Estimating a configuration of charging infrastructure for vehicle fleets

The system optimizes electric vehicle fleet charging infrastructure by predicting load demands and energy requirements, using a learning engine to size and scale infrastructure efficiently, addressing the challenges of varying energy needs and costs.

WO2024246597A1PCT designated stage expired Publication Date: 2024-12-05DAIMLER TRUCK AG GERMANY

Patent Information

Application Number
PCT/IB2023/058943
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-06-01
Filing Date
2023-09-09
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

Optimizing the configuration and scaling of charging infrastructure for electric vehicle fleets is challenging due to varying vehicle arrival and departure times, energy requirements, and location-specific solar energy availability, which affects total charging costs and demands for energy storage systems.

Method used

A system and method utilizing a learning engine and estimation unit to receive user input data on temporal attributes of vehicles, predict probabilistic load demands, and optimize charging infrastructure sizing based on electrical power requirements, considering performance markers like grid charges and investment costs, and energy sources such as solar and renewable energy.

Benefits of technology

This approach enables efficient and cost-effective optimization of charging infrastructure capacity, ensuring optimal load management, compliance with battery limits, and future expansion strategies, minimizing operational and investment costs while meeting energy demands.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IB2023058943_05122024_PF_FP_ABST
    Figure IB2023058943_05122024_PF_FP_ABST
Patent Text Reader

Abstract

The present disclosure provides systems and methods for determining configurations for charging infrastructure for vehicle fleets based on received user inputs and estimated load demand. The disclosed examples include carrying out a probabilistic load simulation for a number of vehicles in the fleet to determine a probabilistic load demand. Further, the disclosed examples include obtaining one or more inputs associated with the charging infrastructure and associated configuration settings, and then mapping the one or more obtained inputs with the determined probabilistic load demand. The disclosed examples further include carrying out optimization of the charging infrastructure taking into consideration the obtained one or more obtained inputs that are mapped with the determined probabilistic load demand.
Need to check novelty before this filing date? Find Prior Art

Description

ESTIMATING A CONFIGURATION OF CHARGING INFRASTRUCTURE FORVEHICLE FLEETSCROSS REFERENCE TO RELATED APPLICATION

[0001] This application claims the benefit of Indian provisional application No. 202311037742, entitled “Estimating a Configuration of Charging Infrastructure for Vehicle Fleets” and filed June 1, 2023, which is herein incorporated by reference in its entirety.TECHNICAL FIELD

[0002] The present disclosure relates to configuring and scaling of a charging base. In particular, the present disclosure provides a system and method for estimating optimal sizing and scaling of charging infrastructure for vehicles.BACKGROUND

[0003] In any electric vehicle fleet station, there could be large number of vehicles with different arrival and departure times and energy requirements, which might vary every day. Depending on the location of a given fleet station, the available solar energy might differ from that at another fleet station. Moreover, the electricity costs might change on an hourly basis, and all this could affect the total charging costs depending on the time and duration of vehicle charging. Additionally, there could be requirements for other energy storage systems of certain capacity, to meet the energy demands. Because of all these factors deciding an optimal component dimensions for a charging station is a problem that is difficult to solve.SUMMARY

[0004] The present disclosure includes description of technologies for providing a simple and efficient system and method that obviates the above-mentioned limitations of conventional systems and methods facilitates optimizing charging infrastructure capacity and electric power consumption.

[0005] The present disclosure further includes description of technologies for providing a system and method for meeting load demand from charging park load and / or depot load.

[0006] The present disclosure further includes description of technologies for providing a system and method for optimizing the charging infrastructure in compliance with battery level limits,generation dependent on supply, compliance with maximum charging and / or discharging power, and / or compliance with grid connection capacity.

[0007] The present disclosure further includes description of technologies for providing a system and method for providing advisory for effective load management in compliance with the commissioned charging infrastructure, and future expansion strategy.

[0008] Aspects of the present disclosure relate to configuring and scaling of a charging base. For example, the present disclosure includes description of technologies for providing a system and method for estimating optimal sizing and scaling of charging infrastructure for vehicles.

[0009] The present disclosure further discloses a method for estimating optimal sizing and scaling of charging infrastructure for vehicles, the method comprising: receiving, at an estimation unit in communication with a learning engine, one or more user input data pertaining to one or more temporal attributes associated with each vehicle among a defined number of vehicles; creating, at the estimation unit, an input mask, using range estimation technique, based on the received one or more user input data, and correspondingly determining a probabilistic load demand; obtaining, at the estimation unit, one or more inputs associated with the charging infrastructure and associated configuration settings; mapping, at the estimation unit, the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generating a mapped data pertaining to electrical power required for consumption; and estimating, at the estimation unit, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0010] In an example, in case the received one or more user input data pertains to one or more first temporal attributes associated with the vehicle, the method comprises predicting, using the learning engine, one or more second temporal attributes of the vehicle based on an amalgamation of the one or more first temporal attributes of the vehicle, and correspondingly the creating the input mask; wherein the one or more first temporal attributes comprise any or a combination of type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle, and wherein the one or more second temporal attributes comprise any or a combination of time of arrival of the vehicle, State of Charge (SOC) of the battery at arrival of the vehicle, time of departure of the vehicle, and end of SOC.

[0011] In an example, in case the received one or more user input data pertains to the one or more first temporal attributes as well as the one or more second temporal attributes, the method comprises creating the input mask based on the received one or more user input data.

[0012] In an example, the method comprises optimizing, based on performance markers and fundamental markers, the electrical power required for consumption; wherein the performance markers comprise grid charges, maintenance charges, and charges, and the fundamental markers comprise investment cost.

[0013] In an example, the method comprises calculating, taking into consideration the created input mask, the electrical power required for consumption by each of the vehicle during pre-defined time slots, and correspondingly determining a probabilistic load demand.

[0014] In an example, the method comprises facilitating optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, where the electrical power required is generated through energy sources comprise any or a combination of solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources; and wherein the vehicles comprise any or a combination of conventional vehicles, electric vehicles, and hybrid vehicles.

[0015] Another example of the present disclosure pertains to a system to estimate optimal sizing and scaling of charging infrastructure for vehicles, the system comprising: an estimation unit in communication with a learning engine, the estimation unit comprising one or more processors operatively coupled to a memory storing one or more instructions executable by the one or more processors, and configured to: receive one or more user input data pertaining to one or more temporal attributes associated with each vehicle among a defined number of vehicles; create, using range estimation technique, an input mask based on the one or more received user input data, and correspondingly determine a probabilistic load demand; obtain one or more inputs associated with the charging infrastructure and associated configuration settings; map the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generate a mapped data pertaining to electrical power required for consumption; and estimate, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0016] In an example, in case the received one or more user input data pertains to one or more first temporal attributes associated with the vehicle, the system predicts, using the learning engine, oneor more second temporal attributes of the vehicle based on an amalgamation of the one or more first temporal attributes of the vehicle, and correspondingly the system creates the input mask; and wherein in case the received one or more user input data pertains to the one or more first temporal attributes as well as the one or more second temporal attributes, the system creates the input mask based on the received one or more user input data; wherein the one or more first temporal attributes comprise any or a combination of type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle, and the one or more second temporal attributes comprise any or a combination of time of arrival of the vehicle, State of Charge (SOC) of the battery at arrival of the vehicle, time of departure of the vehicle, and end of soc.

[0017] In an example, the system optimizes, based on performance markers and fundamental markers, the electrical power required for consumption; wherein the performance markers comprise grid charges, maintenance charges, and charges, and the fundamental markers comprise investment cost.

[0018] In an example, the system comprises energy sources that generate electrical power required for consumption in the vehicles, the energy sources comprise any or a combination of solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources; and wherein the system is configured to facilitate optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, wherein the vehicles comprise any or a combination of conventional vehicles, electric vehicles, and hybrid vehicles.

[0019] Various objects, features, aspects, and advantages of the inventive subject matter will become more apparent from the following detailed description of example features, along with the accompanying drawing figures in which like numerals represent like components.BRIEF DESCRIPTION OF THE DRAWINGS

[0020] FIG. 1 illustrates non-optimal scaling of a charging station.

[0021] FIG. 2 illustrates an exemplary architecture of the proposed system to estimate optimal sizing and scaling of charging infrastructure for vehicles to illustrate its overall working, in accordance with an example of the present disclosure.

[0022] FIG. 3 illustrates exemplary functional units of the proposed system, in accordance with an example of the present disclosure.

[0023] FIG. 4 illustrates a flow diagram representing working of the proposed system, in accordance with an example of the present disclosure.

[0024] FIG. 5A and FIG. 5B illustrate a PV generation profile and load profile, respectively, for a given location for a pre-defined time period, in accordance with an example of the present disclosure.

[0025] FIG. 6A illustrates a profile of power generated from distinct sources for the given location for the pre-defined time period, in accordance with an example of the present disclosure.

[0026] FIG. 6B illustrates optimum component sizes for the given location, in accordance with an example of the present disclosure.

[0027] FIG. 7 is a flow diagram depicting the proposed method for estimating optimal sizing and scaling of charging infrastructure for vehicles, in accordance with an example of the present disclosure.

[0028] FIG. 8 shows an example of determining load profiles using current and historical load demand in accordance with one or more examples of the present disclosure.

[0029] FIG. 9 shows a flow chart of an example method for configuring charging infrastructure for a vehicle fleet in accordance with one or more examples of the present disclosure.

[0030] FIG. 10 shows an example user interface for a charging infrastructure configuration application in accordance with one or more examples of the present disclosure.

[0031] FIG. 11 shows an example user interface for presenting outputs from a charging infrastructure configuration application relating to costs associated with different charging scenarios in accordance with one or more examples of the present disclosure.

[0032] FIG. 12 shows an example user interface for presenting outputs from a charging infrastructure configuration application relating to technical results associated with different charging scenarios in accordance with one or more examples of the present disclosure.

[0033] FIG. 13 shows an example user interface for presenting outputs from a charging infrastructure configuration application relating to financial results associated with different charging scenarios in accordance with one or more examples of the present disclosure.

[0034] FIG. 14 shows an example user interface for presenting outputs from a charging infrastructure configuration application relating to revenues associated with different charging scenarios in accordance with one or more examples of the present disclosure.

[0035] FIG. 15 is a block diagram of an example computing environment in accordance with one or more examples of the present disclosure.

[0036] FIG. 16 shows an example user interface corresponding to a range estimation and / or route calculation operation in accordance with one or more examples of the present disclosure.DETAILED DESCRIPTION

[0037] The following is a detailed description of examples of the disclosure depicted in the accompanying drawings. The examples are in such detail as to clearly communicate the disclosure. However, the amount of detail offered is not intended to limit the anticipated variations of examples; on the contrary, the description herein is understood to cover all modifications, equivalents, and alternatives falling within the spirit and scope of the present disclosure, as well as those defined by the appended claims.

[0038] Examples explained herein relate to configuring and scaling of a charging base. For example, the present disclosure provides a system and method for estimating optimal sizing and scaling and / or other configurations of electrical charging infrastructure for vehicles (e.g., vehicles of a vehicle fleet). It is to be understood that references herein to trucks or other example types of vehicles (e.g., trucks) is not limiting, and such examples are correspondingly applicable to other types of vehicles in a vehicle fleet.

[0039] If a non-optimal dimensioning of components of charging station, such as charger, energy sources, grid connection, etc. is implemented, as illustrated in FIG. 1, then it could result in an under-sized system, where the energy demands are not completely fulfilled, or it could result in an over-sized system, where the user have to invest more than the requirement.

[0040] There is, therefore, a need to provide an efficient, optimum, and cost-effective solution that can obviate the above-mentioned limitations and optimize charging infrastructure capacity and electric power consumption.

[0041] Referring to FIG. 2, exemplary network architecture of an example system 200 (interchangeably referred to as system 200, herein) can include an estimation unit 206, which can, in turn, include a receptor 202, which can be configured to receive data from external sources. In an example, the receptor 202 can be communicatively coupled to the estimation unit 206, such that the receptor 202 can feed the received data to the estimation unit 206. Further, the estimation unit 206 can be in communication with a learning engine 210, through a network 204. In an example, the network 204 can be a wireless network, a wired network, or a combination thereof that can be implemented as one of the different types of networks, such as Intranet, Local Area Network (LAN), Wide Area Network (WAN), Internet, and the like. Further, the network 204 can either be a dedicated network or a shared network. The shared network can represent an association of different types of networks that can use variety of protocols, for example, Hypertext Transfer Protocol (HTTP), Transmission Control Protocol / Internet Protocol (TCP / IP), Wireless Application Protocol (WAP), and the like.

[0042] In an example, the estimation unit 206 can receive one or more user input data through the receptor 202, where the one or more user input data can pertain to one or more temporal attributes associated with a vehicle. In one example, the one or more user input data can be provided by a user through his / her mobile computing device, such as, laptop, smartphone, tablet, and the likes. In other examples, the one or more user input data can be transmitted to the receptor 202 through one or more detectors coupled to the vehicle.

[0043] In an example, the estimation unit 206 can create an input mask, using range estimation technique, based on the one or more received user input data. In one example, the received one or more user input data can pertain to one or more first temporal attributes (also, referred to as first temporal attributes, herein) associated with the vehicle. Further, the system 200 can predict, using the learning engine 210, through machine learning, one or more second temporal attributes (also, referred to as second temporal attributes, herein) of the vehicle based on an amalgamation of the first temporal attributes of the vehicle, and correspondingly the system 200 can create the input mask. In other examples, the received one or more user input data can pertain to the first temporal attributes as well as the second temporal attributes. Then, the system 200 can create the input mask directly based on the received one or more user input data.

[0044] In an example, the first temporal attributes can include, but not limited to, type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle. Further, the second temporal attributes can include, but not limitedto, time of arrival of the vehicle, State of Charge (SOC) of the battery at arrival of the vehicle, time of departure of the vehicle, and end of SOC.

[0045] In an example, the estimation unit 206 can calculate the electrical power required for consumption by the vehicle, during pre-defined time slots, taking into consideration the created input mask. In a similar manner, the estimation unit 206 can calculate the electrical power required for consumption by a definite number of vehicles during the pre-defined time slots, and correspondingly the estimation unit 206 can determine a probabilistic load demand during the predefined time slots for the definite number of vehicles.

[0046] In an example, the estimation unit 206 can obtain one or more inputs associated with a charging infrastructure and associated configuration settings. In an example, the estimation unit 206 can obtain the one or more inputs through one or more detectors or monitoring device configured with the charging infrastructure. Further, the estimation unit 206 can map the one or more obtained inputs with the determined probabilistic load demand, and correspondingly the estimation unit 206 can generate a mapped data pertaining to electrical power required for consumption. Moreover, the estimation unit 206 can estimate, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0047] In an example, the system 200 can optimize the electrical power required for consumption based on performance markers and fundamental markers. In an example, the performance markers can include, but not limited to, grid charges, maintenance charges, and charges, and the fundamental markers can include investment cost.

[0048] In an example, the system 200 can be configured to facilitate optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, where the energy sources can generate electrical power required for consumption in the vehicles, and the energy sources can include, but not limited to, solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources. In an example, the vehicles can be any among the conventional vehicles, electric vehicles, and hybrid vehicles.

[0049] In an example, the system 200 can be implemented using any or a combination of hardware components and software components such as a cloud, a server 208, a computing system, a computing device, a network device and the like. Further, the estimation unit 206 can interact withthe learning engine 210, through a website or an application that can reside in the proposed system 200. In an implementation, the system 200 can be accessed by website or application that can be configured with any operating system, including but not limited to, AndroidTM, IOSTM, and the like.

[0050] Referring to FIG. 3, exemplary functional units of the system 200 can include one or more processor(s) 302. The one or more processor(s) 302 can be implemented as one or more microprocessors, microcomputers, microcontrollers, digital signal processors, central processing units, logic circuitries, and / or any devices that manipulate data based on operational instructions. Among other capabilities, the one or more processor(s) 302 are configured to fetch and execute computer-readable instructions stored in a memory 302 of the system 200. The memory 302 can store one or more computer-readable instructions or routines, which may be fetched and executed to create or share the data units over a network service. The memory 302 can include any non- transitory storage device including, for example, volatile memory such as RAM, or non-volatile memory such as EPROM, flash memory, and the like.

[0051] In an example, the system 200 can also include an interface(s) 306. The interface(s) 306 may include a variety of interfaces, for example, interfaces for data input and output devices, referred to as I / O devices, storage devices, and the like. The interface(s) 306 may facilitate communication of the estimation unit 206 with various devices coupled to the system 200. The interface(s) 306 may also provide a communication pathway for one or more components of the system 200. Examples of such components include, but are not limited to, processing engine(s) 308 and database 310.

[0052] In an example, the processing engine(s) 308 can be implemented as a combination of hardware and programming (for example, programmable instructions) to implement one or more functionalities of the processing engine(s) 308. In examples described herein, such combinations of hardware and programming may be implemented in several different ways. For example, the programming for the processing engine(s) 308 may be processor executable instructions stored on a non-transitory machine-readable storage medium and the hardware for the processing engine(s) 308 may include a processing resource (for example, one or more processors), to execute such instructions. In the present examples, the machine-readable storage medium may store instructions that, when executed by the processing resource, implement the processing engine(s) 308.

[0053] In such examples, the system 200 can include the machine-readable storage medium storing the instructions and the processing resource to execute the instructions, or the machine- readable storage medium may be separate but accessible to the system 200 and the processingresource. In other examples, the processing engine(s) 308 may be implemented by electronic circuitry. The database 310 can include data that is either stored or generated as a result of functionalities implemented by any of the components of the processing engine(s) 308. In an example, the processing engine(s) 308 can include an input mask creating unit 312, a probabilistic load demand determining unit 314, an electrical power optimizing unit 316, and other units(s) 318. The other unit(s) 318 can implement functionalities that supplement applications / functions performed by the system 200.

[0054] According to an example, the input mask creating unit 312 can create an input mask based on the one or more received user input data. In an example, the input mask creating unit 312 can create an input mask using range estimation technique. In one example, the input mask creating unit 312 can create an input mask using the received one or more user input data that can pertain to first temporal attributes associated with the vehicle, where the first temporal attributes can include, but not limited to, type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle. Further, the input mask creating unit 312 can predict second temporal attributes of the vehicle based on an amalgamation of the first temporal attributes of the vehicle, where the second temporal attributes can include, but not limited to, time of arrival of the vehicle, SOC of the battery at arrival of the vehicle, time of departure of the vehicle, and end of SOC. Further, the input mask creating unit 312 can create the input mask by taking into consideration the first temporal attributes and the predicted second temporal attributes.

[0055] In other examples, the received one or more user input data can pertain to the first temporal attributes as well as the second temporal attributes. Then, the input mask creating unit 312 can create the input mask directly based on the received one or more user input data.

[0056] According to an example, the probabilistic load demand determining unit 314 can determine a probabilistic load demand during pre-defined time slots for a definite number of vehicles. The probabilistic load demand determining unit 314 can firstly calculate the electrical power required for consumption by a particular vehicle, during the pre-defined time slots, taking into consideration the created input mask. Further, the probabilistic load demand determining unit 314 can calculate the electrical power required for consumption by the definite number of vehicles during the pre-defined time slots, and correspondingly the probabilistic load demand can be determined.

[0057] According to an example, the electrical power optimizing unit 316 can estimate optimal sizing and scaling of the charging infrastructure for the defined number of vehicles. In animplementation, the electrical power optimizing unit 316 can firstly obtain one or more inputs associated with the charging infrastructure and associated configuration settings. The electrical power optimizing unit 316 can then map the one or more obtained inputs with the determined probabilistic load demand, and correspondingly the electrical power optimizing unit 316 can generate a mapped data pertaining to electrical power required for consumption. Finally, the electrical power optimizing unit 316 can estimate the optimal sizing and scaling of the charging infrastructure for the defined number of vehicles.

[0058] In an example, the electrical power optimizing unit 316 can optimize the electrical power required for consumption based on performance markers and fundamental markers. In an example, the performance markers can include, but not limited to, grid charges, maintenance charges, and charges, and the fundamental markers can include investment cost.

[0059] In an example, the electrical power optimizing unit 316 can be configured to facilitate optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, where the energy sources can generate electrical power required for consumption in the vehicles, and the energy sources can include, but not limited to, solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources, and where, the vehicles can be any among the conventional vehicles, electric vehicles, and hybrid vehicles.

[0060] Referring to FIG. 4, in an example, the system 200 can receive, at block 402, one or more user data (also referred to as user inputs, herein), which can pertain to the first temporal attributes associated with the vehicle, such as, type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, delivery schedule of the vehicle, and the likes, as illustrated in block 404. Further, the system 200 can predict, at block 406, the second temporal attributes, such as, time of arrival of the vehicle, SOC of the battery at arrival of the vehicle, time of departure of the vehicle, end of SOC, and the likes, as illustrated in block 408, based on an amalgamation of the first temporal attributes through predictive range management technique using machine learning. In other examples, the received user inputs can pertain to the first temporal attributes as well as the second temporal attributes. Further, the system 200 can create an input mask, at block 410, by taking into consideration the first temporal attributes as well as the second temporal attributes.

[0061] In an example, the system 200 can carry out, at block 412, a probabilistic load simulation for pre-defined time slots for a definite number of vehicles. In an example, the system 200 cancalculate the electrical power required for consumption, taking into consideration the created input mask, for each of the vehicles, during the pre-defined time slots, say for each day of a week. Further, the system 200 can calculate the electrical power required for consumption by the definite number of vehicles during the whole week by using summation, at block 414, of the calculated electrical power required for consumption by the definite number of vehicles for each day of the week, and correspondingly the system 200 can determine, at block 416, the probabilistic load demand.

[0062] In an example, the system 200 can obtain one or more inputs, at block 418, associated with the charging infrastructure and associated configuration settings, and further the system 200 can map the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generate a mapped data pertaining to electrical power required for consumption. In an example, the one or more inputs can include, but not limited to, grid buying and selling tariff costs, energy intensity profile of other natural sources considered like photovoltaic (PV), wind, and the likes, and depot load profile, component installation and maintenance costs, and the associated configuration settings, which can in turn include, information about components to be included, load management, sale of energy to grid, sale of energy from energy storage system to grid, inclusion of negative demand charge, type of charger allocation, and charger configuration.

[0063] In an example, the system 200 can carry out optimization, at block 420, of the charging infrastructure taking into consideration the obtained one or more obtained inputs that are mapped with the determined probabilistic load demand. In an example, the optimization of the charging infrastructure can include manual charger allocation optimization, departure time-based charger allocation optimization, component size optimization independent of charger allocation, component size optimization integrated with manual charger allocation, component size optimization integrated with departure time-based charger allocation, charging park optimization, and the likes.

[0064] In an example, the system 200 can minimize total cost by optimizing the electrical power required for consumption based on performance markers, such as, grid charges, maintenance charges, and charges, and fundamental markers like investment cost. In an example, the total cost can be computed using the equation-

[0065] Total cost = Operational Cost + Investment Cost where,Operational Cost = Grid Charges + Maintenance Cost + Cost of idle time of vehicle.

[0066] In another example, the total cost can be optimized using the equation -Total Cost = min ( cGrid,t *P,tTt=l +S Tt=l cldle,j,t *NV ehicle ,j ,tnV j=l + c Maintenance] *nj=lSComponent,j + Reinvest, j *SComponent,jnj=l) where,T = total number of time samples considered in the optimization period; nV = total number of vehicles and n is the total number of components considered; CGrid.t , CMaintenancej and cinvestj are the grid costs at time t, the maintenance cost of jth component and the investment cost of jth component respectively;P,t = grid power at tth instant;Scomponentj = size of the jth component; cidie,j,t = cost of idle time of jth vehicle at tth time instant; and Nvehicie,j,t = a binary variable indicating the vehicle idle status for jth vehicle at tth time instant.

[0067] In an example, the system 200 can efficiently overcome one or more of the following constraints: (a) load demand from charging park load and depot load must be met; (b) compliance with battery level limits; (c) compliance with generation should be dependent on supply; (d) compliance with maximum charging power and / or discharging power; (e) compliance with grid connection capacity; (f) stand by vehicle batteries for swapping for situations where a vehicle is very busy and cannot afford to wait for charging; (g) downtime of trucks in the optimization problem; (h) downtime from sources of power, such as, grid interruptions, or interruptions in other sources; (i) state of health of the battery, battery characteristics and degradation with continued use shall be considered; (j) impact of global warming on PV profile shall be considered; (k) discharge of vehicle energy or energy from other renewable sources to grid shall be considered based on user’s choice; (1) the user shall decide if demand charge needs to be considered for energy sold; (m) interval for reallocating a vehicle from one charger to another, or for connecting a new vehicle to a charger shall be a user input; and (n) the user shall decide if the charger allocation should happen with an objective to complete the charging as soon as possible (independent of energy costs) or manage the charging to minimize the energy cost.

[0068] In an example, based on the optimization carried out, the system 200 can provide, at block 422, one or more outputs, which can include minimum operational costs, minimum investment cost, minimum number of chargers to operate the station, charging schedule to minimize the overall costs, minimum energy demands as decided by the predictive range management algorithm, and / or other results usable to size, scale, optimize, and / or otherwise configure a charging station infrastructure. Further, the system 200 can perform, at block 424, load and energy management ofthe charging infrastructure and related components such as, power unit, fast charger, storage of battery, transformer, and the likes.

[0069] For example, charging schedules may be based on short-term forecasting (e.g., predicted load demand at the charging station for a threshold period of time), rolling unit commitment (e.g., a commitment to maintain a target number or percentage of vehicles of a fleet operating on the road, as defined in a contract for example), optimal dispatch, error correction, and / or other factors for generating a custom EV charging profile for a charging station. The charging schedules may be based on other inputs and / or outputs of the system, such as probabilistic load demand and SoC predictions based on route estimations (described in more detail below). In some examples, the outputs may be used for configuring an initial infrastructure for a charging station. In other examples, the outputs may be used for recommending updates to a configuration of an infrastructure for a charging station, based on observations of performance of the charging station.

[0070] In an example, any of the available energy sources in a selected scenario can be considered as a component for optimization, while setting up the charging station, like solar energy, wind energy, diesel generators, fuel cells or any other renewable energy sources specific to a location. While considering stand by batteries for swapping, the system 200 may estimate optimum battery capacities and their optimum number / quantity.

[0071] In another example, the system 200 can utilize range estimation algorithms for fleets of buses and delivery trucks as the route of vehicles of the fleet may be known in many cases, and further the range estimation algorithms can be used for suggesting an end SOC after charging / before starting planned trip for the vehicle, reducing the cost further. In yet another example, the system 200 can utilize range management algorithm also for considering the power requirements of off- highway vehicles.

[0072] In an example, range estimation algorithms can consider the public charging infrastructures like induction charging, pantograph charging, and the likes, while calculating the minimum SOC required for the vehicle to complete the trip. Further, while generating load demand profile, the range estimation algorithm can also consider seasonal changes in the vehicle load profile due to changes in the HVAC load with ambient temperature variations. In some examples, the range estimation algorithm takes into account factors such as truck type, payload, starting state of charge, address (e.g., a start and / or end location for a given route), time of departure, and / or other factors. Based on the data that is fed (e.g., the input factors), a tool (e.g., computing system or portion thereof) executing the range estimation algorithm may figure out further factors for consideration indetermining SoC, such as the change in altitude along the route (e.g., given the start and / or end location, based on map data from one or more third-party and / or local databases) and how that would affect efficiency of the system, which has a direct impact on range and resulting SoC. In additional examples, the time of departure helps the tool predict traffic patterns that can be a major contributor in determining range (e.g., traffic may increase or decrease drive time, resulting in an impact on energy use during the route). In further additional or alternative examples, the range estimation tool may be configured to interpret weather data that help the range estimation values to be more accurate, as ambient temperature has a major impact on battery performance. For example, energy may be spent on conditioning batteries - for example to heat the batteries on a cold day (e.g., when a temperature is below an underheat threshold) or cool the batteries on a hot day (e.g., when a temperature is above an overheat threshold) to attempt to achieve an optimal temperature of operation for the batteries. Similarly, the cab temperature would vary depending on hot or cold it is outside, and conditioning of the cab to reach an ideal cab temperature may correspondingly change based on external weather. Both of these considerations (conditioning to control cab temperature and battery temperature in light of weather) would have an impact on energy use and thus the range of the vehicle. In additional or alternative examples, when long haul trucking and a public charging network for trucks is setup, the tool may have those capabilities (e.g., the capabilities to leverage information from the public charging network for use in estimating SoC for long haul trucking scenarios). In some examples, the range estimation tool is setup to look for whether the route is feasible or not, e.g., whether the route be completed on single charge or not based on one or more of the above considerations.

[0073] Turning briefly to FIG. 16, an example user interface 1600 corresponding to a range estimation and / or route calculation operation is shown. For example, the user interface 1600 may be presented as part of an execution of an application that includes the range estimation tool described herein for estimating a range / SoC of a vehicle over a given route. It is to be understood that the elements of user interface 1600 are exemplary, and alternative configurations of the information and / or different information may be provided in a user interface of a range estimation tool in accordance with the present disclosure. As shown in the illustrated example, the user interface 1600 may include vehicle details 1602 (e.g., a vehicle model, starting SoC, etc., which may be entered by a user in some examples) and route details 1604 (e.g., location and time, total distance for a route, total trip time, total energy usage, and ending SoC). In some examples, one or more of the route details 1604 may be entered by a user, and / or one or more other route details 1604 may be calculated by the range estimation tool. For example, the user may enter start and endlocations and / or other details such as stops along the route, cargo information, starting SoC, time of departure, etc., and the range estimation tool may calculate other details, such as total distance, trip time, energy usage, ending SoC, etc. Based on such calculations, the range estimation tool may generate further visualizations, such as the route data over distance mapping 1606 and the route map 1608. The route data over distance may plot the SoC of the vehicle over distance, as well as the altitude changes in the route over the distance. The user interface 1600 may also include a list of stops along the route, as shown in table 1610.

[0074] Returning to FIG. 2, in an example, the system 200 can carry out demand monitoring, where the system 200 can monitor demand for a time interval and corresponding data can be stored for analysis. Then, the system 200 can perform Monte Carlo simulations and further machinelearning algorithms can be put in place. In an example, the system 200 can provide actual load and a pattern based on the past data and market trends, hence suggesting if the charging infrastructure is being used the way it is planned. Moreover, the system 200 can provide a periodic advice on what should be done to meet the planned conditions.

[0075] For example, as shown in FIG. 8, a current load demand 802 (e.g., based on monitoring energy load demand at one or more charging stations and / or charging elements of one or more charging stations for a time interval and storing associated data for analysis) may be combined with previous / historic load demand 804 (e.g., for a threshold or targeted period of time prior to the start of the current load demand monitoring) and applied to machine learning models and / or Monte Carlo methods 806 (e.g., one or more computing environments executing instructions to implement the machine learning models and / or Monte Carlo methods) to generate a representation 808 of predicted and actual load profiles for the charging station(s) and / or charging elements of the charging station(s). For example, the machine learning models may be trained using data from third-party sources, such as one or more centralized databases with charging profile information for different vehicles and / or charging components, and / or with historical data from actual vehicles within the fleet that uses the charging station(s) under analysis. In this way, actual observed data from vehicles in the fleet and / or components of the charging station(s) may be used to predict charging profiles that are more accurate than rough estimates provided by third-party sources. In some examples, predicted load demand may be based on a prediction of the types or routes of vehicles that utilize the charging station (e.g., different types of vehicles or vehicles that take different routes may have different charging profiles, and thus may affect overall load demand differently from one another). Accordingly, historical charging profiles for different vehicles and / or vehicles that take different types of routes may be stored with identifiers to allow the historicalprofiles to be applied to the prediction calculation as described above. The machine learning models may also be continuously trained and / or updated using feedback from the prediction system (e.g., a comparison of the predicted and actual load profiles).

[0076] In the illustrated example, a graph plotting predicted and actual load profiles over a targeted time period of interest is shown, however it is understood that the representation may take any form, including other graphical representations, tables, alphanumeric text, raw data (e.g., to be input to further processing units for additional analysis, such as optimization unit 420 of FIG. 4), etc.

[0077] In some examples, an actual load over a monitored period of time (e.g., based on monitored current load demand 802) may be compared to a predicted load demand (e.g., based on patterns determined by analyzing the previous load demand 804 and / or other inputs such as market trends, time of day, time of year, etc.) to determine whether the infrastructure is being used as planned and / or to provide advice on operations that may be done to meet with planned conditions. In some examples, the analysis and advice described above may be provided periodically (e.g., on a predetermined schedule) and / or based on user request.

[0078] In an additional or alternative example, the system 200 can provide advisory for effective load management in compliance with the commissioned infrastructure. The predicted load management strategies could be more efficient than the actual strategy employed in the charging station. The system 200 can also provide advisories regarding changes in the load management strategies, which makes the system 200 more efficient.

[0079] In another example, the system 200 can carry out future expansion strategy for scalability of the solution. In an example, if the number of trucks in the fleet station is increased, then demand monitoring can be done for the existing trucks and a probabilistic predicted load profile can be generated for the new trucks. The charging infrastructure planning can be performed considering the existing infrastructure as the minimum infrastructure. Thus, a suggestion on the additional infrastructure capacity required may be calculated by the system 200.

[0080] In an example, for a charging park with 50 vehicles in a specific location, suppose an entity decides to use PV, BSS (Battery Storage System), and grid as the energy sources, and vehicle charging is to be managed to minimize the energy costs, whose PV generation profile for the given location for 2 weeks is as illustrated in FIG. 5A, and load profile generated from manual charger allocation optimization for 2 weeks is as illustrated in FIG. 5B.

[0081] Further, FIG. 6A represents power from distinct sources in kW for 2 weeks for the given charging park. The system 200 can find the optimal component sizes that minimize the overall cost, which are depicted in FIG. 6B, where optimum component sizes for the given charging park are: for PV Panels 3000 kilowatt peak (kWp), for BSS 3000 kilowatt hour (kWh), and grid capacity is 1750 kilo volt-ampere (KVA).

[0082] Referring to FIG. 7, the method 700 can include receiving, at block 702, at an estimation unit in communication with a learning engine, one or more user input data pertaining to one or more temporal attributes associated with each vehicle among a defined number of vehicles.

[0083] In an example, the method 700 can include creating, at block 704, at the estimation unit, an input mask, using range estimation technique, based on the received one or more user input data, and correspondingly determining a probabilistic load demand.

[0084] In an example, the method 700 can include obtaining, at block 706, at the estimation unit, one or more inputs associated with the charging infrastructure and associated configuration settings.

[0085] In an example, the method 700 can include mapping, at block 708, at the estimation unit, the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generating a mapped data pertaining to electrical power required for consumption.

[0086] In another example, the method 700 can include estimating, at block 710, at the estimation unit, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0087] In an example, in case the received one or more user input data pertains to one or more first temporal attributes associated with the vehicle, the method 700 can include predicting, using the learning engine, one or more second temporal attributes of the vehicle based on an amalgamation of the one or more first temporal attributes of the vehicle, and correspondingly the creating the input mask; wherein the one or more first temporal attributes include any or a combination of type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle, and wherein the one or more second temporal attributes include any or a combination of time of arrival of the vehicle, State of Charge (SOC) of the battery atarrival of the vehicle, time of departure of the vehicle, and end of SOC. In some examples, the SOC may be determined using a range estimation algorithm, examples of which are described herein.

[0088] In another example, in case the received one or more user input data pertains to the one or more first temporal attributes as well as the one or more second temporal attributes, the method 700 can include creating the input mask based on the received one or more user input data.

[0089] In yet another example, the method 700 can include optimizing, based on performance markers and fundamental markers, the electrical power required for consumption; wherein the performance markers include grid charges, maintenance charges, and charges, and the fundamental markers include investment cost.

[0090] In yet another example, the method 700 can include calculating, taking into consideration the created input mask, the electrical power required for consumption by each of the vehicle during pre-defined time slots, and correspondingly determining a probabilistic load demand.

[0091] In an example, the method 700 can include facilitating optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, where the electrical power required can be generated through energy sources comprise any or a combination of solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources; and wherein the vehicles include any or a combination of conventional vehicles, electric vehicles, and hybrid vehicles.

[0092] While the foregoing describes various examples of the disclosure, other and further examples of the disclosed technologies may be devised without departing from the basic scope thereof. The disclosure is not limited to the described examples, versions or examples, which are included to enable a person having ordinary skill in the art to make and use the disclosed technologies when combined with information and knowledge available to the person having ordinary skill in the art.

[0093] The present disclosure provides a system and method for optimizing charging infrastructure capacity and electric power consumption.

[0094] The present disclosure provides a system and method for meeting load demand from charging park load and depot load.

[0095] The present disclosure provides a system and method for optimizing the charging infrastructure in compliance with battery level limits, generation dependent on supply, and compliance with grid connection capacity.

[0096] The present disclosure provides a system and method for providing advisory for effective load management in compliance with the commissioned charging infrastructure, and future expansion strategy.

[0097] The present disclosure provides a method for estimating optimal sizing and scaling of charging infrastructure for vehicles, the method comprising: receiving, at an estimation unit in communication with a learning engine, one or more user input data pertaining to one or more temporal attributes associated with each vehicle among a defined number of vehicles; creating, at the estimation unit, an input mask, using range estimation technique, based on the received one or more user input data, and correspondingly determining a probabilistic load demand; obtaining, at the estimation unit, one or more inputs associated with the charging infrastructure and associated configuration settings; mapping, at the estimation unit, the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generating a mapped data pertaining to electrical power required for consumption; and estimating, at the estimation unit, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0098] The present disclosure provides the method, wherein in case the received one or more user input data pertains to one or more first temporal attributes associated with the vehicle, the method further comprising predicting, using the learning engine, one or more second temporal attributes of the vehicle based on an amalgamation of the one or more first temporal attributes of the vehicle, and correspondingly the creating the input mask; wherein the one or more first temporal attributes comprise any or a combination of type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle, and wherein the one or more second temporal attributes comprise any or a combination of time of arrival of the vehicle, State of Charge (SOC) of the battery at arrival of the vehicle, time of departure of the vehicle, and end of SOC.

[0099] The present disclosure provides the method, wherein in case the received one or more user input data pertains to the one or more first temporal attributes as well as the one or more second temporal attributes, the method further comprising creating the input mask based on the received one or more user input data.

[0100] The present disclosure provides the method, wherein the method comprises optimizing, based on performance markers and fundamental markers, the electrical power required for consumption; wherein the performance markers comprise grid charges, maintenance charges, and charges, and the fundamental markers comprise investment cost.

[0101] The present disclosure provides the method, wherein the method comprises calculating, taking into consideration the created input mask, the electrical power required for consumption by each of the vehicle during pre-defined time slots, and correspondingly determining a probabilistic load demand.

[0102] The present disclosure provides the method, wherein the method comprises facilitating optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, where the electrical power required is generated through energy sources comprise any or a combination of solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources; and wherein the vehicles comprise any or a combination of conventional vehicles, electric vehicles, and hybrid vehicles.

[0103] The present disclosure further provides a system to estimate optimal sizing and scaling of charging infrastructure for vehicles, the system comprising: an estimation unit in communication with a learning engine, the estimation unit comprising one or more processors operatively coupled to a memory storing one or more instructions executable by the one or more processors, and configured to: receive one or more user input data pertaining to one or more temporal attributes associated with each vehicle among a defined number of vehicles; create, using range estimation technique, an input mask based on the one or more received user input data, and correspondingly determine a probabilistic load demand; obtain one or more inputs associated with the charging infrastructure and associated configuration settings; map the one or more obtained inputs with the determined probabilistic load demand, and correspondingly generate a mapped data pertaining to electrical power required for consumption; and estimate, based on the electrical power required for consumption, an optimal sizing and scaling of the charging infrastructure, for the defined number of vehicles, taking into consideration the mapped data.

[0104] The present disclosure provides the system, wherein in case the received one or more user input data pertains to one or more first temporal attributes associated with the vehicle, the system predicts, using the learning engine, one or more second temporal attributes of the vehicle based on an amalgamation of the one or more first temporal attributes of the vehicle, and correspondingly thesystem creates the input mask; and wherein in case the received one or more user input data pertains to the one or more first temporal attributes as well as the one or more second temporal attributes, the system creates the input mask based on the received one or more user input data; wherein the one or more first temporal attributes comprise any or a combination of type of the vehicle, capacity of battery of the vehicle, number of batteries in the vehicle, charging power, and delivery schedule of the vehicle, and the one or more second temporal attributes comprise any or a combination of time of arrival of the vehicle, State of Charge (SOC) of the battery at arrival of the vehicle, time of departure of the vehicle, and end of SOC.

[0105] The present disclosure provides the system, wherein the system optimizes, based on performance markers and fundamental markers, the electrical power required for consumption; wherein the performance markers comprise grid charges, maintenance charges, and charges, and the fundamental markers comprise investment cost.

[0106] The present disclosure provides the system, wherein the system comprises energy sources that generate electrical power required for consumption in the vehicles, the energy sources comprise any or a combination of solar energy based unit, wind energy based unit, diesel generator, fuel cell, battery, and renewable energy sources; and wherein the system is configured to facilitate optimal coupling of the vehicles with the charging infrastructure in order to transmit the generated electrical power from the energy sources to the vehicles, wherein the vehicles comprise any or a combination of conventional vehicles, electric vehicles, and hybrid vehicles.

[0107] FIG. 9 is a flow chart of an example method 900 for configuring charging infrastructure for a vehicle fleet. For example, method 900 may be performed by one or more of the computing systems and / or associated processing components of the present disclosure, such as elements from one or more of FIGS. 2-4. At 902, the method includes receiving input data including vehicle fleet information. As indicated at 904, the vehicle fleet information may include charging load curves for one or more vehicles in the vehicle fleet based on historical charging profiles for the one or more vehicles. In additional or alternative examples, the vehicle fleet information may include other vehicle fleet details, such as those described herein, including fleet size (e.g., number of vehicles), fleet schedules (e.g., times / days of deployment, routes, etc.), vehicle data (e.g., charger type, battery capacity, number of batteries, etc.), and / or other fleet information. In some examples, of the method 900 and / or other analysis described herein, information input by a user may be considered as an estimation, and a range of values around the entered information may be considered during analysis to account for real-world effects (e.g., delays, etc.). For example, a user may enter (or adefault may be defined concerning) a range and / or percentage of adjustment to be applied to entered values for analysis, and during analysis a worst-case scenario value within that percentage or range of the entered value may be used. As a non-limiting example, a time of departure of 2 pm may be entered by a user and calculations based on a time of departure ranging from 1:45 pm to 2:15 pm may be considered in analysis (e.g., with the + / -15 minute variance in this non-limiting example being selected by the user in some examples or selected by the system and / or as a default in other examples), with a worst-case result of the analyzed time range (or estimates resulting from the analysis for multiple times within the range) being shown to a user in some examples.

[0108] At 906, the method includes applying a range estimation algorithm to the vehicle fleet information to determine a respective estimated state of charge (SoC) for the one or more vehicles. As indicated at 908, the range estimation may be based at least in part on public charging infrastructures along respective routes of the one or more vehicles. In additional or alternative examples, the range estimation may be further based on other information as described herein with respect to range estimation algorithms and techniques, including weather, time of day, vehicle type, etc.

[0109] At 910, the method includes determining a probabilistic load demand based on the received input data and the respective estimated SoC for the one or more vehicles. For example, the probabilistic load demand may be determined as described herein with respect to the calculation at 416 of FIG. 4 and / or as described elsewhere in the present disclosure.

[0110] At 912, the method includes determining a configuration of charging infrastructure for a charging station based on the probabilistic load demand. For example, the configuration may include parameters such as a layout, size, and / or scale of the charging station, as well as components of the charging station and associated parameters (e.g., energy generation components, etc., and parameters such as size, capacity, output, number, etc. as described in more detail below with respect to FIG. 10).

[0111] At 914, the method optionally discloses generating a charging schedule for charging the vehicles based on the probabilistic load demand and the historical charging profiles. For example, the charging schedule may be based on short term forecasting, rolling unit commitment, optimal dispatch, and / or error correction for generating a custom EV charging profile, as described in more detail herein.

[0112] At 916, the method includes outputting for display, via a graphical user interface, a visualization representing the configuration of the charging infrastructure and one or more outputs indicating a performance parameter or cost parameter associated with the configuration of the charging infrastructure. Examples of graphical user interface outputs are shown and described inmore detail below with respect to FIGS. 10-14. The output of the visualization may be used to efficiently present complex data corresponding to the charging station configuration and / or comparisons of different options for the charging station configuration in a user-friendly manner for consumption by a user of the graphical user interface.

[0113] FIG. 10 shows an example user interface 1000 for a charging infrastructure configuration application. For example, the charging infrastructure application may perform one or more of the methods described herein and / or include one or more of the components of the system shown in FIGS. 2-4 to assist in analyzing, optimizing, sizing, scaling, and / or otherwise configuring charging station infrastructure. The user interface 1000 may be an example of one window or portion of a window of a graphical user interface (GUI) displayed on a display device of a computing system (e.g., a computing system executing the application) and used for visualizing and / or interacting with the application. The user interface 1000 may show a visual representation of a site layout of a charging station, including a power unit 1004, a plurality of parking spaces 1002, one or more charging islands including chargers 1006, and one or more fleet vehicles 1008. The power unit 1004 may be configured to distribute power to the chargers 1006 of the charging islands, and the vehicle 1008 may be equipped with at least one charger input configured to accept a corresponding charging cable with a compatible interface included in charger 1006 to recharge a battery or other power system of the vehicle 1008 using power distributed by power unit 1004. The power unit 1004 may distribute power originating from one or more power sources, including a power grid, solar panel(s), wind power generators, diesel generators, fuel cell(s), batteries, and / or other power sources. In some examples, one or more of the components of the charging station and / or vehicles may include additional details displayed proximate to a graphical representation of the component. For example, a state of charge, charging status, charging speed, vehicle type, vehicle identifier, and / or other vehicle or charging information (e.g., including static information and / or dynamic information updated in real time) may be shown next to each vehicle 1008. Similar details corresponding to the power unit 1004 and the chargers 1006 (e.g., a rate / status of charging, overall power use, etc.) may be displayed proximate to those relative components as well. Statistics such as efficiency, total power use, total power generation (e.g., broken down to different power generation sources such as the power grid, photovoltaic cells, stationary batteries, etc.), and / or other factors for the charging station may be presented in some examples. In additional or alternative examples, the details may include a current state of charge of each vehicle at a selected point in time (e.g., based on simulation results), to help a user visualize a state of each vehicle at different points during a typical day (e.g., based on inputs relating to schedules of the vehicle fleet). For example, the user may provide input to the user interface to select a time of day (or a selected time on a selected day),and an estimated state of charge of each vehicle of the fleet (or a selected vehicle) that is in the charging station at that selected time may be displayed. In some examples, information such as a visualization of what percentage of the battery of the vehicle(s) was charged from renewable resources (e.g., on-site photovoltaic components, wind harvesters, geothermal systems, etc.) versus a power grid may be determined and presented by the system (e.g., based on estimations calculated in light of total charging demand at that time, available output from the on-site versus power grid energy sources, etc.). In this way, a user may determine which vehicles may be pulled into service earlier than scheduled at different times during a day.

[0114] In some examples, one or more of the elements of user interface 1000 may be selectable and / or otherwise available for reconfiguration or to view additional details via interaction with a different user interface window / mechanism. For example, the user interface 1000 may show a current or recommended charging station infrastructure, for which the application may calculate one or more outputs such as charging rates, charging schedules, infrastructure / operating costs, environmental (e.g., carbon) impacts, etc. Examples of these outputs are described in more detail below with respect to FIGS. 11-14. Interaction with the user interface 1000 and / or another window of the associated application’s user interface may be configured to allow a user to adjust parameters of the charging infrastructure (e.g., including layout features such as number / arrangement / sizes of parking spaces, chargers / charging islands, and power units, as well as parameters of those components, such as types of vehicles in the fleet, types of chargers, size of power units, etc.), which may then trigger and / or enable recalculation of the above -referenced outputs to correspond to the adjusted parameters of the charging infrastructure.

[0115] FIG. 11 shows an example user interface 1100 showing outputs from a charging infrastructure configuration application relating to costs associated with different charging scenarios for a given charging station layout and configuration. For example, the user interface 1100 may be an example output for a charging system layout configured using and / or visualized by user interface 1000 of FIG. 10 (e.g., based on input from a user providing details of the charging system layout and / or components, as well as other inputs such as fleet information, charging station location, etc.), and / or the associated charging infrastructure configuration application for user interface 1100 may be configured in accordance with any of the description above, for example, with respect to the application associated with user interface 1000 of FIG. 10.

[0116] User interface 1100 shows visualizations of example cost analyses outputs including investment costs 1102, recurring (e.g., annual) costs 1104, and comparisons 1106 of these costsover a targeted period of time (e.g., 10 years in the illustrated example). The user interface 1100 further includes a comments box 1108 including a narrative relating to the results of the comparisons. As shown, the total investment costs 1102 are shown in a table that breaks down several investment (e.g., one-time) cost factors and provides a sum total of those cost factors for each of a plurality of scenarios (in this illustrated example: infrastructure subject to electric vehicles (Basic EV) utility rates (e.g., without using load management techniques), infrastructure using load management techniques (described in more detail below) subject to electric vehicle utility rates (LM EV), infrastructure subject to non-electric vehicles (Basic Non-EV) utility rates (e.g., without using load management techniques), and infrastructure using load management techniques subject to non-electric vehicle utility rates (LM Non-EV)). As used herein, electric vehicle utility rates may refer to a first configuration or type of utility rates that a utility service / service provider for a power grid charges (e.g., a first energy rate (cost per kWh) and demand charge (cost per kW) configuration), which may be targeted to the typical demands of electric vehicle charging customers of the utility service. Non-electric vehicle utility rates may refer to a second, different configuration or type of utility rates that the utility service charges (e.g., a second energy rate and demand charge configuration), which may be targeted to typical demands of customers without electric vehicle charging loads. However, regardless of the target of these configurations, a given charging infrastructure may selectively operate more cost effectively with either rate type, based on factors of the infrastructure, vehicle fleet, fleet routing, etc. Information such as the abovedescribed rate breakdowns offered by a utility service may be manually input by a user and / or retrieved from a centralized and / or third-party database (e.g., via execution of an Application Programming Interface (API) routine triggered by the system and / or user request). It is to be understood that other example scenarios than those illustrated and / or discussed above may be evaluated in other executions of the cost analysis, such as based on a location of the charging infrastructure, user preferences / requests, etc. For example, scenarios that may be evaluated may further include comparisons between basic (e.g., non-load managed) charging systems, load managed charging systems, charging systems that incorporate photo voltaics, stationary battery storage, and / or other on-site renewable energy sources, and / or charging systems that incorporate renewable energy sources (and / or stationary battery storage) that are load managed.

[0117] Load management may refer to the use of “smart” or otherwise managed charging infrastructure, configured to adjust charging operations to minimize cost and / or achieve other goals. For example, in a basic scenario without load management, vehicles in a fleet may be charged according to a default timing / speed and / or at a timing / speed that ensures that each vehicle reaches aSoC at a targeted time (e.g., without consideration of cost or other factors). In a load management scenario, vehicles in a fleet may be charged according to a schedule and / or at a target and / or variable speed in order to minimize costs associated with the charging. For example, factors such as peak charge times, demand limits, and / or other factors to energy costs for using power supplied by a power grid may be factored into charging schedules (e.g., vehicle charging time may be prioritized to occur at a cheapest / off-peak timing, such as between 9pm and 5am in an illustrative, non-limiting example, and / or at a rate / timing that retains the total draw of the charging station from the power grid below a demand pricing threshold defined by the power grid). Additionally or alternatively, factors such as expected energy output by on-site renewable energy sources (e.g., PV components, wind turbines, etc.) may be considered by load management systems to prioritize charging while power from those sources are able to subsidize power grid usage. The load management system may include one or more computing systems coupled to the charging infrastructure (e.g., chargers and associated controllers) configured to execute instructions to control the distribution of power to charging vehicles based on the above-described considerations to achieve a minimized cost and / or other target for the charging operation.

[0118] The investment cost factors in the illustrated example include utility costs, hardware costs, construction costs, photovoltaic system costs, and stationary storage costs (e.g., costs for stationary batteries used as power sources and / or collectors). However, it is to be understood that other factors may be included in other examples. These costs may be calculated based on one or more inputs, including utility tariff data, depot layout, depot logistics, and / or any other inputs described herein (e.g., including those inputs provided at 402 / 404 of FIG. 4 and / or inputs 418 of FIG. 4). In some examples, the layout and / or other details (e.g., charging output of chargers, number / placement of chargers, size of battery storage, number of renewable energy sources or other on-site energy sources, number / placement of parking spaces, etc.) of the components of the charging station may be input by a user. In other examples, the above-described information may be imported from one or more other sources and / or derived by the analysis system based on a reduced set of input from the user (e.g., the user may input a total size of a depot and a vehicle fleet size, and the charging component details, quantity, layout, and / or other parameters may be selected by the analysis system based on default settings, cost analysis comparisons for different selected configurations, etc.). For example, the system may automatically assign a targeted type of charger for use in the charging infrastructure based on the vehicle fleet information and / or other input information described herein (e.g., with parameters calculated based on hours a vehicle has for charging between shifts, how much energy is to be put back into vehicle batteries while charging to ensure a next route can becompleted, etc.). The system may filter available chargers based on which chargers are capable of meeting charging output parameters of the charging station under analysis, then run preliminary calculations to determine a most cost-effective charger to use and select that charger for inclusion in further cost analysis (e.g., the cost analysis described herein). In some examples, the charger(s) selected automatically by the system may be analyzed in addition to a charger(s) selected by a user to provide cost and / or performance comparisons. In other examples, only the charger(s) selected by the user may be included in the analysis. In some examples, the investment costs may be partially and / or fully derived based on user input regarding the charging station parameters / configuration. For example, the orientation / positioning of a truck that is parked on site also determines how the charger would be installed with respect to the truck, the location of the charger and its distance from other electrical components determines how much trenching and conduit needs to be placed into the ground, and hardware costs can vary depending on the fleet schedule (e.g., how much time fleets have in between shifts to charge a truck - as the lower the dwell time [time between fleet deployments], the greater the cost of the charger as such a schedule would be more ideally served by a charger with a higher power output). Furthermore, charger power output increases cost of the charging hardware increases as well. The size of the fleet has a direct impact on the utility costs, for example, the larger the fleet the greater the energy charge and demand charge values.

[0119] The recurring costs 1104 are shown in a table that breaks down several recurring (e.g., payable continuously and / or periodically on a regular schedule) cost factors and provides a sum total of those cost factors for each of the plurality of scenarios described above. The recurring cost factors in the illustrated example include utility costs, photovoltaic (PV) to grid revenues (e.g., refunds acquired by selling energy collected by PV components back to the power grid), maintenance costs, and load management costs (when applicable, e.g., for the load management scenarios). However, as noted above for the investment cost factors, it is to be understood that other factors may be included for recurring costs as well in other examples. Furthermore, although annual figures for the recurring costs are shown in the illustrated example, it is to be understood that other time frames may be used for analysis, such as quarterly costs, monthly costs, daily costs, etc. The costs for recurring costs 1104 may be calculated based on one or more inputs including vehicle route data (e.g., for fleet vehicles planning to utilize the charging station), available charging times at the charging station, utility tariff data, depot layout for the charging station, and depot logistics for the charging station, and / or any other inputs described herein (e.g., including those inputs provided at 402 / 404 of FIG. 4 and / or inputs 418 of FIG. 4). Furthermore, the inputs used for the investment and / or recurring costs may be provided by a user, retrieved from third-party sources(e.g., a database for costs managed by a power company), and / or retrieved from a maintained database including continuously or periodically updated rates for the various inputs (e.g., rates may be recorded for different time periods, including weekdays versus weekends / holidays during different seasons, such as summer and winter, and may be sorted into on-peak, mid-peak, and off- peak rates for a given day or other time frame). In such examples, the rates for the costs may be applied to the depot layout / logistics to determine an overall cost for each cost factor given a configuration of the charging station under analysis.

[0120] The cost comparison 1106 provides a graphical representation of the total investment and recurring costs (over a targeted period of time; ten years in the non-limiting illustrated example). In the illustrated example, a bar graph is used for the above-described comparison, however, it is to be understood that the visualization may include other representations of the comparison in other examples, such as a table, line graph, etc. In some examples, features of the user interface 1100 may be adjusted by user input, such as the number / types of cost factors used, the scenarios analyzed, the time frame for recurring costs and / or cost comparison, the visualization type of represented data, etc.

[0121] FIG. 12 shows an example user interface 1200 showing outputs from a charging infrastructure configuration application relating to technical results associated with different charging scenarios for a given charging station layout and configuration. For example, the user interface 1200 may be an example output for a charging system layout configured using and / or visualized by user interface 1000 of FIG. 10, and / or the associated charging infrastructure configuration application for user interface 1200 may be configured in accordance with any of the description above, for example with respect to the application associated with user interface 1000 of FIG. 10.

[0122] As shown, exemplary technical results of the basic non-EV rates and load management non-EV rates scenarios (described in more detail above with respect to FIG. 11) are provided, including grid connections data 1202 and charging load visualization 1204. The grid connections data 1202 includes a breakdown of basic charging power, optimized charging power (e.g., under load management, for the LM Non-EV rates) and total energy consumption for the charging station under analysis. These values may be determined based on an evaluation of one or more of the inputs described above with respect to FIG. 11. The charging load visualization 1204 includes a graphical visualization of charging load (e.g., in kW) over time throughout the course of an example period of time (e.g., a day, week, month, year, etc.) for both the basic non-EV scenarioand the load management non- EV scenario. Although a line graph is shown in the illustrated example, it is to be understood that any suitable visualization of these charging load values may be provided including examples of visualizations described above with respect to FIG. 11.

[0123] FIG. 13 shows an example user interface 1300 showing outputs from a charging infrastructure configuration application relating to financial results associated with different charging scenarios for a given charging station layout and configuration. For example, the user interface 1300 may be an example output for a charging system layout configured using and / or visualized by user interface 1000 of FIG. 10, and / or the associated charging infrastructure configuration application for user interface 1300 may be configured in accordance with any of the description above, for example with respect to the application associated with user interface 1000 of FIG. 10.

[0124] As shown, exemplary financial results of the basic non- EV rates and load management non-EV rates scenarios (described in more detail above with respect to FIG. 11) are provided, including one-time charging infrastructure costs 1302 and recurring annual costs 1304. The costs visualized at 1302 and / or 1304 may correspond to those described above with respect to the investment costs 1102 and recurring costs 1104, respectively, of FIG. 11. The recurring annual costs also include revenue for carbon credits, described in more detail below with respect to FIG. 14. These values may be determined based on an evaluation of one or more of the inputs described above with respect to FIG. 11. Although bar graphs are shown in the illustrated example, it is to be understood that any suitable visualization of these costs may be provided including examples of visualizations described above with respect to FIG. 11.

[0125] FIG. 14 shows an example user interface 1400 showing outputs from a charging infrastructure configuration application relating to revenues (e.g., low carbon fuel standard revenues in the illustrated example, although it is to be understood that similar analysis and associated visualizations may be run and provided for other environmental impact revenue-related calculations) associated with different charging scenarios for a given charging station layout and configuration. For example, the user interface 1400 may be an example output for a charging system layout configured using and / or visualized by user interface 1000 of FIG. 10, and / or the associated charging infrastructure configuration application for user interface 1400 may be configured in accordance with any of the description above, for example with respect to the application associated with user interface 1000 of FIG. 10.

[0126] The user interface 1400 includes a visual representation 1402 of estimated low carbon fuel standard revenues for each year, from a time range of 2022-2030. As shown by drop down menu 1404, the electricity source for revenue based on carbon offset may be selected to adjust the calculation of the total revenues for a given charging station under analysis. For example, different electricity sources may have different rates of revenue, which may be applied to energy displacement calculated based on the inputs for the charging station under analysis (e.g., the inputs described above with respect to FIG. 11) to determine annual revenues shown in the representation 1402. Information for determining the different rates of revenue may be retrieved from one or more databases corresponding to the electricity sources in some examples. In additional or alternative examples, one or more of the visualizations shown in user interface 1400 may be retrieved via execution of an Application Programming Interface (API) routine that calls a third-party website or other entity to generate the visualization, which is then received by the application and presented via the user interface 1400. Inputs provided to the third-party website / entity may be generated based on analysis performed by the application and / or user input to the application.

[0127] In some examples, when analyzing an effect of renewable energy harvesting devices on charging infrastructure for the vehicle fleet, an ecosystem as a whole may be considered. For example, charging a fleet of vehicles may provide a significant amount of additional load on a power grid that may result in brownout and / or blackout events, which lead to interruptions in fleet operations. Likewise, local conditions (e.g., based on a location of the charging infrastructure) may affect the availability and efficiency / output of different types of renewable energy resources. Accordingly, a user may input a location of the charging infrastructure (e.g., geo-coordinates), and the system may determine parameters of available renewable energy sources (e.g., solar intensity, average wind speed, etc.) to determine expected energy output for renewable energy harvesting devices. An amount of charging power provided by on-site renewable energy harvesting devices may be suggested by the system and / or determined (e.g., for existing renewable energy harvesting devices at the charging station) and subsequently factored into other analyses by the system (e.g., performance of the system, including costs, revenues, environmental impact, etc. as described herein).

[0128] Other environmental impact analysis may be performed and / or presented to a user in some examples. For example, based on an estimation of tons of carbon dioxide that is saved through the use of the charging station under analysis, an estimation of offset of emissions from equivalent gallons of diesel fuel consumed, pounds of coal burned, propane cylinders consumed, etc. may be provided. In additional or alternative examples, based on an estimation of tons of carbon dioxidethat is saved through the use of the charging station under analysis, an estimation of equivalent carbon dioxide that is sequestered via a number of tree seedlings grown for ten years, acres of U.S. forests in one year, acres of U.S. forests preserved from conversion to cropland in one year, etc. may be provided.

[0129] FIG. 15 depicts a generalized example of a suitable computing environment 1500 in which the described innovations may be implemented. The computing environment 1500 is not intended to suggest any limitation as to scope of use or functionality, as the innovations may be implemented in diverse general-purpose or special-purpose computing systems. For example, the computing environment 1500 can be any of a variety of computing devices (e.g., desktop computer, laptop computer, server computer, tablet computer, etc.).

[0130] With reference to FIG. 15, the computing environment 1500 includes one or more processing units 1510, 1515 and memory 1520, 1525. In FIG. 15, this basic configuration 1530 is included within a dashed line. The processing units 1510, 1515 execute computer-executable instructions. A processing unit can be a general-purpose central processing unit (CPU), processor in an application- specific integrated circuit (ASIC) or any other type of processor. In a multiprocessing system, multiple processing units execute computer-executable instructions to increase processing power. For example, FIG. 15 shows a central processing unit 1510 as well as a graphics processing unit or co-processing unit 1515. The tangible memory 1520, 1525 may be volatile memory (e.g., registers, cache, RAM), non-volatile memory (e.g., ROM, EEPROM, flash memory, etc.), or some combination of the two, accessible by the processing unit(s). The memory 1520, 1525 stores software 1580 implementing one or more innovations described herein, in the form of computer-executable instructions suitable for execution by the processing unit(s).

[0131] A computing system may have additional features. For example, the computing environment 1500 includes storage 1540, one or more input devices 1550, one or more output devices 1560, and one or more communication connections 1570. An interconnection mechanism (not shown) such as a bus, controller, or network interconnects the components of the computing environment 1500. Typically, operating system software (not shown) provides an operating environment for other software executing in the computing environment 1500, and coordinates activities of the components of the computing environment 1500.

[0132] The tangible storage 1540 may be removable or non-removable, and includes magnetic disks, magnetic tapes or cassettes, CD-ROMs, DVDs, or any other medium which can be used to store information in a non-transitory way and which can be accessed within the computingenvironment 1500. The storage 1540 stores instructions for the software 1580 implementing one or more innovations described herein.

[0133] The input device(s) 1550 may be a touch input device such as a keyboard, mouse, pen, or trackball, a voice input device, a scanning device, or another device that provides input to the computing environment 1500. The output device(s) 1560 may be a display, printer, speaker, CD- writer, or another device that provides output from the computing environment 1500.

[0134] The communication connection(s) 1570 enable communication over a communication medium to another computing entity. The communication medium conveys information such as computer-executable instructions, audio or video input or output, or other data in a modulated data signal. A modulated data signal is a signal that has one or more of its characteristics set or changed in such a manner as to encode information in the signal. By way of example, and not limitation, communication media can use an electrical, optical, RF, or other carrier.

[0135] Although the operations of some of the disclosed methods are described in a particular, sequential order for convenient presentation, it should be understood that this manner of description encompasses rearrangement, unless a particular ordering is required by specific language set forth below. For example, operations described sequentially may in some cases be rearranged or performed concurrently. Moreover, for the sake of simplicity, the attached figures may not show the various ways in which the disclosed methods can be used in conjunction with other methods.

[0136] Any of the disclosed methods can be implemented as computer-executable instructions stored on one or more computer-readable storage media (e.g., one or more optical media discs, volatile memory components (such as DRAM or SRAM), or non-volatile memory components (such as flash memory or hard drives)) and executed on a computer (e.g., any commercially available computer, including smart phones or other mobile devices that include computing hardware). The term computer-readable storage media does not include communication connections, such as signals and carrier waves. Any of the computer-executable instructions for implementing the disclosed techniques as well as any data created and used during implementation of the disclosed examples can be stored on one or more computer-readable storage media. The computer-executable instructions can be part of, for example, a dedicated software application or a software application that is accessed or downloaded via a web browser or other software application (such as a remote computing application). Such software can be executed, for example, on a single local computer (e.g., any suitable commercially available computer) or in a network environment (e.g., via the Internet, a wide-area network, a local-area network, a client-servernetwork (such as a cloud computing network), or other such network) using one or more network computers.

[0137] For clarity, only certain selected aspects of the software-based implementations are described. Other details that are well known in the art are omitted. For example, it should be understood that the disclosed technology is not limited to any specific computer language or program. For instance, aspects of the disclosed technology can be implemented by software written in C++, Java, Perl, any other suitable programming language. Likewise, the disclosed technology is not limited to any particular computer or type of hardware. Certain details of suitable computers and hardware are well known and need not be set forth in detail in this disclosure.

[0138] It should also be well understood that any functionality described herein can be performed, at least in part, by one or more hardware logic components, instead of software. For example, and without limitation, illustrative types of hardware logic components that can be used include Field-programmable Gate Arrays (FPGAs), Program- specific Integrated Circuits (ASICs), Program-specific Standard Products (ASSPs), System-on-a-chip systems (SOCs), Complex Programmable Logic Devices (CPLDs), etc.

[0139] Furthermore, any of the software-based examples (comprising, for example, computerexecutable instructions for causing a computer to perform any of the disclosed methods) can be uploaded, downloaded, or remotely accessed through a suitable communication means. Such suitable communication means include, for example, the Internet, the World Wide Web, an intranet, software applications, cable (including fiber optic cable), magnetic communications, electromagnetic communications (including RF, microwave, and infrared communications), electronic communications, or other such communication means.

[0140] The disclosed methods, apparatus, and systems should not be construed as limiting in any way. Instead, the present disclosure is directed toward all novel and nonobvious features and aspects of the various disclosed examples, alone and in various combinations and subcombinations with one another. The disclosed methods, apparatus, and systems are not limited to any specific aspect or feature or combination thereof, nor do the disclosed examples require that any one or more specific advantages be present or problems be solved.

[0141] In view of the many possible examples to which the principles of the disclosed invention may be applied, it should be recognized that the illustrated examples are only examples of thein vention and should not be taken as limiting the scope of the invention. We therefore claim as our invention all that comes within the scope of these claims.

Claims

CLAIMSWHAT IS CLAIMED IS:

1. A method for configuring charging infrastructure for a vehicle fleet, the method comprising: receiving input data including vehicle fleet information, the vehicle fleet information including charging load curves for one or more vehicles in the vehicle fleet based on historical charging profiles for the one or more vehicles; applying a range estimation algorithm to the vehicle fleet information to determine a respective estimated state of charge (SoC) for the one or more vehicles, the estimated SoC being based at least in part on public charging infrastructures along respective routes of the one or more vehicles; determining a probabilistic load demand based on the received input data and the respective estimated SoC for the one or more vehicles; determining a configuration of charging infrastructure for a charging station based on the probabilistic load demand; and outputting for display, via a graphical user interface, a visualization representing the configuration of the charging infrastructure and one or more outputs indicating a performance parameter or cost parameter associated with the configuration of the charging infrastructure.

2. The method of claim 1, further comprising generating a charging schedule for charging the one or more vehicles based on the probabilistic load demand and the historical charging profiles for the one or more vehicles.

3. The method of claim 2, wherein the charging schedule is further based on one or more of short-term forecasting of load demand at the charging station, rolling unit commitment, and optimal dispatching.

4. The method of claim 1, wherein the one or more outputs include a component sizes for chargers, power units, or power sources of the charging station.

5. The method of claim 1, wherein the configuration is selected to minimize operational costs or investment costs.

6. The method of claim 1, wherein the configuration includes an indication of power source makeup for the charging station, the power source makeup including one or more power generators configured to harvest energy from a renewable resource.

7. The method of claim 1, wherein the one or more outputs includes estimated revenue for selling energy to a power grid.

8. The method of claim 1, wherein the one or more outputs includes a comparison of the performance parameter or cost parameter for a plurality of charging scenarios.

9. The method of claim 8, wherein the cost parameter includes one or more of one-time charging infrastructure costs, recurring annual costs, or estimated revenues for selling energy to a power grid.

10. The method of claim 8, wherein the performance parameter includes an estimated charging load over time.

11. A system for configuring charging infrastructure for a vehicle fleet, the system comprising: a user interface configured to receive, via an input device, input data including vehicle fleet information, the vehicle fleet information including charging load curves for one or more vehicles in the vehicle fleet based on historical charging profiles for the one or more vehicles; a range estimation unit comprising first computer-readable instructions executable by the system to apply a range estimation algorithm to the vehicle fleet information to determine a respective estimated state of charge (SoC) for the one or more vehicles, the estimated SoC being based at least in part on public charging infrastructures along respective routes of the one or more vehicles; a probabilistic load demand calculation unit comprising second computer-readable instructions executable by the system to determine a probabilistic load demand based on the received input data and the respective estimated SoC for the one or more vehicles; and a configuration unit comprising third computer-readable instructions executable by the system to determine a configuration of charging infrastructure for a charging station based on the probabilistic load demand and output, for display via the user interface, a visualization representing the configuration of the charging infrastructure and one or more outputs indicating aperformance parameter or cost parameter associated with the configuration of the charging infrastructure.

12. The system of claim 11, further comprising a scheduling unit comprising fourth computer-readable instructions executable by the system to generate a charging schedule for charging the one or more vehicles based on the probabilistic load demand and the historical charging profiles for the one or more vehicles.

13. The system of claim 11, wherein the configuration comprises a combination of power generation sources including one or more renewable energy harvesting devices.

14. The system of claim 13, wherein parameters of the one or more renewable energy harvesting devices are determined by the configuration unit based on a location of the charging infrastructure, and wherein the visualization includes a representation of revenue generated by the one or more renewable energy harvesting devices.

15. The system of claim 11, wherein the visualization includes a representation of a layout of the charging station.

16. The system of claim 11, wherein the one or more outputs includes a visualization of a carbon impact of the configuration.

17. A method for configuring charging infrastructure for a vehicle fleet, the method comprising: receiving charging load curves for one or more vehicles in the vehicle fleet based on historical charging profiles for the one or more vehicles; determining a probabilistic load demand based on the received input data and the respective estimated SoC for the one or more vehicles; determining a configuration of charging infrastructure for a charging station based on the probabilistic load demand; generating a charging schedule for charging the one or more vehicles based on the probabilistic load demand and the historical charging profiles for the one or more vehicles, the charging schedule being determined to maximize efficiency of the charging station for the determined configuration; andoutputting for display, via a graphical user interface, a visualization representing the configuration of the charging infrastructure and the charging schedule.

18. The method of claim 17, wherein the configuration identifies a number of chargers for inclusion in the charging station and parameters of a power unit configured to distribute power to the chargers in the charging station.

19. The method of claim 18, wherein the configuration identifies parameters of power sources, the power sources including at least one renewable energy harvesting device.

20. The method of claim 17, wherein the charging schedule is generated based on an estimated SoC of one or more of the vehicles of the vehicle fleet, the estimated SoC being determined based on a range estimation algorithm applied to the charging load curves to determine a respective estimated state of charge (SoC) for the one or more vehicles, the estimated SoC being based at least in part on public charging infrastructures along respective routes of the one or more vehicles.

Citation Information

Patent Citations

  • Systems for machine learning, optimising and managing local multi-asset flexibility of distributed energy storage resources

    GB2598229A

  • Design and control of electric vehicle charging infrastructure

    US20210276447A1

  • Fleet electrification management

    US20230038368A1

  • Electric vehicle fleet charging and energy management system

    WO2023049998A1

Cited By

  • Oversized parking lot variable pile position scheduling method capable of actively responding to time-varying charging stop demand

    CN120014877A

  • Method and device for controlling the transmission of energy transmission data

    DE102024212065A1

  • Method for determining a charging plan for bidirectional charging of an electrically powered and bidirectionally chargeable motor vehicle, computer program and / or computer-readable medium, data processing device and motor vehicle

    DE102025113154A1

  • METHOD AND SYSTEM FOR OPTIMIZED CHARGING OF A VEHICLE BATTERY ACCORDING TO A CHARGING PLAN

    DE102025116110A1

  • Identifying charging stations for charging an electric vehicle along a route

    DE102025116528A1