Concrete box for open shield construction
By using channel or H-shaped steel members with insert bolts to distribute propulsion reaction forces evenly, the method prevents cracks in concrete box joints, ensuring stable installation of concrete boxes during open shield construction.
Patent Information
- Application Number
- JP2023084399
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-12-05
- Estimated Expiration
- 2043-05-23
AI Technical Summary
Existing open shield construction methods face issues with concrete boxes cracking or breaking at joints due to uneven distribution of propulsion reaction forces, especially in inro-type boxes with smooth connection end surfaces and small wall thickness, leading to instability and difficulty in installation.
The method involves maintaining a predetermined joint spacing using channel or H-shaped steel members connected with insert bolts to distribute the propulsion reaction force evenly across the inner surfaces of concrete boxes, preventing cracks and ensuring stable installation.
This approach ensures that the propulsion reaction force is transmitted through connecting members rather than directly to the joint surfaces, maintaining joint integrity and preventing cracks, allowing for safe and reliable laying of concrete boxes even under high reaction forces.
Smart Images

Figure 2024168020000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to an open shield method for constructing underground structures such as water supply and sewerage systems and underground tunnels in urban areas, and to a concrete box used therein. [Background technology]
[0002] The open shield method is a highly rational method that combines the advantages of the open cut method and the shield method. Figures 13 to 15 show an overview of the method.
[0003] In the figure, reference numeral 1 denotes an open shield machine, which is a shield machine consisting of a front section 1a with an open top, which consists of left and right side wall panels and a bottom plate connected to these side wall panels, as shown in FIG. 17, and a tail section 1b with an open top, which consists of left and right side panels and a bottom plate like the front section 1a.
[0004] A sliding retaining plate 6 extending forward is attached to the left and right cutting edges of the open shield machine 1, and propulsion jacks 3 extending from the rear end of the front section 1a toward the tail section are arranged in a row facing backward, one above the other.
[0005] In the open shield machine 1, the tail machine 1b is fitted into the rear end of the front section 1a, and a center bend section 2 is formed at the mutual fitting section, making it possible to carry out curved construction.
[0006] In the figure, 1 is the front part, and the ground at the cutting edge in front of the front part is excavated while forming a slope as shown in Figures 18 and 19 by an excavator 7 placed in front, and the excavated soil is loaded onto a dump truck for removing residual soil placed behind the excavator 7 and removed. As the excavation progresses, the sliding retaining plate 6 is extended forward to prevent loosening of the ground side with the slope.
[0007] The open shield machine 1 is advanced by extending the shield jack 3 attached to the open shield machine 1 by contacting it with the press bar 8 while the excavator 7 is excavating the ground at the face, and advancing it forward by using the thrust reaction force of the open shield machine 1 against the concrete box behind it. As the machine advances, a gap equivalent to the plate thickness of the shield machine is generated in the ground behind the open shield machine 1, so that the gap is filled with backfill injection material 17 as a secondary injection from grout holes previously installed in the concrete box 4.
[0008] After the open shield machine has excavated one box length, the shield jack 3 is retracted and the press bar 8 is removed from inside the tail section 1b, creating space for installing the concrete box 4. Before installing the concrete box 4 inside the tail section, PC steel rods 14 are inserted and fastened to the rear concrete box 4 already laid and the concrete box 4 further behind it, as shown in Figure 20.
[0009] This allows the entire construction box to have an almost integral structure, so that the thrust reaction force of the open shield machine 1 is smoothly transmitted to the multiple concrete boxes 4 already laid behind it.
[0010] After the above work, as shown in Fig. 13, the concrete box 4 is lowered into the tail section by a lifting machine 13 arranged at the rear of the open shield machine 1 and installed. After installation, a press bar 8 is installed so as to abut against the front end face of the concrete box 4. Then, backfill injection material 17 is filled as the primary injection into the tail clearance (gap) between the installed concrete box 4 and the inner surface of the tail section 1b. After filling, the open shield machine 1 is excavated again.
[0011] In addition, the backfilling work on the upper part of the laid concrete box immediately behind the tail portion 1b of the open shield machine 1 is carried out in parallel with the excavation work of the open shield machine 1.
[0012] The above operations are repeated to bury the concrete box 4 in the ground. The open shield machine 1 is assembled at the starting shaft 10, and then, after cutting the front end in the direction of travel, it is advanced while receiving a thrust reaction force from the bearing wall 12. This operation, as well as the initial excavation and the operation of reaching the destination shaft, are almost the same as those in the normal shield construction method, and so details will be omitted.
[0013] The concrete box 4 is made of reinforced concrete and is one piece consisting of a left slab 4a, a right slab 4b, a top slab 4c and a bottom slab 4d as shown in Figure 16, and the connecting end faces are smooth so that the thrust reaction force of the open shield machine 1 can be evenly distributed and transmitted to the entire slabs on both sides of the concrete box 4 that it abuts against via the press bar 8. Grout holes 24 are provided. Although not shown explicitly, there are insertion holes for the PC steel rods 14 in the haunch portion, into which the PC steel rods are inserted. The front and rear faces are open as openings.
[0014] Regarding the concrete box 4, the patent document below proposes a method of connecting concrete boxes that can prevent the concrete boxes from shifting or opening up, without compromising work efficiency or damaging the concrete boxes, even in cases where thrust is applied unevenly to the joint end faces of the concrete boxes, such as in curved construction, and furthermore, allows parts such as metal fittings to be easily removed and reused after thrust is no longer applied to the concrete box. [Patent Document 1] JP 2009-114642 A
[0015] As shown in Figure 17, in Patent Document 1, the upper end of an anchor bolt 121 embedded in the outer or inner surface of a concrete box body 4 is screwed into a fixing bracket 120 so that a standing portion 124 of the fixing bracket 120 stands on the surface of the concrete box 4, and the screw end of a fully threaded bolt 122 is passed through the standing portion 124 to span adjacent concrete boxes 4, and by screwing this in place, the fully threaded bolt 122, the fixing bracket 120, and the anchor bolt 121 can be freely attached and detached from each other, thereby connecting and fixing both concrete boxes 4.
[0016] The use of similar connecting fittings (turnbuckles, etc.) to join concrete boxes (box culverts) can also be seen in the following patent documents. [Patent Document 2] Japanese Utility Model Application Publication No. 49-113221 [Patent Document 3] Japanese Utility Model Application Publication No. 49-113221 Summary of the Invention [Problem to be solved by the invention]
[0017] These patent documents aim to prevent misalignment and gaps between concrete boxes. In the case of a so-called "ink bottle type" concrete box, in which the concave connecting end face of one concrete box is fitted into the convex connecting end face of another concrete box to connect the concrete boxes, the pressure-receiving area for the thrust reaction force at the mating part is smaller than that of a concrete box in which the connecting end face is smooth, so the stress acting on that part is greater, making it easier for the concrete to break or crack at the joint.
[0018] Furthermore, in recent years, the use of inro-shaped open-cut concrete boxes, which have been increasingly adopted with individual boxes having earthquake-resistant properties and are made flexible, is difficult to install because the thrust reaction force cannot be smoothly transmitted to the concrete box behind the open shield machine in its current state.
[0019] However, when the end face of the inro-shaped cut-and-cover concrete box is fitted with the end face of the convex part of another concrete box into its end face on the concave side, the tip of the end face of the concave part and the tip of the end face of the convex part do not abut and a certain distance is maintained so that a specified joint distance can be secured.
[0020] Therefore, the vertical dimensional accuracy of the recess end face and the smoothness of the vertical surface are not taken into consideration. Therefore, depending on the smoothness of the vertical direction and surface unevenness, etc., depending on the manufacturing accuracy of the steel frame press bar and the recess, etc., there may be some parts of the steel frame press bar that are not in contact, and local stress due to the thrust reaction force may occur and concentrate at the contact points, resulting in cracks or concrete breaks at the contact points.
[0021] In other words, the thrust reaction force of the open shield machine is not evenly distributed over the entire contact area of the recess of the concrete box, increasing the possibility of cracks occurring.
[0022] The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional examples and to provide a concrete box for open shield construction which is used under conditions where a large thrust reaction force is received and which can be laid without the occurrence of cracks or breaks at or near the connecting end faces of the concrete box, not only for concrete boxes for open shield construction which have a thin wall thickness and a smooth connecting end face, but also for ordinary inro-shaped concrete boxes for open cutting and concrete boxes in which the individual boxes have been given flexibility and have earthquake-resistant performance. [Means for solving the problem]
[0023] In order to achieve the above-mentioned object, the present invention as described in claim 1 is characterized in that a predetermined joint spacing is maintained at the joints on the inner surfaces of the top, side and bottom slabs between concrete boxes, and a plurality of channel steel members or H-shaped steel members are cross-hung in the vertical and horizontal directions as connecting members for the joints and fixed with insert bolts.
[0024] According to the present invention described in claim 1, a plurality of channel steel members or H-shaped steel members are laid horizontally as connecting members of the joint between the leading concrete box and multiple concrete box bodies laid behind it, maintaining a predetermined joint spacing, and are fixed with insert bolts. Therefore, the thrust reaction force of the open seal machine 1 does not act on the connection end face of the concrete box joint, but is transmitted sequentially to the concrete boxes laid behind via the connecting members.
[0025] Therefore, even for concrete boxes with relatively thin walls and smooth connecting end surfaces under conditions where a large thrust reaction force is expected to act, or inro-shaped cut-and-cover concrete boxes, there is no need to worry about cracks or breaks in the side wall end surfaces, and since the connecting members are fixed with insert bolts so as to maintain the specified joint spacing, these concrete boxes can be laid safely and reliably using the open shield machine 1. Effect of the Invention
[0026] As described above, the thrust reaction force associated with the excavation of the open shield machine is not transmitted to the connection end face of the laid concrete box as in conventional open shield construction methods, but can be transmitted to the laid concrete box via reaction force transmission members, connecting members, and the insert bolts that secure them.
[0027] Therefore, it is possible to safely and reliably lay concrete boxes or inro-shaped cut-and-cover concrete boxes with smooth connecting end surfaces and relatively small wall thicknesses under conditions in which a large thrust reaction force is expected to act, without causing cracks or breaks on the end faces of the concrete boxes or in their vicinity, while maintaining the specified joint spacing. [Brief description of the drawings]
[0028] [Figure 1] 1 is a cross-sectional plan view showing one embodiment of a concrete box for an open shield construction method according to the present invention. FIG. [Diagram 2] FIG. 2 is a view taken along line AA in FIG. [Diagram 3] 1 is a vertical cross-sectional side view showing one embodiment of a concrete box body for an open shield construction method according to the present invention. FIG. [Figure 4] FIG. 4 is a view taken along line BB in FIG. [Diagram 5] FIG. 1 is an enlarged cross-sectional plan view showing one embodiment of a concrete box for an open shield construction method according to the present invention. [Figure 6] 1 is a longitudinal sectional front view showing one embodiment of a concrete box body for an open shield construction method according to the present invention. FIG. [Figure 7] FIG. 7 is an enlarged view of part A in FIG. 6. [Figure 8] FIG. 2 is a cross-sectional plan view showing another embodiment of a concrete box for an open shield construction method according to the present invention. [Figure 9] FIG. 4 is a longitudinal sectional front view showing another embodiment of a concrete box body for an open shield construction method according to the present invention. [Figure 10] FIG. 10 is an enlarged view of part A in FIG. [Figure 11] FIG. 4 is a plan view showing the installation status of the buckling prevention material. [Figure 12] FIG. 4 is a front view showing the installation status of the buckling prevention material. [Figure 13] FIG. 2 is a perspective view showing the construction status of the open shield method. [Figure 14] FIG. 1 is a plan view showing an overview of the open shield method. [Figure 15] FIG. 2 is a longitudinal section showing an overview of the open shield method. [Figure 16] FIG. 2 is a perspective view of a concrete box for the open shield construction method. [Figure 17] FIG. 11 is a vertical sectional side view showing a conventional example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0029] The following describes the embodiments of the present invention. Fig. 1 is a cross-sectional plan view showing one embodiment of a concrete box for an open shield construction method of the present invention. In the figure, 1 is an open shield machine, which has been described above.
[0030] In the figure, reference numeral 18 denotes a reaction force transmission member and 21 denotes a connecting member. The reaction force transmission member 18 consists of a planar member that abuts against the rear surface of the push bar 8 (press bar) and a planar member that protrudes rearward from its rear surface and abuts against the inner surfaces of both side walls of the leading concrete box 29, and is reinforced with rib material.
[0031] The planar member that abuts against the inner surface of the leading concrete box 29 has multiple holes through which the fixing bolts 20 can be passed, and an insert 19 is embedded in the leading concrete box 29 in advance, and the fixing bolts 20 are inserted to fix the reaction force transmission member 18.
[0032] A plurality of reaction force transmission members 18 are arranged in the vertical direction on both side slabs of the leading concrete box body 29 and are connected in the vertical direction by bolts or the like.
[0033] The reaction force transmission member 18 is fixed so that the front surface of the planar member with which the rear surface of the push angle 8 (press bar) of the reaction force transmission member 18 abuts is positioned forward of the front side slab end face of the leading concrete box 29.
[0034] When the open shield machine 1 is propelled, the shield jack 3 extends and presses the pusher 8 rearward, so that the rear surface of the pusher 8 is pressed against the planar member of the reaction force transmission member 18 .
[0035] Therefore, the thrust reaction force caused by the thrust of the open shield machine 1 is not transmitted to the end faces of both side slabs of the leading concrete box 29, but is transmitted through the reaction force transmission member 18 to the inside of the leading concrete box 29 from the fixing bolts 20 and inserts 19 of the both side slabs on the inner surface of the leading concrete box 29.
[0036] The concrete box body 4 of the present invention maintains a specified joint spacing at the joints on the inner surfaces of the top, side and bottom slabs between the concrete boxes, and has a plurality of channel steel members or H-shaped steel members cross-hung in the vertical and horizontal directions as connecting members 21 at the joints and fixed in place with insert bolts.
[0037] The connecting member 21 is provided with holes for inserting the fixing bolts 20, and is firmly fixed by inserting the fixing bolts 20 into the inserts 19 pre-installed at predetermined positions across each surface of the inner surface of the concrete box.
[0038] Figures 4 to 7 show an example in which a channel steel material is used as the connecting member 21. The thrust reaction force associated with the thrust of the open shield machine 1 is transmitted from the inside of the leading concrete box 29 to the rear via the reaction force transmission member 18 installed in the leading concrete box 29, through the fixing bolts 20 and inserts 19 that secure the reaction force transmission member 18, and is then transmitted sequentially to the rear via the connecting members 21 that are cross-bridged and fixed to each joint section.
[0039] As a result, the thrust reaction force is not transmitted to the connection end faces of the joints between the concrete boxes, so there is no risk of cracks or breakage at the connection end faces. In addition, it is possible to safely lay even a spigot-shaped cut-and-cover box.
[0040] In each of the above figures, the connecting members 21 are horizontally installed at all of the joints on the inner surfaces of the top plate, side plates, and bottom plate, but depending on the magnitude of the thrust reaction force, etc., the number of connecting members 21 installed may be adjusted, or the installation locations of the connecting members may be changed to both side plates and the bottom plate.
[0041] 8 to 10 show an example in which an H-shaped steel member is used as the connection member 22. The mechanism for transmitting the thrust reaction force is the same as when the above-mentioned connection member 21 is installed, and therefore a description thereof will be omitted.
[0042] In the event that the thrust reaction force is large and there is a risk of local buckling occurring in the connecting member 22 itself installed at the joint between each concrete box body 4, local buckling can be prevented by holding down the connecting member 22 with a hydraulic jack or a strong support 23, as shown in Figures 11 and 12.
[0043] The support can also serve to prevent the box body joint from shifting when the open shield machine 1 is excavating. [Explanation of symbols]
[0044] 1...Open shield machine 1a...Front part 1b…Tail section 2…Bent section 3...Propulsion jack (shield jack) 4...Concrete box 4a...Left side plate 4b...Right side version 4c...Top version 4d...Bottom plate 4f...Haunch 6...Sliding retaining plate 7...Excavator 8...Press bar 9...Water stop bar 10...Start shaft 11...Steel sheet pile 12...Bearing wall 13...Lifting machine 14...PC steel bar 15...Backfill soil 16...Dump truck for transporting residual soil 17... Backfill injection material 18... Reaction force transmission member 19...Insert 20...Fixing bolt 21...Connection member (channel steel) 22...Connection member (H-shaped steel) 23…Support (hydraulic jack or strong support) 24...Grout hole 25...Backfilling heavy equipment 27...Connecting bolts and nuts 30...Joint
Claims
[Claim 1] A concrete box for open shield construction, characterized in that a specified joint spacing is maintained at the joints on the inner surface between the concrete boxes, and multiple channel steel members or H-shaped steel members are laid horizontally in the vertical and horizontal directions as connecting members for the joints and secured in place with insert bolts.