Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

31 results about "Joint spacing" patented technology

Ultra-short radius radial horizontal well drilling, completion tool and technique thereof

The invention relates to a radial horizontal drilling and well completion tool with super-short radius and the process, belonging to the oil exploitation industry. It adopts deflecting drilling tool and horizontal drilling tool to drill well. The deflecting drilling tool comprises guide pipe, locating drilling bit and soft drilling bar. The horizontal drilling tool comprises horizontal rotary assembly, soft drilling bar, guide pipe, bushing with concave reversing thread and convex collar. It is characterized in that on the sleeve of deflecting rotary assembly triangle padding iron is set and the tail of deflecting rotary assembly is connected with the soft drilling bar by nut; quick coupling matched with the horizontal rotary assembly is set on the soft drilling bar; bushing with concave reversing thread and convex collar are set at the tail pipe; each segment of soft bar is 140-150mm; outer spline is set at the front end of inner ball; inner spline is set on the body and is fixed by nut; the ball is set in ball bowl and body; each segment of soft bar can bend in 3-6: ; joint spacing of slotting steel pipe following the guide pipe is 100-110mm and the joint width is 3.5-4.0mm. the invention is provided with ultra-short radius of horizontal drilling well, high accuracy, short drilling period and high efficiency. It can be used in oil exploitation, gas and running water industries.
Owner:BEIJING WANWEI YITONG TECHNOLOGICAL DEV

Parallel serial embarkation mechanism motion planning method based on sea wave active compensation

ActiveCN110027678AOptimize spatial movement distributionSolve multiple problems in kinematicsCargo handling apparatusPassenger handling apparatusSea wavesStructural analysis
The invention discloses a parallel serial embarkation mechanism motion planning method based on sea wave active compensation. According to the parallel serial embarkation mechanism motion planning method, the structure of a parallel serial embarkation system is analyzed and decomposed, thus a six-degree-of-freedom parallel platform and a three-degree-of-freedom serial gangway ladder kinematic module are established, motion quantity distribution is conducted on two subsystems through a jacobian matrix pseudo-inverse technique, present mission situation and constrained situation of the subsystems are combined, motion quantity of the system is optimized by using a gradient projection method, and the situation of singularity postures of the system is avoided. According to the parallel serial embarkation mechanism motion planning method, the kinematics multi-solution problem of degree-of-freedom redundancy of a parallel serial mechanism is effectively solved, meanwhile, factors such as joint spacing and the mechanism singularity postures are comprehensively considered, space motion distribution of the parallel serial mechanism is optimized to great extent, input parameters are providedfor control of the parallel serial embarkation system, and demands of operation and maintenance under actual working situation are met.
Owner:青岛哈船智能海洋装备技术有限公司

Rapid measurement and analysis method for rock mass structural features of underground engineering

The invention relates to a rapid measurement and analysis method for rock mass structural features of underground engineering. The method comprises the following steps that: step one, a survey area isdetermined based on a survey purpose and the area is divided into a plurality of sub areas by using a large geological structure like a fault as a boundary; step two, a plurality of measuring pointsare divided in the survey area, wherein the measuring points are arranged in the survey area at intervals; step three, according to occurrence characteristics of the joints in the range of the measuring points, dominant joint groups are divided and joint measurement windows are arranged by using the center points of the measuring points as centers based on the trend occurrence characteristics of the dominant joint groups; and step four, the measurement and analysis of the tendency, the inclination angle, the average joint spacing and the average trace length of the joint are carried out basedon the joint measurement windows. Therefore, defects of large field work load, many needed measurement field indexes, and statistic analysis work delay due to the joint information full-sample measurement and statistics of the traditional surveying method are overcome; and the rapid and accurate measurement and analysis of rock mass structure surface of underground space are realized.
Owner:NORTHEASTERN UNIV

Fuzzy matter element evaluation method for cavability of rock

InactiveCN104680308AFix crashability evaluation incompatibilityResourcesCorrelation coefficientSpelunking
The invention discloses a fuzzy matter element evaluation method for the cavability of a rock. According to the method, fuzzy mathematics is organically combined with matter element analysis together, the cavability of the rock is divided into five grades of no cavability, poor cavability, better cavability, good cavability and excellent cavability as matter elements, an RQD (rock quality designation) value, uniaxial saturated compressive strength, a joint spacing, a primary undermining hydraulic radius and a water characteristic value are selected as evaluation indexes. Through membership grade calculation, correlation degree transformation and preferred membership grade treatment, a correlation coefficient fuzzy matter element for evaluating the cavability of the rock is established. An evaluation index weight is determined by adopting a summation normalization method, the membership grades, relative to different evaluation levels, of each index quantity of the rock are calculated by applying correlation degree calculation and a maximum correlation degree principle, further the membership grade evaluation is carried out on the cavability of the rock, and the problem that a single-factor index and the evaluation of the cavabiliyt of the rock are incompatible is solved. An important reference basis is provided for the evaluation of the cavability of the rock at a mine and the design of a mining method in a spontaneous caving method.
Owner:UNIV OF SCI & TECH BEIJING +2

A combination planter for arable land with adjustable row spacing

The invention discloses a plowing and sowing combined machine capable of adjusting row spacing. Multiple discharge holes are formed in the bottom of a seed storage cylinder, according to the row spacing requirements of plowing and sowing, the positions, on an installation shaft below the seed storage cylinder, of plowing mechanisms are adjusted, sowing mechanisms are installed on the corresponding discharge holes, in the walking process of the combined machine, the plowing mechanisms plow land, and meanwhile the sowing mechanisms sow seeds in the seed storage cylinder in plowed grooves; the sowing mechanisms are driven by the installation shaft of the plowing mechanisms to conduct intermittent sowing, and sowing in the grooves according to preset spacing at intervals is achieved. According to the plowing and sowing combined machine capable of adjusting the row spacing, the structure is compact, the design is reasonable, the spacing between the plowing mechanisms can be adjusted according to the plowing requirement, the sowing mechanisms are driven by the installation shaft to conduct intermittent sowing, multiple-groove plowing can be conducted on the land, and meanwhile sowing is conducted at intervals according to the preset spacing in the grooves; therefore, the sowing efficiency is greatly improved.
Owner:全椒县汊河农机服务专业合作社

Dendrobium officinale bonsai cultivation method

The invention discloses a dendrobium officinale bonsai cultivation method. The method comprises the following steps of 1, selecting seedlings of dendrobium officinale, putting a cultivation medium into a pelelith flowerpot, and then planting the seedlings of dendrobium officinale into the pelelith flowerpot; 2, conducting water and fertilizer management; 3, adopting and spraying a 500-2,000 fold paclobutrazol solution with the effective component content accounting for 15% to the plants 1-3 times every 15-20 days at least 7 days after the seedlings of dendrobium officinale are transplanted. By means of the dendrobium officinale bonsai cultivation method, the pelelith flowerpot serves as a cultivation container of dendrobium officinale, since the inside of pelelith has many pores, partial water can be stored and then slowly released to the cultivation medium, the humidity of the medium can be effectively maintained, as is tested, the watering period can be prolonged by 3-7 days under a common indoor environment, and the manual watering frequency is effectively lowered. By spraying paclobutrazol multiple times, the joint spacing of dendrobium officinale is effectively reduced, the situation that dendrobium officinale gets spindling due to insufficient illumination is prevented, and thus the overall ornament value of dendrobium officinale is increased.
Owner:FLOWER RES INST GUANGXI ACADEMY OF AGRI SCI

Top cover and side wall welding assembly structure

The invention discloses a welding assembly structure of a top cover and a side wall, comprising six parts: a top cover, a luggage installation bracket, a side wall outer panel, an upper reinforcement plate on a front column, an edge beam on an inner panel of a center column, and an upper inner panel on a front column , the top cover is provided with a sunroof reinforcement ring, and the edge of the reinforcement ring is provided with a welding block, the welding block is located between the connection part of the top cover and the connection part of the side wall outer panel, and the connection part of the inner panel on the front pillar is provided with The first plug welding hole, the reinforcement plate on the front column is provided with a welding block installation groove corresponding to the welding block, and the second plug welding hole is provided on the installation groove, and the reinforcement plate on the front column is provided with a third plug welding hole corresponding to the first plug welding hole The connection part of the side beam on the inner panel of the center column corresponds to the second plug welding hole and has a gap. The welding assembly structure of the top cover and the side wall of the present invention solves the problems of weak solder joints, prone to false welds, excessively large solder joint spacing, difficult welding operations, and inconvenient grinding when spot welding is used, and effectively improves performance and modality of the body-in-white.
Owner:北汽瑞翔汽车有限公司

Quality grading method for toppling deformed rock mass

The invention discloses a quality grading method for a toppling deformation rock mass, relates to the field of engineering investigation, and solves the problem that the existing rock mass quality grading method cannot completely, accurately and reasonably reflect the quality grade of the toppling deformation rock mass. According to the technical scheme, the quality grading method for the toppling deformation rock mass comprises the steps that firstly, the rock strength, the rock quality index, the joint spacing, the structural plane character and the rock mass integrity degree serve as basic grading indexes and are graded respectively, and according to the influence of the opening degree of a toppling fracture and the structural plane occurrence on engineering, the quality of the toppling deformation rock mass is graded; the method comprises the following steps of: respectively scoring by taking the rock mass quality grade and the rock stratum toppling degree as correction factors, calculating the total score of the quality grade of the toppled deformed rock mass by summing the score values, and finally dividing the rock mass quality grade according to the total score. The method also recommends how to determine the score value of the basic grading index and how to determine the score value of the correction factor. The method is used for quality grading of the toppling deformation rock mass.
Owner:POWERCHINA CHENGDU ENG

A rapid measurement and analysis method for rock mass structure characteristics in underground engineering

A method for rapid measurement and analysis of rock mass structure characteristics in underground engineering, comprising the following steps: Step 1, determine the survey area according to the survey purpose, and divide the area into several sub-areas with large-scale geological structures such as faults as boundaries; Step 2, in the survey Divide several measuring points in the area, and the measuring points are arranged at intervals in the survey area; step 3, according to the occurrence characteristics of the joints within the range of the measuring points, divide the dominant joint group, and according to the trend occurrence characteristics of each dominant joint group, use The central point of the measuring point is the center of the joint measurement window; step 4, based on the joint measurement window, the measurement and analysis of the tendency, inclination, average joint spacing and average trace length of the joint are carried out; the present invention overcomes the traditional joint investigation method. The measurement and statistics of the full sample of information have the disadvantages of large on-site workload, many on-site measurement indicators, and lagging statistical analysis work, etc., which can realize rapid and accurate measurement and analysis of rock mass structural surfaces in underground spaces.
Owner:NORTHEASTERN UNIV LIAONING

A fan coil temperature control valve group

ActiveCN107725832BSolve the problem of hydraulic balanceSatisfying the Problem of Spacing JoinsMultiple way valvesValve housingsRefluxTemperature control
The invention relates to a front end temperature control valve group of a fan coil of a central air conditioner. The temperature control valve group of the fan coil comprises a tee side-entering areavalve, and a middle cavity communicates with an end opening of the lower side of the tee side-entering area valve; the middle cavity is internally provided with a bottom-passing top-stopping pressuredifferential valve core part, and the middle cavity communicates with the end opening of the upper side of a tee side-entering ball valve; a lower water inlet of the left end of the tee side-enteringball valve communicates with the middle cavity all the time; and an upper water outlet of the left end of the tee side-entering area valve communicates with the middle cavity all the time, and openingand closing of the upper water outlet and the upper water inlet are realized through an area valve core. According to the front end temperature control valve group of the fan coil of the central airconditioner, a pressure difference circulating reflux pipeline is achieved at the front end of the fan coil, and pressure balance of the pipeline is protected; in addition, an extending pipe part andthe tee side-entering ball valve adopt the split structure, and the telescopic distance adjusting function of the front end temperature control valve group meets the connecting problem of different fan coil joint spacings; and the connecting mode is changed, so that the whole assembly makes construction quick, convenient, safe and reliable, and the front end temperature control valve group has very good market promotion value.
Owner:TAIZHOU BANCHENG HVAC TECH CO LTD

Temperature control valve group of fan coil

ActiveCN107725832ASolve the problem of hydraulic balanceSatisfying the Problem of Spacing JoinsMultiple way valvesValve housingsTemperature controlDifferential pressure
The invention relates to a front end temperature control valve group of a fan coil of a central air conditioner. The temperature control valve group of the fan coil comprises a tee side-entering areavalve, and a middle cavity communicates with an end opening of the lower side of the tee side-entering area valve; the middle cavity is internally provided with a bottom-passing top-stopping pressuredifferential valve core part, and the middle cavity communicates with the end opening of the upper side of a tee side-entering ball valve; a lower water inlet of the left end of the tee side-enteringball valve communicates with the middle cavity all the time; and an upper water outlet of the left end of the tee side-entering area valve communicates with the middle cavity all the time, and openingand closing of the upper water outlet and the upper water inlet are realized through an area valve core. According to the front end temperature control valve group of the fan coil of the central airconditioner, a pressure difference circulating reflux pipeline is achieved at the front end of the fan coil, and pressure balance of the pipeline is protected; in addition, an extending pipe part andthe tee side-entering ball valve adopt the split structure, and the telescopic distance adjusting function of the front end temperature control valve group meets the connecting problem of different fan coil joint spacings; and the connecting mode is changed, so that the whole assembly makes construction quick, convenient, safe and reliable, and the front end temperature control valve group has very good market promotion value.
Owner:TAIZHOU BANCHENG HVAC TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products