A Calculation Method of Spare Parts Requirements for Gamma Type Series Parts
A calculation method and technology of demand, which can be used in calculation, complex mathematical operations, data processing applications, etc., and can solve the problems of low accuracy of spare parts demand results, uncertain guarantee level, and excessive guarantee.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Taking the number of installed units N=3 and the demand for spare parts S=3 as an example, if the guarantee task is successful, the total number of spare parts used in each unit location is shown in Table 1:
[0048] Table 1 Quantity of spare parts used in each unit location
[0049]
[0050]
[0051]For each row in the table, the probability of the event occurring can be calculated. For example, for the row data [1 0 2] in the table, its physical meaning is: all 3 unit positions are guaranteed to succeed, 1 spare part is used in No. 1 cell position, no spare part is used in No. 2 cell position, and No. 3 cell position is used. Using 2 spare parts, the probability of this event occurring is equal to P(N s =1)×P(N s =0)×P(N s =2), N s The physical meaning of is the number of spare parts used at each unit location during the sustainment mission. Add the probabilities of events in each row in Table 1 to get the probability when the total number of spare parts us...