Low-blasting-speed rock crushing method

The low-explosive rock crushing method with inclined perforations and low-explosive explosives addresses the inefficiencies and environmental concerns of conventional rock blasting by reducing vibration and noise through tensile fracture, enhancing economic efficiency and constructability.

WO2024228457A1PCT designated stage expired Publication Date: 2024-11-07EUNWOO CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/KR2024/002765
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-03
Filing Date
2024-03-05
Publication Date
2024-11-07

AI Technical Summary

Technical Problem

Conventional rock blasting methods using gunpowder generate excessive noise, vibration, and empty blasts due to shear forces, making them unsuitable for urban construction and inefficient in terms of installation and economic feasibility.

Method used

A low-explosive rock crushing method involving inclined perforations to minimize ballistics, vibration, and noise by utilizing low-explosive explosives that generate volumetric expansion pressure for tensile fracture, with the perforations angled between 0 to 70 degrees from the vertical, and an electromagnetic field composed of mud and sand to concentrate shock and pressure waves.

Benefits of technology

This method reduces vibration and noise, minimizes empty blasts, and enhances economic efficiency and constructability by using low-explosive explosives for tensile fracture, improving the rock crushing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure KR2024002765_07112024_PF_FP_ABST
    Figure KR2024002765_07112024_PF_FP_ABST
Patent Text Reader

Abstract

The present invention relates to a low-blasting-speed rock crushing method comprising a step of using a low-speed explosive to bore and destroy an object to be crushed, wherein the boring is inclined boring for forming an incline from the vertical of the surface of the object to be crushed, such that the crushing direction is offset from the boring direction, and thus empty blasting is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Low-velocity rock breaking method

[0001] The present invention relates to a low-explosion rock breaking method, and more specifically, to a low-explosion rock breaking method in which a perforation formed in a rock is inclined so as to reduce explosion, noise, and scattering during rock breaking.

[0002] As industrialization progresses and urbanization accelerates, civil engineering projects are required to secure large-scale housing, road, and factory sites. In these civil engineering projects, the removal of underground bedrock is essential. Typically, rock crushers or explosives are used to fracture the bedrock to an appropriate size. When explosives are used, a hole is drilled to a specified depth in the target rock, explosives are filled into the hole, and a detonator connected to a connecting wire capable of imparting impact force to the explosives is installed. The detonator detonates the explosives, blasting the bedrock.

[0003] However, this conventional blasting method using gunpowder is not only unsuitable for excavating buildings in urban areas or subways because it causes noise due to blasting along with the destruction of rock, and also generates vibrations due to blasting.

[0004] Due to these issues, numerous vibration-free rock blasting methods have been proposed. For example, Republic of Korea Patent Publication No. 1991-6768 describes a vibration-free rock blasting method that sequentially installs a detonator such as gunpowder and a shock-absorbing component. However, while this vibration-free blasting method is more environmentally friendly than methods using coarse gunpowder, it presents challenges in terms of efficiency and cost-effectiveness during installation and construction.

[0005] In addition, when blasting is performed by forming a hole vertically in the rock, there is a problem that vibration becomes severe due to the shear force generated during crushing, and the occurrence of blasting increases.

[0006] Accordingly, in the industry, continuous and active research and development is being conducted to solve the problems of the above-mentioned rock blasting method using gunpowder and the problems of the above-mentioned vertical blasting method and to develop a more effective rock blasting method.

[0007] The present invention was created to solve the problems of the prior art as described above, and the purpose of the present invention is to provide a low-velocity rock crushing method that forms a perforation in a material to be crushed in an inclined manner during low-velocity crushing to crush the material to be crushed by using the volumetric expansion pressure generated by a low-velocity explosive, thereby minimizing the co-fire, vibration, and noise generated during crushing.

[0008] The low-explosion-velocity rock fragmentation method of the present invention comprises the steps of: forming at least one perforation in a material to be fragmented; loading a low-explosion-velocity explosive into the perforation; forming a sealing field that seals the entrance of the perforation; and destroying the material to be fragmented using the low-explosion-velocity explosive; wherein the perforation is formed to be an inclined perforation that is formed so as to be inclined from the vertical of the surface of the material to be fragmented, so that the direction of fragmentation and the direction of the perforation are misaligned to reduce the explosion.

[0009] Each of the plurality of above-described inclined perforations may be formed in parallel.

[0010] The inclination of the above-mentioned inclined perforation may have an angle of more than 0 degrees and less than 70 degrees with respect to the vertical line of the surface of the crushed material.

[0011] The above-mentioned blasting chamber is composed of mud and sand, and can concentrate the shock wave and pressure wave caused by the explosion and deflagration of the low-velocity explosive on the location of the fracture of the fractured material.

[0012] Depending on the product specifications of the low-velocity explosive, the distance from the surface of the shattered material to the low-velocity explosive and the ratio of the length of the pre-filled explosive may be different.

[0013] The ratio of the distance from the surface (the distance from the surface of the above-mentioned fragment to the above-mentioned low-velocity explosive) and the length of the above-mentioned pre-filled cartridge is

[0014] [Table 1]

[0015]

[0016] It may be as shown in Table 1 above.

[0017] The above low-velocity explosive can cause the composition to generate high temperatures due to an external stimulus, and can shatter the material to be shredded through the volumetric expansion pressure generated as the composition is replaced by vapor.

[0018] The step of loading the low-velocity explosive may be to inject at least one of the low-velocity explosive, a vibration crusher, a plasma, and a rock crusher into the inclined perforation.

[0019] The step of loading the low-velocity explosive may be to load at least one low-velocity explosive into each of the inclined perforations, but to load it so as to form a step with respect to the low-velocity explosives of other adjacent inclined perforations.

[0020] A low-velocity rock crushing method according to one embodiment of the present invention has the effect of minimizing shock waves and pressure waves by crushing rock in the form of tensile destruction using low-velocity explosives.

[0021] In addition, the low-velocity rock crushing method according to one embodiment of the present invention has the effect of minimizing explosion, scattering, and noise by reducing shear fracture and utilizing tensile fracture by performing fracture through perforations formed to be inclined.

[0022] In addition, the low-velocity rock breaking method according to one embodiment of the present invention has the effect of improving economic efficiency and constructability by using low-velocity explosives.

[0023] Figure 1 is a drawing schematically showing the difference between gunpowder and low-velocity explosive according to an embodiment of the present invention.

[0024] FIG. 2 is a schematic drawing showing an example of an inclined perforation according to an embodiment of the present invention.

[0025] Figure 3 is a schematic diagram showing steps of a low-velocity rock crushing method according to an embodiment of the present invention.

[0026] Figure 4 is a drawing schematically showing the overall shape of a low-velocity rock crushing method according to an embodiment of the present invention.

[0027] FIG. 5 is a diagram showing the forces generated during vertical and inclined perforation crushing according to an embodiment of the present invention.

[0028] The objects, specific advantages, and novel features of the present invention will become more apparent from the following detailed description and preferred embodiments, taken in conjunction with the accompanying drawings. In this specification, when reference numerals are assigned to components in each drawing, it should be noted that, where possible, identical components are given the same reference numerals even if they appear in different drawings. Furthermore, in describing the present invention, if a detailed description of a related known technology is deemed to unnecessarily obscure the gist of the present invention, the detailed description thereof will be omitted.

[0029] Hereinafter, a detailed description will be provided along with the drawings shown below.

[0030] FIG. 1 is a drawing schematically showing the difference between gunpowder and low-velocity explosive according to an embodiment of the present invention, FIG. 2 is a drawing schematically showing an example of inclined perforation according to an embodiment of the present invention, FIG. 3 is a drawing schematically showing steps of a low-velocity rock breaking method according to an embodiment of the present invention, FIG. 4 is a drawing schematically showing the overall shape of a low-velocity rock breaking method according to an embodiment of the present invention, and FIG. 5 is a drawing schematically showing the forces generated during vertical and inclined perforation breaking according to an embodiment of the present invention, respectively.

[0031] A low-explosion rock crushing method according to one embodiment of the present invention is a method for crushing a material to be crushed using low-explosion explosives rather than gunpowder.

[0032] Here, the low-velocity explosive (E) may be composed of a composition that provides crushing power through an expansion pressure different from that of gunpowder, for example, by providing an expansion vapor pressure to cause tensile destruction of rock.

[0033] In addition, all configurations known in the field to which the present invention pertains can be applied to the low-velocity explosive (E).

[0034] First, as shown in FIGS. 1 to 5, the low-velocity explosive (E) and the inclined perforation (D) used in the present invention will be described in detail.

[0035] Referring to Figure 1, the low-velocity explosive (E) can be formed into a larger volume than when only gunpowder (E`) is used, as it is formed from metal powder and metal oxide.

[0036] Accordingly, when breaking up rock, if a low-velocity explosive (E) is used, the proportion of the charge (C) in the total perforation field (L) increases, and the proportion of the charge (F) decreases.

[0037] There is concern that the amount of flying rockets (S) may increase due to this cause.

[0038] As a method to prevent this, the present invention proposes an inclined perforation (D) as shown in Fig. 2.

[0039] An inclined perforation (D) is a perforation that forms a perforation with an incline from the rock surface. Compared to a vertically formed perforation (L), the length of the charge field (C) is the same, but the length of the charge field (F) is formed longer to minimize flying projectiles (S), and the incline allows for tensile destruction rather than shear destruction, thereby minimizing vibration and noise. This will be described in detail later.

[0040] The low-velocity rock fragmentation method according to the present invention comprises the steps of: forming at least one inclined perforation (D) in a material to be fragmented (G) (S10); loading a low-velocity explosive (E) into the inclined perforation (D) (S20); forming a sealing field (F) that seals the entrance of the inclined perforation (D) (S30); and destroying the material to be fragmented (G) using the low-velocity explosive (E) (S40); wherein the low-velocity explosive (E) and the sealing field (F) can be formed in the order of the low-velocity explosive (E) and the sealing field (F) from the inside of the perforation.

[0041] Here, the low-velocity explosive (E) may be composed of a composition that provides crushing power through expansion pressure different from that of gunpowder, for example, by providing expansion vapor pressure to cause tensile destruction of rock, and may be, for example, Nonex.

[0042] Additionally, low-velocity explosives (E) can be injected so as to be placed at the bottom of the perforation (F), and can be injected in different capacities or different quantities depending on the hardness of the rock.

[0043] That is, low-velocity explosives (E) can be used with explosives having a high crushing rate when the rock hardness is high, and multiple explosives of a set capacity can be used.

[0044] At this time, the low-velocity explosive (E) may be injected into each perforation (F) so as to have a step difference from other low-velocity explosives (E) injected into other adjacent perforations (F).

[0045] For example, a low-velocity explosive (E) having a length of 10 cm may be injected into a hole (F) adjacent to a hole (F) into which a low-velocity explosive (E) having a length of 10 cm has been injected, followed by another low-velocity explosive (E) having a length of 10 cm.

[0046] The housing may include an internal fixing portion and an external fixing portion to facilitate fixation after insertion into the perforation (H`).

[0047] The internal fixing member may be formed at the lowest side of the housing and may have a protruding shape that can be inserted and fixed into the shredded material (G). In this case, the internal fixing member may have, for example, the shape of a sharp needle or a rod.

[0048] The external fixing member may be formed on the top side of the housing and may have a flange-shaped form that can be fixed to the surface of the crushed material (G).

[0049] The low-explosion rock breaking method of the present invention discloses each step for breaking up a material to be broken (G) (rock). Simply put, it may be formed by forming an inclined perforation (D) in the material to be broken (G), forming a low-explosion explosive (E) and a pre-filled field (F), and then detonating it.

[0050] Specifically, the step (S10) of forming a slanted perforation (D) may be to form a slanted perforation (D) when forming a perforation (H`) in the crushed material (G). As described above, the slanted perforation can lengthen the length of the pre-cutting field (F), and the occurrence of a void (S) can be minimized by the lengthened pre-cutting field (F).

[0051] The step (S20) of loading the low-velocity explosive (E) may be a step of inserting the low-velocity explosive (E) into an inclined perforation (D) formed in the shattered material (G).

[0052] The step (S30) of forming a sealing field (F) may be to form the sealing field (F) in the remaining space of the perforation hole (L) into which the low-velocity explosive (E) is inserted. Specifically, the sealing field (F) may be inserted by closely contacting sand, mud, etc. to seal the perforation. By forming the sealing field (F), it is possible to prevent the explosive (S) generated by the detonation of the low-velocity explosive (E) from scattering outside the rock.

[0053] The step (S40) of destroying the fragment (G) may be to detonate the low-velocity explosive (E) after both the low-velocity explosive (E) and the pre-color field (F) have been formed. The detonation causes cracks in the rock.

[0054] At this time, the perforation site (L) may be formed in the order of low-velocity explosive (E) and pre-filled explosive (F) starting from the inside (inside the rock). If formed in the above order, the detonation (S) can be minimized and the explosive power of the low-velocity explosive (E) can be concentrated and transmitted to the rock.

[0055] The low-velocity explosive (E) of the low-velocity rock breaking method according to one embodiment of the present invention can form a slope to minimize vibration.

[0056] Specifically, as shown in Fig. 4, the case of crushing gunpowder (E`) by vertical perforation and the case of crushing low-velocity explosive (E) by oblique perforation (D) are compared and explained.

[0057] In the case of vertical perforation, the impact generated by the explosion of the gunpowder (E`) spreads in all directions, and most of it is formed as a shear force formed in the direction perpendicular to the perforation (H`), and a tensile force is generated between the longitudinal direction of the perforation (H`) and the direction perpendicular to the perforation (H`). The material to be crushed (G) is sheared and destroyed by the shear force that accounts for the majority of it. In the case of shear destruction, there is the problem of generating large vibrations.

[0058] Conversely, in the case of an oblique perforation (D), the impulse generated by the explosion of a low-velocity explosive (E) spreads in all directions, and most of it is formed as a tensile force perpendicular to the perforation (D), and a normal stress is generated on the material to be crushed (G) between the longitudinal direction of the perforation and the direction perpendicular to the perforation. The material to be crushed (G) is destroyed by the tensile force, which accounts for the majority of the stress. In the case of tensile failure, less vibration is formed than in the case of shear failure.

[0059] That is, by crushing the material to be crushed (G) using tensile destruction by tensile force with little vibration, vibration can be minimized. In addition, as vibration is reduced, the amount of flying debris (S) can be reduced.

[0060] In one embodiment of the low-velocity rock breaking method of the present invention, each of the plurality of inclined perforations (D) may be formed in parallel.

[0061] The inclined perforation (D) is intended to be pulverized by the low-velocity explosive (E) inserted inside it, and there is a range that can be blasted by the low-velocity explosive (E). The rock outside this range will not be broken and will maintain its original shape. Therefore, in order to effectively pulverize the rock, the space between the multiple perforations (H) may be formed to have a certain interval. In this case, each low-velocity explosive (E) will destroy the rock within a certain range, and the low-velocity explosives (E) located further away from the location will also destroy the rock within a certain range from that location, so that the entire rock can be pulverized. In addition, multiple low-velocity explosives (E) can be detonated simultaneously to create a synergistic effect, thereby enhancing the explosive power.

[0062] The slope of the inclined perforation (D) of the low-velocity rock crushing method according to one embodiment of the present invention may have an angle of 0 to 70 degrees from the vertical of the surface of the material to be crushed (G).

[0063] Generally, it is drilled perpendicular to the surface of the fractured material (G) (hereinafter, this case is referred to as 0 degree).

[0064] However, the reason why the pre-filled field (F) becomes shorter when the perforation hole (L) is formed at 0 degrees may be because it is formed at a certain angle. The angled oblique perforation hole (D) increases the length of the pre-filled field (F), and the length and amount of pre-filled field (F) that can be filled increase, which can minimize the flying debris caused by the explosion of the low-velocity explosive (E).

[0065] The angle of the inclined perforation (D) may be preferably 45 degrees, but is not limited thereto and may vary depending on the condition, location, and size of the rock.

[0066] The above-described pre-fracture field (F) of the low-velocity rock crushing method according to one embodiment of the present invention may be composed of mud and sand, and may be configured to cause shock waves and pressure waves caused by the explosion and deflagration of the low-velocity explosive (E) to be concentrated at the fracture location of the fractured material (G).

[0067] Here, the pre-filled area (F) may be readily available and may be constructed of sand and mud that can form cohesion through moisture, allowing the detonation of the low-velocity explosive (E) to be confined in the pre-filled area (F) and the explosive power to be concentrated at the rupture point.

[0068] Here, rock fragmentation using low-velocity explosives (E) may be performed by inserting the low-velocity explosives (E) into the perforation (F) together with a spacer to form the above-mentioned step.

[0069] Specifically, the lengths of the low-velocity explosive (E) and the spacer (not shown) may be formed differently, and a step may be formed between a hole (F) into which only the low-velocity explosive (E) is injected and a low-velocity explosive (E) injected together with a spacer into an adjacent hole (F).

[0070] Here, the spacer can be formed into a capsule shape having a predetermined length, and may contain a fluid such as polyethylene or a gas.

[0071] In a low-velocity rock crushing method according to one embodiment of the present invention, the distance from the surface of the material to be crushed (G) to the low-velocity explosive (E) and the ratio of the length of the pre-cutting length (F) may be different depending on the specifications of the low-velocity explosive (E).

[0072] Because low-velocity explosives (E) are explosive materials that can contain gunpowder, there are capacity specifications based on the amount of gunpowder that generates vibration. A typical example is weight. The amount of gunpowder and low-velocity explosive for each specification is fixed, and as the capacity increases, the volume occupied may increase.

[0073] In a low-velocity rock breaking method according to one embodiment of the present invention, the diameter of the perforation may be constant, but when the volume increases according to the capacity, the length of the charge field (C) formed in the perforation hole (L) increases, and as the charge field increases, the length of the pre-filled field (F) decreases.

[0074] In such cases, a problem may arise where the firing (S) that occurs during shredding is not sufficiently blocked by the full-color field (F).

[0075] To prevent the above problem, the overall length of the perforation hole (L) formed in the shattered material (G) may be changed according to the specifications. For example, when using a low-velocity explosive (E) with a large specification (large capacity), the length of the perforation hole (L) may be formed longer to increase the length of the pre-filled field (F) and prevent empty detonation (S).

[0076] The ratio of the color (C) and the color (F) according to the product specifications is explained in detail below.

[0077] The low-velocity rock crushing method according to one embodiment of the present invention is characterized in that the ratio of the distance from the surface (the distance from the surface of the material to be crushed (G) to the low-velocity explosive (E)) and the length of the pre-cutting (F)

[0078] Product Specifications 200g 400g 600g 1000g Distance from surface 50cm~70cm 70cm~100cm 100cm~130cm 130cm~150cm Length of full color 1.0m~1.3m 1.2m~1.7m 1.3m~1.9m 1.5m~2.2m

[0079] It may be as shown in Table 1 above.

[0080] First, regarding Table 1, if the product specification is 200g, the length of the pre-painting field (F) is 1.0m when the distance from the surface to the low-velocity explosive (E) is 50cm, and if the product specification is 200g, the length of the pre-painting field (F) is 1.3m when the distance from the surface to the low-velocity explosive (E) is 70cm.

[0081] Here, the distance from the surface to the low-velocity explosive (E) and the length of the pre-filled area (F) can be adjusted by changing the length of the perforation hole (L) according to the product specification. That is, the volume of the low-velocity explosive (E) is different according to the product specification, and by changing the length of the perforation hole (L) according to the volume, the length of the pre-filled area (F) can be kept constant while increasing the quantity of the low-velocity explosive (E).

[0082] The low-velocity rock crushing method of the present invention having the specifications as shown in Table 1 above can prevent the explosive charge (S) generated by the explosion of the low-velocity explosive (E) from flying outside the crushed material (G) by securing the length of the pre-cutting member (F) to a certain level or more.

[0083] Although the present invention has been described in detail through specific embodiments, this is intended to specifically explain the present invention, and the present invention is not limited thereto, and it will be apparent that modifications and improvements can be made by those skilled in the art within the technical spirit of the present invention.

[0084] All simple modifications or changes of the present invention fall within the scope of the present invention, and the specific scope of protection of the present invention will be made clear by the appended claims.

Claims

1. A step of forming at least one perforation in a crushed material; A step of loading low-velocity explosives into the above-mentioned perforation; A step of forming a color field that colors the entrance of the above perforation; A step of destroying the fragments using the low-velocity explosive; The above perforation is, A low-explosion rock crushing method characterized by comprising an inclined perforation formed so as to generate an incline from the vertical of the surface of the above-mentioned crushed material, thereby reducing the blast by causing the crushing direction and the perforation direction to deviate from each other.

2. In paragraph 1, A low-explosion rock breaking method characterized in that each of the plurality of above-mentioned inclined perforations is formed in parallel.

3. In paragraph 2, A low-explosion rock crushing method characterized in that the slope of the above-mentioned inclined perforation has an angle of more than 0 degrees and less than 70 degrees with respect to the vertical line of the surface of the crushed material.

4. In paragraph 1, A low-velocity rock crushing method characterized in that the distance from the surface of the crushed material to the low-velocity explosive and the ratio of the length of the pre-cutting wall are different according to the product specifications of the low-velocity explosive.

5. In paragraph 4, The ratio of the distance from the surface (the distance from the surface of the above-mentioned shattered material to the above-mentioned low-velocity explosive) and the length of the above-mentioned pre-filled gun [Table 1] A low-explosion rock breaking method characterized by the same as in Table 1 above.

6. In paragraph 1, The above low-velocity explosives are, A low-explosion rock crushing method characterized by crushing a material to be crushed through volumetric expansion pressure generated as the composition is replaced by steam by heating the composition to a high temperature through an external stimulus.

7. In paragraph 6 The step of loading the above low-velocity explosive is: A low-velocity rock crushing method characterized in that at least one of the low-velocity explosive, micro-vibration crusher, plasma and rock crushing agent is injected into the inclined perforation.

8. In paragraph 1, The step of loading the above low-velocity explosive is: A low-explosive rock breaking method characterized in that at least one low-explosive explosive is injected into each of the above-mentioned inclined perforations, and is injected so as to form a step with respect to the low-explosive explosive of another adjacent inclined perforation.

Citation Information

Patent Citations

  • Rock Blasting Method for using Air Tube

    KR100316161B1

  • Method for producing great rock

    KR101722722B1

  • New Filling Blashing method

    KR101995692B1

  • Blasting method of low shock explosive

    KR102059606B1

  • Pocket Charge Blasting Method

    KR102312036B1