Arrangement and method for handling boards
The handling arrangement for particle, OSB, and MDF boards addresses the challenge of thin board removal by stacking them in staggered bundles and using dual gripping means to remove them efficiently, reducing breakages and enhancing processing speed.
Patent Information
- Application Number
- PCT/FI2024/050161
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-12
- Filing Date
- 2024-04-10
- Publication Date
- 2024-10-17
AI Technical Summary
The existing methods for handling particle boards, OSB boards, and MDF boards face challenges in efficiently removing thin boards from stacks due to thickness variations, leading to handling errors and breakages, and reduce the capacity of sawing and sanding lines.
A handling arrangement and method that stacks boards into superposed bundles alternately staggered on opposite sides and ends, using gripping means to alternately remove bundles from the top of the stack, one at a time, to facilitate reliable removal and reduce breakages.
This approach allows for the reliable removal of thin board bundles with reduced breakages and increased handling efficiency, speeding up the process and reducing the risk of board damage.
Smart Images

Figure FI2024050161_17102024_PF_FP_ABST
Abstract
Description
[0001] ARRANGEMENT AND METHOD FOR HANDLING BOARDS
[0002] FIELD OF THE INVENTION
[0003] The invention relates to an arrangement and method for particle boards , OSB boards and / or MDF boards .
[0004] BACKGROUND OF THE INVENTION
[0005] When manufacturing particle boards , OSB boards and / or MDF boards , the boards are stacked at the downstream end of the press line . The height of the board stack may be 1 to 4 meters . Thereafter, the board stacks are conveyed directly to a sawing or sanding line , or to an intermediate storage and from the intermediate storage to the sawing or sanding line . At the upstream end of the sawing line individual boards or board bundles comprising multiple boards and having a suitable thickness for the sawing are separated from the board stack . Typically, thin boards are sawn as bundles of multiple superposed boards . The height of the board bundle is typically 50 -250 mm .
[0006] I f the board stack comprises thin, e . g . 1 -3 mm thick, boards , the maximum height of the board stack is typically 2 meters as the thicknes s variations of thin boards cumulate in the stack and a higher board stack would no longer be straight enough . As it is not practical to saw thin boards one at a time , thin boards are sawn in bundles , each of which comprises a plurality of superposed boards . Before sawing, a board bundle having a suitable height for sawing must be removed from the top of the board stack, whereby the thickness variations of the thin boards may cause handling errors and breakages of the boards . On the other hand, removing boards from the stack one at a time is time-consuming, which reduces the capacity of the sawing line . Boards can also be removed from the top of the board tack using a suction cup hoist , which is also time-consuming and thus reduces the capacity of the sawing line .
[0007] Similar problems also occur when thin boards are removed from the board stack for sanding .
[0008] SUMMARY
[0009] An obj ect of the present invention is to provide a handling arrangement and method by which the above-mentioned drawbacks can be reduced .
[0010] The obj ect according to the invention may be achieved by a handling arrangement according to claim 1 . The handling arrangement according to the invention comprises a stacking station configured to stack the boards into a board stack comprising superposed board bundles , each of which comprises a plurality of boards , which superposed board bundles are alternately staggered on opposite sides and / or ends of the board stack .
[0011] The handling arrangement further comprises an unstacking station configured to receive the staggered board stack and comprising gripping means arrangeable on a staggered side or end of the board stack, and further gripping means arrangeable on the opposite staggered side or end of the board stack, which gripping means and further gripping means are configured to alternately remove the board bundles from the top of the board stack, one board bundle at a time .
[0012] In the method according to the invention the boards are stacked into a board stack compri sing superposed board bundles , each of which comprises a plurality of boards , which superposed board bundles are alternately staggered on opposite sides and / or ends of the board stack . Thereafter, the board stack is moved to an unstacking station, in which the board bundles are alternately removed from the top of the board stack, one board bundle at a time , by gripping means arranged on the staggered side or end of the board stack and further gripping means arranged on the opposite staggered side or end of the board stack .
[0013] The invention offers many advantages . By means of the invention , bundles of thin boards having a predetermined height , e . g . height suitable for sawing, can be removed from the board stack in a reliable manner . Thus , breakages of boards during the removal can be reduced and board handling facilitated . The handling of boards in bundles also reduces the number of board transfers need to be performed in the plant , which speeds-up the board handling, such as sawing, and reduces the risk of board breakage .
[0014] According to an embodiment of the invention, the gripping means and further gripping means are configured to alternately hold in place the second topmost board bundle on the board stack while the topmost board bundle is being removed from the board stack . This prevents the second topmost board bundle from moving during the removal of the topmost board bundle and thus facilitates the removal of the board bundles one at a time .
[0015] According to the embodiment of the invention, the gripping means are configured to remove , e . g . pull , the topmost board bundle from the board stack, and at the same time the further gripping means are configured to hold in place the second topmost board bundle on the board stack, and / or vice versa . According to an embodiment of the invention, the unstacking station i s provided with a conveyor arranged at the end of the board stack, and the gripping means and the further gripping means are conf igured to move the board bundles from the board stack to the conveyor .
[0016] According to an embodiment of the invention, the unstacking station is provided with a side conveyor arranged on the staggered side or end the board stack and a further side conveyor arranged on the opposite staggered side or end of the board stack, and the gripping means are configured to move the board bundles from the board stack to the side conveyor and the further gripping means are configured to move the board bundles from the board stack to the further side conveyor .
[0017] According to an embodiment of the invention, the gripping means comprises two or more grippers arranged at a distance from each other in the direction of staggered side of the board stack, and the further gripping means comprises two or more further grippers arranged at a distance from each other in the direction of opposite staggered side of the board stack .
[0018] According to an embodiment of the invention, the distance between the grippers is adj ustable , and the distance between the further grippers is adj ustable .
[0019] According to an embodiment of the invention, the distance between the gripping means and the further gripping means on the opposite sides of the board stack is adj ustable .
[0020] According to an embodiment of the invention, the gripping means and the further gripping means are configured to grip the staggered / pro j ecting edge portion of the board bundle to be removed .
[0021] According to an embodiment of the invention, the second topmost board bundle is held in place on the board stack alternately by the gripping means and further gripping means , while the topmost board bundle is being removed from the board stack .
[0022] According to an embodiment of the invention, the topmost board bundle is removed from the board stack by the gripping means , and at the same time the second topmost board bundle is held in place on the board stack ( 5 ) by the further gripping means , and / or vice versa .
[0023] According to an embodiment of the invention, the unstacking station comprises a conveyor arranged at the end of the board stack, and the board bundles are removed from the board stack to the conveyor .
[0024] According to an embodiment of the invention, the unstacking station comprises a side conveyor arranged on the staggered side of the board stack and a further side conveyor arranged on the opposite staggered side of the board stack, and the board bundles are removed from board stack alternately to the side conveyor and the further side conveyor .
[0025] According to an embodiment of the invention, the board bundles are transferred from the unstacking station to a sawing line and / or sanding line .
[0026] According to an embodiment of the invention, the di stance between the grippers is adj usted, and the distance between the further grippers is adj usted .
[0027] According to an embodiment of the invention, the distance between the gripping means and the further gripping means on the opposite sides of the board stack is adjusted.
[0028] BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In the following, the invention is described in more detail by way of examples with reference to the accompanying drawings, in which
[0030] Fig. 1 shows schematically a handling arrangement according to an embodiment of the invention,
[0031] Figs. 2a to 2n show a stacking station of fig. 1 in different phases of stacking, and
[0032] Figs. 3a to 3e show an unstacking station of fig. 1 in different phases of unstacking.
[0033] DETAILED DESCRIPTION
[0034] Fig. 1 shows a handling arrangement 1 for particle boards, OSB (Oriented Strand Boards) and / or MDF (Medium Density Fibreboards) 4. The length of the boards 4 to be handled is typically 3.6-7.2 meters. The width of the boards 4 to be handled is typically 1.8-3.2 meters. The thickness of the boards 4 is typically at most 4 mm, typically 1-3 mm. The invention may also be used to handle thicker boards 4.
[0035] The handling arrangement 1 may comprise a stacking station 2 arranged at a downstream end of a press line 12 of the boards 4. In the press line 12 the boards 4 are pressed, sawn to a desired length and width, cooled and stacked. The stacking station 2 is configured to receive boards 4 from the press line 12 and stack the boards 4 into a board stack 5 comprising superposed board bundles 6 . Each board bundle 6 comprises a plurality of superposed boards 4 . The superposed board bundles 6 are alternately staggered on opposite sides and / or ends of the board stack 5 .
[0036] The boards 4 are stacked on the pallet 11 . The pallet 11 may be provided with a spacer plate 14 on which the boards 4 are stacked so that the lowermost board bundle 6 is staggered relative to the edge of the spacer plate 14 . The upper surface of the pallet 11 is at distance from the edge portion of the lowermost board bundle 6 . The gap between the lowermost board bundle 6 and pallet 11 enables the removal of the lowermost board bundle 6 from the pallet 11 . Alternatively, the upper surface of the pallet 11 can be shaped so that the edge portion lowermost board bundle 6 can be gripped and the board bundle 6 removed from the pallet 11 .
[0037] The structure and operation of the stacking station 2 is shown in more detail in figs . 2a-2n . The stacking station 2 may comprise two fork-shaped supports 10 arranged on the opposite sides of the pallet 11 on which the board stack 5 is formed . The fork-shaped supports 10 are movable above the pallet 11 and the board stack 5 in a horizontal direction . The fork-shaped supports 10 are movable toward and away from each other .
[0038] The stacking station 2 may further comprise two pushers 12 arranged on the opposite sides of the pallet 11 . The pushers 12 are arranged above the fork-shaped supports 10 so that the pushers 12 can push boards 4 on the fork-shaped supports 10 to form a staggered board bundle 6 . The pushers 12 are movable in a hori zontal direction towards and away from each other . Moreover, the pushers 12 and fork-shaped supports 10 are movable in the vertical direction . The stacking station 3 comprises a frame (not shown) on which the pushers 12 and fork-shaped supports 10 are mounted .
[0039] As shown in fig . 2a, the fork-shaped supports 10 are moved above the pallet 11 and the spacer plate 14 , on which the board stack 6 i s being formed . Boards
[0040] 4 are fed one by one or in sub-bundles onto the forkshaped supports 10 . Each board 4 or sub-bundle is pushed by the pusher 12 against the other pusher 12 , as shown in fig . 2b . The next boards 4 or sub-bundles are fed onto the fork-shaped supports 10 and pushed by the pusher 12 in a similar manner ( figs . 2c and 2d) . When the height of the board bundle 6 is as desired, the fork-shaped supports 10 are pulled out from under the board bundle 6 and the board bundle 6 drops on the spacer plate 14 or on a lower board bundle 6 on the board stack
[0041] 5 ( figs . 2e and 2 f ) . Next board bundle 6 is formed in a similar manner by pushing boards 4 against the pusher 12 on the opposite side or end of the board stack 5 ( figs . 2g-2m) . The stacking of the board bundles 6 al ternately on the opposite sides and / or ends of the board stack 5 is continued until the number of board bundles
[0042] 6 and / or the height of board stack 5 is as desired ( fig . 2n) .
[0043] The height of the board bundle 6 is selected to be suitable for sawing the board bundle 6 in the sawing line . The height (Y, shown in fig . 2n) of the board bundle 6 is typically 50 -250 mm . The magnitude of the staggered offset (X, shown in fig . 2n) of the board bundle 6 is typically 50 - 150 mm .
[0044] The handling arrangement 1 further comprises an unstacking station 3 configured to receive the staggered board stack 5 arranged on the pallet 11 . The unstacking station 3 comprises gripping means 7 arranged or arrangeable on staggered side or end of the board stack 6 , and further gripping means 8 arranged or arrangeable on the opposite staggered side or end of the board stack 6 . The gripping means 7 and further gripping means 8 are configured to alternately remove board bundles 6 from the top of the board stack 5 . The gripping means 7 and further gripping means 8 are configured to remove board bundles 6 one by one from the board stack 5 . Moreover, the gripping means 7 and further gripping means 8 are configured to alternately hold in place the second topmost board bundle 6 on the board stack 5 while the topmost board bundle 6 is being removed from the board stack 5 . The board bundles 6 can be removed from the board stack 5 in longitudinal or transverse direction of the boards 4 .
[0045] The structure and operation of the unstacking station 3 is shown in more detail in figs . 3a-3e . The staggered board stack 5 is conveyed to the unstacking station 3 . The board bundles 6 are removed from the top of the board stack 5 alternately by the gripping means 7 and the further gripping means 8 , one board bundle 6 at a time . Moreover, the second topmost board bundle is held in place alternately by the gripping means 7 and the further gripping means 8 at the same time when the topmost board bundle 6 i s being removed from the board stack 5 . When the topmost board bundle 6 is removed from the board stack 5 by the gripping means 7 , the second topmost board bundle 6 is held in place by the further gripping means 8 as shown in fig . 3a, or vice versa, i . e . when the topmost board bundle 6 is removed by the further gripping means 8 , the second topmost board bundle 6 is at the same time held in place by the gripping means 7 , as shown in figs . 3b-3d .
[0046] The unstacking of the board bundles 6 alternately by the gripping means 7 and further gripping means 8 is continued until all the board bundles 6 of the board stack 5 have been removed . The edge of the lowermost board bundle 6 is spaced from the pallet surface by the spacer plate 14 so that the edge can be gripped and the board bundle removed by the gripping means 7 or further gripping means 8 , as shown in fig . 3e .
[0047] The gripping means 7 and further gripping means 8 are configured to grip the staggered / pro j ecting edge portion of the board bundle 6 to be removed . The gripping means 7 and further gripping means 8 are arranged against upper surface of the topmost board and the lower surface of the lowermost board of the board bundle 6 to be removed . The gripping means 7 and further gripping means 8 are arranged against upper surface of the topmost board and the lower surface of the lowermost board of the second topmost board bundle 6 to be held in place .
[0048] The gripping means 7 may comprise two or more grippers 7 . 1 arranged at a di stance from each other in the direction of the edge of the board bundle 6 to be gripped . Similarly, the further gripping 8 means may comprise two or more further grippers 8 . 1 arranged at a distance from each other in the direction of the edge of the board bundle 6 to be gripped . The distance between the grippers 7 . 1 is adj ustable . The distance between the further grippers 8 . 1 is adj ustable . Moreover, the distance between the gripper 7 . 1 and the further gripper 8 . 1 on the opposite sides of the board stack 5 is adj ustable . This enables the handling of boards 4 of different widths . The gripping means 7 and the further gripping means 8 are also movable in the vertical direction . The gripping means 7 and the further gripping means 8 are mounted on linear guides 15 arranged at opposite sides or ends of the board stack 5 . The unstacking station 3 may be provided with a conveyor 9 onto which the board bundles 6 are moved from the board stack 5 by the gripping means 7 and further gripping means 8 . The conveyor 9 may be placed at the end of the board stack 6 . The conveyor 9 conveys the board bundles 6 to the sawing line or sanding line .
[0049] Alternatively, the unstacking station 3 may be provided with a side conveyor (not shown) arranged on the staggered side or end of the board stack 5 and a further side conveyor (not shown) arranged on the opposite staggered side or end of the board stack 5 . The gripping means 7 are configured to move the board bundles 6 from the board stack 5 onto the side conveyor and the further gripping means 8 are conf igured to move the board bundles 6 from the board stack 5 onto the further side conveyor . The side conveyor and the further side conveyor convey the board bundles 6 to the sawing line or sanding line .
[0050] The handling arrangement 1 may further comprise an intermediate storage 13 , to which the board stacks 5 are conveyed from the stacking station 2 . The board stacks 6 are conveyed from the intermediate storage 13 to the unstacking station 3 . Alternatively, the board stacks 5 may be conveyed from stacking station 2 directly to the unstacking station 3 .
[0051] The unstacked board bundles 6 are transferred from the unstacking station 3 to the saw line and / or sanding line .
[0052] It i s obvious to a person s ki lled in the art that with the advancement of technology, the basic idea of the invention may be implemented in various ways . The invention and its embodiments are thus not limited to the examples described above, instead they may vary within the scope of the claims.
Claims
CLAIMS1. A handling arrangement (1) for particle boards, OSB boards and / or MDF boards (4) , characterized in that the handling arrangement (1) comprises:- a stacking station (2) configured to stack the boards (4) into a board stack (5) comprising superposed board bundles (6) , each of which comprises a plurality of boards (4) , which superposed board bundles (6) are alternately staggered on opposite sides and / or ends of the board stack (5) , and- a unstacking station (3) configured to receive the staggered board stack (5) and comprising gripping means (7) arrangeable on a staggered side or end of the board stack (5) , and further gripping means (8) arrangeable on the opposite staggered side or end of the board stack (5) , which gripping means (7) and further gripping means (8) are configured to alternately remove the board bundles (6) from the top of the board stack (5) , one board bundle (6) at a time.
2. The arrangement (1) according to claim 1, characterized in that the gripping means (7) and the further gripping means (8) are configured to alternately hold in place the second topmost board bundle (6) on the board stack (6) while the topmost board bundle (6) is being removed from the board stack (5) .
3. The arrangement (1) according to claim 1 or 2, characterized in that the gripping means (7) are configured to remove, e.g. pull, the topmost board bundle (6) from the board stack (5) , and at the same time the further gripping means (8) are configured to hold in place the second topmost board bundle (6) on the board stack (6) , and / or vice versa.
4. The arrangement (1) according to any of the preceding claims, characterized in that the unstacking station (3) is provided with a conveyor (9) arranged at the end of the board stack (5) , and the gripping means (7) and the further gripping means (8) are configured to move the board bundles (6) from the board stack (5) to the conveyor (9) .
5. The arrangement (1) according to any of claims 1-3, characterized in that the unstacking station (3) is provided with a side conveyor arranged on the staggered side or end the board stack (5) and a further side conveyor arranged on the opposite staggered side or end of the board stack (5) , and the gripping means (7) are configured to move the board bundles (6) from the board stack (5) to the side conveyor and the further gripping means (8) are configured to move the board bundles (6) from the board stack (5) to the further side conveyor .
6. The arrangement (1) according to any of the preceding claims, characterized in that the gripping means (7) comprises two or more grippers (7.1) arranged at a distance from each other in the direction of staggered side of the board stack (5) , and the further gripping means (8) comprises two or more further grippers (8.1) arranged at a distance from each other in the direction of opposite staggered side of the board stack (5) .
7. The arrangement (1) according to claim 6, characterized in that the distance between the grippers (7.1) is adjustable, and the distance between the further grippers (8.1) is adjustable.
8. The arrangement (1) according to any of the preceding claims, characterized in that the distance between the gripping means (7) and the further grippingmeans (8) on the opposite sides of the board stack (5) is adjustable.
9. The arrangement (1) according to any of the preceding claims, characterized in that the gripping means (7) and the further gripping means (8) are configured to grip the staggered / pro ecting edge portion of the board bundle (6) to be removed.
10. A method of handling particle boards, OSB boards and / or MDF boards (4) , characterized in that the- the boards (4) are stacked into a board stack (5) comprising superposed board bundles (6) , each of which comprises a plurality of boards (4) , which superposed board bundles (6) are alternately staggered on opposite sides and / or ends of the board stack (5) , and- the board stack (5) is moved to an unstacking station (3) , in which the board bundles (6) are alternately removed from the top of the board stack (5) , one board bundle (6) at a time, by gripping means (7) arranged on the staggered side or end of the board stack (5) and further gripping means (8) arranged on the opposite staggered side or end of the board stack (5) .
11. The method according to claim 10, characterized in that the second topmost board bundle (6) is held in place on the board stack (6) alternately by the gripping means (7) and further gripping means (8) , while the topmost board bundle (6) is being removed from the board stack (5) .
12. The method according to claim 10 or 11, characterized in that topmost board bundle (6) is removed from the board stack (5) by the gripping means (7) , and at the same time the second topmost board bundle(6) is held in place on the board stack (5) by the further gripping means (8) , and / or vice versa.
13. The method according to any of preceding claims 10-12, characterized in that the unstacking station (3) comprises a conveyor (9) arranged at the end of the board stack (5) , and the board bundles (6) are removed from the board stack (5) to the conveyor (9) .
14. The method according to any of preceding claims 10-12, characterized in that the unstacking station (3) comprises a side conveyor arranged on the staggered side of the board stack (5) and a further side conveyor arranged on the opposite staggered side of the board stack (5) , and the board bundles (6) are removed from board stack (5) alternately to the side conveyor and the further side conveyor.
15. The method according to any of preceding claims 9-13, characterized in that the board bundles (6) are transferred from the unstacking station (3) to a sawing line and / or sanding line.
Citation Information
Patent Citations
A cardboard stacking machine and its staggered stacking method
CN102295185A
Device for stacking metal sheets offset in groups
DE1081831B
Transport mechanism for sheet packer from starch
DE19504708A1
Sheet set feeder
EP1127819A1
Sheet stacker and method for forming sheets stacks of staggered sheets bundles
EP3378811A1
