressure of the molten metal or mold gas at any point in the mold space.
[0011] The present invention also provides a program for causing a computer to execute the above-mentioned analysis method.
[0012] The present invention also provides a casting method, which uses the above-mentioned analysis method to verify basic design aspects of a casting plan, including the orientation of a product, the inlet for molten metal, and the position of a riser, reflects the verification results in the casting plan design, and produces a casting using the optimized casting plan.
[0013] The present invention also provides a casting produced using the above casting method. Effect of the Invention
[0014] According to the casting plan analysis method and analysis device of the present invention, as well as the program, casting method, and casting using said analysis method, the analysis time can be significantly shortened. Therefore, by quickly verifying the basic design aspects of the casting plan, such as the product orientation, the molten metal inlet, and the position of the riser, it is possible to verify an infinite number of casting plans and easily derive an optimal solution for the casting plan design, even for products with unprecedented shapes. [Brief description of the drawings]
[0015] [Figure 1] FIG. 1 is a block diagram illustrating an example in which a computer program is installed to cause a computer to function as the analysis device of the present embodiment. [Diagram 2] FIG. 1 is a schematic diagram illustrating the concept of liquid column motion. [Diagram 3] FIG. 2 is a front view of a casting model to be analyzed in the embodiment. [Figure 4] FIG. 2 is a diagram showing a liquid column model of an embodiment. [Diagram 5]FIG. 2 is a diagram showing a liquid column model of an embodiment. [Figure 6] FIG. 13 is a diagram showing a branching portion of the liquid column model. [Figure 7] FIG. 13 is a diagram showing a confluence portion of a liquid column model. [Figure 8] FIG. 1 is a schematic diagram showing an experimental setup for an experiment using a water model. [Figure 9] FIG. 13 is a graph showing the analysis results when the flow rate is 106 ml / s. [Figure 10] FIG. 13 is a graph showing the experimental results when the flow rate was 106 ml / s. [Figure 11] FIG. 13 is a graph showing the analysis results when the flow rate is 98 ml / s. [Figure 12] FIG. 13 is a graph showing the experimental results when the flow rate was set to 98 ml / s. [Figure 13] FIG. 13 is a graph showing the analysis results when the flow rate is 80 ml / s. [Figure 14] FIG. 13 is a graph showing the experimental results when the flow rate was 80 ml / s. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0016] Hereinafter, preferred embodiments of the present invention will be described with reference to the drawings.
[0017] <Basic configuration of analysis equipment> 1 is a block diagram showing an example of installing a computer program to cause a computer to function as the analysis device 1 of this embodiment. The analysis device 1 is realized by installing a computer program (software) 4 in a storage device 3, such as an HDD (hard disk drive), in a computer having an arithmetic processing device 2, such as a CPU (central processing unit). The functions of the analysis device 1 are realized by cooperation between the hardware resources of the computer and the software of the computer program 4. The computer program 4 controls input / output and the like, and also causes the computer to execute the analysis method of this embodiment. The storage device 3 stores the computer program 4, a liquid column model 5, which will be described later, and analysis results 6.
[0018] The source code of the computer program 4 may be recorded in a computer-readable recording medium (not shown). This makes it possible to provide a portable recording medium in which a computer program for designing a casting plan using the analysis method of the present embodiment is recorded. Examples of the recording medium include magnetic tapes, magnetic disks such as FDs and HDDs, optical disks such as CD-ROMs, MOs, and DVDs, and recording media using semiconductor memories such as USB memories.
[0019] The arithmetic processing device 2 executes various arithmetic processing based on a computer program 4. The computer program 4 may be loaded into the storage device 3 from the portable recording medium described above, or may be loaded into the storage device 3 from a computer network such as a LAN (Local Area Network) or the Internet. The arithmetic processing device 2 and the storage device 3 are connected to each other, for example, by a bus 7. An input interface 8, an output interface 9, and a buffer unit 10 are further connected to the bus 7.
[0020] The input interface 8 functions as a kind of interface for inputting input data including the liquid column model 5 to the analysis device 1, and is connected to an input device 81 such as a keyboard or a mouse.
[0021] The output interface 9 is connected to a display device 91 such as a display. Through this output interface 9, input data input to the analysis device 1, analysis results 6 by the computer program 4, and the like are displayed on the display device 91.
[0022] The buffer unit 10 is configured, for example, by a RAM, and temporarily stores data necessary for the arithmetic processing of the computer program 4. For example, the buffer unit 10 stores input data input from the input interface 9. The stored input data is used for the arithmetic processing by the computer program 4. Note that the input data may be stored in the storage device 3, and may be called from the storage device 3 to the buffer unit 10 in response to an instruction from the computer program 4.
[0023] <Liquid column movement> The equation of motion of the liquid column, which is the basis of the analysis method of this embodiment, will be described with reference to FIG.
[0024] In Figure 2, for a liquid column in the atmosphere, the liquid surface in the tube is displaced by x from the equilibrium position, causing vibration. If the cross-sectional area is S, the density is ρ, the gravitational acceleration is g, and the length of the liquid column is h, then the liquid column acts on the liquid column with a restoring force that tries to return it to the equilibrium position. At this time, the gravity F in the high part on the left (within the range of 2x) is expressed as follows (Equation 1).
[0025]
number
[0026] The equation of motion of this liquid column is expressed by (Equation 2).
[0027]
number
[0028] In the analysis method of this embodiment, a liquid column model 5 of the product shape is created, a casting plan is added, and an equation of motion is formulated by comparing the water pressure at the branching point of the liquid column model 5. The equation of continuity at the branching point and the junction of the liquid column model 5, as well as the equation of agreement between the volume of the liquid column and the total amount of molten metal, are solved simultaneously with the equation of motion to calculate the inflow displacement and inflow time of the molten metal in the mold space, as well as the pressure of the molten metal and the mold space, for the casting plan. EXAMPLES
[0029] <Analysis example> (Creating a liquid column model) Figure 4 shows the casting model in Figure 3 converted into a liquid column model 5. In liquid column model 5, the branching and merging sections are T-shaped. Each liquid column extends vertically, and there is no change in cross-sectional area except before and after the branching and merging. The liquid columns connected to air hole a are numbered a1, a2, ..., a9, and the liquid columns connected to air hole b are numbered b1, b2, b3, b4. The height of the liquid column for liquid column number i is H i , the cross-sectional area is S i These are the various parameters for designing the casting plan.
[0030] As shown in Figure 5, consider a virtual cross section D at the bottom of the pipe, and derive the equation of motion by assuming the force transmitted through the virtual cross section D. The height of the liquid level in each liquid column from the bottom of the pipe x i Let be xa1, xa2, ···xa9, xb1, ···, and xb4, respectively.
[0031] The pressure Pa at the left side of the imaginary cross section D, i.e., the lowest part on side a, and the pressure Pb at the right side of the imaginary cross section D, i.e., the lowest part on side b, are expressed by (Equation 3) and (Equation 4), respectively. In this embodiment, the density is ρ=1000 kg / m 3 , the acceleration due to gravity is g=9.81m / s 2 , the loss coefficient of the branching part of liquid column i to liquid columns j and k is ζ i_jk, the loss coefficient at the junction of liquid columns l and m with liquid column n is ζ lm_n Let us assume that.
[0032]
number
[0033]
number
[0034] (Derivation of the equation of motion) Comparing the water pressure at the branching part of the liquid column model 5, the pressure is the same on both sides of the virtual cross section D, so the equation of motion is Pa = Pb. In other words, the equation of motion is formulated assuming that the pressure is equal on both sides of the virtual cross section D at the bottom of the liquid column model 5. Also, at any branching part, branching and merging are switched depending on whether the upward velocity of the liquid column is positive or negative, so the loss coefficient ζ of the branching and merging changes. In the analysis of this embodiment, the loss coefficient ζ of the branching part was calculated based on the literature value. i_jk The loss coefficient ζ of the junction is calculated as 1.29 at the branch and 0.5 at the merge. lm_n The same applies to.
[0035] (Continuity equation) At the branching portion of the liquid column model 5 shown in FIG. 6 and the merging portion of the liquid column model 5 shown in FIG. 7, the flow rate does not change before and after the branching and merging, so the continuity equation (Equation 5) holds.
[0036]
number
[0037] (Equation for the correspondence between the volume of the liquid column and the total amount of molten metal) The sum of the volumes of the liquid columns is equal to the total volume of the poured molten metal, V, so equation 6 holds. The total volume of the molten metal, V, is calculated by multiplying the liquid surface height x i (variable) and cross-sectional area S iIn the analysis of this embodiment, the total amount V of the poured molten metal is calculated as 0.157 L / s, which is obtained by an experiment described later.
[0038]
number
[0039] By simultaneously establishing the equation of motion (Equation 3) = (Equation 4), the equation of continuity (Equation 5), and the equation for the coincidence between the volume of the liquid column and the total amount of molten metal (Equation 6), the acceleration d 2 x i / dt 2 , speed dx i / dt, and the height of the liquid level of each column x i By substituting these into (Equation 3) and (Equation 4), the pressures Pa and Pb can be calculated.
[0040] <Experiment using water model> (Experimental Equipment) A schematic diagram of the experimental apparatus is shown in Figure 8. The main body 21 is made of ABS resin and forms the shape of the liquid column model 5. The ABS resin part is covered with an acrylic part, and the two are fixed with bolts and screws. A scale (not shown) is affixed to the acrylic part to measure the height of the liquid surface. Water is injected into the main body 21 from a submersible pump 23 through a hose 22. A flow meter (not shown) is provided to measure the flow rate of water injected from the submersible pump into the main body 21. A micromanometer 24 was used to measure the air pressure in the hollow parts on sides a and b of the main body 21.
[0041] (Experimental Procedure) The experiment was carried out according to the following procedure. (1) Measure the flow rate of the submersible pump 23 with a flow meter. (2) The submersible pump 23 is connected to the main body 21 by a hose 22. (3) The air hole on side b is blocked with a silicone plug, and the submersible pump 23 is started. (4) When the height of the liquid column on side a reaches 50 mm, remove the silicone plug and photograph the vibration of the liquid column. (5) When removing the silicone plug, change the height to 100 mm and then 150 mm, and repeat (3) and (4). (6) The air hole on side a is blocked with a silicone plug, and the submersible pump 23 is started. (7) When the height of the liquid column on side b reaches 50 mm, remove the silicone plug and photograph the vibration of the liquid column. (8) When removing the silicone plug, change the height to 100 mm and then 150 mm, and repeat (6) and (7). (9) When the micromanometer indicates 0 kPa, i.e., the moment the silicone plug is removed, is taken as the starting time. Observe the state of the photographed liquid column and plot the height every 0.1 seconds to create a graph.
[0042] <Analysis and Experimental Results> (Flow rate: 106ml / s) The analysis results and experimental results when the flow rate was 106 ml / s are shown in Figure 9 and Figure 10. The analysis time was 13.38 seconds.
[0043] (Flow rate: 98ml / s) The analytical results and experimental results when the flow rate was 98 ml / s are shown in Figure 11 and Figure 12. The analysis time in this case was 13.26 seconds.
[0044] (Flow rate: 80ml / s) The analysis results and experimental results when the flow rate was 80 ml / s are shown in Figure 13 and Figure 14. The analysis time was 12.60 seconds.
[0045] The average analysis time for the above three analyses was 13.08 seconds, which confirmed that the analysis time could be significantly reduced compared to finite element analysis, which requires more than an hour of analysis time.
[0046] Table 1 shows a comparison of the analysis results and the experiment results for the junction at a flow rate of 106 ml / s regarding the state of the liquid column at the junction. The analysis results and the experiment results agreed regarding the presence or absence of overhang. This means that by considering the overhang of molten metal, it is possible to predict the cold shut. There were some locations where the overhanging liquid column was reversed, but this is thought to be due to the fact that when the flow rate was large in the experiment, rippling caused a large error with the calculation of the initial flow velocity.
[0047] [Table 1]
[0048] <Selecting the optimal inlet> Using the analysis method of this embodiment, at least one optimal inlet can be selected from multiple candidate inlets for flowing molten metal into the mold for target values of displacement and pressure of the molten metal or mold gas at any point in the mold space.
[0049] <Casting method using analytical methods> The analysis method of the present embodiment is used to verify the basic design of the casting plan, including the product orientation, the molten metal inlet, and the position of the riser, and the verification results are reflected in the casting plan design, and the casting is manufactured using the optimized casting plan.
[0050] <Effects of the Invention> As described above, according to the analysis method of the present embodiment, the design of a casting plan, which has been conventionally performed by the designer's experience and intuition, or by reusing previous products with similar shapes, can be replaced with an analysis that takes about 10 seconds per design plan, making it possible to verify countless design plans of casting plans, and to easily and accurately design an optimal casting plan.
[0051] <Application areas> The present invention is not limited to application to sand casting and metal mold casting, which require the use of a feeder to reduce shrinkage cavities, but can also be applied to the study of pressure casting methods such as low pressure casting, high pressure casting, and die casting. [Explanation of symbols]
[0052] 1 Analysis device 2 Processing Unit 3 Storage device 4 (Computer) Programs 5 Liquid column model
Claims
1. Create a liquid column model of the product shape, add the casting plan, Formulating an equation of motion by comparing the water pressure at the branching portion of the liquid column model; The equation of continuity at the branching portion and the merging portion of the liquid column model, and the equation for the coincidence between the volume of the liquid column and the total amount of molten metal are solved simultaneously with the equation of motion. and calculating an inflow displacement and inflow time of the molten metal in the mold cavity, and a pressure of the molten metal and the mold cavity for the casting plan.
2. 2. The analysis method according to claim 1, further comprising the step of selecting at least one optimal inlet from a plurality of candidate inlets for injecting the molten metal into the mold for target values of displacement and pressure of the molten metal or the mold gas at any point in the mold space.
3. A processing unit; a storage device; The arithmetic processing device executes the program stored in the storage device, Create a liquid column model of the product shape, add the casting plan, Formulating an equation of motion by comparing the water pressure at the branching portion of the liquid column model; The equation of continuity at the branching portion and the merging portion of the liquid column model, and the equation for the coincidence between the volume of the liquid column and the total amount of molten metal are solved simultaneously with the equation of motion. Calculate the inflow displacement and inflow time of the molten metal in the mold cavity, and the pressure of the molten metal and the mold cavity for the casting plan; An analytical device that performs the above steps.
4. The arithmetic processing device writes the program selecting at least one optimal inlet from a plurality of candidate inlets for introducing the molten metal into the mold for a target displacement and pressure of the molten metal or the mold gas at an arbitrary point in the mold space; The analysis device according to claim 3 ,
5. A program for causing a computer to execute the analysis method according to claim 1 or 2.
6. A casting method, comprising: verifying basic design parts of a casting plan, including a product orientation, a molten metal inlet, and a feeder position, by using the analysis method according to claim 1 or 2; reflecting the verification results in a casting plan design; and producing a casting by using the optimized casting plan.
7. A casting produced by the casting method according to claim 6.