Flash unit and method for removing residues after shutdown

The flash device with a high-pressure air and water supply system efficiently removes residues from flash tanks, addressing clogging issues and reducing shutdown duration.

JP7589516B2Active Publication Date: 2024-11-26SUMITOMO METAL MINING CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2020191623
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-11-18
Publication Date
2024-11-26
Estimated Expiration
2040-11-18

AI Technical Summary

Technical Problem

The accumulation of leaching residues at the bottom of flash tanks due to their high-temperature, high-pressure conditions leads to clogging of drain pipes, prolonging the shutdown period and reducing the operating efficiency of hydrometallurgical equipment.

Method used

A flash device equipped with a high-pressure air and industrial water supply system, along with a method involving cooling displacement, agitation, and controlled extraction processes to efficiently remove residues from the flash tank after shutdown.

Benefits of technology

The method significantly reduces the shutdown duration by effectively removing residues, allowing for quicker inspection and repair of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007589516000001
    Figure 0007589516000001
  • Figure 0007589516000002
    Figure 0007589516000002
  • Figure 0007589516000003
    Figure 0007589516000003
Patent Text Reader

Abstract

To provide a flash device and a method for efficiently extracting a residue such as a leach residue left inside a flash tank.SOLUTION: A flash device 9 is positioned on a downstream side of an autoclave 4 which performs exudation processing with a sulfuric acid in a high temperature / high pressure condition on ore slurry which is prepared by adding water to ore including metal, receives the exuded high temperature and high pressure slurry generated by the exudation processing, and flashes the same. The flash device comprises: a flash tank 10 for separating steam generated by the flash into a gas and liquid, and discharging the exuded low temperature and low pressure slurry after the flash by overflow; and a supply pipeline system 20 for high pressure gas and industrial water which is coupled to a drain pipe 13 coupled to a bottom drain nozzle of the flash tank 10 through a partition valve 21.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a flash unit that is located downstream of a high-pressure reactor in which valuable metal-containing ores, such as nickel oxide ores, are subjected to acid leaching treatment under high-temperature and high-pressure conditions, and that reduces the pressure of a leaching slurry produced by the acid leaching treatment, and a method for extracting the residue after the operation of the flash unit is stopped. [Background technology]

[0002] As a hydrometallurgical method for nickel oxide ore, a high-pressure acid leaching method, also known as the HPAL (High Pressure Acid Leaching) method, is known, in which an ore slurry prepared by adding water to nickel oxide ore is introduced into a high-pressure reaction vessel called an autoclave together with high-pressure steam, and then sulfuric acid is added to carry out a leaching treatment under high temperature and high pressure to leach valuable metals such as nickel and cobalt, as shown in Patent Document 1. In this high-pressure acid leaching method, the leachate containing valuable metals produced in the leaching treatment is extracted from the autoclave together with the leach residue as a high-temperature and high-pressure leach slurry, and the leach residue is separated and removed in the next step.

[0003] The leaching residue is generally separated and removed using a thickener that separates solid and liquid by gravity settling, and the high-temperature, high-pressure leaching slurry is introduced into a flash tank before being separated into solid and liquid in the thickener, where it is reduced in pressure to approximately normal pressure by flashing. The steam generated by this flashing is generally reused as a heat source for the preheater for the ore slurry in the upstream stage of the autoclave. Meanwhile, the low-temperature, low-pressure leaching slurry after the flashing temporarily remains at the bottom of the flash tank, and is then discharged by overflow and transferred to the downstream thickener.

[0004] As described above, the flash tank is exposed to harsh conditions where high-temperature, high-pressure leach slurry containing sulfuric acid flows in forcefully and flashes inside, so the flash tank is lined with bricks to improve corrosion resistance and wear resistance. However, during long-term operation, the bricks may wear or deteriorate due to physical impacts, thermal stress, corrosion by sulfuric acid, etc., making it necessary to periodically stop operation of the hydrometallurgical facility to open and inspect the inside and repair the bricks as necessary. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2010-31341 A Summary of the Invention [Problem to be solved by the invention]

[0006] As described above, since the high-temperature and high-pressure leaching slurry discharged from the autoclave is introduced into the flash tank, in order to open and inspect the flash tank after the operation is stopped, it is necessary to first cool the autoclave and the flash tank and remove the residues such as leaching residues remaining inside these devices. Therefore, after stopping the introduction of the ore slurry raw material and sulfuric acid into the autoclave, a shutdown operation is generally performed in which water is introduced into the autoclave to replace the ore, leaching residues, and other residues remaining inside with water while cooling. The water introduced into the autoclave is discharged from the autoclave together with the above-mentioned residues such as the ore, and then introduced into the downstream flash tank, where it is cooled in the same way to replace the residues such as leaching residues remaining inside. The water introduced into the flash tank is discharged from the overflow nozzle together with the residues.

[0007] After continuing this cooling and residue replacement with water for a certain period of time, when it is confirmed that the autoclave has reached a specified temperature, the introduction of water into the autoclave is stopped. This allows the flash tank to be cooled in the same way, but since solids such as leaching residue have a higher specific gravity than water, the solids that remain below the overflow nozzle are difficult to discharge from the flash tank and remain in the flash tank diluted with water.

[0008] Therefore, after the introduction of water is stopped, the drain valve at the bottom of the flash tank is generally opened to remove the leach residue and other solids remaining in the flash tank together with the water from the drain pipe. However, the leach residue and other solids tend to accumulate at the bottom of the flash tank and tend to become compacted and clog the drain pipe, and it takes time and effort to break down the deposits and remove the clogging solids. As a result, the hydrometallurgical facility is often shut down for a long period of time, resulting in a problem of a reduced operating rate.

[0009] The present invention has been made in consideration of the above-mentioned circumstances, and has an object to efficiently extract residues such as leaching residue remaining in a flash tank, which is located downstream of a high-pressure reactor in which a slurry of an ore such as nickel oxide ore is subjected to acid leaching treatment under high-temperature and high-pressure conditions, and which receives the leaching slurry produced by the acid leaching treatment from the high-pressure reactor and reduces the pressure in the flash tank, after operation is stopped. [Means for solving the problem]

[0010] In order to achieve the above object, the flash device according to the present invention is a flash device located downstream of a high-pressure reaction vessel in which an ore slurry prepared by adding water to a metal-containing ore is leached with sulfuric acid under high-temperature, high-pressure conditions, and receives and flashes the high-temperature, high-pressure leaching slurry produced by the leaching process, and comprises a flash tank which separates the steam produced by the flash into gas and liquid and which discharges the low-temperature, low-pressure leaching slurry after the flash by overflow, and a drain pipe connected to a bottom drain nozzle of the flash tank.Between the drain valve and the auxiliary drain valve and a supply piping system for high-pressure air and industrial water connected to the The supply piping system is composed of a high-pressure air supply pipe and a high-pressure air supply valve provided at the end of the pipe, and an industrial water supply pipe and an industrial water supply valve provided at the end of the pipe. It is characterized by the above.

[0011] The method for removing residues from a flash tank according to the present invention is a method for removing residues from a flash tank after the operation of the flash tank is stopped, the flash tank being located downstream of a high-pressure reactor in which a leaching treatment is carried out with sulfuric acid under high-temperature and high-pressure conditions on an ore slurry prepared by adding water to a metal-containing ore, and receiving and flashing the high-temperature and high-pressure leaching slurry produced by the leaching treatment, the method comprising the steps of: Continue for a specified period of time a step of introducing water to replace the residue while cooling the high-pressure reactor and the flash tank in this order with the water; After the predetermined time of water introduction has elapsed blowing high pressure air into the bottom of the flash tank to agitate the residue slurry in the flash tank produced by the displacement; Confirm the completion of the replacement with water. Introduction of the water and blowing in the high pressure air. Stop did thereafter withdrawing the residue slurry from the flash tank through a drain line. a step of introducing a predetermined amount of industrial water from the bottom of the flash tank after the extracting step to slurry the residue remaining in the flash tank after the extracting step; a step of continuously blowing high-pressure air into the bottom of the flash tank for a predetermined period of time after the introduction of the predetermined amount of industrial water to agitate the slurried residue; and a step of withdrawing the slurried residue from the flash tank through a drain pipe after the predetermined period of blowing high-pressure air has elapsed. The present invention is characterized in that it comprises: Effect of the Invention

[0012] According to the present invention, since residues such as leaching residues remaining in the flash tank after shutdown can be efficiently removed, it is possible to shorten the shutdown period. [Brief description of the drawings]

[0013] [Figure 1] FIG. 2 is a block flow diagram of one embodiment of a hydrometallurgical process carried out using a hydrometallurgical facility equipped with a flash device of the present invention. [Diagram 2] FIG. 1 is a schematic process flow diagram showing one embodiment of a flash facility of the present invention, with a preheater and an autoclave upstream of the facility. [Diagram 3] FIG. 3 is a flow diagram showing the operating state of the flash facility shown in FIG. 2 during operation. [Figure 4]FIG. 3 is a flow diagram showing how cooling and residue replacement are performed with water used to cool the autoclave in the flash equipment shown in FIG. 2. [Diagram 5] FIG. 3 is a flow diagram showing how the residue slurry made into a slurry with water is stirred with high-pressure air introduced from the bottom in the flash equipment shown in FIG. 2. [Figure 6] FIG. 3 is a flow diagram showing how the residue slurry, which has been slurried with water and uniformly stirred, is discharged from the drain pipe by opening the drain valve at the bottom in the flash equipment shown in FIG. 2. [Figure 7] FIG. 3 is a flow diagram showing how the residue remaining inside the flash equipment shown in FIG. 2 is turned into a slurry by introducing industrial water from a drain pipe at the bottom. [Figure 8] FIG. 3 is a flow diagram showing how the residue slurry remaining inside the flash equipment shown in FIG. 2 in a slurried state with water is stirred with high-pressure air introduced from the bottom. [Figure 9] FIG. 3 is a flow diagram showing a state in which the level of the residue remaining after being removed from the drain pipe is lower than the lowest part of the manhole in the body in the flushing equipment shown in FIG. 2. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] First, a specific example of a hydrometallurgical process for nickel oxide ore performed using hydrometallurgical equipment equipped with a flash facility of the present invention will be described with reference to Fig. 1. The hydrometallurgical process shown in Fig. 1 includes a leaching step S1 in which an ore slurry prepared by adding water to a raw nickel oxide ore is leached with sulfuric acid under high-temperature and high-pressure conditions to leach nickel and cobalt as valuable metals, and a countercurrent multi-stage washing step S2 in which the leached slurry produced by the leaching process is reduced in pressure and cooled in a flash tank, and then the leached slurry and washing water are made to flow countercurrently through a plurality of continuous thickeners to separate the leachate containing the valuable metals from the leach residue. The process generally comprises a neutralization step S2 in which a neutralizing agent is added to the leachate to separate and remove impurity elements, mainly iron, contained in the leachate as a neutralization precipitate to obtain a neutralized final liquid, a liquid purification step S4 in which a sulfiding agent such as hydrogen sulfide is added to the neutralized final liquid under slightly pressurized conditions to remove zinc as an impurity to obtain a nickel recovery mother liquor, and a nickel recovery step S5 in which a sulfiding agent such as hydrogen sulfide is added to the nickel recovery mother liquor under pressurized conditions to recover nickel and cobalt in the form of a mixed sulfide.

[0015] Among the above-mentioned series of wet processes, a leaching treatment facility mainly composed of a preheater 1, an autoclave 4, and a flash unit 9 as shown in FIG. 2 is used in the preceding stages of the leaching process S1 and the countercurrent multi-stage washing process S2. The preheater 1 receives the ore slurry sent from an ore slurry tank (not shown) that temporarily stores the ore slurry prepared by adding water to nickel oxide ore, and heats the received ore slurry by reusing steam recovered in a flash unit 9 (described later) as a heat source. As the nickel oxide ore as the raw material, so-called laterite ores such as limonite ore and saprolite ore are mainly used. Laterite ores usually have a nickel content of 0.8 to 2.5 mass% and are contained in the form of hydroxide or magnesia (magnesium silicate) mineral. Although FIG. 2 shows the preheater 1 composed of one tank, the preheater 1 may be composed of two or more tanks in series.

[0016] The ore slurry heated in the preheater 1 is pressurized by a slurry pump 2 and then introduced into an autoclave 4 via an ore slurry supply line 3. The autoclave 4 has a shape of a substantially cylindrical pressure vessel turned sideways, and its interior is divided by weirs 4a into a number of storage sections arranged in a row (four storage sections are illustrated in FIG. 2). Of these storage sections, the one at the left end of the drawing, which is located on the most upstream side, receives the leaching slurry from the autoclave 4, and sulfuric acid is also introduced from a sulfuric acid supply source (not shown) via a sulfuric acid supply line 5. High-pressure steam is also introduced into the autoclave 4 via a steam supply line 6.

[0017] The ore slurry introduced into the autoclave 4 is stirred by agitators (not shown) installed in each storage section, overflows the weir 4a, and is transferred to the adjacent storage section on the downstream side in sequence, during which acid leaching is performed under high temperature and high pressure conditions with a slurry temperature of about 200 to 270°C and an atmospheric pressure of about 1.8 to 5.8 MPaG. As a result, the valuable metals nickel and cobalt are leached from the ore.

[0018] The leachate containing valuable metals produced by the above leaching, together with a leach residue mainly composed of hematite and having an iron content of about 55 to 60 mass %, is extracted as a leach slurry from the most downstream storage section at the right end of the autoclave 4 on the page by pressure difference through an extraction line 7. When the leach slurry is extracted, the liquid level in the most downstream storage section is controlled by the opening of a level control valve 8 provided on the extraction line 7.

[0019] The high-temperature, high-pressure leaching slurry extracted from the autoclave 4 is introduced into a flash unit 9, where it is depressurized to approximately atmospheric pressure, before being subjected to multistage countercurrent washing in a series of multiple thickener groups. Although Fig. 2 shows the flash unit 9 consisting of one flash tank, the flash unit 9 may also be composed of two or more flash tanks connected in series, in which case the high-temperature, high-pressure leaching slurry is depressurized in stages by these multiple flash tanks.

[0020] The flash device 9 comprises a vertical cylindrical flash tank 10 equipped with an overflow nozzle in its body, and a supply piping system 20 for high-pressure air and industrial water introduced from the bottom of the flash tank 10. To explain in detail with reference to Figures 2 and 3, the high-temperature, high-pressure leaching slurry extracted from the autoclave 4 is introduced from the top of the flash tank 10, which is maintained at an operating pressure lower than that of the autoclave 4, and flashed.

[0021] The steam generated by the flash is separated from the leaching slurry in the flash tank 10 and discharged from the top nozzle, and is transferred to the preheater 1 via a steam recovery line 11 connected to the top nozzle, where it is reused as a heat source for heating the ore slurry as described above. On the other hand, the leaching slurry, whose temperature has been reduced by the removal of the latent heat of evaporation by the steam generated by the flash, temporarily resides in the lower part of the flash tank 10, and then is extracted by overflow from the overflow nozzle 10a in the body of the flash tank 10 and is transferred to the downstream thickener group via an overflow line 12 connected to the overflow nozzle 10a.

[0022] A drain pipe 13 is connected to the bottom drain nozzle of the flash tank 10, and a drain valve 14 and a sub-drain valve 15, both of which are closed during operation, are provided on the drain pipe 13. These drain valves 14 and sub-drain valves 15 are opened as necessary during inspection equipment after operation is stopped, and this allows residues such as leachate residues remaining inside the flash tank 10 to be extracted through the drain pipe 13. A strainer 11b is provided at the inlet of the bottom drain nozzle to prevent excessively large solids that may clog the drain pipe 13, such as brick pieces that have fallen off the inner wall of the flash tank 10 and scale peeled off from the liquid-contacting parts of the autoclave 4, from flowing into the drain pipe 13.

[0023] A supply piping system 20 for supplying high-pressure air and industrial water is connected to the drain pipe 13 between the drain valve 14 and the sub-drain valve 15 via a gate valve 21. This supply piping system 20 is composed of a high-pressure air supply piping 22 that introduces high-pressure air supplied from a high-pressure air supply source (not shown), such as a compressor, into the flash tank 10, a high-pressure air supply valve 23 provided at the end of the pipe on the gate valve 21 side, and an industrial water supply piping 24 that introduces industrial water supplied from an industrial water supply source (not shown), such as an industrial water tank and an industrial water supply pump, into the flash tank 10, and an industrial water supply valve 25 provided at the end of the pipe on the gate valve 21 side.

[0024] Next, a method of extracting the residue remaining in the flash device 9 after the operation is stopped according to an embodiment of the present invention will be described with reference to Figs. 4 to 9. In Figs. 4 to 9, the valves drawn in white indicate that they are in a closed state, and the valves drawn in black indicate that they are in an open state. First, the supply of the raw material ore slurry to the preheater 1 shown in Fig. 2 and the supply of sulfuric acid to the autoclave 4 are stopped, and the supply of high-pressure steam to the autoclave 4 is gradually reduced to stop the operation. In this state, as a cooling and replacing step, industrial water is preferably introduced from the preheater 1 and is made to flow through the preheater 1, the autoclave 4, and the flash tank 10 in this order. As a result, these devices are cooled with the industrial water, and the residues such as the ore slurry and the leaching slurry remaining inside these devices are replaced with the industrial water.

[0025] In the above cooling and replacement step, as shown in Fig. 4, industrial water discharged from the upstream autoclave 4 together with replaced residues such as leaching residue is introduced into the flash tank 10. As a result, residues such as leaching residue remaining at the bottom of the flash tank 10 are gradually replaced with this industrial water, and the replaced residues are discharged together with the industrial water from the overflow nozzle 10a on the side of the flash tank 10. In this cooling and replacement step, as shown in Fig. 4, the drain valve 14, the auxiliary drain valve 15, the gate valve 21, the high-pressure air supply valve 23, and the industrial water supply valve 25 are all closed, similarly to during operational operation.

[0026] After continuing the above cooling and replacement process for a certain period of time, when it is confirmed that the industrial water discharged by overflow from the flash tank 10 contains almost no solids or that the solids content has decreased, the high-pressure air supply valve 23 and gate valve 21 of the supply piping system 20 are opened, and the drain valve 14 is also opened to blow in high-pressure air from the bottom of the flash tank 10, as shown in Fig. 5. This causes the solids remaining inside the flash tank 10, mainly consisting of leach residue, to be agitated with the industrial water transferred from the autoclave 4, making it possible to discharge the residue again from the overflow nozzle of the flash tank 10.

[0027] The pressure of the high-pressure air introduced into the flash tank 10 is desirably higher than the pressure inside the flash tank 10 when it receives the industrial water transferred from the autoclave 4 in the cooling and replacement step, and lower than the operating pressure of the flash tank 10 during normal operation. For example, when the flash equipment 9 is composed of two flash tanks connected in series, the pressure inside the first flash tank when it receives the industrial water transferred from the autoclave 4 is about 500 kPaG, and the operating pressure during normal operation is about 1800 kPaG, so that the pressure of the high-pressure air is preferably within the range of 500 to 1800 kPaG.

[0028] If the pressure of the high-pressure air introduced into the flash tank 10 is equal to or lower than the pressure inside the flash tank 10 when receiving the industrial water transferred from the autoclave 4, the high-pressure air cannot be blown into the flash tank 10. Conversely, if the pressure of this high-pressure air is equal to or higher than the operating pressure of the flash tank 10 during operation, there is an increased risk that the rupture disk for emergency decompression installed in the flash tank will burst.

[0029] It is preferable to continue blowing the high-pressure air until the residues inside the preheater 1, autoclave 4, and flash tank 10 are sufficiently replaced with the industrial water supplied to the preheater 1. The fact that the residues have been sufficiently replaced with the industrial water can be determined by the fact that the industrial water discharged from the overflow nozzle 10a of the flash tank 10 contains almost no solid matter. Alternatively, it may be determined that the residues have been sufficiently replaced by the fact that the temperature of the autoclave 4 has been reduced to a predetermined temperature based on past operating data or the like.

[0030] When the replacement with the industrial water is completed, the supply of the industrial water to the preheater 1 is stopped, and the high-pressure air supply valve 23 and the gate valve 21 are closed to stop the blowing of the high-pressure air into the flash tank 10. At this time, the drain valve 14 may be left open. Next, as shown in Fig. 6, in the extraction step, if the drain valve 14 was closed in the previous step, it is opened and then the auxiliary drain valve 15 is opened to extract the slurry-like residue remaining in the flash tank 10 through the drain pipe 13. After it is confirmed that the slurry-like residue is not discharged from the outlet of the drain pipe 13, the auxiliary drain valve 15 is closed to end the extraction step through the drain pipe 13. At this time, the drain valve 14 may be left open.

[0031] Next, in order to slurry the solids such as the leaching residue remaining in the flash tank 10 without being discharged in the above-mentioned extraction step and to increase the fluidity, as shown in Fig. 7, in a slurrying step, if the drain valve 14 was closed in the previous step, it is opened and then the industrial water supply valve 25 and the gate valve 21 of the supply piping system 20 are opened to introduce industrial water into the bottom of the flash tank 10. During this slurrying step, it is preferable to introduce industrial water to such an extent that it is not discharged from the overflow nozzle 10a. Specifically, industrial water is introduced at a flow rate of 300 m 3 / h for about 10 minutes.

[0032] When the above-mentioned predetermined amount of industrial water is introduced, the industrial water supply valve 25 is closed, and instead, as shown in Fig. 8, as an air re-injection step, the high-pressure air supply valve 23 is opened to inject high-pressure air, preferably at a pressure of about 500 to 1800 kPaG, for about 10 minutes. This stirs the residue slurry obtained in the previous slurrying step, thereby increasing the fluidity of the residue slurry. After the elapse of about 10 minutes, the high-pressure air supply valve 23 and the gate valve 21 are closed to stop the injection of high-pressure air, and as a re-extraction step, the auxiliary drain valve 15 is opened to extract the above-mentioned residue slurry again through the drain pipe 13, as in the case of Fig. 6 described above.

[0033] After completion of this re-extraction step, the top nozzle or top manhole of the flash tank 10 is opened, and as a confirmation step, a dipstick is used to confirm the level of the solid matter remaining without being discharged from the drain pipe 13. If, as a result of this confirmation, the level of the solid matter remaining in the flash tank 10 has fallen to or below the lowest level L of the manhole 10c in the body, as shown in Fig. 9, it can be determined that the extraction method of the embodiment of the present invention has ended. On the other hand, if the level of the solid matter remaining in the flash tank 10 is higher than the lowest level L of the manhole 10c, the above-mentioned slurrying step, air re-blowing step, re-extraction step, and confirmation step are repeated until the level of the solid matter falls to or below the lowest level L.

[0034] In this way, by lowering the level of the solid matter remaining in the flash tank 10 to below the lowest level L of the manhole 10c, it becomes possible to open the manhole 10c without any particular problems. This makes it possible to enter the inside of the flash tank 10 without causing problems such as scattering of the residual matter when the manhole 10c is opened, so that it is possible to quickly begin work such as inspecting or repairing the bricks inside the flash tank 10 after extracting the solid matter remaining in the flash tank 10 using a vacuum or the like as necessary. EXAMPLES

[0035] (Example) Following the block flow shown in Figure 1, nickel oxide ore as a raw material was hydrometallurgically smelted to produce nickel-cobalt mixed sulfide, and then the operation of the hydrometallurgical plant was stopped to carry out a regular internal inspection. In the leaching treatment equipment consisting of a preheater 1, an autoclave 4, and a flash tank 10 shown in Figure 2, industrial water was first introduced from the preheater 1 in an amount of about 1 / 3 the volume of the autoclave 4 per hour to cool the leaching treatment equipment and to remove residues such as the ore slurry and leaching slurry in the system (cooling replacement process). In this case, in the flash tank 10, the industrial water containing the replaced residues such as the leaching residue was discharged by overflow as shown in Figure 4.

[0036] Three hours after the start of the introduction of the industrial water, the flash tank 10 (capacity 195 m) was 3 ) through the supply piping system 20 to supply high-pressure air at a pressure of 700 to 800 kPaG at a flow rate of 1400 Nm 3 / h (air blowing step). After 7 hours had passed since the start of the introduction of the industrial water, the temperature of the autoclave 4 had dropped to a predetermined temperature, so the introduction of the industrial water was stopped and the blowing of the high-pressure air was also stopped.

[0037] Next, as shown in Fig. 6, the residue in the flash tank 10 diluted with industrial water was extracted from the drain pipe 13 (extraction process). In this extraction process, industrial water at a pressure of 550 to 650 kPaG was supplied at a flow rate of 300 m3 from the bottom of the flash tank 10 via a supply piping system 20, as shown in Fig. 7. 3 The mixture was introduced at a rate of 1000 / h for about 10 minutes to form a slurry (slurrying step).

[0038] In order to agitate the slurried solid matter, as shown in Fig. 8, the introduction of industrial water was switched to the introduction of high-pressure air in the supply piping system 20, and the high-pressure air was blown in from the bottom of the flash tank 10 for 10 minutes (air re-blowing step). After continuing this re-blowing of high-pressure air for 10 minutes, the slurried solid matter was extracted from the drain pipe 13 (re-extraction step). Thereafter, the nozzle at the top of the flash tank 10 was opened, and a measuring rod was used to check whether the level of the residue remaining in the flash tank 10 was below the lowest level L of the manhole 10c in the body (checking step).

[0039] By repeating the above-mentioned slurrying step, air re-blow step, re-extraction step, and verification step three times in total, the residue level in the flash tank 10 could be reduced to below the lowest level L of the manhole 10c. As a result, the manhole 10c in the body of the flash tank 10 could be opened without any problems about 16 hours after the introduction of industrial water was stopped.

[0040] (Comparative Example) For comparison, in a leaching treatment facility consisting of the same preheater 1, autoclave 4, and flash tank 10 as in the Example, residues such as leaching residue remaining in the flash tank were removed after operation was stopped in the same manner as in the Example, except that high-pressure air was not blown in from the bottom of the flash tank 10. As a result, in addition to the leaching residue, scale that seemed to have peeled off from the liquid-contacting parts in the system and fallen brick fragments were deposited on the surface of the bottom strainer 11b of the flash tank 10.

[0041] Therefore, it took about 72 hours from the stop of the introduction of industrial water until the residues such as leachate residues inside the flash tank 10 were lowered to below the lowest level L of the manhole 10c in order to open the manhole 10c without any problems. As described above, in the comparative example, it took about 72 hours to open the manhole compared with about 16 hours in the example, so that the resumption of operation of the hydrometallurgical plant was significantly delayed and the operating rate was reduced. [Explanation of symbols]

[0042] 1 Preheater 2. Slurry pump 3. Ore slurry supply line 4. Autoclave 4a Weir 5. Sulfuric acid supply line 6 Steam Supply Line 7 Extraction Line 8 Level Control Valve 9. Flash Equipment 10. Flash Tank 10a Overflow nozzle 10b Strainer 10c Body manhole 11 Steam recovery line 12 Overflow Line 13 Drain pipe 14 Drain valve 15 Sub drain valve 20 Supply piping system 21 Gate valve 22 High pressure air supply pipe 23 High pressure air supply valve 24 Industrial water supply piping 25 Industrial water supply valve L Bottom level of manhole

Claims

1. A flash device is located downstream of a high-pressure reactor in which a leaching treatment is carried out with sulfuric acid under high-temperature and high-pressure conditions on an ore slurry prepared by adding water to a metal-containing ore, and receives and flashes the high-temperature and high-pressure leaching slurry produced by the leaching treatment, The system comprises a flash tank for separating the steam generated by the flash into gas and liquid and discharging the low-temperature, low-pressure leaching slurry after the flash by overflow, and a supply piping system for high-pressure air and industrial water connected via a gate valve between a drain valve of a drain pipe connected to a bottom drain nozzle of the flash tank and a sub-drain valve, A flush device characterized in that the supply piping system comprises a high-pressure air supply piping and a high-pressure air supply valve provided at an end of the high-pressure air supply piping, and an industrial water supply piping and an industrial water supply valve provided at an end of the industrial water supply piping.

2. 2. The flash apparatus of claim 1, wherein the ore is a nickel oxide ore.

3. A method for extracting residue after the operation of a flash tank, which is located downstream of a high-pressure reactor in which a leaching treatment is performed with sulfuric acid under high-temperature and high-pressure conditions on an ore slurry prepared by adding water to a metal-containing ore, and which receives and flashes the high-temperature and high-pressure leaching slurry produced by the leaching treatment, comprising the steps of: a step of introducing water into the high-pressure reactor for a predetermined period of time to replace the residue while cooling the high-pressure reactor and the flash tank with water in that order; a step of blowing high-pressure air into the bottom of the flash tank after the predetermined period of water introduction to stir the residue slurry in the flash tank produced by the replacement; a step of withdrawing the residue slurry from the flash tank through a drain pipe after confirming the completion of the replacement with water and stopping the introduction of the water and the blowing of the high-pressure air; a step of introducing a predetermined amount of industrial water from the bottom of the flash tank after the blowing step to slurry the residue remaining in the flash tank after the blowing step; a step of blowing high-pressure air into the bottom of the flash tank for a predetermined period of time to stir the slurried residue after the introduction of the predetermined amount of industrial water; and a step of withdrawing the slurried residue from the flash tank through a drain pipe after the blowing of the high-pressure air for the predetermined period of time.

4. 4. The method for withdrawing residue from a flash tank as described in claim 3, wherein the steps of slurrying, agitating the slurried residue, and withdrawing the slurried residue are repeated until the level of the residue remaining in the flash tank is below the lowest level of a manhole in the body of the flash tank.

5. 5. The method for extracting residue from a flash tank according to claim 3, wherein the pressure of the high-pressure air blown into the bottom of the flash tank is lower than the operating pressure of the flash tank during commercial operation and higher than the pressure in the flash tank during the step of performing replacement while cooling.

Citation Information

Patent Citations

  • Recycling system for valuable metal

    CN106222404A

  • Hydrometallurgical process for nickel oxide ore

    JP2010031341A

  • Hydrometallurgical process of nickel oxide ore and exudation treatment facility

    JP2017061733A

  • Slurry extraction method from reaction facility, autoclave

    JP2019089031A

  • Operation method of flash vessel

    JP2019203161A