System for managing vegetable inside electric power plant and program for managing vegetable inside electric power plant

The in-power plant management system addresses the challenge of managing plants near the ocean by formulating management plans based on environmental and historical data, ensuring timely and effective plant care despite wind and salt damage.

JP2024154841AInactive Publication Date: 2024-10-31THE CHUGOKU ELECTRIC POWER CO INC
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023068988
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-20
Publication Date
2024-10-31
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Power plants near the ocean face unique challenges in managing plants due to wind and salt damage, which existing systems fail to address appropriately by simply determining felling timing based on tree type and age.

Method used

An in-power plant management system that analyzes environmental circumstances, including wind and salt damage, and formulates management plans using habitat information, plant information, weather data, and historical data to determine the timing and type of management actions.

Benefits of technology

Enables appropriate plant management at the right time, place, and on the plants, adapting to the unique coastal environment and improving management accuracy through machine learning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024154841000001_ABST
    Figure 2024154841000001_ABST
Patent Text Reader

Abstract

To properly manage vegetable inside an electric power plant.SOLUTION: A system for managing vegetable inside an electric power plant comprises: an inhabitation information database 341 which stores, for each of inhabiting places of vegetable inside the electric power plant, inhabitation information including an environmental condition including kinds and inhabiting years of the vegetable and a level of at least one of storm damage and salt damage at the inhabiting place; a plant information database 342 which stores, for each of the kinds of the plants, vegetable information including information on a growing speed, dryness resistance and harmful insects; and a management plan task 36 which defines acts including cutting, affusion and disinfestant for the vegetable to be management acts and lays a management plan including details, time and place of the management acts to be taken in future based upon the inhabitation information and the vegetable information.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power plant plant management system and a power plant plant management program for managing plants in a power plant. [Background technology]

[0002] Thermal power plants, nuclear power plants, and other power plants have vast green spaces within their premises, where a wide variety of plants have traditionally been managed. In this case, different types of plants have different adaptability to dryness and different types of pests that occur, so management according to the type of plant is necessary. For example, for plants that require irrigation, the timing of irrigation was determined based on the knowledge and experience of the person in charge while checking the condition of the plant. Furthermore, tree felling was also planned on an annual basis based on the experience of the person in charge.

[0003] Meanwhile, a system is known that formulates plans for operational road and network networks taking into consideration the growth of trees in forests and the timing of felling (for example, see Patent Document 1). This system takes into account the time axis of tree growth rates (values ​​obtained from a prediction formula using parameters such as tree age, number density, and thickness), and determines the profitability of felling at a specified timing based on data and information such as forest conditions such as tree species and age, weather conditions, and land conditions. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-197085 Summary of the Invention [Problem to be solved by the invention]

[0005] Incidentally, thermal power plants and nuclear power plants are generally located near the sea, and are often built on reclaimed land, which means that the plants there are susceptible to wind and salt damage, and the trees grow differently from forests, etc. Therefore, simply determining the time to cut down trees based on the type and age of the trees, as in the system of Patent Document 1, does not allow cutting down trees at the appropriate time.

[0006] Therefore, an object of the present invention is to provide a power plant plant management system and a power plant plant management program that enable proper management of plants within a power plant. [Means for solving the problem]

[0007] In order to solve the above problem, the invention of claim 1 is a plant management system within a power plant, characterized by comprising: a habitat information storage means for storing, for each habitat of a plant within a power plant, habitat information including the type of plant, the number of years it has lived, and environmental conditions including the degree of at least one of wind damage and salt damage in the habitat; a plant information storage means for storing, for each type of plant, plant information including information on growth rate, drought resistance, and pests; and a management planning means for defining actions against the plants including felling, watering, and pest control as management actions, and for formulating a management plan including the content, timing, and habitat of the management action to be performed in the future based on the habitat information and the plant information.

[0008] The invention of claim 2 is characterized in that, in the power plant plant management system described in claim 1, it is provided with a management history storage means for storing a management history including the content of management actions carried out in the past, the time of their implementation, and the habitat where they were implemented, and the management planning means formulates the management plan based on the habitat information, the plant information, and the management history.

[0009] The invention of claim 3 is characterized in that, in the power plant plant management system described in claim 1, it is provided with a weather information acquisition means for acquiring weather information in the power plant, and the management planning means formulates the management plan based on the habitat information, the plant information, and the weather information.

[0010] The invention of claim 4 is characterized in that, in the power plant plant management system described in claim 1, it is provided with a current state acquisition means for acquiring the current state of the plants, and the management planning means formulates the management plan based on the habitat information, the plant information, and the current state of the plants.

[0011] The invention of claim 5 is characterized in that, in the power plant plant management system described in claim 1, the management planning means uses a learning model for the management plan that has been machine-learned based on past performance data so that when the habitat information and the plant information are input, the management plan is output.

[0012] The invention of claim 6 is the power plant in-plant management system according to claim 1, characterized in that the environmental conditions include a traffic situation of vehicles in the habitat.

[0013] The invention of claim 7 is characterized in that, in the power plant plant management system according to claim 1, the environmental conditions include the condition of the soil in the habitat.

[0014] The invention of claim 8 is characterized in that, in the power plant plant management system according to claim 1, the environmental conditions include whether or not there is a sightseeing course around the habitat.

[0015] The invention of claim 9 is a plant management program for a power plant, characterized in that the computer functions as: a habitat information storage means for storing, for each habitat of a plant within a power plant, habitat information including the type of plant, the number of years it has lived, and environmental conditions including the degree of at least one of wind damage and salt damage in the habitat; a plant information storage means for storing, for each type of plant, plant information including growth rate, drought resistance, and information on pests; and a management planning means for defining actions against the plants including felling, watering, and pest control as management actions, and for formulating a management plan including the content, timing, and habitat of the management actions to be performed in the future based on the habitat information and the plant information.

[0016] The invention of claim 10 is characterized in that, in the power plant plant management program described in claim 9, a computer is made to function as a management history storage means for storing a management history including the content, timing, and habitat location of management actions carried out in the past, and the management planning means formulates the management plan based on the habitat information, the plant information, and the management history.

[0017] The invention of claim 11 is characterized in that, in the power plant plant management program described in claim 9, the management planning means uses a learning model for management planning that has been machine-learned based on past performance data so that when the habitat information and the plant information are input, the management plan is output. Effect of the Invention

[0018] According to the inventions described in claims 1 and 9, a management plan is automatically formulated based on habitat information including the type of plant in the habitat and environmental conditions, and plant information including the growth rate and drought resistance of each plant type, as to when, where, and what kind of management action should be taken. This makes it possible to properly manage plants in a power plant at the right time and in the right place, regardless of human knowledge or experience. Moreover, environmental conditions include the degree of wind damage and salt damage in the habitat, and a management plan is formulated based on the degree of wind damage and salt damage in the habitat, making it possible to formulate an appropriate management plan that is suited to the unique conditions of power plants, which are often built near the sea.

[0019] According to the inventions described in claims 2 and 10, a management plan is formulated based on the management history of when, where, and what management actions were carried out in the past, making it possible to formulate an appropriate management plan that takes into account management actions carried out in the past.

[0020] According to the invention described in claim 3, since a management plan is formulated based on meteorological information at the power plant, it is possible to formulate an appropriate management plan suited to the weather at the power plant.

[0021] According to the invention described in claim 4, since a management plan is formulated based on the current state of the plant, it is possible to formulate an appropriate management plan suited to the current state and circumstances of the plant.

[0022] According to the inventions described in claims 5 and 11, a management plan is output using a machine-learned learning model for a management plan, making it possible to formulate a more appropriate management plan.

[0023] According to the invention described in claim 6, a management plan is formulated based on vehicle traffic conditions in the habitat, making it possible to formulate an appropriate management plan that takes into account the impact of vehicle traffic on plants.

[0024] According to the invention described in claim 7, a management plan is formulated based on the soil condition of the habitat, making it possible to formulate an appropriate management plan that takes into account the impact of differences in soil on plants.

[0025] According to the invention described in claim 8, a management plan is formulated based on whether or not there is a tour course around the habitat. This makes it possible to formulate an appropriate management plan suited to the unique circumstances of a power plant, such as the fact that it is preferable to frequently manage plants that are visible to visitors. [Brief description of the drawings]

[0026] [Figure 1] 1 is a schematic diagram showing a plant management system in a power plant according to an embodiment of the present invention; [Diagram 2] 2 is a schematic block diagram showing the configuration of a plant management computer of the power plant plant management system of FIG. 1. [Diagram 3] 3 is a diagram showing map information stored in a habitat information database of the plant management computer of FIG. 2. [Figure 4] 3 is a functional block diagram showing a schematic configuration of a learning model for management planning in the plant management computer of FIG. 2. [Diagram 5] 3 is a diagram showing map information formulated in a management plan task of the plant management computer of FIG. 2. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] Hereinafter, the present invention will be described based on the illustrated embodiment.

[0028] FIG. 1 is a schematic diagram showing a power plant plant management system 1 according to an embodiment of the present invention. This power plant plant management system 1 is a system for managing plants P growing within the premises of a power plant G, such as a thermal power plant or a nuclear power plant, and in this embodiment, the case where the plants P are mainly trees P1 and grass P2 will be described, but other plants P can also be managed in a similar manner. Hereinafter, plants in general will be described as "plants P." Also, the power plant G is assumed to be built on reclaimed land in the sea W and to face the sea W.

[0029] The power plant plant management system 1 includes a management drone (current status acquisition means) 2 and a plant management computer 3.

[0030] The management drone 2 is an unmanned flying object that photographs and acquires the current state of the plant P while flying within the power plant G, and in this embodiment, it automatically flies along a predetermined flight route and course from a predetermined takeoff and landing point within the power plant G. That is, it is equipped with a GPS (Global Positioning System), and flies autonomously along a flight route set by the plant management computer 3 described later and stored in the management drone 2 while confirming its own position with the GPS. At this time, it may be equipped with a function to avoid objects that become obstacles to flight depending on the flight environment, etc.

[0031] The management drone 2 also includes a camera (imaging means) 21, and hovers over each habitat of the plant P to capture images of the current state of the plant P. That is, the drone 2 hovers over each habitat set on the flight route, starts up the camera 21, captures images of the plant P, and transmits the captured images to the plant management computer 3 together with position information (latitude, longitude) of the capture location.

[0032] Here, multiple such management drones 2 may be provided and flown simultaneously along different flight routes, or instead of automatic flight, they may be remotely controlled by a person. Also, the management drone 2 may continuously photograph the plant P with the camera 21 while flying along the flight route, and the images photographed at each time and the flight position (latitude, longitude) may be stored sequentially, so that it is possible to know which plant P each image is of.

[0033] In this embodiment, such a management drone 2 is started and flown when a management planning task 36, which will be described later, is started, and captures the latest current state of the plant P and transmits the image to the plant management computer 3. Alternatively, the management drone 2 may be started and flown periodically to periodically transmit images of the current state of the plant P to the plant management computer 3. In this case, the latest image received is used and referenced in the management planning task 36.

[0034] The plant management computer 3 is a computer that formulates a management plan for the plant P, and in this embodiment, is located in the office G1 of the power plant G, but may be located in another location. As shown in Fig. 2, the plant management computer 3 mainly comprises an input unit 31, a display unit 32, a communication unit 33, a memory unit 34, a weather information acquisition task (weather information acquisition means) 35, a management planning task (management planning means) 36, a learning task 37, and a central processing unit 38 that controls these.

[0035] The input unit 31 is an interface for inputting various information and commands, and specifically, inputs a management history to a management history database 343 described later, and inputs a command to start a management plan task 36. The display unit 32 is a display for displaying various data and information, and specifically, displays the management history of the management history database 343, and displays the management plan formulated in the management plan task 36. The communication unit 33 is an interface for communicating with the outside via the Internet network, a telephone communication network, and the like, and specifically, receives images from the management drone 2, and receives weather information from a weather information server 4 described later.

[0036] The memory unit 34 mainly includes a habitat information database (habitat information storage means) 341, a plant information database (plant information storage means) 342, a management history database (management history storage means) 343, a learning model for management plans 344, and a performance database for management plans 345. Here, the databases 341, 342, and 343 will be explained, and the learning model for management plans 344 and the performance database for management plans 345 will be explained later.

[0037] The habitat information database 341 is a database that stores habitat information including the type of plant P, the number of years it has lived, and the environmental conditions of the habitat for each habitat of the plant P in the power plant G. Here, "each habitat" means a place where the plant P lives and where the same management action and management plan are required for all the plants P living in that place. Even within the same habitat (area), if the amount of sunlight or the degree of salt damage is different, the plant P may be divided into multiple habitats. In addition, a management action is an action that includes at least one of care and maintenance for the plant P, such as felling (including pruning), watering, and pest control.

[0038] For each habitat, its location information (latitude, longitude) and the following information are stored: First, the type of plant P that inhabits this habitat (same meaning as the type of plant P in the plant information database 342 described later) and the number of years that the plant P has inhabited (age) are stored, and the type of plant P may be one or more. Also, the environmental circumstances of this habitat are stored, and the following information that may affect management actions and management plans for this habitat is stored in the environmental circumstances:

[0039] First, the degree of wind damage and salt damage in this habitat is stored. Second, the vehicle traffic conditions in this habitat, that is, the frequency of vehicle traffic and whether there are many large vehicles passing through, etc. are stored. Third, the soil condition in this habitat, that is, what type of soil is buried and at what ratio (soil composition), the composition of the soil, such as whether the soil is shallowly piled up with cocrete underneath, etc. are stored. Fourth, whether there is a tour course around this habitat, that is, whether plant P in this habitat can be seen well from visitors to power plant G, etc. are stored.

[0040] 3, the habitat information database 341 stores map information indicating the habitats of plants P that grow within the premises of the power plant G. That is, the database stores map information indicating, on a plan view showing the premises of the power plant G, what kind of trees P1 grow in what habitat, what kind of grass P2 grow in what habitat, and so on.

[0041] The plant information database 342 is a database that stores plant information, which is information about the plant P, for each type of plant P. Specifically, the database stores information necessary for formulating a management plan regarding what management actions should be performed and when, such as the growth rate of the plant P (including the felling time and pruning cycle), drought resistance (basic cycle for watering during dry periods, etc.), and information about pests (whether or not pests are likely to occur, the types of pests that occur, etc.).

[0042] Here, the type of plant P does not necessarily have to be an academic type or classification, but may be divided into groups or classifications necessary for formulating a management plan, and multiple types of plants P that may be managed at the same time may be considered to be the same type even if they are academically different types. For example, they may be coniferous trees, broad-leaved trees, annual herbs, biennial herbs, perennial herbs, etc.

[0043] The management history database 343 stores management history, which is information about management actions that have been performed in the past on plants P in the power plant G. Specifically, the management history includes the content of the management action (what kind of care and maintenance was performed), the time of its implementation (date), and the habitat where it was performed, that is, when, where, and what kind of management action was performed in the past.

[0044] The weather information acquisition task 35 is a task program for acquiring weather information for the power plant G. That is, the weather information server 4, which provides weather information and weather forecasts for each region, is accessed via the communication unit 33 to acquire short-term, medium-term, and long-term weather information and weather forecasts for the power plant G. Here, the weather information includes information that will affect the plant P, such as predicted temperature, humidity, rainfall, solar radiation, and drought. This weather information acquisition task 35 is started when the management planning task 36 is started, and the acquired weather information for the power plant G is used and referred to in the management planning task 36.

[0045] The management plan task 36 is a task program that is started when a start command is input or started periodically, and formulates and creates a management plan for when, where, and what kind of management action should be taken for the plants P in the power plant G. In other words, based on the habitat information and plant information, a management plan is formulated for the plants P in the power plant G, including the content of the management action to be taken in the future, the timing of the action, and the habitat where the action will be taken.

[0046] In this embodiment, a management plan is formulated for a predetermined period (different for each management action) from the time of startup. That is, a management plan is formulated for felling to be performed within a predetermined felling period from the current time, for example, within three years, a management plan for irrigation to be performed within a predetermined irrigation period from the current time, for example, within one month, and a management plan for pest control to be performed within a predetermined pest control period from the current time, for example, within three months. Alternatively, management plans for all management actions to be performed within a period specified at startup (for example, one month or one year from the current time) may be formulated.

[0047] Then, a management plan is formulated based on the habitat information stored in the habitat information database 341, the plant information stored in the plant information database 342, the management history stored in the management history database 343, the weather information acquired in the weather information acquisition task 35, and an image of the current state of the plant P received from the management drone 2.

[0048] Specifically, first, based on the habitat information and plant information, we determine what kind of management actions are necessary for each habitat, and at what timing and frequency. For example, we can determine the following: Based on the growth rate and number of years that the plant P in that habitat has, determine when (approximately how many years later) it will need to be cut down and how often it will need to be pruned. - Determine how often irrigation is required based on the drought tolerance of the plant species in that habitat. Based on information about pests in the species of plant P in the habitat, determine whether pest control is necessary and, if so, what type of pest control is needed, when and how often.

[0049] In addition, the matters formulated in this way will be adjusted taking into account the environmental conditions of the habitat. For example, the matters will be adjusted as follows: - If wind damage is severe in the habitat, the felling season should be brought forward, and if salt damage is severe, the timing and frequency of irrigation should be brought forward. If turfgrass P2 grows in that habitat and vehicles pass over it frequently, the turfgrass P2 will easily wither, so management actions will include bringing forward the irrigation time and cycle and replanting the turfgrass P2. - If the soil in the habitat is shallowly piled up with cocrete, harvest trees earlier and water earlier. If there are observation trails around the habitat, the timing and cycle of pruning, watering, pest control, and replanting of turfgrass P2 should be accelerated. - Accelerate the timing and cycle of management activities such as tree felling and pest control, taking into consideration the time between when the activities are requested of a partner company and when they are actually carried out.

[0050] In addition, the management plan is adjusted taking into account the management history, meteorological information, and the current state of plant P. For example, the plan is adjusted and formulated as follows: -The next implementation date is calculated by adding the above cycle to the previous implementation date (year, month, and day) in the management history. - If the management history shows that the timing and frequency of management actions are later or earlier than normal (than the timing and frequency established above), adjust the timing and frequency to take this into account. - If the weather information at power plant G predicts heavy rainfall in the future, the next irrigation will be canceled or the timing or cycle will be postponed. If drought is predicted to continue in the future, irrigation will be brought forward. If the current state and images of the plant P show that the plant P is deteriorating or dying faster or slower than usual, the timing and cycle are adjusted taking this into account. Even if the turfgrass P2 is one on which vehicles pass frequently, if the turfgrass P2 does not appear to have died much based on the current state and images of the plant P, the time and cycle of irrigation may be delayed or replanting of the turfgrass P2 may be canceled.

[0051] In this management plan task 36, when habitat information, plant information, management history, weather information, and the current state and image of plant P are input, a management plan is output using a management plan learning model 344 that has been machine-learned based on past performance data. This management plan learning model 344 is created by a learning task 37.

[0052] That is, the learning task 37 uses past performance data recorded and accumulated in a performance database for management plan 345 to create a learning model for management plan 344 by a known machine learning algorithm such as a neural network. This performance database for management plan 345 is a database in which performance data including management plans formulated by experts in plant management and care and experts in the management of plant P at the power plant G, etc., based on habitat information, plant information, management history, weather information, and the current state of plant P as input information, is recorded and accumulated. The past performance data includes actual habitat information, the current state of plant P, data created based on management plans actually formulated by experts and experts, and data created through advance training, etc.

[0053] As shown in Fig. 4, this learning task 37 uses machine learning and deep learning using a neural network to create a neural network based on the performance data recorded in the performance database for management plan 345, with habitat information, plant information, management history, meteorological information, and the current state of plant P as an input layer, a management plan as an output layer, and an intermediate layer for analysis processing from the input layer to the output layer. Then, the learning task 37 uses the performance data of the learning model for management plan 344 as learning data to learn various parameters in the intermediate layer. In other words, the learning task 37 learns various parameters in the intermediate layer so that an appropriate management plan is output based on the habitat information, plant information, management history, meteorological information, and the current state of plant P.

[0054] The results of the management plan thus formulated are output in text and are illustrated on the map information of the habitat information database 341 and displayed on the display unit 32. For example, as shown in Fig. 5, on a plan view showing the premises of the power plant G, a tree P1 in a habitat S1 is indicated as "cutting required in about one year" and a first color is applied to this habitat S1, a plant P (flowering plant) in a habitat S2 is indicated as "watering required in about 10 days" and a second color is applied to this habitat S2, and a plant P (flowering plant) in a habitat S3 is indicated as "pest control required within about two weeks" and a third color is applied to this habitat S3.

[0055] As described above, according to the power plant plant management system 1, a management plan is automatically formulated as to when, where, and what kind of management action should be taken, based on habitat information including the type of plant P in the habitat and environmental conditions, and plant information including the growth rate and drought resistance of each type of plant P. Therefore, it becomes possible to properly manage the plants P in the power plant G at the right time, in the right place, for the plants P, without relying on human knowledge or experience.

[0056] Moreover, the environmental circumstances include the degree of wind damage and salt damage in the habitat, and the management plan is formulated based on the degree of wind damage and salt damage in the habitat, so it is possible to formulate an appropriate management plan that is suited to the particular circumstances of the power plant G, which is often built near the sea. Also, since the management plan is formulated based on the vehicle traffic conditions in the habitat, it is possible to formulate an appropriate management plan that takes into account the impact of vehicle traffic on the plant P. Also, since the management plan is formulated based on the soil condition of the habitat, it is possible to formulate an appropriate management plan that takes into account the impact of differences in soil on the plant P. Also, since the management plan is formulated based on whether or not there is a tour course around the habitat, it is possible to formulate an appropriate management plan that is suited to the particular circumstances of the power plant G, such as the fact that it is preferable to frequently manage the plant P that is visible to visitors.

[0057] In addition, since the management plan is formulated based on the management history of when, where, and what management actions were performed in the past, it is possible to formulate an appropriate management plan that takes into account management actions performed in the past. Furthermore, since the management plan is formulated based on meteorological information at the power plant G, it is possible to formulate an appropriate management plan that is suited to the weather at the power plant G. Moreover, since the management plan is formulated based on the current state of the plant P, it is possible to formulate an appropriate management plan that is suited to the current state and circumstances of the plant P.

[0058] In addition, since the management plan is output using the machine-learned learning model for management plan 344, it is possible to formulate a more appropriate management plan.

[0059] Although the embodiment of the present invention has been described above in detail, the specific configuration is not limited to this embodiment, and even if there are design changes within the scope of the present invention, they are included in the present invention. For example, in the above embodiment, the plant management computer 3 is configured as an integrated computer, but it may be configured as multiple computers or servers, which may be arranged in different locations. In addition, although the case where the management drone 2 equipped with the camera 21 constitutes the current status acquisition means has been described, a surveillance camera arranged around each habitat, which takes pictures of the current status of the plant P, and which is connected to the plant management computer 3 may also serve as the current status acquisition means.

[0060] On the other hand, the above-mentioned power station plant management system 1 and plant management computer 3 may be configured by installing the following power station plant management program in a general-purpose computer.

[0061] That is, actions including felling, watering and pest control for plants P are regarded as management actions, and the computer is configured to store, for each habitat of plants P in the power plant G, habitat information including the type of plant P, the number of years it has lived, and environmental conditions in the habitat such as wind damage and salt damage, in the habitat, in a habitat information storage means (habitat information database 341), for storing plant information including the growth rate, drought resistance and information regarding pests for each type of plant P, in a plant information storage means (plant information database 342), and a management history storage means (management history database 343) for storing a management history including the content, timing and habitat of management actions carried out in the past. The plant P is controlled by a management planning means (management planning task 343), a weather information acquisition means (weather information acquisition task 35) for acquiring weather information at the power plant G, a current situation acquisition means for acquiring the current situation of the plant P, and a management planning means (management planning task 36) for formulating a management plan including the content and timing of management actions to be performed in the future and the habitat location to be performed, based on the habitat information, plant information, management history, weather information, and the current situation of the plant P, and the management planning means uses a management plan learning model 344 that has been machine-learned based on past performance data so that a management plan is output when the habitat information, plant information, management history, weather information, and the current situation of the plant P are input. [Explanation of symbols]

[0062] 1. Plant management system within the power plant 2 Management drone (current status acquisition method) 3. Plant Management Computer 34 Storage section 341 Habitat information database (habitat information storage means) 342 Plant information database (plant information storage means) 343 Management history database (management history storage means) 344 Learning Model for Management Planning 345 Performance database for management planning 35 Weather information acquisition task (Means of acquiring weather information) 36 Management Plan Tasks (Management Plan Tools) 4. Weather Information Server G Power Plant P plant P1 Tree P2 Turfgrass

Claims

1. a habitat information storage means for storing habitat information for each habitat of a plant in the power plant, the habitat information including the type and age of the plant and environmental conditions including the degree of at least one of wind damage and salt damage in the habitat; a plant information storage means for storing plant information including information on growth rate, drought resistance, and pests for each type of plant; a management planning means for formulating a management plan including management actions such as felling, watering and pest control for the plants, and including the content, timing and habitat location of the management actions to be implemented in the future based on the habitat information and the plant information; A plant management system for a power plant comprising:

2. A management history storage means is provided for storing a management history including the contents of management actions carried out in the past, the time of carrying out the management actions, and the habitats where the management actions were carried out; the management planning means formulates the management plan based on the habitat information, the plant information, and the management history; The plant management system in a power plant according to claim 1 .

3. A weather information acquisition means for acquiring weather information about the power plant, The management planning means formulates the management plan based on the habitat information, the plant information, and the meteorological information. The plant management system in a power plant according to claim 1 .

4. A current state acquisition means for acquiring a current state of the plant, The management planning means formulates the management plan based on the habitat information, the plant information, and the current state of the plant. The plant management system in a power plant according to claim 1 .

5. the management planning means uses a learning model for management planning that is machine-learned based on past performance data so as to output the management plan when the habitat information and the plant information are input; The plant management system in a power plant according to claim 1 .

6. The environmental conditions include vehicle traffic conditions in the habitat; The plant management system in a power plant according to claim 1 .

7. The environmental conditions include the soil conditions of the habitat; The plant management system in a power plant according to claim 1 .

8. The environmental conditions include whether there are any sightseeing trails around the habitat; The plant management system in a power plant according to claim 1 .

9. Computer, a habitat information storage means for storing habitat information for each habitat of a plant in the power plant, the habitat information including the type and age of the plant and environmental conditions including the degree of at least one of wind damage and salt damage in the habitat; a plant information storage means for storing plant information including information on growth rate, drought resistance, and pests for each type of plant; a management planning means for formulating a management plan including management actions, such as felling, watering and pest control, based on the habitat information and the plant information, the management plan including the content of management actions to be performed in the future, the timing of the actions and the habitat where the actions will be performed; A plant management program within a power plant that functions as a

10. Computer, functioning as a management history storage means for storing management history including the contents, timing, and habitat locations of management actions taken in the past; the management planning means formulates the management plan based on the habitat information, the plant information, and the management history; 10. The plant management program according to claim 9,

11. the management planning means uses a learning model for management planning that is machine-learned based on past performance data so as to output the management plan when the habitat information and the plant information are input; 10. The plant management program according to claim 9,

Citation Information

Patent Citations

  • Server, road network planning system, road network planning metho, and program

    JP2021197085A