Scaffolding device for steel bridge repairing and steel bridge repair method
The scaffolding device with rotatable panels efficiently converts the work environment for steel bridge repair, addressing the complexity of existing methods by simplifying the transition between ventilated and dust-controlled states, thus improving repair efficiency.
Patent Information
- Application Number
- JP2023085467
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-12-05
AI Technical Summary
Existing steel bridge repair methods using suspended scaffolding require significant time and effort to convert the work environment between ventilated and dust-controlled states, complicating the repair process.
A scaffolding device with rotatable movable panels that can be easily switched between open and closed positions to create ventilated or dust-controlled work areas, using a hydraulic system for panel movement and negative pressure to manage dust.
The device allows for efficient conversion of the work environment to suit different repair tasks, reducing labor and time required for environmental adjustments, thereby enhancing overall repair efficiency.
Smart Images

Figure 2024168628000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a scaffolding device for repairing a steel bridge used for repairing a steel bridge, and a method for repairing a steel bridge using said scaffolding device for repairing a steel bridge. [Background technology]
[0002] Conventionally, repair work has been carried out on steel bridges to prevent corrosion due to rust or to repair damage such as cracks and breaks due to fatigue. Repair work is carried out on a suspended scaffolding temporarily installed directly under the bridge girder of the steel bridge. Furthermore, since blasting is generally carried out in repair work to remove rust and old paint films, the work area between the scaffolding and the bridge girder is sealed off with a sheet or the like to prevent the scattering of dust generated by the blasting.
[0003] On the other hand, in the repair work, anti-rust paint may be applied to prevent corrosion, and when applying the paint, it is necessary to ventilate the work area. For example, Patent Document 1 proposes a repair sheet with an openable and closable ventilation hole. If the work area is sealed with such a conventional repair sheet, the scattering of dust can be prevented by closing the ventilation hole of the repair sheet, while the work area can be ventilated by opening the ventilation hole. In this way, the environment of the work area can be changed according to the work. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] JP 2003-213934 A Summary of the Invention [Problem to be solved by the invention]
[0005] Incidentally, when the sheet for repair work described in the above-mentioned Patent Document 1 is used in repair work of a steel bridge, a plurality of ventilation openings are provided along the longitudinal direction of the steel bridge in order to adequately ventilate the work area. In such a configuration, it takes a lot of time and effort to close and open each ventilation opening, which causes a problem of complicating the work.
[0006] The present invention proposes a scaffolding device for repairing steel bridges and a steel bridge repair method that can be relatively easily adapted to an environment suited to each type of work depending on the type of repair work. [Means for solving the problem]
[0007] The first aspect of the present invention is a scaffolding device for repairing a steel bridge, comprising: a suspended scaffolding section that is suspended below the bridge girder section of a steel bridge and forms a work area for repair work between it and the bridge girder section; and a movable panel section that is provided on at least one of the left and right side edges of the suspended scaffolding section and is arranged to be rotatable in the left and right direction around a rotation axis along the longitudinal direction of the bridge girder section, and that can be converted into an open position where an upper opening that opens up the work area is formed between the suspended scaffolding section and the bridge girder section, and a closed position where the upper opening is closed, and which converts the work area into a blast work area for blasting the bridge girder section when the movable panel is in the closed position.
[0008] In this configuration, the movable panel is opened and closed around a pivot shaft provided on the side edge of the suspended scaffolding to open and close the upper opening, and opening the upper opening allows ventilation in the work area, while closing the upper opening prevents the scattering of dust and other particles generated in the blasting work area converted from the work area. In this way, this configuration allows relatively easy conversion between an environment suitable for repair work and an environment suitable for blasting work by opening and closing the movable panel, reducing the effort and time required for the conversion.
[0009] The second of the present invention is a steel bridge repair method performed using the steel bridge repair scaffolding device of the first of the present invention described above, characterized in that it includes a scaffolding installation step of installing the steel bridge repair scaffolding device on the steel bridge, a repair step of holding the movable panel part of the steel bridge repair scaffolding device in the open position and performing specified repair work, an area closure step of converting the work area into a blast work area by converting the movable panel part from the open position to a closed position and putting the work area into a negative pressure state after the repair step, and a blasting step of performing blast treatment in the blast work area.
[0010] In this method, the repair work can be performed in a ventilated work area by opening the upper opening, and the blasting process can be performed in a blasting work area converted by closing the upper opening and creating a negative pressure state. This allows the repair work and the blasting process to be performed in work environments suitable for each. Furthermore, the area closing process allows the environment suitable for the repair work to be converted to an environment suitable for the blasting work relatively easily, reducing the effort and time required for such an environmental conversion.
[0011] In the steel bridge repair method according to the present invention described above, a method is proposed which includes, after the blasting process, an area opening process in which the negative pressure in the blasting work area is released and the movable panel portion is converted from a closed position to an open position, and a painting process in which predetermined painting work is carried out in the work area opened in the area opening process.
[0012] In this method, the painting work can be performed in a ventilated work area by opening the upper opening, and the painting work can be performed in a work environment suitable for the painting work. Furthermore, the area opening step can relatively easily change the environment to one suitable for the painting work. Effect of the Invention
[0013] According to the steel bridge repair scaffolding device and steel bridge repair method of the present invention, the work area can be relatively easily converted between an environment suitable for repair work and an environment suitable for blasting work, reducing the effort and time required for such conversion, and overall improving the work efficiency of steel bridge repair. [Brief description of the drawings]
[0014] [Figure 1] 1A is a cross-sectional view of a scaffolding device 1 for repairing a steel bridge, showing a state in which movable panel sections 3, 3 are open, and a state in which movable panel sections 3, 3 are closed. FIG. [Diagram 2] FIG. 2 is a perspective view showing the movable panel portions 3, 3 in an open state. [Diagram 3] FIG. 2 is a perspective view showing the movable panel portions 3, 3 in a closed state. [Figure 4] FIG. 1 is a flow chart showing a steel bridge repair method. [Diagram 5] FIG. 4 is a cross-sectional view showing another example of a scaffolding device 51 for repairing a steel bridge. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0015] An embodiment embodying the steel bridge repair scaffolding device 1 and the steel bridge 101 repair method according to the present invention will be described below. 1 to 3, the steel bridge 101 comprises a plurality of main girders 102 arranged in parallel at a predetermined interval in the width direction, a plurality of piers (not shown) arranged vertically in the longitudinal direction to support the main girders 102, and a base slab 103 installed on the main girders 102, with ground covering sections 104, 104 provided on both left and right side edges of the base slab 103. In this embodiment, the bridge slab according to the present invention is constituted by the main girders 102 and cross beams (not shown).
[0016] The steel bridge repair scaffolding device 1 comprises a suspended scaffolding section 2 suspended from the main girder section 102 by a plurality of suspension chains 5, left and right movable panel sections 3 rotatably disposed on both left and right side edges of the suspended scaffolding section 2, and dustproof sheet sections (not shown) stretched over both longitudinal ends of the suspended scaffolding section 2. Note that since a conventionally known dustproof sheet section can be applied, details thereof will be omitted.
[0017] The suspended scaffolding section 2 comprises a scaffolding frame section (not shown) suspended from the suspension chains 5, and a plurality of scaffolding planks (not shown) supported and fixed to the scaffolding frame section, with a fireproof sheet and a flame-retardant protective sheet laid over the scaffolding planks (not shown). The suspended scaffolding section 2 is disposed below the main girder section 102 and approximately parallel to the bottom slab section 103, and a work area 9 is formed between the suspended scaffolding section 2 and the bottom slab section 103 where a worker can carry out repair work. In this work area 9, repair work, blasting, and the like are carried out by workers.
[0018] The movable panel section 3 is provided on both left and right side edges of the suspended scaffold section 2 via hinge members 6 so as to be rotatable in the left and right direction. The movable panel section 3 includes a substantially rectangular frame (not shown) and a flat panel made of resin attached to the frame. The length dimension of the movable panel section 3 in the vertical direction substantially perpendicular to the longitudinal direction is set to a predetermined dimension longer than the height distance between the suspended scaffold section 2 and the bottom plate section 103. As a result, as described later, when the movable panel section 3 is in the closed position, the upper part of the movable panel section 3 abuts against the side edge of the ground covering section 104 (see Fig. 1(B) and Fig. 3). The hinge members 6 are disposed on the side edges of the suspended scaffold section 2 and are connected to the lower part of the movable panel section 3, and the movable panel section 3 can be rotated around a rotation axis (not shown) along the longitudinal direction. The rotation axis of the hinge members 6 corresponds to the rotation axis according to the present invention. In this embodiment, the left-right direction is the same as the width direction of the steel bridge 101.
[0019] The left and right movable panel parts 3, 3 are rotated around the rotation axis of the hinge member 6 to change their positions between a closed position (FIGS. 1(B) and 3) in which they stand up in a substantially vertical direction and their upper parts abut the outer parts of the ground covering parts 104, 104, and an open position (FIGS. 1(A) and 2) in which they incline outwardly to the left and right from the closed position and move away from the ground covering parts 104, 104. When the left and right movable panel parts 3, 3 are in the closed position, the working area 9 is surrounded by the left and right movable panel parts 3, 3 and the dustproof sheet part, forming a sealed closed space. On the other hand, when the left and right movable panel parts 3, 3 are in the open position, upper openings 11, 11 that open upward are formed on both the left and right sides between the movable panel parts 3, 3 and the ground covering parts 104, 104. In this state, the working area 9 becomes a space that is open to the outside through the left and right upper openings 11, 11.
[0020] The steel bridge repair scaffolding device 1 of this embodiment is also provided with a panel opening / closing means (not shown) for converting the movable panel parts 3, 3 between the closed position and the open position. This panel opening / closing means includes a hydraulic cylinder for rotating the movable panel parts 3, 3 between the closed position and the open position, a holding chain for holding the movable panel parts 3, 3 at the closed position and the open position, and the like.
[0021] Furthermore, in the repair method for the steel bridge 101 of this embodiment, the above-mentioned steel bridge repair scaffolding device 1 is installed, and a negative pressure device (not shown) is also installed and used. This negative pressure device reduces the pressure in the work area 9 to create a negative pressure state, and by operating the above-mentioned movable panel parts 3, 3 in the closed position, the work area 9 is converted into a blast work area 19 in a negative pressure state. This makes it possible to prevent dust and the like generated in the blast work area 19 from scattering to the outside.
[0022] A repair method for a steel bridge 101 carried out by installing the steel bridge repair scaffolding device 1 of this embodiment will be described. In the repair method of this embodiment, as shown in Fig. 4, first, a temporary curing facility is installed on a steel bridge 101, which is the target of repair (S101). Specifically, the above-mentioned steel bridge repair scaffolding device 1 is installed on the steel bridge 101, and repair equipment, negative pressure equipment, equipment for blasting and shot peening, etc. are also installed. Here, the steel bridge repair scaffolding device 1 is installed with the left and right movable panel sections 3, 3 held in the open position.
[0023] After this, the type and thickness of the old paint film applied to the steel bridge 101 and the condition of the steel bridge 101 are investigated to identify the target areas requiring repair (S102). Then, based on the results of this investigation, the repair work procedure and the materials required for the repair are prepared, and the type and injection speed of the grit to be used in the blasting process and the shot to be used in the shot peening process are determined. Note that this step of S102 may be performed before S101.
[0024] Next, a repair process is performed on the area to be repaired identified in S102 while the movable panel units 3, 3 are held in the open position (S103). In the repair process, floor panel replacement work, concrete repair work, bearing replacement work, etc. are performed. As described above, such repair process is performed in an environment where the work area 9 is open through the upper openings 11, 11 (i.e., a ventilated environment).
[0025] After the first repair step, an area closing step is performed in which the left and right movable panel sections 3, 3 are rotated from the open position to the closed position and held in the closed position (S104). This area closing step is performed before the next blasting process, in which the movable panel sections 3, 3 are converted to the closed position and the negative pressure device is operated to put the work area 9 into a negative pressure state. This converts the work area 9 into a blasting work area 19. In this embodiment, the blasting work area 19 is maintained from the next blasting step (S105) to the surface inspection step (S108) described below.
[0026] After the area closing step, a blasting step is performed (S105). In the blasting step, blasting is performed according to the conditions such as the grit and the spraying speed determined in S102 to remove old paint film, rust, etc. adhering to the surface of the main girder section 102. Here, the blasting generates dust from the old paint film, rust, and used grit, but since the blasting is performed in the blasting work area 19 where the movable panel sections 3, 3 are held in the closed position and are in a negative pressure state, it is possible to prevent the dust from scattering to the outside. Then, the dust is collected in sequence as described below.
[0027] Next, a salt removal process (S106) is carried out to precisely remove salt adhering to the main beams 102, etc. Laser light can be used in this salt removal process.
[0028] Next, a shot peening process is performed (S107). In this embodiment, while the blasting work area 19 is maintained, a replacement process is performed before the shot peening process, in which the blasting device that sprayed the grit is loaded with the shot determined in S102 instead of the grit and made ready to spray. In the shot peening process, the fatigue strength and stress corrosion cracking resistance of the material surface of the main girder 102 are improved by performing a shot peening treatment. Since the shot peening process is performed in the blasting work area 19, it is possible to prevent the shot from scattering to the outside. Then, the used shots generated in the shot peening process are sequentially collected as described below.
[0029] After the shot peening process, the processed material surface 5 is checked (S108). This checking process includes not only visual inspection, but also comparison with an ISO8501 blast photo book, checking the roughness with a surface roughness measuring instrument, etc. This allows checking whether any unpeeled coating remains, whether the roughness of the material surface is within the standard, etc., and appropriate treatment is carried out for any insufficient areas.
[0030] Next, the area opening step is performed (S109). In this area opening step, the negative pressure device is stopped, and the left and right movable panel parts 3, 3 are rotated from the closed position to the open position and held in the open position. This converts the blast work area 19 into a work area 9, and the work area 9 is opened to the outside through the left and right upper openings 11, 11.
[0031] After this, a painting process is performed (S110). In this embodiment, heavy-duty anticorrosive painting is performed on the area that was blasted in S105. This heavy-duty anticorrosive painting is performed, for example, by applying an anticorrosive paint as an undercoat with epoxy resin paint, applying a middle coat of fluororesin paint on top of that to protect the anticorrosive paint, and then applying a top coat of fluororesin paint on top of that. This forms a new paint film that covers the material surface of the main girder section 102. This painting process is performed in an environment where the work area 9 is open through the upper openings 11, 11 (i.e., a ventilated environment).
[0032] When the painting process is completed, the process is checked (S111). This check includes not only checking the thickness of the coating after the coating has dried, but also checking the wet coating thickness during the painting operation, for example, using a wetness gauge. This check is also performed not only after the top coat is painted, but also during the undercoat and undercoat painting. The painting operation is completed when this painting check is completed.
[0033] Once all painting work has been confirmed as complete, the site is cleaned up (S112). Specifically, the steel bridge repair scaffolding device 1 is removed and collected, and the blasting device, etc. are removed. When the cleanup is complete, the entire process of the steel bridge 101 repair method is complete.
[0034] In addition to the above-mentioned steps S101 to S112, a dust collection step is performed (S120). Specifically, the used grit generated in the blasting step (S105), the used shot generated in the shot peening step (S107), and the dust including old paint film, rust, etc. generated in each step are collected while being separated.
[0035] In the repair method of this embodiment, S101 for installing a temporary protective equipment corresponds to the scaffold installation step according to the present invention. The repair step of S103 corresponds to the repair step according to the present invention, and the area closing step of S104 corresponds to the repair step according to the present invention. The area opening step of S109 corresponds to the area opening step according to the present invention.
[0036] In this way, in the steel bridge repair scaffolding device 1 of this embodiment, the left and right movable panel parts 3, 3 are opened and closed to convert the working area 9 into an open position to open it and a closed position to close it. When the working area 9 is in the open position, it becomes a ventilated environment, so that repair work and painting work can be performed in that environment. On the other hand, when the movable panel parts 3, 3 are closed at the closed position to close the working area 9 and the working area 9 is in a negative pressure state, it becomes an environment (blast work area 19) in which scattering of dust and the like to the outside can be prevented. In this environment, it is possible to prevent scattering of dust and abrasives (shots, grits) generated by blast processing and shot peening processing to the outside. In this way, the configuration of this embodiment can convert the working area 9 into an environment suitable for each work performed by the repair method by opening and closing the left and right movable panel parts 3, 3. And, since such an environment can be converted relatively easily, the effort and time required for repair can be reduced, and the work efficiency can be significantly improved.
[0037] In addition, since the steel bridge repair method of the present embodiment uses the steel bridge repair scaffolding device 1, it exerts the same effects as the steel bridge repair scaffolding device 1.
[0038] The present invention is not limited to the above-described embodiment, and may be modified as appropriate within the scope of the present invention. For example, the dimensions and shapes of the various parts in the embodiment may be modified as appropriate.
[0039] In the above embodiment, one movable panel is provided on each of the left and right sides, but the present invention is not limited to this, and multiple movable panels may be provided in a row on each of the left and right sides. In such a configuration, each movable panel may be capable of being opened and closed independently, or all the movable panels may be capable of being opened and closed integrally.
[0040] In the above embodiment, the movable panel is provided on each of the left and right sides, but the present invention is not limited to this, and the movable panel may be provided on only one of the left and right sides. In this case, for example, a dustproof sheet portion can be provided on the other of the left and right sides.
[0041] In the above embodiment, a dustproof sheet is provided at both ends of the suspended scaffold in the longitudinal direction, and one work area is provided by both dustproof sheet sections and the left and right movable panel sections, but this is not limited to the above. A plurality of dustproof sheet sections can be provided at predetermined intervals along the longitudinal direction of the suspended scaffold to partition and form a plurality of work areas, and a plurality of rows of a pair of left and right movable panel sections that open and close each work area can be provided. In this configuration, the environment of each work area can be changed independently.
[0042] In the above-mentioned embodiment, the open position and the closed position of the left and right movable panel parts can be appropriately changed and set. Specifically, in the above-mentioned embodiment, the position where the left and right movable panel parts abut the ground cover part is defined as the closed position of the movable panel parts, but this is not limited thereto, and the closed position may be defined as the position where the movable panel parts are in close contact with the ground cover part, or the closed position may be defined as the position where the movable panel parts are close to the ground cover part. Even in the latter case, by putting the working area into a negative pressure state, the same effect as the above-mentioned embodiment can be achieved.
[0043] In the above-mentioned embodiment, the movable panel parts are rotatably arranged on both left and right edges of the flat-shaped suspended scaffolding part via hinge members, but the structure of the suspended scaffolding part can be changed as appropriate. Another example of a scaffolding device 51 for repairing a steel bridge is shown in FIG. 5. In this configuration, a suspended scaffolding part 52 is provided, which is composed of a flat-shaped scaffolding part 52a and side scaffolding parts 52b, 52b erected on both left and right edges of the flat-shaped scaffolding part 52a, and movable panel parts 53, 53 are provided on the upper edges of the side scaffolding parts 52b, 52b via hinge members 56, 56. Here, the left and right movable panel parts 53, 53 can be changed in position between a closed position (FIG. 5(B)) in which they abut against the ground covering parts 104, 104 and an open position (FIG. 5(A)) in which they are separated from each other, and when in the open position, an upper opening 61, 61 is formed between the ground covering parts 104, 104. As in the above-mentioned embodiment, the scaffolding includes a panel opening / closing means (not shown) for converting the movable panel parts 53, 53 between the open position and the closed position and holding them at each position. The flat scaffolding part 52a has the same structure as the suspended scaffolding part in the above-mentioned embodiment, and the side scaffolding part 52b has a disaster prevention sheet and a fire-retardant protective sheet attached to the inner surface of the scaffolding board part supported and fixed to the frame part, similar to the flat scaffolding part 52a. Even in the configuration of this other example, the repair method of the above-mentioned embodiment can be carried out by opening and closing the left and right movable panel parts 53, 53, and the same effect as that of the embodiment can be achieved. [Explanation of symbols]
[0044] 1,51 Scaffolding equipment for steel bridge repair 2,52 Suspended scaffolding 3,53 Movable panel part 9 Working area 11,61 Upper opening 19 Blast Work Area 101 Steel Bridge 102 Main girder section (bridge girder section) 103 Bottom plate part
Claims
1. A suspended scaffolding section that is suspended below the bridge girder section of the steel bridge and forms a work area for repair work between the suspended scaffolding section and the bottom slab section of the steel bridge; a movable panel section that is provided on at least one of the left and right side edges of the suspended scaffolding section and is arranged to be rotatable in the left and right direction around a rotation axis along the longitudinal direction of the bridge girder section, and that is converted into an open position that forms an upper opening between the bottom slab section and the suspended scaffolding section to open the work area, and a closed position that closes the upper opening; Equipped with A scaffolding device for repairing a steel bridge, characterized in that, when the movable panel is in the closed position, the work area is converted into a blast work area for blasting the bridge girder portion.
2. A steel bridge repair method using the steel bridge repair scaffolding device according to claim 1, A scaffolding installation process for installing the steel bridge repair scaffolding device on a steel bridge; A repair process in which a movable panel portion of the steel bridge repair scaffolding device is held in an open position to perform a predetermined repair work; a region closing process for closing the work area to a blast work area by converting the movable panel portion from an open position to a closed position and putting the work area into a negative pressure state after the repair process; a blasting step of performing a blasting process in the blasting work area; A steel bridge repair method comprising the steps of:
3. a region opening step of releasing the negative pressure in the blasting work region and converting the movable panel portion from a closed position to an open position after the blasting step; a painting process in which a predetermined painting operation is performed in the work area opened in the area opening process; 3. The steel bridge repair method according to claim 2, further comprising:
Citation Information
Patent Citations
Sheet for repair work
JP2003213934A