Mining electric excavator automatic operation control method taking into consideration sudden change in load during excavation
By installing a binocular camera and a force sensor on the mining electric shovel, real-time monitoring and avoidance of large coal rocks solve the problem of excavation trajectory deviation, realize automatic and precise control of the mining electric shovel and efficient excavation, and improve the bucket's reliability. Full bucket rate and energy utilization efficiency.
Patent Information
- Application Number
- PCT/CN2023/110954
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-21
- Filing Date
- 2023-08-03
- Publication Date
- 2024-10-24
AI Technical Summary
During the excavation process, the mining electric shovel may encounter large pieces of coal and rock, causing the excavation trajectory to deviate, making it impossible to ensure the bucket full rate and the energy utilization efficiency of the mining electric shovel.
By installing a binocular camera and a force sensor on a mining electric shovel, the morphology of the material pile can be reproduced in three dimensions, the excavation trajectory and the dynamic depth of the bucket can be calculated, large coal rocks can be monitored and avoided in real time, and the excavation trajectory can be re-planned to ensure the safety of the bucket. Real-time calculation and mining efficiency of internal materials.
It realizes the automatic and precise control of the mining electric shovel, avoids the phenomenon of 'shallow digging' or 'deep digging', improves the bucket full rate and the energy utilization efficiency of the mining electric shovel, and promotes intelligence and unmanned operation. process.
Smart Images

Figure CN2023110954_24102024_PF_FP_ABST
Abstract
Description
An automatic operation control method for mining electric shovel considering sudden excavation load Technical Field
[0001] The present invention relates to the technical field of mining machinery, and in particular to an automatic operation control method for a mining electric shovel taking into account sudden excavation loads. Background Art
[0002] To advance intelligent and unmanned surface shovel operations, ensuring the bucket's fullness and energy efficiency during individual excavation operations is essential. In practice, the bucket may encounter large chunks of material, such as coal and rock, in the excavation pile. This can cause the bucket's subsequent excavation trajectory to deviate from the planned trajectory, resulting in shallow or deep excavation. This can lead to instability in ensuring the bucket's fullness and energy efficiency. Therefore, a method for automatically controlling the operation of an electric mining shovel that accounts for sudden excavation load fluctuations is urgently needed.
[0003] Summary of the Invention
[0004] The object of the present invention is to provide an automatic operation control method for a mining electric shovel taking into account sudden excavation load changes, so as to solve the problem of excavation trajectory deviation in the prior art.
[0005] To achieve the above-mentioned object, the present invention provides an automatic operation control method for a mining electric shovel taking into account sudden excavation load changes, comprising the following steps:
[0006] Step S1: Establish a spatial coordinate system with O0, O1, O2, and O3 as origins at the joints of the mining shovel and the center of the binocular camera, and obtain the kinematic solution of the working device of the mining shovel by the DH method;
[0007] Step S2: Using a binocular camera installed on a mining shovel, the topography of the material pile to be excavated is reproduced in three dimensions;
[0008] Step S3: Select appropriate starting and ending positions of excavation and obtain the surface function y of the excavation pile through the three-dimensional model of the pile in Matlab. L =f L (x,t);
[0009] Step S4: Select function y w =f w (x, t) is used as the excavation trajectory of the mining shovel. The expected trajectory of the arm extension d and the inclination angle θ is obtained by using the forward solution of the shovel kinematics and the geometric relationship.
[0010] Step S5: Let d t is the dynamic excavation depth of the mining shovel bucket, then d t=y L -y w =f L (x,t)-f w (x, t), so the real-time volume of excavated material in the bucket t∈(0,t f ); where t f is the moment when the bucket leaves the pile, which depends on the width of the mining shovel bucket;
[0011] Step S6: When the force sensor installed in the transmission part detects the presence of a large piece of coal rock in front of the bucket, the current bucket tooth tip position (x0, y0) and the volume of excavated material V1 in the bucket are recorded and the excavation operation is stopped;
[0012] Step S7: Based on the actual excavation operation situation obtained by the camera, a corresponding path planning scheme is selected to avoid the bucket from digging large pieces of coal and rock in front;
[0013] Step S8: Obtain the current pile surface function y again through the binocular camera L2 =f L2 (x,t);
[0014] Step S9: Calculate the remaining excavable material volume V2 in the mining shovel bucket and use it as the objective function for secondary excavation;
[0015] Step S10: Using the end point of the avoidance path as the starting point of the secondary excavation, replanning the excavation trajectory and continuing the excavation to complete the entire excavation operation.
[0016] Furthermore, in the spatial coordinate system with the joint of the mining shovel and the center of the binocular camera as the origin, X0, Y0, X1, Z1, X2, Z2, X3, and Y3 are on the same plane, and Z0, Y1, Y2, and Z3 are perpendicular to this plane. The X0 and X3 coordinate axes are oriented horizontally to the right, the Y0 and Y3 coordinate axes are oriented vertically upward, the X1 coordinate axis is parallel to the X2 coordinate axis and is oriented along the shovel boom, and the Z1 coordinate axis is parallel to the Z2 coordinate axis and is oriented along the shovel bucket arm.
[0017] Furthermore, the binocular camera is specifically installed at the front center of the mining electric shovel arm.
[0018] Furthermore, the method for extracting the morphological features of the excavated material pile is:
[0019] The image of the excavated material pile is obtained by taking pictures of the material pile to be excavated using the installed binocular camera.
[0020] picture;
[0021] Image correction: distortion correction and stereo correction of acquired stockpile images;
[0022] Feature extraction: detect and extract feature points from the left and right images of the pile;
[0023] Stereo matching: using the extracted feature points to complete stereo matching of the left and right images to obtain a disparity map of the pile;
[0024] Hole filling, using the mean filling method to deal with invalid errors caused by uneven lighting;
[0025] Disparity to depth conversion: converting the processed disparity map into a depth map through geometric methods;
[0026] 3D reconstruction, the depth map is converted into point cloud data through coordinate transformation, imported into Matlab and converted into a stereogram
[0027] Presented in form.
[0028] Furthermore, the pile surface function y L =f L (x, t) is a curve function obtained by fitting the coordinates of the stockpile point cloud distributed on the middle section in the bucket width direction using the least squares method.
[0029] Furthermore, the mining trajectory of the mining electric shovel can be selected as a logarithmic spiral.
[0030] Furthermore, the path planning scheme is: according to the specific position of the large coal rock in the stockpile, considering the distance of the large coal rock from the ground and the surface of the stockpile, three different avoidance paths are taken: upward, alternating up and down, and downward.
[0031] Furthermore, the method for calculating the volume of the remaining excavable material in the bucket is V2=V0-V1, where V0 refers to the bucket capacity of the mining electric shovel bucket.
[0032] Furthermore, the end point of the secondary excavation is determined by combining V2=V0-V1 and the volume of the excavated material by the secondary excavation bucket.
[0033] Reverse the solution to get .
[0034] Furthermore, the secondary excavation trajectory of the mining electric shovel is selected as a logarithmic spiral
[0035] The beneficial effects of the present invention are:
[0036] (1) The present invention can effectively promote the intelligent and unmanned process of mining electric shovels by realizing automatic and precise control of mining electric shovels;
[0037] (2) The present invention uses machine vision to measure the volume of excavated material in the bucket of a mining shovel in a non-contact manner. Without affecting the movement changes of various components of the mining shovel working device, it can quickly realize real-time calculation of the volume of excavated material in the bucket of the mining shovel.
[0038] (3) The present invention takes the remaining excavable material in the bucket as the objective function, so that the planned excavation operation can avoid the phenomenon of "shallow excavation" or "deep excavation", which not only ensures the full bucket rate of the bucket, but also ensures the energy utilization efficiency of the mining electric shovel. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] FIG1 is a flow chart of an automatic operation control method for a mining electric shovel according to the present invention;
[0040] FIG2 is a schematic diagram of a spatial coordinate system of a mining electric shovel according to the present invention;
[0041] FIG3 is a diagram of the polar diameter ρ and polar angle of the present invention. Diagram of plane geometric relationship with elongation d and inclination angle θ;
[0042] FIG4 is a schematic diagram showing the principle of solving the real-time volume of excavated material in the bucket of the present invention;
[0043] FIG5 is a schematic diagram of the optimized re-excavation trajectory of the mining electric shovel after avoiding coal and rock according to the present invention. DETAILED DESCRIPTION
[0044] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0045] As shown in Figure 1, an automatic operation control method for a mining electric shovel that takes into account sudden excavation loads is proposed. To facilitate the subsequent planning of the automatic operation control method, it is necessary to place the pile surface function and the excavation trajectory in the same coordinate system and to solve the kinematic solution of the mining electric shovel working device. To this end, a spatial coordinate system is established with the joints of the mining electric shovel and the center of the binocular camera as the origin, as shown in Figure 2. X0, Y0, X1, Z1, X2, Z2, X3, and Y3 are on the same plane, and Z0, Y1, Y2, and Z3 are perpendicular to this plane. The X0 and X3 coordinate axes are horizontally to the right, the Y0 and Y3 coordinate axes are vertically upward, the X1 coordinate axis is parallel to the X2 coordinate axis and is oriented along the electric shovel boom, and the Z1 coordinate axis is parallel to the Z2 coordinate axis and is oriented along the electric shovel bucket arm. Let θ be the angle at which the electric shovel rotates from the X0 coordinate axis to the X1 coordinate axis around the Z0 coordinate axis, and L1 is the angle between the origin O0 of the joint 0 coordinate system and the origin O of the joint 1 coordinate system. lThe distance between the origin of the joint 1 coordinate system O1 and the origin of the joint 2 coordinate system O2 along the Z2 coordinate axis, L2 is the distance between the origin of the joint 1 coordinate system O1 and the origin of the joint 2 coordinate system O2 along the Z2 coordinate axis, and L3 is the distance between the origin of the joint 0 coordinate system O0 and the origin of the binocular camera coordinate system O3 along the X3 coordinate axis.
[0046] After the coordinate system is transformed, the corresponding transformation matrix is solved, that is, the pose transformation from the origin O3 of the binocular camera coordinate system to the origin O0 of the joint 0 coordinate system, so as to achieve the purpose of placing the pile surface point cloud and the excavation trajectory in the same coordinate system. According to the constructed coordinate system, the DH parameter table shown in Figure 1 below is obtained.
[0047] Table 1
[0048] The coordinate system with O0 as the origin is transformed twice to the coordinate system with O2 as the origin to obtain the posture transformation matrix T from the saddle to the bucket tooth tip. The kinematic solution of the mining electric shovel working device is:
[0049] Use Visual Studio to call the camera to shoot the excavation pile image, and then perform image correction, feature extraction, stereo matching, hole filling, and depth conversion to obtain the txt point cloud data file of the excavation pile. Import the txt point cloud data file of the excavation pile obtained above into Matlab and present it in the form of a stereogram. The staff can select the appropriate excavation starting point (x s ,y s ) and the end point (x f ,y f ). At the same time, the point cloud coordinates distributed on the middle section of the bucket width are screened out and exported. After eliminating the points with abnormal values, the type of curve to be fitted and the number of parameters to be fitted are set, and the least squares method is used to start fitting the excavation pile surface function y L =f L (x, t). Here the preferred fitting function type is a linear function: L = kx + b. Perform a coordinate system transformation to transform the pile surface function from the coordinate system with O3 as the coordinate origin to the coordinate system with O0 as the coordinate origin. At this time, the pile surface function is y L =k(x-L3)+b.
[0050] Select a function y w =f w (x, t) is the excavation trajectory of the mining shovel, and the logarithmic spiral is preferred here. Where ρ0 is the initial extension of the bucket arm and δ is the cutting angle. The excavation trajectory function in the base coordinate system is: In order to ensure that the excavation track is smooth without speed mutation and stops smoothly during the excavation operation of the electric shovel, the following conditions must be met: In the formula t f They are bucket tooth tip angular displacement, angular velocity, angular acceleration, initial excavation angle, end angle, and end time. According to the conditions that need to be met for a mining shovel to achieve stable excavation, a 5th-order polynomial is used to calculate the tooth tip rotation angle of the mining shovel bucket, i.e., the polar angle. Perform interpolation fitting to obtain the polar angle Functional relationship about time t:
[0051] According to the kinematic solution of the mining shovel working device obtained above and the geometric relationship shown in Figure 3, we can get ρ, About p x 、p y expression Then we get the polar radius ρ and polar angle The relationship between the elongation d and the inclination angle θ is: This yields the arm extension d as a function of time t, d(t), and the inclination angle θ as a function of time t, θ(t). Based on the desired trajectory of arm extension d and inclination angle θ, commands are sent to the variable-frequency AC motor, which drives the mining shovel's actuator to perform excavation.
[0052] At the same time, the volume measurement system of the excavated material in the bucket starts working, and its working principle is shown in Figure 3. Because at any moment in the entire excavation process, the X-axis coordinate of the pile surface function is the same as the X-axis coordinate of the excavation trajectory function, that is, the X-axis coordinate of the pile surface function can be expressed as Therefore, according to the formula The dynamic excavation depth d of the mining shovel bucket can be obtained t , and then use the indefinite integral principle to solve the real-time volume formula of the excavated material: It can realize rapid real-time measurement of excavated materials in the bucket during the excavation process and send the numerical value to the human-computer interaction interface.
[0053] During the excavation process, we can obtain real-time excavation resistance by installing force sensors at the connection between the bucket and the end of the hoist rope and between the push motor and the synchronous pulley. Monitor whether the fluctuation upper limit of the force sensor reading exceeds the specified threshold. When the sensor reading increases sharply and exceeds the specified threshold, it indicates that the mining electric shovel bucket tooth tip has contacted a large piece of coal rock. After recording the current bucket tooth tip coordinates (x0, y0) and the volume of excavated material in the bucket, we can obtain the real-time excavation resistance by installing force sensors at the connection between the bucket and the end of the hoist rope and between the push motor and the synchronous pulley. After that, the electric shovel stopped digging and began to execute the large coal and rock avoidance instructions.
[0054] Here we take the execution of the avoidance path instruction once as a specific implementation case. The specific operation is shown in Figure 5: first move the bucket tooth tip horizontally backward by a distance S, then move it vertically downward by a distance H, and finally move it horizontally.
[0055] Move forward a distance S to the point (x0, y0-H) directly below the excavation stop point (x0, y0). At the same time, the reading of the monitoring force sensor does not exceed the threshold, indicating that the large coal rock has been successfully avoided.
[0056] Then, the end point of the avoidance path (x0, y0-H) is used as the starting point for the secondary excavation, and the logarithmic spiral is selected. is the excavation trajectory. Use the binocular camera to obtain the pile surface function y at this time L2 =f L2 (x, t) = k2x + b2, which is converted to y in the base coordinate system L2 =k2(x-L3)+b2; because at any moment of secondary excavation, the X-axis coordinate of the pile surface function is the same as the excavation trajectory function, that is, the X-axis coordinate of the pile surface function can be expressed as Therefore, according to the formula The dynamic excavation depth dt of the mining shovel bucket can be obtained, and then the formula for the excavated material volume can be solved by using the principle of indefinite integral:
[0057] at the same time Therefore, the coordinates of the end point of the secondary excavation (x f2 ,y f2 ). Knowing the starting point of the secondary excavation (x0, y0-H), through the geometric relationship expression Get two sets of coordinates Bring in the mining trajectory function respectively Win The solution yields the initial extension and cutting angle for the secondary excavation trajectory. Similarly, using the forward kinematic solution for the mining shovel working device and the geometric relationships shown in Figure 2, we obtain the desired trajectory of the arm extension d(t) and inclination angle θ(t), which drives the variable-frequency AC motor to continue the excavation operation.
[0058] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited thereto. Various changes that can be made within the scope of knowledge possessed by technicians in the relevant technical field without departing from the spirit of the present invention are all within the scope of protection of the claims of the present invention.
Claims
1. A method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes, characterized in that: The steps include: Step S1, establishing a spatial coordinate system with O0, O1, O2, and O3 as origins at the joints of the mining shovel and the center of the binocular camera, and obtaining a kinematics positive solution of the mining shovel working device by the DH method; Step S2: using a binocular camera installed on a mining shovel to reproduce the morphological features of the pile to be excavated in three dimensions; Step S3: Select appropriate starting and ending positions of excavation and obtain the surface function y of the excavation pile through the three-dimensional model of the pile in Matlab L =f L (x,t); Step S4: Select function y w =f w (x, t) is used as the excavation trajectory of the mining shovel. The expected trajectory of the arm extension d and the inclination angle θ is obtained by using the forward solution of the shovel kinematics and the geometric relationship. Step S5: Let d t is the dynamic excavation depth of the mining shovel bucket, then d t =y L -y w =f L (x,t)-f w (x, t), so the real-time volume of excavated material in the bucket Among them, t f is the moment when the bucket leaves the pile, which depends on the width of the mining shovel bucket; Step S6: When a large piece of coal rock is detected in front of the bucket by the force sensor installed in the transmission part, the current bucket tooth tip position (x0, y0) and the excavated material volume V1 in the bucket are recorded, and the excavation work is stopped; Step S7: Based on the actual excavation operation situation obtained by the camera, a corresponding path planning scheme is selected to avoid the bucket from excavating large pieces of coal and rock in front; Step S8: Obtain the current pile surface function y again through the binocular camera L2 =f L2 (x,t); Step S9, calculating the remaining excavable material volume V2 of the mining electric shovel bucket and using it as the objective function of the secondary excavation; Step S10: taking the end point of the avoidance path as the starting point of the secondary excavation, replanning the excavation trajectory and continuing the excavation to complete the entire excavation operation.
2. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1 is characterized in that: The spatial coordinate system with the joint of the mining electric shovel and the center of the binocular camera as the origin, wherein X0, Y0, X1, Z1, X2, Z2, X3, and Y3 are on the same plane, and Z0, Y1, Y2, and Z3 are perpendicular to the plane. The X0 and X3 coordinate axes are horizontally to the right, the Y0 and Y3 coordinate axes are vertically upward, the X1 coordinate axis is parallel to the X2 coordinate axis, and the direction is along the electric shovel boom, and the Z1 coordinate axis is parallel to the Z2 coordinate axis, and the direction is along the electric shovel bucket rod.
3. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1 is characterized in that: The specific installation position of the binocular camera is at the front center of the mining electric shovel boom.
4. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1 is characterized in that: The method for extracting the morphological features of the excavated material pile is: The image of the excavated material pile is obtained by taking pictures of the material pile to be excavated through the installed binocular camera; Image correction: distortion correction and stereo correction of the acquired stockpile image; Feature extraction: detect and extract feature points from the left and right images of the pile; Stereo matching: using the extracted feature points to complete stereo matching of the left and right images to obtain a disparity map of the pile; Hole filling: Use the mean filling method to deal with invalid errors caused by uneven lighting; Disparity to depth: convert the processed disparity map into a depth map through geometric methods; 3D reconstruction,After the depth map is converted into point cloud data through coordinate transformation, it is imported into Matlab and presented as a stereogram.
5. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1 is characterized in that: The stockpile surface function y L =f L (x, t) is a curve function obtained by fitting the coordinates of the stockpile point cloud distributed in the middle section in the bucket width direction using the least squares method.
6. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1 is characterized in that: The mining trajectory of the mining electric shovel is selected as a logarithmic spiral 7. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1, characterized in that: The path planning scheme is: according to the specific position of the large coal rock in the stockpile, considering the distance of the large coal rock from the ground and the surface of the stockpile, three different avoidance paths are adopted: upward, alternating up and down, and downward.
8. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1, characterized in that: The method for calculating the volume of the remaining excavable material in the bucket is V2=V0-V1, where V0 refers to the bucket capacity of the mining electric shovel bucket.
9. The method for automatic operation control of a mining electric shovel taking into account sudden excavation load changes according to claim 1, characterized in that: The end point of the secondary excavation can be determined by combining V2=V0-V1 and the volume formula of the excavated material by the secondary excavation bucket: Reverse the solution to get .
10. The method for controlling automatic operation of a mining electric shovel taking into account sudden excavation load changes according to claim 1, characterized in that: The secondary excavation trajectory of the mining electric shovel is selected as a logarithmic spiral
Citation Information
Patent Citations
Excavator intelligent control method, device and equipment, storage medium and excavator
CN112652012A
Control method and device for excavator, processor and excavator
CN114442616A
Intelligent electric shovel optimal automatic excavation operation method based on stockpile surface prediction model
CN114722586A
Mining electric shovel automatic operation control method considering excavation sudden change load
CN116464119A
Power shovel
JP1993311692A
Cited By
Mining electric shovel trajectory planning method based on whole-process asymmetric multi-section S-shaped curve
CN119511702A
Self-adaptive excavation trajectory planning method for shovel loading robot based on multi-trajectory quantitative evaluation
CN121143058A
Bucket tooth tip trajectory planning method based on intelligent detection of electric shovel bucket material volume
CN121381711A
Intelligent capturing, collecting and analyzing method for dynamic force change of excavation force
CN122045715A
Dredged object volume calculation and display method, device and equipment based on multi-source sensing and medium
CN122237710A