Clamping device for steel arch frame and steel arch frame mounting trolley
A clamping device and steel arch technology, applied in shaft equipment, shaft lining, tunnel lining, etc., can solve the problems of high labor intensity, low efficiency, heavy steel arch, etc., to meet the needs of flexible transportation and installation, guarantee The effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] The arch clamping device of the present invention is mainly suitable for folding arches, such as Figure 7 As shown, the folded arch frame is composed of multiple steel arch segments, and the adjacent arch segments are connected by hinges, as shown in Figure 7 As shown, the folding arch includes a middle section 201, a left section one 301, a left section two 302, a left section three 303, a right section one 401, a right section two 402 and a right section three 403; wherein, the left section two 302 and the left section After the three 303 are folded in half, they are folded into the left section one 301; after the right section two 402 and the right section three 403 are folded in half, they are folded into the right section one 401.
[0043] In order to clamp the above-mentioned arches conveniently, the present invention discloses a clamping device for steel arches, which includes an installation platform 8, an arch grabbing mechanism 1, an arch grabbing mechanism ...
Embodiment 2
[0068] A trolley for installing a steel arch, which includes the clamping device used for the steel arch in Embodiment 1; the clamping device is arranged on the trolley through an arm frame, and each side of the arm frame is provided with a Auxiliary jibs, two auxiliary jibs are provided with hanging baskets and / or arch auxiliary grippers and / or auxiliary hoisting mechanisms and / or rock wall breaking mechanisms.
[0069] In the above structure, during the unfolding process of the arch, the jib and the clamping device lift the entire folded arch, and then the auxiliary jib on the left side of the jib follows the left section 2 302 and the left section 3 303 to move, and the auxiliary left section 2 302 3. The left section three 303 is unfolded, and the auxiliary boom frame on the right side of the jib follows the right section two 402 and the right section three 403 to move, and the auxiliary right section two 402 and the right section three 403 are launched. The arch auxiliary...