Immersed tube production system and production method
By designing the immersed tube production system and using the method of tying steel bars and pouring immersed tube segments, the problems of heavy weight and difficulty in moving the immersed tubes were solved, efficient production and low-cost transportation of immersed tubes were achieved, and production efficiency and cleanliness were improved.
Patent Information
- Application Number
- PCT/CN2024/090289
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-06
- Filing Date
- 2024-04-28
- Publication Date
- 2024-10-31
AI Technical Summary
In the existing production process of immersed tubes, due to the huge weight of the immersed tubes, moving the immersed tubes is slow and costly. Moreover, the length of the molds in the existing system is limited, which makes the transportation and pouring process complicated and increases the cost.
An immersed tube production system is designed, including a production line, steel bar production area, pouring area and outfitting area. The steel bars are tied to form a steel cage, and concrete is poured in the ground production area to form immersed tube segments, which float on the water surface using buoyancy. Transportation on the immersed tube reduces the need for moving and transportation equipment.
It achieves high efficiency and cost savings in the immersed tube production process, reduces dependence on large equipment, improves production efficiency and neatness, and reduces the complexity of transportation and installation.
Smart Images

Figure CN2024090289_31102024_PF_FP_ABST
Abstract
Description
Immersed tube production system and production method
[0001] This application claims priority to the Chinese patent application filed with the China Patent Office on May 6, 2023, with application number: 2023104976159, and invention name: “Immersed Tube Production System and Production Method”, the entire contents of which are incorporated by reference into this application. Technical Field
[0002] The present application belongs to the technical field of immersed tube production, and in particular relates to an immersed tube production system and production method. Background Art
[0003] Underwater tunnels are a fast way to travel through water. The immersed tube method is a construction method for underwater tunnels. In this method, several immersed tubes are transported to the site and lowered one by one into a dredged trench.
[0004] CN217123497U discloses a factory system for prefabricating monolithic reinforced concrete immersed tubes on an assembly line. The system uses concrete to cast a reinforced cage to form the immersed tubes. After partial or complete casting, the immersed tubes are transported via a first trolley mechanism and a second trolley mechanism on first and second trolley tracks. Because the immersed tubes are extremely heavy, movement is very slow. Furthermore, laying the first and second trolley tracks and setting up the first and second trolley mechanisms are very costly.
[0005] Summary of the Invention
[0006] In order to solve some problems existing in the prior art, the first aspect of the present application provides an immersed tube production system, which includes:
[0007] A production line comprising a steel bar binding area, a steel bar cage storage area, a production area, and an outfitting area sequentially arranged along a first horizontal direction; wherein the production area is opened on the ground and located below ground level; a first steel sealing door and a second steel sealing door are respectively provided at both ends of the production area to separate the production area from the steel bar cage storage area and the outfitting area; the production area comprises a plurality of casting areas distributed along the first direction; the outfitting area is located on the surface of the external water area;
[0008] A steel bar production area; comprising a steel bar storage area configured to store steel bars; and a bottom plate steel bar processing area, a side wall steel bar processing area, and a top plate steel bar processing area arranged along a first direction, respectively configured to process and form bottom plate steel bars, side wall steel bars, and top plate steel bars; the steel bar production area is arranged on one side of the steel bar binding area; the steel bar binding area is configured to bind the bottom plate steel bars, side wall steel bars, and top plate steel bars into a steel cage; and
[0009] A first lifting device is configured to transport the steel bars in the steel bar production area.
[0010] In this application, the steel bars in the steel production area are processed into the required length and shape, and the steel bars are transported to the steel cage binding area of the production line and tied into steel cages. Each steel cage is transported to a separate steel cage storage area. When it is time to cast a submerged tube, the first steel cage is transported to the casting area farthest from the steel cage storage area, where concrete is poured and waits for the concrete to solidify to form a submerged tube segment. The next steel cage is transported to the casting area adjacent to the submerged tube segment and concrete is poured and waits for the concrete to solidify to form a submerged tube segment. The above steps are repeated until the required number of submerged tube segments is reached, and multiple submerged tube segments form a submerged tube. Sealing doors are connected at both ends of the submerged tube, and then the first steel sealing door is closed. Water is injected into the production area to float the submerged tube. The second steel sealing door and dock door are opened, and the submerged tube is towed out of the production area and outfitting area by boat. The submerged tube is formed by multiple submerged tube segments. The manufacture of the submerged tube is completed in the production area, and the production process of the submerged tube does not require relocation. After the submerged tube is produced, it floats on the water surface using buoyancy and can be towed away by a ship. No large equipment is required to move the submerged tube, thus saving costs.
[0011] In one embodiment, the immersed tube production system further includes a concrete production area located to one side of the production area. The concrete production area is equipped with a concrete mixing station, ground pumps, and delivery pipes. The number of delivery pipes is the same as the number of casting areas, and they are connected one-to-one. Multiple delivery pipes are connected to the concrete mixing station and the ground pumps to deliver concrete from the concrete mixing station to the casting areas. During the manufacture of immersed tubes, the concrete production area is directly located to one side of the production area. The concrete mixing station mixes the concrete and delivers it to the delivery pipes. The ground pumps then deliver the concrete directly through the delivery pipes to the various casting areas. This eliminates the need for tank trucks to transport concrete, saving costs.
[0012] In one embodiment, the concrete production area further comprises a sand area, a large gravel area, and a small gravel area, to provide the concrete mixing station with sand, large gravel, and small gravel, respectively, as raw materials. The sand area, large gravel area, and small gravel area are located on the side of the concrete mixing station away from the production line. This arrangement allows the sand, large gravel, and small gravel in the sand area, large gravel area, and small gravel area to be promptly transported to the concrete mixing station, thereby stockpiling raw materials and further saving costs. It also facilitates replenishment of materials at the concrete mixing station and avoids concrete shortages.
[0013] In one embodiment, the immersed tube production system further includes a fence and a dock door; the fence encloses the outfitting area; the dock door and the second steel sealing door are used to open and close the outfitting area, and a tower crane is installed within the outfitting area. After the immersed tube is towed to the outfitting area, the tower crane can be used to install measurement and tensioning equipment on the exterior of the immersed tube, allowing for direct installation after transporting the immersed tube to the installation location.
[0014] In one embodiment, the rebar binding area includes a bottom slab rebar binding area, a side wall rebar binding area, and a top slab rebar binding area spaced apart along a first direction, each configured to receive the bottom slab rebar, the side wall rebar, and the top slab rebar from the rebar production area. The bottom slab rebar, the side wall rebar, and the top slab rebar can be transported to the bottom slab rebar binding area, the side wall rebar binding area, and the top slab rebar binding area, respectively, thereby avoiding confusion among rebar of different specifications or the resulting rebar slabs, and improving production cleanliness.
[0015] In one embodiment, the steel bar binding area, steel bar cage storage area, and production area are all located inside the dock, and the steel bar production area is located outside the dock; the outside of the dock is higher than the inside of the dock. The first direction is substantially parallel to the length direction of the immersed tube.
[0016] A second aspect of the present application provides an immersed tube production method, which uses the immersed tube production system described in any of the above embodiments, including the following steps:
[0017] Rebar production: The rebar in the rebar storage area is transported to the bottom plate rebar processing area, the side wall rebar processing area, and the top plate rebar processing area using the first lifting equipment, so that the rebar is processed into bottom plate rebar, side wall rebar, and top plate rebar using the rebar processing equipment respectively;
[0018] Rebar tying: transport the bottom slab, side wall and top slab reinforcement to the reinforcement tying area, and use tying equipment to tie the bottom slab, side wall and top slab reinforcement to form a reinforcement cage;
[0019] Rebar cage storage: transport the rebar cage to the rebar cage storage area;
[0020] Production of immersed tube sections: Open the first steel sealing door and transport the reinforcement cage to the casting area farthest from the reinforcement cage storage area. Pour concrete in this casting area and wait for the concrete to solidify to form the first immersed tube section. Transport the next reinforcement cage to the casting area adjacent to the first immersed tube section and pour concrete there. Wait for the concrete to solidify to form the second immersed tube section. Repeat the above steps until the required number of immersed tube sections is reached.
[0021] Immersed tube segment splicing: connecting the individual immersed tube segments to form an immersed tube;
[0022] The immersed tube leaves the factory: sealing doors are connected at both ends of the immersed tube; then the first steel sealing door is closed, and water is injected into the production area to make the immersed tube float on the water surface; then the second steel sealing door and dock door are opened, and the immersed tube is towed out of the production area and outfitting area by boat.
[0023] In this application, there is no need to move the immersed tube or its segments during the production process, which saves costs. In addition, the finished immersed tube can be towed to the outfitting area by a ship using buoyancy and then to the construction site through external waters, which saves costs.
[0024] In one embodiment, more specifically, the rebar tying steps include transporting the bottom slab rebar, side wall rebar, and top slab rebar to the bottom slab rebar tying area, the side wall rebar tying area, and the top slab rebar tying area, respectively; tying the bottom slab rebar in the bottom slab rebar tying area to form a bottom slab rebar plate; transporting the bottom slab rebar plate to the side wall rebar tying area and tying the side wall rebar to form a semi-finished rebar cage; and transporting the semi-finished rebar cage to the top slab rebar tying area and tying the top slab rebar to form a rebar cage. Forming the rebar cage through the bottom slab rebar tying area, the side wall rebar tying area, and the top slab rebar tying area provides a clear production process and saves costs.
[0025] In one embodiment, more specifically, the immersed tube segment splicing step includes sequentially passing steel strands through prefabricated holes in each immersed tube segment, tightening the strands and securing both ends of the strands, securing the two ends of the immersed tube segment to the strands, and allowing the strands to rebound and tighten the immersed tube segments. Tensing the immersed tube segments with the strands eliminates the need to move the segments, saving costs.
[0026] In one embodiment, more specifically, the steps of splicing the immersed tube segments are as follows: first, the elastic steel strand is sequentially inserted into the prefabricated through-holes of each immersed tube segment to connect the immersed tube segments in series; then, the first end of the steel strand is fixed to the first end of the two ends of the immersed tube; the steel strand is tightened at the second end of the two ends of the immersed tube, and after being tightened to a predetermined tightness, the second end of the steel strand opposite to the first end is fixed to the second end of the immersed tube.
[0027] In one embodiment, more specifically, during the immersed tube delivery process, sealing doors are connected at both ends of the immersed tube. The first steel sealing door is then closed, and water is injected into the production area to float the immersed tube. The second steel sealing door is then opened, and the immersed tube is towed to the outfitting area, where a tower crane is used to install measurement and tensioning equipment on the exterior of the immersed tube. Finally, the dock door is opened, and the immersed tube is towed out of the outfitting area. Using the tower crane to install measurement and tensioning equipment on the exterior of the immersed tube in the outfitting area allows the immersed tube to be quickly deployed during construction.
[0028] In one embodiment, during the immersed tube shipment process, the molds in the production area are moved to the mold storage area after the first steel sealing door is closed and water is injected into the production area to float the immersed tube. Moving the molds to the mold storage area before water injection prevents water damage and saves costs.
[0029] In one embodiment, more specifically, the steps for sending the immersed tube out of the factory are: connecting sealing doors at both ends of the immersed tube; then closing the first steel sealing door, keeping the second steel sealing door closed, and injecting water into the closed production area to make the immersed tube float on the water surface; after the water surface in the production area is roughly flush with the water surface in the outfitting area, opening the second steel sealing door, keeping the dock door closed, and then towing the immersed tube to the outfitting area, and using a tower crane to install measuring and pulling and closing equipment on the outside of the immersed tube; finally, opening the dock door and towing the immersed tube out of the outfitting area.
[0030] In one embodiment, after the immersed tube segment production step and before the immersed tube segment splicing step, the immersed tube production method further includes installing a sealing ring and a riveting structure between any two adjacent immersed tube segments for sealing and docking respectively; in the immersed tube segment splicing step, the sealing ring and the riveting structure are further tightened.
[0031] In at least one embodiment of the present application, the immersed tube production system or method is provided. The immersed tube is formed from multiple segments and manufactured within the production area, without requiring any relocation. Furthermore, after production, the immersed tube floats on the water surface using buoyancy and can be towed away by ship, eliminating the need for large-scale equipment to move the tube, thus saving costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] FIG1 is a schematic diagram of the overall structure of an immersed tube production system according to one embodiment;
[0033] FIG2 is a schematic cross-sectional view of an immersed tube production system according to an embodiment;
[0034] FIG3 is a schematic diagram of a process for producing immersed tubes according to an embodiment;
[0035] In the figure: 1 production line; 2 steel bar production area; 3 first lifting equipment; 4 steel bar binding area; 5 production area; 6 flatbed transport track; 7 second lifting equipment; 8 concrete production area; 100 steel bar storage area; 200 bottom plate steel bar processing area; 300 side wall steel bar processing area; 400 top plate steel bar processing area; 500 bottom plate steel bar binding area; 600 side wall steel bar binding area; 700 top plate steel bar binding area; 800 steel cage storage area; 900 mold storage area; 110 first steel sealing door; 120 pouring area; 130 concrete mixing plant; 131 ground pump; 132 conveying pipe; 140 sand area; 150 large gravel area; 160 small gravel area; 170 second steel sealing door; 180 outfitting area; 190 fence; 210 tower crane; 220 dock door; X is the first direction, Y is the second direction. DETAILED DESCRIPTION
[0036] The technical solution of the present application is described in detail below in conjunction with specific embodiments. However, it should be understood that without further description, the elements, structures and features in one embodiment may also be beneficially combined with other embodiments.
[0037] In the description of this application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood to indicate or imply relative importance or implicitly specify the number of technical features indicated. Therefore, features specified as "first" or "second" may explicitly or implicitly include one or more of such features.
[0038] In the description of this application, it should be understood that the terms "upper", "lower", "bottom", "inner", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in FIG2 . They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on this application.
[0039] In the description of this application, it should be noted that, unless otherwise expressly specified or limited, the terms "connected" and "connection" should be understood in a broad sense. For example, they can refer to fixed connection, detachable connection, or integral connection; they can refer to direct connection, indirect connection through an intermediate medium, or internal communication between two components. Those skilled in the art will understand the specific meanings of the above terms in this application based on the specific circumstances.
[0040] In the background technology, CN217123497U discloses a factory system for prefabricating integral reinforced concrete immersed tubes on an assembly line; because in the existing immersed tube production process, it is necessary to prefabricate a mold at the steel cage when pouring concrete, and the length of the mold is limited. Therefore, in this existing patent, after the mold is placed in the steel cage and part of the concrete is poured, the immersed tube is moved, the position of the mold is changed, and re-poured. When moving the immersed tube, the first trolley mechanism and the second trolley mechanism on the first trolley track and the second trolley track are utilized for transportation. Because the weight of the immersed tube is huge, the weight of the immersed tube after molding can even reach 80,000 tons, so it is extremely expensive to set up the first and second trolley tracks, as well as the first and second trolley mechanisms. To solve this problem, the present embodiment provides a immersed tube production system and production method.
[0041] As shown in Figures 1 and 2, the first embodiment of the present application provides an immersed tube production system. Assuming a first horizontal direction X, the immersed tube production system includes: a production line 1, a rebar production area 2, and a first lifting device 3. The production line 1 includes a rebar binding area 4, a rebar cage storage area 800, a production area 5, and an outfitting area 180, which are arranged in sequence along the first direction X. Specifically:
[0042] The production area 5 is located above ground and below ground level. A first steel sealing door 110 and a second steel sealing door 170 are respectively provided at both ends of the production area 5. These first and second steel sealing doors 110 and 170 separate the production area 5 from the rebar cage storage area 800 and the outfitting area 180, respectively. The production area 5 includes a plurality of casting areas 120 distributed along a first direction X. The outfitting area 180 is located on the surface of the external waters.
[0043] The rebar production area 2 includes a rebar storage area 100, and a bottom slab rebar processing area 200, a side wall rebar processing area 300, and a top slab rebar processing area 400 arranged along a first direction X. These areas respectively receive rebar from the rebar storage area 100 to produce the bottom slab rebar, the side wall rebar, and the top slab rebar. The rebar production area 2 is located to one side of the rebar binding area 4.
[0044] The first lifting device 3 is used to transport the steel bars in the steel bar production area 2 .
[0045] The rebar binding area 4, rebar cage storage area 800, and production area 5 are arranged sequentially along a first direction X, all located on the ground and below ground level; for example, all three can be located in a dry dock. The rebar production area 2 is higher than these three and located outside the dry dock. Furthermore, the production area 5 can be separated from the rebar cage storage area 800 and outfitting area 180 at both ends by first and second steel sealing doors 110 and 170, respectively, allowing water to be injected into the production area to float the prefabricated immersed tubes without flooding the rebar binding area 4 and rebar cage storage area 800.
[0046] Through the above arrangement, the steel bars in the steel bar production area 2 are processed into the required length and shape, and the steel bars are transported to the binding area 4 of the production line and bound into steel cages. Multiple bound steel cages are transported to the steel cage storage area 800 for temporary storage; when it is necessary to cast a submerged tube, the steel cage is transported to the casting area 120 farthest from the steel cage storage area 800 (i.e., a casting area closest to the second steel sealing door 170 and farthest from the first steel sealing door 110), concrete is poured in the casting area 120, and the first submerged tube segment is formed after the concrete solidifies; the next steel cage is transported to the casting area 120 adjacent to the first submerged tube segment and concrete is poured, and the second submerged tube segment is formed after the concrete solidifies; the above steps are repeated until the required number of submerged tube segments is reached and multiple submerged tube segments form a submerged tube. Sealing doors are connected at both ends of the immersed tube. The first steel sealing door 110 is then closed, and water is injected into the production area to float the tube. Once the water level in production area 5 is roughly level with that in outfitting area 180, the second steel sealing door 170 and dock door 220 are opened, and the immersed tube is towed out of production area 5 and outfitting area 180 using a ship. The immersed tube is formed from multiple sections and is manufactured in production area 5, requiring no relocation. After production, the tube floats on the water using buoyancy and can be towed away by ship, eliminating the need for large-scale equipment to move the tube, thus saving costs.
[0047] Specifically, assume that the second direction Y is horizontal and perpendicular to the first direction X. Multiple production lines 1 are spaced apart along the second direction Y. The rebar production area 2 provides rebar for these multiple production lines 1. Multiple production lines 1 can speed up production and eliminate the need for new rebar production areas, saving costs. As shown in Figure 1, the first direction X is roughly parallel to the length of the immersed tube, and the second direction Y is roughly parallel to the width of the immersed tube.
[0048] In one embodiment, the rebar production area 2 is located on one side of the production line 1 along the second direction Y. The rebar production area 2 also includes a flatbed transport vehicle (not shown) and a flatbed transport track 6. The flatbed transport track 6 is arranged along the first direction X and is located on the side of the bottom slab rebar processing area 200, the side wall rebar processing area 300, and the roof rebar processing area 400 that is closest to the production line 1. The flatbed transport vehicle slides on the flatbed transport track 6 and can transport semi-finished rebar components between the bottom slab rebar processing area 200, the side wall rebar processing area 300, and the roof rebar processing area 400, thereby rationalizing the layout of the processing areas and reducing costs. The rebar for each processing area primarily comes from the rebar storage area 100 and is processed in these three processing areas 200, 300, and 400. However, some small components and rebar suitable for the bottom slab, side wall, and roof rebar (collectively referred to as semi-finished rebar components) can be processed in one of the processing areas and then moved between the three processing areas 200, 300, and 400 using a flatbed transport vehicle for distribution, optimizing space and improving productivity.
[0049] The steel bar storage area 100 may be provided at a side of the bottom plate steel bar processing area 200, the side wall steel bar processing area 300 and the top plate steel bar processing area 400 away from the production line 1. The steel bar storage area 100 is used to store steel bars.
[0050] The rebar binding area 4 includes a bottom plate rebar binding area 500, a side wall rebar binding area 600, and a top plate rebar binding area 700, spaced apart along a first direction X. The bottom plate rebar, side wall rebar, and top plate rebar are transported to the bottom plate rebar binding area 500, the side wall rebar binding area 600, and the top plate rebar binding area 700, respectively, to avoid confusion among rebars of different specifications or the resulting rebar slabs, thereby improving production cleanliness.
[0051] Specifically, the bottom plate rebar processing area 200, the side wall rebar processing area 300, and the top plate rebar processing area 400 produce bottom plate rebar, side wall rebar, and top plate rebar, respectively. The first lifting equipment 3, including but not limited to overhead cranes and gantry cranes, is used to transport the bottom plate rebar, side wall rebar, and top plate rebar to the bottom plate rebar binding area 500, the side wall rebar binding area 600, and the top plate rebar binding area 700, respectively. In the bottom plate rebar binding area 500, the bottom plate rebar is bound to form a bottom plate rebar slab; the bottom plate rebar slab is transported to the side wall rebar binding area 600 and bound to form a semi-finished rebar cage; the semi-finished rebar cage is transported to the top plate rebar binding area 700 and bound to form a finished rebar cage. The first lifting equipment 3, the rebar binding area 4, and the rebar production area 2, arranged along the second direction Y, can be located indoors, such as in a factory building, to facilitate the installation and protection of these equipment.
[0052] In each production line 1 , a plurality of steel cage storage areas 800 may be provided at intervals along the first direction X. The steel cages after production are transported to the steel cage storage areas 800 to prevent the steel cages from occupying the top plate steel bar binding area 700 and causing unsustainable steel cage production.
[0053] When there are multiple production lines 1, a steel cage communication channel is set between the steel cage storage areas 800 in two production lines 1 to facilitate the transportation of the steel cages between the two production lines; when any production line has a problem, the production line can partially work and cooperate with other production lines to save costs.
[0054] In Figure 1, eight casting areas 120 are arranged at intervals along the first direction X, and four steel cage storage areas 800 are arranged; however, they can be arranged according to actual needs. The casting area 120 is also provided with margins at both ends of the first direction X to provide space for the installation of sealing doors at both ends of the immersed tube. The steel cage is transported to the casting area 120 farthest from the steel cage storage area 800, and concrete is poured in the casting area 120. After the concrete solidifies, the first immersed tube segment is formed; the next steel cage is transported to the casting area 120 adjacent to the first immersed tube segment and concrete is poured therein. After the concrete solidifies, the second immersed tube segment is formed; the above steps are repeated until immersed tube segments are formed in all casting areas 120. The individual immersed tube segments are spliced together to form a immersed tube. The setting of the immersed tube is completed. There is no need to move the immersed tube or the immersed tube segments during this process.
[0055] In one embodiment, a mold storage area 900 can be located on the side of the rebar cage storage area 800 near the production area 5. This area can also be used to store excess rebar cages. Mold storage area 900 is used to store molds and electromechanical equipment. These molds primarily include core and outer molds used for concrete pouring in immersed tubes; they can also include mobile tower cranes, etc.
[0056] In one embodiment, a second lifting device 7 can be provided on one side of the production area 5, which can be a tower crane or a crane; before the production area 5 is filled with water, the molds and electromechanical equipment in the production area 5 are transported to the mold storage area 900 by the second lifting device 7.
[0057] The immersed tube production system also includes a concrete production area 8, located on one side of the production area 5. The concrete production area 8 is equipped with a concrete mixing station 130, a ground pump 131, and a delivery pipe 132. The number of delivery pipes 132 is the same as the number of casting areas 120, and they are connected one-to-one to each other to provide concrete for casting the immersed tubes. Each of the delivery pipes 132 is connected to the ground pump 131 to provide power for pumping the concrete. During the manufacture of the immersed tubes, the concrete production area 8 is directly located on one side of the production area 5 along the second direction Y. The concrete mixing station 130 mixes the concrete and outputs it to the delivery pipe 132. The ground pump 131 then directly delivers the concrete through the delivery pipe to each casting area 120. This eliminates the need for tank trucks to transport concrete, saving costs.
[0058] In one embodiment, the concrete production area 8 also includes a sand area 140, a large gravel area 150, and a small gravel area 160, all located on the side of the concrete mixing station 130 away from the production line. This arrangement allows for the timely delivery of the sand, large gravel, and small gravel stored in the sand area 140, large gravel area 150, and small gravel area 160 to the concrete mixing station 130, thereby conserving raw materials and further saving costs. It also facilitates replenishment of materials at the concrete mixing station 130, preventing concrete shortages. The particle size of the large gravel is generally greater than 32 mm, while the particle size of the small gravel is generally no greater than 32 mm, as is well known to those skilled in the art and can be adjusted based on actual needs.
[0059] Furthermore, to increase concrete production, multiple concrete mixing stations 130 can be installed at intervals. FIG1 shows an example of two mixing stations 130 installed along the first direction X. To increase the supply of raw materials to the concrete mixing station 130, multiple sand areas 140, large gravel areas 150, and small gravel areas 160 can each be provided.
[0060] Specifically, when there are multiple production lines 1, concrete can be delivered to the pouring areas 120 of different production lines via the concrete mixing station 130 in the concrete production area 8 using ground pumps and delivery pipes. In one embodiment, a road is provided at the second steel sealing door 170. When the ground pumps or delivery pipes are unable to deliver concrete, the concrete can be transported to other production lines via tank trucks.
[0061] The immersed tube production system may also include a fence 190 and a dock door 220; wherein, the area surrounded by the fence 190 is the outfitting area 180; the dock door 220 and the second steel sealing door 170 are used to open or close the outfitting area 180. In addition, a tower crane 210 is provided in the outfitting area 180 to install and transport the immersed tube. After the immersed tube is dragged from the production area 5 to the outfitting area 180, the tower crane 210 can be used to install measuring and pulling equipment (i.e. outfitting) on the outside of the immersed tube so that the immersed tube can be directly installed after being transported to the installation location. The first steel sealing door 110, the second steel sealing door 170 and the dock door 220 can be controlled by a control console. In addition, the open space around the production line 1 is a spare area for temporary storage or use.
[0062] As shown in FIG3 , a second embodiment of the present application provides a method for producing immersed tubes, which may employ the immersed tube production system described in any of the above embodiments. The method includes the following specific steps:
[0063] S100 Rebar Production: The rebars in the rebar storage area 100 are transported to the bottom plate rebar processing area 200, the side wall rebar processing area 300, and the top plate rebar processing area 400 using the first lifting device 3; the rebars are processed into bottom plate rebar, side wall rebar, and top plate rebar in these processing areas using the rebar processing equipment;
[0064] S200 Rebar Binding: Transport the bottom slab, side wall, and top slab reinforcement to the reinforcement binding area, and use binding equipment to bind the bottom slab, side wall, and top slab reinforcement to form a reinforcement cage.
[0065] S300 Rebar Cage Storage: Transport the rebar cage to the rebar cage storage area 800;
[0066] S400 immersed tube segment production: Open the first steel sealing door 110, transport the steel cage to the casting area 120 farthest from the steel cage storage area 800, pour concrete in the casting area 120, and wait for the concrete to solidify to form the first immersed tube segment; transport the next steel cage to the casting area 120 adjacent to the first immersed tube segment and pour concrete therein, and wait for the concrete to solidify to form the second immersed tube segment; repeat the above steps until the required number of immersed tube segments is reached;
[0067] S500 immersed tube segment splicing: connect the individual immersed tube segments to form an immersed tube;
[0068] The S600 immersed tube leaves the factory: sealing doors are connected at both ends of the immersed tube; then the first steel sealing door 110 is closed, and water is injected into the production area 5 to make the immersed tube float on the water surface; then the second steel sealing door 170 and dock door 220 are opened, and the immersed tube is towed out of the production area and outfitting area 180 by boat.
[0069] During the production of the immersed tube, there is no need to move the immersed tube or its segments, which saves costs. In addition, the finished immersed tube can be towed out of the outfitting area 180 by a ship using buoyancy and then towed to the construction site through external waters, thus saving costs.
[0070] In one embodiment, when a flatbed transport track 6 and a flatbed transport vehicle are provided, the S100 steel bar production step also includes that semi-finished steel bar parts applicable to the bottom plate, side wall and top plate steel bars are centrally processed in one of the bottom plate steel bar processing area 200, the side wall steel bar processing area 300 and the top plate steel bar processing area 400, and then placed on the flatbed transport vehicle and moved in the first direction X along the flatbed transport track 6 to be allocated between the bottom plate steel bar processing area 200, the side wall steel bar processing area 300 and the top plate steel bar processing area 400.
[0071] In one embodiment, the specific steps of rebar tying in S200 are as follows: transporting the bottom slab rebar, side wall rebar, and top slab rebar to the bottom slab rebar tying area 500, the side wall rebar tying area 600, and the top slab rebar tying area 700, respectively; tying the bottom slab rebar in the bottom slab rebar tying area 500 to form a bottom slab rebar slab; transporting the bottom slab rebar slab to the side wall rebar tying area 600 and tying the side wall rebar to form a semi-finished rebar cage; and transporting the semi-finished rebar cage to the top slab rebar tying area 700 and tying the top slab rebar to form a rebar cage. Forming the rebar cage by tying in different tying areas provides a clear production process and saves costs.
[0072] In one embodiment, during the immersed tube segment production step S400, more specifically, the first steel sealing door 110 is opened, the rebar cage is transported to the casting area 120 farthest from the rebar cage storage area 800, a mold is installed on the rebar cage, concrete is poured in this casting area 120, and after the concrete solidifies, the first immersed tube segment is formed. The mold is then removed. The next rebar cage is transported to the casting area 120 adjacent to the first immersed tube segment, a mold is installed on the rebar cage, concrete is poured, and after the concrete solidifies, the second immersed tube segment is formed. The mold is then removed. These steps are repeated until the required number of immersed tube segments is reached. In other embodiments, these steps may be repeated until all casting areas 120 have formed immersed tube segments.
[0073] In one embodiment, after the S400 immersed tube segment production step and before the S500 immersed tube segment splicing step, it also includes installing a sealing ring and a riveting structure between any two adjacent immersed tube segments, wherein the sealing ring can achieve sealing between the two adjacent immersed tubes, and the riveting structure can achieve alignment and docking between the two adjacent immersed tubes.
[0074] In one embodiment, during the immersed tube segment splicing step S500, more specifically, steel strands are sequentially passed through prefabricated holes in each immersed tube segment. The strands are then tightened and secured at both ends. The immersed tube segments at the two ends are then secured to the strands, and the strands rebound to tighten the immersed tube segments. Tensing the immersed tube segments with the strands eliminates the need to move the segments, saving costs.
[0075] More specifically, the steel strands are elastic. During construction, the strands are first threaded through prefabricated holes in each immersed tube segment, connecting them in series. The first end of the strand is then secured to the first of the two ends of the immersed tube using a rivet. The strand is then tensioned at the second end of the immersed tube. After being tightened to a predetermined tension, the second end of the strand, opposite the first, is secured to the second end of the immersed tube using a rivet. With this arrangement, the first end of the strand is secured to the first end of the immersed tube, and the second end of the strand is secured to the second end of the immersed tube (the first and second ends are the opposite ends). The strands are then tensioned within the immersed tube, thereby tightening the individual immersed tube segments. This replaces the conventional technique of connecting the segments with post-cast strips. Furthermore, the tensioned strands compress the rivet joints between adjacent immersed tubes, reducing gaps between them and improving the sealing effect of the sealing rings between adjacent tubes.
[0076] The steel strands can be sequentially threaded through the prefabricated perforations of each immersed tube segment using a threading machine. Furthermore, there can be multiple steel strands; therefore, in step S500, multiple steel strands are threaded through the prefabricated perforations of each immersed tube segment. One end (the second end) of the steel strand can be tightened using a winch or tensioning device (e.g., a jack).
[0077] In one embodiment, during the S600 immersed tube delivery process, the specific steps for opening the second steel sealing door 170 and dock door 220 and towing the immersed tube from the production area and outfitting area 180 by ship are as follows: opening the second steel sealing door 170, towing the immersed tube to the outfitting area 180, and installing measurement and tensioning equipment on the exterior of the immersed tube using the tower crane 210; and opening the dock door 220, towing the immersed tube out of the outfitting area 180. Using the tower crane 210 to install the measurement and tensioning equipment on the exterior of the immersed tube in the outfitting area 180 allows the immersed tube to be quickly used during construction.
[0078] In one embodiment, during step S600, before closing the first steel sealing door 110 and filling the production area with water to float the immersed tube, the molds in the production area are transported to the mold storage area 900. This prevents damage to the molds caused by water exposure and saves costs. Specifically, the molds and electromechanical equipment can be transported to the mold storage area 900 using the second lifting device 7.
[0079] In one embodiment, more specifically, the steps for shipping the S600 immersed tube are as follows: connecting sealed doors at both ends of the immersed tube, and transporting the mold in the production area 5 to the mold storage area 900 adjacent to the steel cage storage area 800; then closing the first steel sealing door 110, and keeping the second steel sealing door 170 closed, and injecting water into the closed production area 5 to make the immersed tube float on the water surface; after the water surface of the production area 5 is roughly flush with the water surface of the outfitting area 180, open the second steel sealing door 170, keep the dock door 220 closed, and then tow the immersed tube to the outfitting area 180 for outfitting; after the outfitting is completed, open the dock door 220 and tow the immersed tube out of the outfitting area 180. Among them, the water surface of the production area 5 and the outfitting area 180 are flush, which can prevent the water level in the outfitting area 180 from impacting the immersed tube after the second steel sealing door 170 is opened, making transportation unstable; keeping the dock door 220 closed during the outfitting of the immersed tube can prevent external waves from affecting the stability of the outfitting construction, which is not conducive to construction.
[0080] In this application, after the immersed tube is completed, it is towed out of the outfitting area by a tugboat, enters external waters, and is transported to the construction site. Such external waters include, but are not limited to, rivers, lakes, seas, oceans, and canals. Furthermore, the various embodiments are described in this specification in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical portions between the various embodiments can be referenced separately.
[0081] The described embodiments are merely descriptions of the preferred embodiments of the present application and do not limit the scope of the present application. Without departing from the design spirit of the present application, various modifications and improvements made to the technical solutions of the present application by ordinary technicians in this field should fall within the scope of protection determined by the claims of the present application.
Claims
1. An immersed tube production system, wherein: include: A production line, comprising a steel bar binding area, a steel bar cage storage area, a production area and an outfitting area arranged in sequence along a first horizontal direction; wherein the production area is opened on the ground and is located below the ground level; a first steel sealing door and a second steel sealing door are respectively provided at both ends of the production area to separate the production area from the steel bar cage storage area and the outfitting area; the production area comprises a plurality of casting areas distributed along the first direction; the outfitting area is located on the water surface of the external water area; A steel bar production area includes a steel bar storage area configured to store steel bars; and a bottom plate steel bar processing area, a side wall steel bar processing area, and a top plate steel bar processing area arranged along a first direction, respectively configured to process and form bottom plate steel bars, side wall steel bars, and top plate steel bars; the steel bar production area is arranged on one side of the steel bar binding area; the steel bar binding area is configured to bind the bottom plate steel bars, the side wall steel bars, and the top plate steel bars into a steel bar cage; and The first lifting device is configured to transport the steel bars in the steel bar production area.
2. The immersed tube production system according to claim 1, wherein: It also includes a concrete production area arranged on one side of the production area; a concrete mixing station, a ground pump and a delivery pipe are arranged in the concrete production area, the number of the delivery pipes is the same as the number of the casting areas and they are connected one by one, and the multiple delivery pipes are connected to the concrete mixing station and the ground pump to provide the concrete in the concrete mixing station to the casting area.
3. The immersed tube production system according to claim 2, wherein: The concrete production area also includes a sand area, a large crushed stone area and a small crushed stone area, all of which are located at a side of the concrete mixing station away from the production line.
4. The immersed tube production system according to any one of claims 1 to 3, wherein: The steel bar binding area includes a bottom plate steel bar binding area, a side wall steel bar binding area and a top plate steel bar binding area which are spaced apart along a first direction and are respectively configured to receive the bottom plate steel bars, side wall steel bars and top plate steel bars from the steel bar production area.
5. The immersed tube production system according to any one of claims 1 to 3, wherein: It also includes a fence and a dock door; the fence surrounds the outfitting area; the dock door and the second steel sealing door are used to open or close the outfitting area, and a tower crane is arranged in the outfitting area.
6. The immersed tube production system according to any one of claims 1 to 3, wherein: The steel bar binding area, steel bar cage storage area and production area are all located inside the dock, and the steel bar production area is located outside the dock; the outside of the dock is higher than the inside of the dock; the first direction is roughly parallel to the length direction of the immersed tube.
7. A method for producing an immersed tube, using the immersed tube production system according to any one of claims 1 to 6, comprising the following steps: Rebar production: The rebars in the rebar storage area are transported to the bottom plate rebar processing area, the side wall rebar processing area and the top plate rebar processing area by using the first lifting equipment, so that the rebars are processed into bottom plate rebars, side wall rebars and top plate rebars by using the rebar processing equipment respectively; Rebar tying: transport the bottom slab steel bars, side wall steel bars and top slab steel bars to the steel bar tying area, and use tying equipment to tie the bottom slab steel bars, side wall steel bars and top slab steel bars to form a steel cage; Rebar cage storage: transport the rebar cage to the rebar cage storage area; Production of immersed tube sections: Open the first steel sealing door, transport the steel cage to the casting area farthest from the steel cage storage area, pour concrete in the casting area, and wait for the concrete to solidify to form the first immersed tube section; transport the next steel cage to the casting area adjacent to the first immersed tube section and pour concrete, and wait for the concrete to solidify to form the second immersed tube section; repeat the above steps until the required number of immersed tube sections is reached; Immersed tube segment splicing: connect the individual immersed tube segments to form an immersed tube; The immersed tube leaves the factory: sealing doors are connected at both ends of the immersed tube; then the first steel sealing door is closed, and water is injected into the production area to make the immersed tube float on the water surface; then the second steel sealing door and dock door are opened, and the immersed tube is towed out of the production area and outfitting area by boat.
8. The immersed tube production method according to claim 7, wherein: When the steel bar binding area includes a bottom plate steel bar binding area, a side wall steel bar binding area and a top plate steel bar binding area which are spaced apart along a first direction, more specifically, the steel bar binding steps are: transporting the bottom plate steel bars, the side wall steel bars and the top plate steel bars to the bottom plate steel bar binding area, the side wall steel bar binding area and the top plate steel bar binding area respectively; binding the bottom plate steel bars in the bottom plate steel bar binding area to form a bottom plate steel bar plate; transporting the bottom plate steel bar plate to the side wall steel bar binding area and binding the side wall steel bars to form a semi-finished steel bar cage; transporting the semi-finished steel bar cage to the top plate steel bar binding area and binding the top plate steel bars to form a steel bar cage.
9. The immersed tube production method according to claim 7, wherein: More specifically, the immersed tube segment splicing steps are: passing the steel strands through the prefabricated through-holes of each immersed tube segment in turn, tightening the steel strands and fixing the two ends of the steel strands, fixing the immersed tube segments at the two ends to the steel strands, and allowing the steel strands to rebound to tighten each immersed tube segment.
10. The immersed tube production method according to claim 7, wherein: More specifically, the steps for splicing the immersed tube segments are as follows: first, the elastic steel strand is sequentially inserted into the prefabricated through-holes of each immersed tube segment to connect the immersed tube segments in series; then, the first end of the steel strand is fixed to the first end of the two ends of the immersed tube; the steel strand is tightened at the second end of the two ends of the immersed tube, and after being tightened to a predetermined tightness, the second end of the steel strand opposite to the first end is fixed to the second end of the immersed tube.
11. The immersed tube production method according to claim 7, wherein: More specifically, the steps for the immersed tube to leave the factory are as follows: connecting sealing doors at both ends of the immersed tube, and transporting the molds in the production area to the mold storage area adjacent to the steel cage storage area; then closing the first steel sealing door, keeping the second steel sealing door closed, and injecting water into the closed production area to make the immersed tube float on the water surface; after the water surface in the production area is roughly flush with the water surface in the outfitting area, opening the second steel sealing door, keeping the dock door closed, and then towing the immersed tube to the outfitting area, and using a tower crane to install measuring and pulling equipment on the outside of the immersed tube; finally, opening the dock door and towing the immersed tube out of the outfitting area.
Citation Information
Patent Citations
Semi-rigid pipe joint for immersed tunnel
CN103526777A
Pipe joint prefabricating workshop
CN104786367A
Construction method for continuously prefabricating section bodies of tube sections of immersed tube of dry dock
CN109680720A
Immersed tube production system and production method
CN116214707A
Factory system for assembly line prefabrication of integral reinforced concrete immersed tube
CN217123497U
Cited By
Dismounting and transferring method for large immersed tube full-section prefabricated formwork in limited space
CN119388560A
Full-section assembly method for large-section immersed tube reinforcement system of small dry dock
CN119388568A