Method and structural arrangement for providing continuous reinforcement in pre-cast columns
The method of erecting pre-cast columns with interconnected beams and dowel bars addresses the lack of continuous reinforcement, improving structural strength and reducing construction time by enhancing moment carrying capacity and preventing cracks.
Patent Information
- Application Number
- PCT/IB2023/056928
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-11
- Filing Date
- 2023-07-04
- Publication Date
- 2024-11-14
AI Technical Summary
Pre-cast columns often lack continuous reinforcement, leading to poor moment carrying capacity, cracks, and reinforcement corrosion, while in-situ construction is time-consuming.
The method involves erecting pre-cast columns with a predefined shell and notch, interconnecting them with pre-cast beams, and coupling dowel bars with reinforcement bars to transfer loads and create continuous reinforcement, filling voids with cement concrete to develop bond strength.
This approach enhances the moment carrying capacity, prevents cracks, and reduces construction time by providing continuous reinforcement and structural integration between pre-cast columns and beams.
Smart Images

Figure IB2023056928_14112024_PF_FP_ABST
Abstract
Description
[0001] METHOD AND STRUCTURAL ARRANGEMENT FOR PROVIDING CONTINUOUS REINFORCEMENT IN PRE-CAST COLUMNS
[0002] EARLIEST PRIORITY DATE
[0003] This Application claims priority from a Complete patent application filed in India having Patent Application No. 202321033405, filed on May 11, 2023, and titled “METHOD AND STRUCTURAL ARRANGEMENT FOR PROVIDING CONTINUOUS REINFORCEMENT IN PRE-CAST COLUMNS”.
[0004] FIELD OF INVENTION
[0005] Embodiments of the present disclosure relate to a field of anchoring steel bars of reinforced concrete members and more particularly to a method and a structural arrangement for providing continuous reinforcement in one or more pre-cast columns.
[0006] BACKGROUND
[0007] A structure is a group of interconnected elements such as foundations, columns, and beams to support loads. The structure includes at least one of in- situ structures and precast structures. Further, vertical members that are used to transfer loads to the foundation is termed ‘columns’. Similarly, horizontal members that are used to transfer the loads to the columns is termed as ‘beams’. Reinforcement plays an important role in the structure since the reinforcement provides strength, stability, and durability to the structure.
[0008] The reinforcement enables the structure to bear tensile stresses as well as compressive stresses along with ensuring uniform distribution of loads from a superstructure to a substructure, thereby preventing differential settlement. Lack of continuous reinforcement results in a poor moment carrying capacity of the structure. The poor moment carrying capacity causes cracks in the structure. Water accumulation in the cracks leads to reinforcement corrosion affecting the strength of the structure. Apart from that, the construction process of the in-situ structures is time-consuming and is another point of concern. Hence, there is a need for an improved method and a structural arrangement for providing continuous reinforcement in one or more pre-cast columns to address the aforementioned issue(s).
[0009] OBJECTIVE OF THE INVENTION
[0010] An objective of the invention is to provide continuous reinforcement in pre-cast columns along with reducing construction time of a structure.
[0011] BRIEF DESCRIPTION
[0012] In accordance with an embodiment of the present disclosure, a method for providing continuous reinforcement in one or more pre-cast columns is provided. The method includes erecting one or more first pre-cast columns on a founding media. The one or more first pre-cast columns are to transfer one or more loads acting on the one or more first pre-cast columns to the founding media. The one or more first pre-cast columns includes a corresponding shell of a predefined thickness. The corresponding shell includes a first predefined portion and a second predefined portion. The first predefined portion includes cement concrete. The one or more first pre-cast columns includes a corresponding notch located in the second predefined portion of the one or more first pre-cast columns. The method also includes erecting one or more pre-cast beams interconnecting the one or more first pre-cast columns erected through the corresponding notch to transfer the one or more loads acting laterally on the one or more pre-cast beams to the one or more first pre-cast columns erected. The method further includes providing one or more dowel bars coupled to one or more first reinforcement bars of the one or more corresponding first pre-cast columns upon erecting the one or more pre-cast beams to couple with one or more second reinforcement bars of one or more corresponding second pre-cast columns during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns and the one or more first pre-cast columns. The method also includes filling one or more voids in the one or more first pre-cast columns by the cement concrete upon providing the one or more dowel bars to develop a predefined bond strength between the one or more pre-cast beams, the one or more first pre-cast columns, and the one or more dowel bars, thereby providing the continuous reinforcement. In accordance with an embodiment of the present disclosure, a structural arrangement for providing continuous reinforcement in one or more pre-cast columns is provided. The structural arrangement include one or more first pre-cast columns erected on a founding media. The one or more first pre-cast columns are adapted to transfer one or more loads acting on the one or more first pre-cast columns to the founding media. The one or more first pre-cast columns includes a corresponding shell of a predefined thickness. The corresponding shell includes a first predefined portion and a second predefined portion. The first predefined portion includes cement concrete. The one or more first pre-cast columns includes a corresponding notch located in the second predefined portion of the one or more first pre-cast columns. The structural arrangement also includes one or more pre-cast beams adapted to interconnect the one or more first pre-cast columns erected through the corresponding notch to transfer the one or more loads acting laterally on the one or more pre-cast beams to the one or more first precast columns erected. The structural arrangement further includes one or more dowel bars coupled to one or more first reinforcement bars of the one or more corresponding first pre-cast columns. The one or more dowel bars are adapted to couple with one or more second reinforcement bars of one or more corresponding second pre-cast columns bars during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns and the one or more first pre-cast columns. The second predefined portion is adapted to receive the cement concrete to develop a predefined bond strength between the one or more precast beams, the one or more first pre-cast columns, and the one or more dowel bars, thereby providing the continuous reinforcement.
[0013] To further clarify the advantages and features of the present disclosure, a more explicit description of the disclosure will follow by reference to specific embodiments thereof, which are illustrated in the appended figures. It is to be appreciated that these figures depict typical embodiments of the disclosure and are therefore not to be considered limiting in scope. The disclosure will be described and explained with additional details with the appended figures.
[0014] BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The disclosure will be described and explained with additional specificity and detail with the accompanying figures in which: FIG. 1 is a flow chart representing the steps involved in a method for providing continuous reinforcement in pre-cast columns in accordance with an embodiment of the present disclosure; and
[0016] FIG. 2 is a schematic representation of a structural arrangement for providing continuous reinforcement in pre-cast columns in accordance with an embodiment of the present disclosure.
[0017] Further, those skilled in the art will appreciate that elements in the figures are illustrated for simplicity and may not have necessarily been drawn to scale. Furthermore, in terms of the construction of the device, one or more components of the device may have been represented in the figures by conventional symbols, and the figures may show only those specific details that are pertinent to understanding the embodiments of the present disclosure so as not to obscure the figures with details that will be readily apparent to those skilled in the art having the benefit of the description herein.
[0018] DETAILED DESCRIPTION
[0019] To promote an understanding of the principles of the disclosure, reference will now be made to the embodiment illustrated in the figures and specific language will be used to describe them. It will nevertheless be understood that no limitation of the scope of the disclosure is thereby intended. Such alterations and further modifications in the illustrated system, and such further applications of the principles of the disclosure as would normally occur to those skilled in the art are to be construed as being within the scope of the present disclosure.
[0020] The terms "comprises", "comprising", or any other variations thereof, are intended to cover a non-exclusive inclusion, such that a process or method that comprises a list of steps does not include only those steps but may include other steps not expressly listed or inherent to such a process or method. Similarly, one or more devices or sub-systems or elements or structures or components preceded by "comprises... a" does not, without more constraints, preclude the existence of other devices, sub-systems, elements, structures, components, additional devices, additional sub-systems, additional elements, additional structures, or additional components. Appearances of the phrase "in an embodiment", "in another embodiment" and similar language throughout this specification may, but not necessarily do, all refer to the same embodiment. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the art to which this disclosure belongs. The system, methods, and examples provided herein are only illustrative and not intended to be limiting.
[0021] In the following specification and the claims, reference will be made to a number of terms, which shall be defined to have the following meanings. The singular forms “a”, “an”, and “the” include plural references unless the context clearly dictates otherwise.
[0022] In the discussion that follows, references will be made to “one or more first pre-cast columns”, and “one or more second pre-cast columns” with reference to an entity (columns) that are positioned within the structure at different levels of the structure. In the discussion that follows, the entity (columns) may be used interchangeably to refer to another entity (walls). In the discussion that follows, references will be made to “one or more first pre-cast beams” with reference to an entity (beams) that are positioned on the one or more first pre-cast columns.
[0023] Embodiments of the present disclosure relate to a method and a structural arrangement for providing continuous reinforcement in one or more pre-cast columns. The method includes erecting one or more first pre-cast columns on a founding media. The one or more first pre-cast columns are to transfer one or more loads acting on the one or more first pre-cast columns to the founding media. The one or more first pre-cast columns includes a corresponding shell of a predefined thickness. The corresponding shell includes a first predefined portion and a second predefined portion. The first predefined portion includes cement concrete. The one or more first pre-cast columns includes a corresponding notch located in the second predefined portion of the one or more first pre-cast columns. The method also includes erecting one or more pre-cast beams interconnecting the one or more first pre-cast columns erected through the corresponding notch to transfer the one or more loads acting laterally on the one or more pre-cast beams to the one or more first pre-cast columns erected. The method further includes providing one or more dowel bars coupled to one or more first reinforcement bars of the one or more corresponding first pre-cast columns upon erecting the one or more pre-cast beams to couple with one or more second reinforcement bars of one or more corresponding second pre-cast columns during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns and the one or more first pre-cast columns. The method also includes filling one or more voids in the one or more first pre-cast columns by the cement concrete upon providing the one or more dowel bars to develop a predefined bond strength between the one or more pre-cast beams, the one or more first pre-cast columns, and the one or more dowel bars, thereby improving the moment carrying capacity.
[0024] FIG. 1 is a flow chart representing the steps involved in a method (10) for providing continuous reinforcement in one or more pre-cast columns in accordance with an embodiment of the present disclosure. As used herein, the pre-cast columns the pre-cast columns are structural elements used in construction that is manufactured in at least one of an off-site in a factory and a casting yard and then transported to a construction site for installation. The method (10) includes erecting one or more first pre-cast columns on a founding media in step 20. As used herein, the founding media may be defined as layers of rock located beneath ground that is capable of withstanding the weight of a structure.
[0025] Further, in one embodiment, the structure may include, but not limited to, commercial buildings, residential buildings, institutional buildings, industrial buildings, dams, bridges and the like. The one or more first pre-cast columns are adapted to transfer one or more loads acting on the one or more first pre-cast columns to the founding media. In some embodiments, the one or more loads may be acting on the one or more pre-cast columns in at least one of a direction including an axial direction, a radial direction and a combination thereof as specified by respective country codes. In one embodiment, the one or more loads may include, but not limited to, a dead load, a live load, a wind load, a seismic load, a soil load, a hydrostatic load, a thermal load, a snow load, and the like. The one or more first pre-cast columns includes a corresponding shell of a predefined thickness.
[0026] Furthermore, in one embodiment, the predefined thickness may be at least 65 milli meters. In an exemplary embodiment, the core may be a vacant space located between an outer wall and the one or more first pre-cast columns adapted to receive reinforcement cement concrete for binding several structural components together. The corresponding core includes a first predefined portion and a second predefined portion. The first predefined portion includes the cement concrete. In one embodiment, the cement concrete may include a grade between M15 and M 100. The one or more first pre-cast columns includes a corresponding notch located in the second predefined portion of the one or more first pre-cast columns.
[0027] The method (10) also includes erecting one or more pre-cast beams interconnecting the one or more first pre-cast columns erected through the corresponding notch to transfer the one or more loads acting laterally on the one or more pre-cast beams to the one or more first pre-cast columns erected in step 30. In one embodiment, the one or more precast beams may include one or more corresponding third reinforcement bars adapted to anchor with the one or more first reinforcement bars to structurally integrate the one or more pre-cast beams to the one or more first pre-cast columns. In such an embodiment, the third reinforcement bars are adapted to bend in a predefined angle to anchor with the one or more first reinforcement bars. In one embodiment, the predefined angle may include 90 degrees.
[0028] The method (10) further includes providing one or more dowel bars coupled to one or more first reinforcement bars of the one or more corresponding first pre-cast columns upon erecting the one or more pre-cast beams to couple with one or more second reinforcement bars of one or more corresponding second pre-cast columns during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns and the one or more first pre-cast columns in step 40. In one embodiment, the one or more first pre-cast columns and the one or more second pre-cast columns may include a corresponding hollow core. In such an embodiment, the hollow core may include a first predefined dimension including at least one of 100 milli meters x 100 milli meters, 125 milli meters x 125 milli meters, 150 milli meters x 150 milli meters, and 200 milli meters x 200 milli meters. In one embodiment, the hollow core may include, but not limited to, a rectangular core, a square core, a triangular core, a circular core and the like.
[0029] Further, in some embodiments, the one or more first precast columns and the one or more second precast columns comprises a rectangular shape. In such an embodiment, the rectangular shape may include a second predefined dimension comprising at least one of 200 milli meters x 600 milli meters, 250 milli meters x 900 milli meters, 300 milli meters x 1150 milli meters, 350 milli meters x 1200 milli meters, 400 milli meters x 1350 milli meters, 450 milli meters x 1500 milli meters, 470 milli meters x 1650 milli meters, and 500 milli meters x 2000 milli meters. In a specific embodiment, the one or more dowel bars may be adapted to overlap with the one or more corresponding first reinforcement bars and the one or more corresponding second reinforcement bars to structurally integrate the one or more first pre-cast columns and the one or more second pre-cast columns.
[0030] The method (10) also includes filling one or more voids in the one or more first precast columns by the cement concrete upon providing the one or more dowel bars to develop a predefined bond strength between the one or more pre-cast beams, the one or more first pre-cast columns, and the one or more dowel bars, thereby improving the moment carrying capacity in step 50.
[0031] FIG. 2 is a schematic representation of a structural arrangement (100) for providing continuous reinforcement in one or more pre-cast columns in accordance with an embodiment of the present disclosure. As used herein, the pre-cast columns the pre-cast columns are a structural element used in construction that is manufactured off-site in a factory and then transported to a construction site for installation. The structural arrangement (100) include one or more first pre-cast columns (110) erected on a founding media (not shown in FIG. 2). The one or more first pre-cast columns (110) are adapted to transfer one or more loads (not shown in FIG. 2) acting on the one or more first pre-cast columns (110) to the founding media.
[0032] Further, in one embodiment, the one or more loads may include, but not limited to, a dead load, a live load, a wind load, a seismic load, a soil load, a hydrostatic load, a thermal load, a snow load, and the like. The one or more first pre-cast columns (110) includes a corresponding shell (120) of a predefined thickness. In one embodiment, the predefined thickness may be at least 65 milli meters. In an exemplary embodiment, the core may be a vacant space enclosing the shell of the one or more first pre-cast columns (110) adapted to receive cement concrete for binding several structural components together.
[0033] Furthermore, the corresponding shell (120) includes a first predefined portion and a second predefined portion. The first predefined portion includes the cement concrete. In one embodiment, the cement concrete may include a grade between M15 and M 100. The one or more first pre-cast columns (110) includes a corresponding notch (130) located in the second predefined portion of the one or more first pre-cast columns (110). The structural arrangement (100) also includes one or more pre-cast beams (140) adapted to interconnect the one or more first pre-cast columns (110) erected through the corresponding notch (130) to transfer the one or more loads acting laterally on the one or more pre-cast beams (140) to the one or more first pre-cast columns (110) erected.
[0034] Moreover, in one embodiment, the one or more pre-cast beams (140) may include one or more corresponding third reinforcement bars (190) adapted to anchor with the one or more first reinforcement bars (190) to structurally integrate the one or more pre-cast beams (140) to the one or more first pre-cast columns (110). In such an embodiment, the third reinforcement bars (180) are adapted to bend in a predefined angle to anchor with the one or more first reinforcement bars (160). In one embodiment, the predefined angle may include 90 degrees.
[0035] Additionally, the structural arrangement (100) further includes one or more dowel bars (150) coupled to one or more first reinforcement bars (160) of the one or more corresponding first pre-cast columns (110). The one or more dowel bars (150) are adapted to couple with one or more second reinforcement bars (170) of one or more corresponding second pre-cast columns (180) bars during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns (180) and the one or more first pre-cast columns (HO).
[0036] Also, the second predefined portion is adapted to receive the cement concrete to develop a predefined bond strength between the one or more pre-cast beams (140), the one or more first pre-cast columns (110), and the one or more dowel bars (150). thereby providing the continuous reinforcement. In one embodiment, the one or more first precast columns (110) and the one or more second pre-cast columns (180) may include a corresponding hollow core. In such an embodiment, the hollow core may include a first predefined dimension including at least one of 100 milli meters x 100 milli meters, 125 milli meters x 125 milli meters, 150 milli meters x 150 milli meters, and 200 milli meters x 200 milli meters. In one embodiment, the hollow core may include, but not limited to, a rectangular core, a square core, a triangular core, a circular core and the like. Further, in some embodiments, the one or more first pre-cast columns (110) and the one or more second pre-cast columns (180) includes a rectangular shape. In such an embodiment, the rectangular shape may include a second predefined dimension comprising at least one of 200 milli meters x 600 milli meters, 250 milli meters x 900 milli meters, 300 milli meters x 1150 milli meters, 350 milli meters x 1200 milli meters, 400 milli meters x 1350 milli meters, 450 milli meters x 1500 milli meters, 470 milli meters x 1650 milli meters, and 500 milli meters x 2000 milli meters. In a specific embodiment, the one or more dowel bars (150) may be adapted to overlap with the one or more corresponding first reinforcement bars (160) and the one or more corresponding second reinforcement bars (170) to structurally integrate the one or more first pre-cast columns (110) and the one or more second pre-cast columns (180).
[0037] Various embodiments of the method and the structural arrangement for providing continuous reinforcement in one or more pre-cast columns described above enable various advantages. The one or more dowel bars interconnecting the one or more first reinforcement bars and the second reinforcement bars provides continuous reinforcement between the one or more first pre-cast columns and the one or more second pre-cast columns, thereby improving moment carrying capacity of an associated structure. The continuous reinforcement improves strength of the structure and prevents the occurrence of cracks to the structure. Use of pre-casted structural elements such as the one on more first pre-cast columns, the one or more second pre-cast columns, and the one or more pre-cast beams enables rapid completion of the construction process since the pre-casted structural elements are already manufactured in advance compared to the in-situ counterparts. Also, the pre-cast structural elements are light weight, thereby making the handling of the same easy.
[0038] It will be understood by those skilled in the art that the foregoing general description and the following detailed description are exemplary and explanatory of the disclosure and are not intended to be restrictive thereof. While specific language has been used to describe the disclosure, any limitations arising on account of the same are not intended.
[0039] The figures and the forgoing description give examples of embodiments. Those skilled in the art will appreciate that one or more of the described elements may well be combined into a single functional element. Alternatively, certain elements may be split into multiple functional elements. Elements from one embodiment may be added to another embodiment. For example, the order of processes described herein may be changed and is not limited to the manner described herein. Moreover, the actions of any flow diagram need not be implemented in the order shown; nor do all the acts need to be necessarily performed. Also, those acts that are not dependent on other acts may be performed in parallel with the other acts. The scope of embodiments is by no means limited by these specific examples.
Claims
LAIM:
1. A method (10) for providing continuous reinforcement in one or more precast columns comprising: erecting one or more first pre-cast columns on a founding media, wherein the one or more first pre-cast columns are to transfer one or more loads acting on the one or more first pre-cast columns to the founding media, wherein the one or more first pre-cast columns comprises a corresponding shell of a predefined thickness, wherein the corresponding shell comprises a first predefined portion and a second predefined portion, wherein the first predefined portion comprises cement concrete, wherein the one or more first pre-cast columns comprises a corresponding notch located in the second predefined portion of the one or more first pre-cast columns; (20) erecting one or more pre-cast beams interconnecting the one or more first pre-cast columns erected through the corresponding notch to transfer the one or more loads acting laterally on the one or more pre-cast beams to the one or more first pre-cast columns erected; (30) characterized in that: providing one or more dowel bars coupled to one or more first reinforcement bars of the one or more corresponding first pre-cast columns upon erecting the one or more pre-cast beams to couple with one or more second reinforcement bars of one or more corresponding second pre-cast columns during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns and the one or more first pre-cast columns; and (40) filling one or more voids in the one or more first pre-cast columns by the cement concrete upon providing the one or more dowel bars to develop a predefined bond strength between the one or more pre-cast beams, the one or more first pre-cast columns, and the one or more dowel bars, thereby providing the continuous reinforcement. (50)2. The method (10) as claimed in claim 1, wherein the predefined thickness comprises at least 65 milli meters.
3. The method (10) as claimed in claim 1, wherein the cement concrete comprises a grade between M15 and M 100.
4. The method (10) as claimed in claim 1, wherein the one or more pre-cast beams comprises one or more corresponding third reinforcement bars (190) adapted to anchor with the one or more first reinforcement bars to structurally integrate the one or more pre-cast beams to the one or more first pre-cast columns.
5. The method (10) as claimed in claim 1, wherein the one or more first precast columns and the one or more second pre-cast columns comprises a corresponding hollow core.
6. The method (10) as claimed in claim 3, wherein the hollow core comprises a first predefined dimension comprising at least one of 100 milli meters x 100 milli meters, 125 milli meters x 125 milli meters, 150 milli meters x 150 milli meters, and 200 milli meters x 200 milli meters.
7. The method (10) as claimed in claim 1, wherein the one or more first precast columns and the one or more second precast columns comprises a rectangular shape.
8. The method (10) as claimed in claim 5, wherein the rectangular shape comprises a second predefined dimension comprising at least one of 200 milli meters x 600 milli meters, 250 milli meters x 900 milli meters, 300 milli meters x 1150 milli meters, 350 milli meters x 1200 milli meters, 400 milli meters x 1350 milli meters, 450 milli meters x 1500 milli meters, 470 milli meters x 1650 milli meters, and 500 milli meters x 2000 milli meters.
9. The method (10) as claimed in claim 1, wherein the one or more dowel bars are adapted to overlap with the one or more corresponding first reinforcement bars and the one or more corresponding second reinforcement bars to structurallyintegrate the one or more first pre-cast columns and the one or more second precast columns.
10. A structural arrangement (100) for providing continuous reinforcement in one or more pre-cast columns comprising: one or more first pre-cast columns (110) erected on a founding media, wherein the one or more first pre-cast columns (110) are adapted to transfer one or more loads acting on the one or more first pre-cast columns (110) to the founding media, wherein the one or more first pre-cast columns (110) comprises a corresponding shell (120) of a predefined thickness, wherein the corresponding shell (120) comprises a first predefined portion and a second predefined portion, wherein the first predefined portion comprises cement concrete, wherein the one or more first pre-cast columns comprises a corresponding notch (130) located in the second predefined portion of the one or more first pre-cast columns (110); one or more pre-cast beams (140) adapted to interconnect the one or more first pre-cast columns (110) erected through the corresponding notch (130) to transfer the one or more loads acting laterally on the one or more pre-cast beams (140) to the one or more first pre-cast columns (110) erected; and characterized in that: one or more dowel bars (150) coupled to one or more first reinforcement bars (160) of the one or more corresponding first pre-cast columns (110), wherein the one or more dowel bars (150) are adapted to couple with one or more second reinforcement bars (170) of one or more corresponding second pre-cast columns (180) during construction of a super structure to transfer dead load of the super structure to the founding media through the one or more second pre-cast columns (180) and the one or more first pre-cast columns (110), wherein the second predefined portion is adapted to receive the cement concrete to develop a predefined bond strength between the one or more pre-castbeams (140), the one or more first pre-cast columns (110), and the one or more dowel bars (150). thereby providing the continuous reinforcements.
Citation Information
Patent Citations
Connecting joint and connecting method of fabricated reinforced concrete prefabricated column and beam
CN114508175A
AU2018202413A1
