Precast concrete structure for constructing floor gradient of sedimentation tank and method for constructing floor gradien of sedimentation tank using the precast concrete structure

The use of precast concrete blocks with a donut-shaped top plate and vertical side plates, assembled on-site, addresses the inefficiencies of conventional methods by reducing personnel and time, and improves waterproofing in sedimentation tank bottom slope construction.

KR103046871B1Active Publication Date: 2026-11-10SAMSUNG E&A CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
KR1020250183477
Authority / Receiving Office
KR · KR
Patent Type
Patents
Current Assignee / Owner
Filing Date
2025-11-27
Publication Date
2026-11-10
Estimated Expiration
2045-11-27

AI Technical Summary

Technical Problem

The construction of sedimentation tank bottom slopes requires a large number of personnel and time, and conventional methods face challenges with surface treatment and waterproofing due to concrete shrinkage and fluidity, especially when using steel formwork.

Method used

A hollow precast concrete block with a donut-shaped top plate and vertical side plates is used, pre-fabricated and assembled on-site to form a slope, connected by brackets, and filled with concrete, followed by non-shrink mortar injection to ensure complete filling and waterproofing.

Benefits of technology

This method reduces construction time and personnel, minimizes surface treatment, and enhances waterproofing by replacing steel formwork with precast concrete blocks, ensuring efficient and complete filling of the sedimentation tank bottom slope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 112025133531142-PAT00003_ABST
    Figure 112025133531142-PAT00003_ABST
Patent Text Reader

Abstract

The disclosed content relates to a hollow precast concrete block for constructing a floor slope of a sedimentation tank, a precast concrete structure for constructing a floor slope of a sedimentation tank using the same, and a method for constructing a floor slope of a sedimentation tank using the same, which reduces the number of personnel and time required for constructing a floor slope of a sedimentation tank and minimizes surface treatment work for waterproofing. As an example, the hollow precast concrete block for constructing a floor slope of a sedimentation tank, a donut-shaped fan-shaped top plate sloping downward toward the radial inner side, vertical side plates integrally formed on both sides of the top plate, an arc-shaped curved plate integrally formed to connect the vertical side plates to the radial inner side of the top plate, a filling pouring hole formed through the top plate, and a mortar injection hole formed through the top plate, a precast concrete structure for constructing a floor slope of a sedimentation tank using the same, and a method for constructing a floor slope of a sedimentation tank using the same are presented.
Need to check novelty before this filing date? Find Prior Art

Description

Technology Field

[0001] The disclosed content relates to blocks, structures, and methods for constructing a floor slope in the central part of the bottom of a sedimentation tank, excluding corner blocks. Background Technology

[0002] Unless otherwise indicated in this specification, the contents described in this identification item are not prior art for the claims of this application, and are not recognized as prior art simply because they are described in this identification item.

[0003] Generally, water treatment facilities such as wastewater treatment plants may include water treatment tanks such as quicklime tanks, sedimentation tanks, and concentration tanks.

[0004] Among these, the sedimentation tank, which is one of the water treatment tanks, corresponds to a water purification tank that receives and fills a large volume of wastewater (sewage or sewage, etc.), causes waste and various sludges (sand and other sedimentation foreign substances, etc.) contained in the wastewater to settle, and collects and treats the settled waste and sludge.

[0005] Such sedimentation tanks can be manufactured primarily from concrete with excellent rigidity, durability, watertightness, and chemical resistance. Additionally, corner blocks forming a sloping surface can be integrally installed at the bottom corners of the sedimentation tank to prevent sludge from settling or accumulating. Furthermore, a sloping section forming a floor gradient that slopes downward toward the center can be poured at the bottom of the sedimentation tank, excluding the corner blocks.

[0006] Regarding the casting of an inclined section for the bottom slope of a sedimentation tank, Korean Patent Registration No. 10-2045189 (published Nov. 15, 2019) describes a method comprising forming a cylindrical waste guide groove molding tube with an open top surface, and forming a foundation frame unit extending and connecting in a plurality of equally divided radial arrangements around the outer surface of the waste guide groove molding tube, wherein the foundation frame unit is formed by a horizontal frame having an upper and lower two-stage structure, a multi-stage spacing frame that evenly divides the length configuration of the horizontal frame into multiple parts and is vertically installed with an upward height configuration in which the height increases stepwise from an inner installation position toward an outer installation position and an even spacing configuration, and a circular band structure multi-stage casting diaphragm formed by being coupled and installed in a stepwise height configuration and an even spacing configuration on the upper inner surface of each multi-stage spacing frame having the stepwise height configuration and the even spacing configuration. A buried formwork for unreinforced casting of the sedimentation tank floor is disclosed.

[0007] In addition, Korean Patent Registration No. 10-2045189 (published November 15, 2019) describes a foundation frame construction process in which a foundation frame unit is formed with a plurality of evenly divided radial arrangements by assembling, using either bolting or welding, a horizontal frame forming an upper and lower two-stage structure around the outer perimeter of a cylindrical waste induction groove molding pipe, and a multi-stage spaced frame with a spaced arrangement configuration that increases in height stepwise, and an auxiliary temporary structure installation process in which, in the foundation frame unit assembled through the foundation frame construction process, a scaffolding board divided into multiple parts is arranged and installed as a support structure on a platform support provided as an upper horizontal frame, and a multi-stage circular band structure with a stepwise height configuration and an evenly spaced arrangement configuration on the upper inner surface of the multi-stage spaced frame that forms the foundation frame unit using the scaffolding board installed through the auxiliary temporary structure installation process as a safety support. A method for constructing a sedimentation tank floor using an embedded formwork for unreinforced casting of a sedimentation tank floor is disclosed, characterized by comprising: a process for constructing an embedded formwork to form a completed formwork structure body by fastening and assembling a casting diaphragm using either a bolt connection or a welding connection; a process for transporting and installing a formwork to separate and remove scaffolding from the formwork structure body formed through the embedded formwork construction process, and to lift the formwork structure body from which the scaffolding has been removed using a traction means and transport and settle it on the floor surface of the internal space of the sedimentation tank body; and a multi-stage cement casting and curing process in which, in the formwork structure body formed by the foundation frame unit and the multi-stage casting diaphragm, cement is cast in a sequential multi-stage injection method from the inner partition space to the outer partition space of the formwork structure body, and the formwork structure body is embedded in the cast cement and cured to construct a sedimentation tank floor surface with a conical inclined structure.

[0008] However, in the case of pouring the slope for the bottom gradient of a conventional sedimentation tank as described above, as shown in FIG. 1, the process includes a first step (S101) of separately manufacturing and installing a steel formwork inside the sedimentation tank, a second step (S102) of primarily pouring the bottom of the sedimentation tank in a flat gradient using ready-mixed concrete, and a third step (S103) of secondarily pouring the bottom of the sedimentation tank, which was primarily poured in a flat gradient, in a slope gradient using the ready-mixed concrete poured in the first step, and thus there is a problem that the number of personnel involved in the work to construct the bottom gradient of the sedimentation tank increases.

[0009] In addition, due to the fluidity of the ready-mixed concrete, additional surface treatment work is required after the third stage (S103), and there is also a problem that waterproofing surface treatment work becomes difficult if the top of the steel formwork is exposed due to the shrinkage of the concrete. Prior art literature

[0010] Korean Patent Registration No. 10-2045189 (Published Nov. 15, 2019) The problem to be solved

[0011] The present invention aims to provide a hollow precast concrete block for constructing the floor slope of a sedimentation tank, a precast concrete structure for constructing the floor slope of a sedimentation tank using the same, and a method for constructing the floor slope of a sedimentation tank using the same, which reduces the number of personnel and time required for constructing the floor slope of a sedimentation tank and minimizes surface treatment work for waterproofing.

[0012] Furthermore, it is evident that the technical challenges described above are not limited to those mentioned, and that other technical challenges may be derived from the following description. means of solving the problem

[0013] The disclosed content presents, as an embodiment, a hollow precast concrete block for constructing a bottom slope of a sedimentation tank, comprising a top plate having a donut-shaped fan shape sloping downward toward the radial inner side, vertical side plates integrally formed on both sides of the top plate, an arc-shaped curved plate integrally formed to connect the vertical side plates to the radial inner side of the top plate, a filling pouring hole formed through the top plate, and a mortar injection hole formed through the top plate.

[0014] The disclosed content presents, as an embodiment, a precast concrete structure for constructing a bottom slope of a sedimentation tank comprising: a plurality of hollow precast concrete blocks for constructing a bottom slope of a sedimentation tank arranged in a series to form a circle on the bottom of the sedimentation tank; a top plate connecting bracket for connecting and fixing the top plates of the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank arranged in a series to form a circle; and a bottom fixing bracket for connecting and fixing the vertical side plates of the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank arranged in a series to form a circle to the bottom of the sedimentation tank.

[0015] According to a preferred feature of the disclosed content, hollow precast concrete blocks for constructing the bottom slope of the sedimentation tank can be pre-fabricated and then lifted into the sedimentation tank at the site and arranged in a connected manner to form a circle.

[0016] According to a preferred feature of the disclosed content, the donut-shaped sector of the top plate of the hollow precast concrete block for constructing the bottom slope of the sedimentation tank may be a shape in which two arcs having the same center and center angle but different radii are connected by two straight lines.

[0017] According to a preferred feature of the disclosed content, the hollow precast concrete blocks for constructing the bottom slope of the sedimentation tank can be arranged in a connected manner such that a total of eight blocks form a circle, with the center angle of the top plate being 45°.

[0018] According to a preferred feature of the disclosed content, the top plate connecting bracket is formed as a plate-shaped bracket, and a bracket groove into which the top plate connecting bracket is seated and coupled may be formed in the connecting portion of the top plate of the hollow precast concrete block for constructing the bottom slope of the sedimentation tank.

[0019] According to a preferred feature of the disclosed content, the lower fixing bracket may be formed as an angle bracket in which one side is fastened to a vertical side plate of a hollow precast concrete block for constructing the bottom slope of the sedimentation tank, and the other side is fastened to the bottom of the sedimentation tank by an anchor.

[0020] Additionally, the disclosed content relates to a method for constructing a floor slope of a sedimentation tank using a precast concrete structure for constructing a floor slope of a sedimentation tank described above, comprising: a first step of pre-manufacturing a plurality of hollow precast concrete blocks for constructing a floor slope of the sedimentation tank; a second step of transporting the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank to the construction site of the sedimentation tank; a third step of lifting the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank and arranging them in a connected manner to form a circle on the bottom of the sedimentation tank; a fourth step of connecting and fixing the top plate of the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank arranged in a connected manner to form a circle using the top plate connecting bracket and connecting and fixing the vertical side plate of the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank to the bottom of the sedimentation tank using the lower fixing bracket; and pouring filling concrete through the filling pouring hole. A method for constructing a bottom slope of a sedimentation tank, characterized by including a fifth step of curing, is presented as an example.

[0021] According to a preferred feature of the disclosed content, the method for constructing the bottom slope of a sedimentation tank using a precast concrete structure for constructing the bottom slope of the sedimentation tank may further include a sixth step of injecting non-shrink mortar through the mortar injection hole after the filling concrete has cured. Effects of the invention

[0022] According to one embodiment of the disclosed content, the hollow precast concrete block for constructing the bottom slope of a sedimentation tank, the precast concrete structure for constructing the bottom slope of a sedimentation tank using the same, and the method for constructing the bottom slope of a sedimentation tank using the same, the conventional concrete pouring work using steel formwork in relation to the construction of forming a bottom slope in the central part of the sedimentation tank floor excluding corner blocks is replaced by the filling pouring work of the precast concrete structure for constructing the bottom slope of a sedimentation tank formed by a plurality of hollow precast concrete blocks that are pre-fabricated, lifted onto the bottom of the sedimentation tank at the site, and assembled and installed. As a result, the personnel and time required for the construction of the bottom slope of the sedimentation tank are reduced, and at the same time, the surface treatment work for waterproofing can be minimized.

[0023] The effects of the present invention are not limited to those mentioned above, and other unmentioned effects will be clearly understood by those skilled in the art from the description in the claims. Brief explanation of the drawing

[0024] Figure 1 is an overall process flowchart of the construction of the bottom slope of a conventional sedimentation tank. FIG. 2 is a perspective view of a hollow precast concrete block for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content. FIG. 3 is a perspective view of a precast concrete structure for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content. FIG. 4 is a partially exploded perspective view of a precast concrete structure for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content. FIG. 5 is an overall process flowchart of a method for constructing a bottom slope of a sedimentation tank using a precast concrete structure for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content. Specific details for implementing the invention

[0025] Hereinafter, the configuration, operation, and effects of a preferred embodiment will be examined with reference to the attached drawings. For reference, in the drawings below, each component is omitted or schematically depicted for convenience and clarity, and the size of each component does not reflect its actual size. Furthermore, throughout the specification, the same reference numerals refer to the same components, and reference numerals for the same configuration in individual drawings will be omitted.

[0027] A hollow precast concrete block (10) for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content may include, as shown in FIG. 2, a top plate (11) having a donut-shaped fan shape that slopes downward toward the radial inner side, vertical side plates (12) formed integrally on both sides of the top plate (11), an arc-shaped curved plate (13) formed integrally to connect the vertical side plates (12) to the radial inner side of the top plate (11), a filling pouring hole (14) formed through the top plate (11), and a mortar injection hole (15) formed through the top plate (11).

[0028] A precast concrete structure (1) for constructing a bottom slope of a sedimentation tank according to one embodiment of the disclosed content may include a plurality of hollow precast concrete blocks (10) for constructing a bottom slope of a sedimentation tank arranged in series to form a circle on the bottom (2) of the sedimentation tank as shown in FIGS. 3 and 4, a top plate connecting bracket (20) for connecting and fixing the top plates (11) of the hollow precast concrete blocks (10) for constructing a bottom slope of a sedimentation tank arranged in series to form a circle, and a lower fixing bracket (30) for connecting and fixing the vertical side plates (12) of the hollow precast concrete blocks (10) for constructing a bottom slope of a sedimentation tank arranged in series to form a circle to the bottom (2) of the sedimentation tank.

[0029] Here, the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank corresponds to a unit body forming the precast concrete structure (1) for constructing the bottom slope of the sedimentation tank according to one embodiment of the disclosed content.

[0030] As shown in FIGS. 3 and 4, a number of hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank are connected and fixed to form a circle on the bottom (2) of the sedimentation tank, thereby enabling the formation of a bottom slope that slopes downward toward the radial inner side.

[0031] To this end, the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank may have a shape in which vertical side plates (12) are integrally formed on both sides based on a top plate (11) having a donut-shaped fan shape that slopes downward toward the radial inner side as shown in FIG. 2, and an arc-shaped curved plate (13) is integrally formed on the radial inner side to connect the vertical side plates (12).

[0032] The top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank may have a donut-shaped fan shape, that is, a shape in which two arcs with the same center and center angle but different radii are connected by two straight lines.

[0033] A hollow precast concrete block (10) for constructing the bottom slope of a sedimentation tank can be pre-manufactured by pouring and curing concrete into a separate precast concrete mold, particularly a precast concrete mold having an internal space corresponding to the hollow precast concrete block (10) for constructing the bottom slope of a sedimentation tank. At this time, a separate reinforcing bar may be placed inside the precast concrete mold.

[0034] In addition, hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank can be pre-fabricated using a separate precast concrete mold, transported to the construction site of the sedimentation tank, and then lifted into the sedimentation tank and arranged and fixed in a connected manner to form a circle on the bottom (2) of the sedimentation tank.

[0035] At this time, for example, to facilitate lifting by a crane, the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank can be divided into multiple blocks having the same shape and then connected and fixed to form a circle on the bottom (2) of the sedimentation tank.

[0036] As shown in FIGS. 3 and 4, the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank can be arranged in a continuous sequence of eight blocks to form a circle on the bottom (2) of the sedimentation tank, with the center angle of the top plate (11) being 45°. In addition, although not shown, the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank may be formed such that a total of 12 blocks are connected to form a circle on the bottom (2) of the sedimentation tank with a central angle of 30° on the top plate (11), a total of 9 blocks may be connected to form a circle on the bottom (2) of the sedimentation tank with a central angle of 40° on the top plate (11), a total of 6 blocks may be connected to form a circle on the bottom (2) of the sedimentation tank with a central angle of 60° on the top plate (11), or a total of 4 blocks may be connected to form a circle on the bottom (2) of the sedimentation tank with a central angle of 90° on the top plate (11).

[0037] A through hole (14) for filling can be formed in the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the aforementioned sedimentation tank.

[0038] The filling pouring hole (14) serves to form a through hole into which the pipe of a concrete pump truck can be inserted so that concrete can be poured as filling in the space formed between the bottom (2) of the sedimentation tank and the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank.

[0039] As shown in FIG. 2, one of these filling holes (14) may be formed through the center line of the top plate (11) at a distance from the center of the donut-shaped fan formed by the top plate (11) based on the center line of the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank, and two holes may be formed through the center line of the top plate (11) at a distance from the center of the donut-shaped fan formed by the top plate (11) on both sides of the center line of the top plate (11).

[0040] A mortar injection hole (15) may be formed through the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the aforementioned sedimentation tank.

[0041] The mortar injection hole (15) serves to allow for the supplementary injection of non-shrink mortar to resolve the problem that the space formed between the bottom (2) of the sedimentation tank and the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank cannot be completely filled with concrete as the filling concrete poured through the filling pouring hole (14) shrinks during the curing process.

[0042] As shown in FIG. 2, these mortar injection holes (15) may be formed by penetrating through three arcs spaced apart from each other along the center of the donut-shaped fan formed by the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank, and may be arranged spaced apart from the filling pouring holes (14).

[0043] In addition, the top plate (11) of the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tanks arranged in a continuous sequence to form a circle can be connected and fixed to each other by a top plate connecting bracket (20).

[0044] The top plate connecting bracket (20) serves to connect and fix the top plates (11) of the hollow precast concrete blocks (10) for constructing the bottom slope of the connected sedimentation tanks so that the height difference is minimized, and at the same time, the vertical side plates (12) of the hollow precast concrete blocks (10) for constructing the bottom slope of the connected sedimentation tanks come into contact with each other.

[0045] This top plate connecting bracket (20) is formed as a plate-shaped bracket, and a bracket groove (16) into which the top plate connecting bracket (20) is seated and connected can be formed in the connecting portion of the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank.

[0046] The vertical side plate (12) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank, which is arranged in a connected manner to form a circle, can be connected and fixed to the bottom (2) of the sedimentation tank by a lower fixing bracket (30).

[0047] The lower fixing bracket (30) serves to prevent the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank from rising upward from the bottom (2) of the sedimentation tank when pouring the filling concrete through the filling pouring hole (14).

[0048] This lower fixing bracket (30) can be formed as an angle bracket, with one side fastened to the vertical side plate (12) of a hollow precast concrete block (10) for constructing the bottom slope of a sedimentation tank and the other side fastened to the bottom (2) of the sedimentation tank by an anchor.

[0049] In addition, the method for constructing the bottom slope of a sedimentation tank using the aforementioned precast concrete structure (1) for constructing the bottom slope of a sedimentation tank comprises, as illustrated in FIGS. 2 to 5, a first step (S1) of pre-manufacturing a plurality of hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank, a second step (S2) of transporting the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank to the construction site of the sedimentation tank, a third step (S3) of lifting the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank and arranging them in a connected manner to form a circle on the bottom (2) of the sedimentation tank, and connecting and fixing the top plate (11) of the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank arranged in a connected manner to form a circle using a top plate connecting bracket (20), and the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank It may include a fourth step (S4) of connecting and fixing the vertical side plate (12) to the bottom (2) of the sedimentation tank with a lower fixing bracket (30), and a fifth step (S5) of pouring and curing filling concrete through the filling pouring hole (14).

[0050] Step 1 (S1) is a step of pre-manufacturing hollow precast concrete blocks (10) for constructing the bottom slope of a plurality of sedimentation tanks. In Step 1 (S1), the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank can be pre-manufactured by pouring and curing concrete into a separate precast concrete mold, specifically a precast concrete mold having an internal space corresponding to the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank. Separate reinforcing bars may be arranged inside the precast concrete mold, for example, in a mesh form. Additionally, the hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank that are pre-manufactured may be integrally equipped with a hook for future lifting. These rings may be attached to the precast concrete mold during the pre-production of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank using the precast concrete mold, or a separate ring installation groove may be integrally formed during the pre-production of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank using the precast concrete mold, and then the rings may be inserted into the ring installation groove and fixed integrally with concrete or cement.

[0051] The second step (S2) is a step of transporting the hollow precast concrete blocks (10) for constructing the bottom slope of a plurality of sedimentation tanks, which were pre-fabricated by the first step (S1), to the construction site of the sedimentation tank. If the aforementioned first step (S1) is carried out at a separate factory located far from the construction site of the sedimentation tank, the second step (S2) may be carried out by loading the hollow precast concrete blocks (10) for constructing the bottom slope of a plurality of sedimentation tanks, which were pre-fabricated by a precast concrete mold, onto a separate transport vehicle and transporting them to the construction site of the sedimentation tank, and depending on the situation, the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank may be unloaded at the construction site using a crane.

[0052] Step 3 (S3) is a step of lifting a plurality of hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank, which were transported to the construction site of the sedimentation tank in Step 2 (S2), using a crane or the like, and arranging them in series to form a circle on the bottom (2) of the sedimentation tank. When arranging a plurality of hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank in series to form a circle on the bottom (2) of the sedimentation tank in Step 3 (S3), the seating position of the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank can be marked in advance on the bottom (2) of the sedimentation tank using a marking line. In addition, a leveling shim can be inserted between the vertical side plate (12) of the hollow precast concrete block (10) for the bottom slope construction of a plurality of sedimentation tanks and the bottom (2) of the sedimentation tank so that the hollow precast concrete block (10) for the bottom slope construction of a plurality of sedimentation tanks can be installed at the same height.

[0053] Step 4 (S4) is a step of connecting and fixing the top plate (11) of the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank, which are connected and arranged to form a circle through Step 3 (S3), using a top plate connecting bracket (20), and connecting and fixing the vertical side plate (12) of the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank to the bottom (2) of the sedimentation tank using a lower fixing bracket (30). A plurality of hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank, which are connected and arranged to form a circle, can be integrated into a precast concrete structure (1) for constructing the bottom slope of the sedimentation tank by connecting and fixing by the top plate connecting bracket (20), and can be fixed to the bottom (2) of the sedimentation tank so as not to float upward despite the pouring of the filling concrete by connecting and fixing by the lower fixing bracket (30).

[0054] Step 5 (S5) is a step of pouring filling concrete into the precast concrete structure (1) for constructing the bottom slope of the sedimentation tank formed through Step 4 (S4). In Step 5 (S5), the pipe of a concrete pump truck is inserted into the filling pouring hole (14) formed through the top plate (11) of the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank, so that concrete can be poured and cured within the space formed between the bottom (2) of the sedimentation tank and the hollow precast concrete block (10) for constructing the bottom slope of the sedimentation tank.

[0055] In addition, the method for constructing the bottom slope of a sedimentation tank using the precast concrete structure (1) for constructing the bottom slope of the sedimentation tank described above may further include a sixth step (S6) of injecting non-shrink mortar through the mortar injection hole (15) after the filling concrete is cured according to the fifth step (S5) described above.

[0056] Step 6 (S6) is a step of curing by separately injecting non-shrink mortar through a mortar injection hole (15) formed through the top plate (11) of a hollow precast concrete block (10) for constructing the bottom slope of a sedimentation tank, taking into account that the filling concrete poured in Step 5 (S5) shrinks during the curing process. In addition, in Step 6 (S6), the space between the hollow precast concrete blocks (10) for constructing the bottom slope of the sedimentation tank or the bracket groove (16), etc., can be finished with non-shrink mortar.

[0057] When the hollow precast concrete block (10) for constructing the bottom slope of a sedimentation tank according to one embodiment of the disclosed content, the precast concrete structure (1) for constructing the bottom slope of a sedimentation tank using the same, and the method for constructing the bottom slope of a sedimentation tank using the same are applied to the construction of forming a bottom slope in the central part of the bottom (2) of a sedimentation tank excluding the corner blocks, the conventional concrete pouring work using steel formwork is replaced by the filling pouring work of the precast concrete structure (1) for constructing the bottom slope of a sedimentation tank, which is formed by a plurality of hollow precast concrete blocks (10) for constructing the bottom slope of a sedimentation tank that are pre-fabricated, lifted onto the bottom (2) of the sedimentation tank at the site, and assembled and installed, thereby reducing the number of personnel and time required for the construction of the bottom slope of the sedimentation tank, and at the same time, the surface treatment work for waterproofing can be minimized.

[0059] Although preferred embodiments of the present invention have been described above with reference to the attached drawings, the embodiments described in this specification and the configurations illustrated in the drawings are merely the most preferred embodiments of the present invention and do not represent all technical concepts of the present invention. Therefore, it should be understood that various equivalents and modifications that can replace them may exist at the time of filing this application. Accordingly, the embodiments described above should be understood as illustrative in all respects and not restrictive, and the scope of the present invention is defined by the claims set forth below rather than by the detailed description. Furthermore, all modifications or variations derived from the meaning and scope of the claims and equivalent concepts should be interpreted as being included within the scope of the present invention. Explanation of the symbols

[0060] 1: Precast concrete structure for constructing the bottom slope of a sedimentation tank 2: Bottom of the sedimentation tank 10: Hollow precast concrete blocks for constructing the bottom slope of sedimentation tanks 11 : Top plate 12: Vertical side plate 13: Arc-shaped curved plate 14: Pouring work for backfill 15: Mortar injection hole 16 : Bracket groove 20 : Top plate connection bracket 30 : Lower fixing bracket S1: Phase 1 S2: Phase 2 S3: Stage 3 S4: Stage 4 S5: Stage 5 S6: Stage 6 S101: Phase 1 S102: Phase 2 S103: Phase 3

Claims

Claim 1 A precast concrete structure for constructing a floor slope of a sedimentation tank, comprising: a plurality of hollow precast concrete blocks for constructing a floor slope of a sedimentation tank arranged in series to form a circle on the bottom of the sedimentation tank, each including a top plate and a vertical side plate; a top plate connecting bracket for connecting and fixing the top plates of the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank arranged in series to form a circle; and a lower fixing bracket for connecting and fixing the vertical side plates of the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank arranged in series to form a circle to the bottom of the sedimentation tank, wherein the top plate connecting bracket is formed as a plate-shaped bracket, and a bracket groove into which the top plate connecting bracket is seated and coupled is formed in the connecting portion of the top plate of the hollow precast concrete blocks for constructing a floor slope of the sedimentation tank. Claim 2 A precast concrete structure for constructing a floor slope of a sedimentation tank according to claim 1, wherein the hollow precast concrete block for constructing a floor slope comprises: a top plate having a donut-shaped fan shape sloping downward toward the radial inner side; vertical side plates integrally formed on both sides of the top plate; an arc-shaped curved plate integrally formed to connect the vertical side plates to the radial inner side of the top plate; a filling pouring hole formed through the top plate; and a mortar injection hole formed through the top plate. Claim 3 A precast concrete structure for constructing a bottom slope of a sedimentation tank according to claim 1, characterized in that the hollow precast concrete blocks for constructing the bottom slope of the sedimentation tank are pre-fabricated and then lifted into the sedimentation tank at the site and arranged in a connected manner to form a circle. Claim 4 A precast concrete structure for constructing a bottom slope of a sedimentation tank according to claim 2, characterized in that the donut-shaped sector of the top plate of the hollow precast concrete block for constructing a bottom slope of the sedimentation tank is a shape in which two arcs having the same center and center angle but different radii are connected by two straight lines. Claim 5 A precast concrete structure for constructing a bottom slope of a sedimentation tank according to claim 1, characterized in that the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank are arranged in a connected manner such that a total of eight blocks form a circle, with the center angle of the top plate being formed at 45°. Claim 6 delete Claim 7 A precast concrete structure for constructing a bottom slope of a sedimentation tank according to claim 1, characterized in that the lower fixing bracket is formed as an angle-type bracket, with one side fastened to a vertical side plate of a hollow precast concrete block for constructing a bottom slope of the sedimentation tank and the other side fastened to the bottom of the sedimentation tank by an anchor. Claim 8 A method for constructing a bottom slope of a sedimentation tank using a precast concrete structure for constructing a bottom slope of a sedimentation tank according to claim 2 or claim 4, comprising: a first step of pre-manufacturing a plurality of hollow precast concrete blocks for constructing a bottom slope of a sedimentation tank; a second step of transporting the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank to a construction site of the sedimentation tank; a third step of lifting the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank and arranging them in a connected manner to form a circle on the bottom of the sedimentation tank; and a fourth step of connecting and fixing the top plate of the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank, arranged in a connected manner to form a circle, using the top plate connecting bracket, and connecting and fixing the vertical side plate of the hollow precast concrete blocks for constructing a bottom slope of the sedimentation tank to the bottom of the sedimentation tank using the lower fixing bracket. A method for constructing a bottom slope of a sedimentation tank, characterized by including: a fifth step of pouring and curing filling concrete through the filling pouring hole described above. Claim 9 A method for constructing a bottom slope of a sedimentation tank according to claim 8, further comprising a sixth step of injecting non-shrink mortar through the mortar injection hole after the filling concrete has cured.

Citation Information

Patent Citations

  • Slow-release grouting material for steel shell immersed tube grouting and construction method of slow-release grouting material

    CN112592127A

  • Thin walled precast concrete placing formwork wall plate size assembling method

    JP1995102668A

  • Form for molding inner surface of covering segment filled with concrete in steel shell

    JP1997076222A

  • Circular tank assembly built in sections and water tank using thereof

    KR100569726B1

  • Construction method of sedimentation tank using buried formwork

    KR102045189B1