Management method of steel structured project management system

A management method and engineering management technology, applied in the management field of steel structure engineering management system, can solve problems such as untimely information acquisition, poor communication and coordination, and errors

Inactive Publication Date: 2013-10-02
CHINA CONSTR STEEL STRUCTURE CORP LTD
View PDF0 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a management method of a steel structure engineering management system based on a building information model to solve the problem of untimely, unequal, and poor communication and coordination among project management parties in steel structure engineering The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0027] The management method of the steel structure engineering management system based on the building information model provided by the present invention comprises the following steps:

[0028] A three-dimensional model of steel structure engineering with steel components as the basic unit is established in the system; the specification information of the corresponding steel components is attached to each steel component in the three-dimensional model of steel structure engineering, and the steel structure engineering is divided into several parts according to the process Station. The so-called steel components refer to ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The present invention relates to application field of building information modeling, and particularly to a management method of a steel structured project management system based on building information modeling. Compared with the prior art, according to the management method of the steel structured project management system, the related information of the steel structured project is integrated in the three-dimensional modeling of the steel structured project, and furthermore related information is divided into steel components and stations. The data of the three-dimensional model of the steel structured project is updated in real time. Each related party of the project performs corresponding management on the project in real time through the three-dimensional model of the steel structured project. The management method of the invention settles the following problems in the steel structured project: incapability of acquiring information in real time among parties in project management, non-equivalence, and inferior communication compatibility.

Description

technical field [0001] The present invention relates to the application field of building information models, in particular to a management method of a steel structure engineering management system based on building information modeling (BIM, Building Information Modeling). The so-called building information model means that the 3D model of the building not only includes the geometric model of the building, but also includes the relevant information and data of the components that make up the building into the 3D model of the building, thus providing a basis for system-related calculations. Enable the system to automatically calculate relevant results based on relevant information and data for relevant applications. Background technique [0002] In the traditional steel structure engineering project management process, due to the various progress stages of the project (structural design, detailed design, material management, component production, project construction, post-o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
Inventor 王宏戴立先刘星徐重良申屠辉宏叶国新陈华周陈振明周轶钟荣发高勇刚刘曙许宝扬张羽茹高明卢俊平
Owner CHINA CONSTR STEEL STRUCTURE CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products