A large garbage disposal machine
By designing a large waste disposal machine with prefabricated pyrolysis gasifier and multiple box exhaust gas treatment equipment, the problem of difficulty in easy transportation and disassembly of existing equipment is solved, and efficient utilization of resources and simplification of processes is achieved.
Patent Information
- Application Number
- CN201911333836.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-23
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2039-12-23
AI Technical Summary
Existing garbage disposal equipment is difficult to facilitate transportation and disassembly, and the shell and base of the pyrolysis gasifier are usually poured with cement and can no longer be used after removal, resulting in waste of resources.
A large garbage disposal machine was designed, and exhaust gas treatment equipment consisting of prefabricated pyrolysis gasifier and multiple box equipment, including a two-combustion quench heat exchange box, a dust removal desulfurization and denitrification box and a wet electric dust removal defog box. The equipment box-type structure is easy to stack and disassemble.
It realizes the convenience of transportation and disassembly of large waste disposal machines, saves land occupation and investment, simplifies processes, reduces dependence on factories, avoids the "neighbor avoidance effect" and realizes efficient utilization of resources.
Smart Images

Figure CN111023103B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to garbage processing equipment, in particular to a large-scale garbage processing machine. Background Art
[0002] Heterogeneous biomass pyrolysis and gasification technology is a hot research field at present, because the treatment and resource utilization of domestic waste, industrial waste, and agricultural and forestry waste included in the country's environmental protection energy strategy all belong to this field.
[0003] The existing temporary garbage disposal equipment usually has a relatively small processing capacity, and the temporary garbage disposal equipment is made into a non-disassembly structure, and even the main manufacturing process is completed at the project site, and the equipment cannot be disassembled and moved. For cleaning landfills or emergency treatment projects, usually only temporary equipment is required with a large processing capacity, and the equipment needs to be dismantled after 1-3 years of use. The existing pyrolysis gasification furnace usually has a shell and a base cast with cement. If the existing pyrolysis gasification furnace is used, it cannot be used after dismantling, and the equipment is still within its service life when it is dismantled, which causes great waste. Therefore, technical personnel in this field are in urgent need of a large garbage disposal machine that is easy to transport and disassemble. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a large-scale garbage disposal machine which is convenient for transportation and disassembly.
[0005] The technical solution of the present invention to solve the above-mentioned technical problems is as follows: a large-scale garbage disposal machine comprises a feeding device, an assembled pyrolysis gasification furnace, an exhaust gas treatment equipment and a chimney which are connected in sequence, the exhaust gas treatment equipment comprises a two-fuel quenching heat exchange box, a dust removal, desulfurization and denitrification box and a wet electrostatic precipitator and demisting box which are connected in sequence, the two-fuel box inlet of the two-fuel quenching heat exchange box is connected to the pyrolysis gas outlet of the assembled pyrolysis gasification furnace, and the outlet of the wet electrostatic precipitator and demisting box is connected to the chimney.
[0006] The beneficial effects of the present invention are as follows: a large-scale garbage disposal machine adopts an exhaust gas treatment equipment composed of an assembled pyrolysis gasification furnace and a plurality of box-type equipment; the secondary combustion rapid cooling heat exchange box, the dust removal, desulfurization and denitrification box and the wet electrostatic precipitator and mist removal box can be stacked and placed, and the structure is convenient for disassembly, assembly and transportation; it occupies a small area; no factory building is required, investment is saved, and the process is simplified; it is de-factorized and the "NIMBY effect" is eliminated.
[0007] Based on the above technical solution, the present invention can also be improved as follows.
[0008] Furthermore, the exhaust gas treatment equipment also includes a flue gas spray water comprehensive treatment box, the wastewater outlets of the dust removal, desulfurization and denitrification box and the wet electrostatic precipitator and demisting box are connected to the oily hot water inlet of the flue gas spray water comprehensive treatment box, and the spray water outlet of the flue gas spray water comprehensive treatment box is respectively connected to the dust removal, desulfurization and denitrification box and the spray pipes in the wet electrostatic precipitator and demisting box.
[0009] The beneficial effect of adopting the above further scheme is that the garbage disposal machine is equipped with a flue gas spray water comprehensive treatment box, and the generated spray waste water can be directly treated and recycled to avoid pollutant emissions. The flue gas spray water comprehensive treatment box is a box structure, which can be stacked with the exhaust gas treatment equipment to save space and have a compact structure.
[0010] Furthermore, the exhaust gas treatment equipment also includes an activated carbon adsorption box and a smoke exhaust fan, and the outlet of the wet electrostatic precipitator and mist removal box, the activated carbon adsorption box, the smoke exhaust fan and the chimney are connected in sequence.
[0011] The beneficial effects of adopting the above further scheme are: the activated carbon adsorption box further adsorbs the untreated particles or substances, and the smoke exhaust fan increases the air flow rate in the device, so that the smoke can smoothly enter the chimney.
[0012] Furthermore, there are at least two tail gas treatment devices, the secondary fuel box inlets of at least two secondary fuel quenching heat exchange boxes are connected to the pyrolysis gas outlet of the assembled pyrolysis gasifier, and at least two exhaust fans are connected to the chimney.
[0013] The beneficial effect of adopting the above further scheme is that the tail gas treatment equipment can be adjusted according to the amount of flue gas to be treated, and the tail gas treatment equipment can be one or more. When there are multiple tail gas treatment equipment, multiple tail gas treatment equipment are connected in parallel. The container modular tail gas treatment device has the following advantages: the treatment capacity can be adjusted arbitrarily; the box structure is convenient for disassembly and transportation; it occupies less space; no factory is required, saving investment and simplifying the process; de-factorization eliminates the "NIMBY effect".
[0014] Furthermore, the flue gas spray water comprehensive treatment box includes a treatment box body and an oil-water separation device, a waste hot water tank, a filter press device, a clear hot water tank, a heat exchange device and a cool water tank arranged in the treatment box body; the side wall of the treatment box body has the oil-water hot water inlet, the oil-water hot water inlet is connected to the oil-water separation device, the waste hot water outlet of the oil-water separation device is connected to the inlet of the filter press device through the waste hot water tank, the outlet of the filter press device is connected to the heat medium inlet of the heat exchange device through the cool water tank, and the heat medium outlet of the heat exchange device is connected to the spray water outlet of the treatment box body through the cool water tank.
[0015] The beneficial effect of adopting the above further scheme is that the flue gas spray water passes through the oil-water separation device to separate the dirty hot water and tar, the dirty hot water passes through the filter press device to filter the sludge, and then the dirty hot water passes through the heat exchange device to cool down to obtain spray water that can be used again. The dirty hot water tank provides a buffer and storage area for the dirty hot water. After the dirty hot water is filtered by the filter press device, it forms clear hot water. The clear hot water tank provides a buffer and storage area for the clear hot water. After the clear hot water is cooled by the heat exchange device, it becomes clear cold water. The clear cold water tank provides a buffer and storage area for the clear cold water. The flue gas spray water comprehensive treatment box is integrated in a box body, with a compact structure, fast spray water treatment, and has the functions of oil-water separation, particle filtration, forced spray water heat exchange and cooling, so that the spray water can be comprehensively treated and recycled, and zero discharge of spray water is achieved.
[0016] Furthermore, the flue gas spray water comprehensive treatment box also includes a tar tank and an alkali liquid tank, the tar tank is connected to the tar outlet of the oil-water separation device; the outlet of the alkali liquid tank is connected to the cool water tank.
[0017] The beneficial effect of adopting the above further scheme is that the tar separated by the oil-water separation device is stored in the tar tank and can be cleaned regularly. The alkali solution in the spray water is consumed during the adsorption process, and the alkali solution tank replenishes the alkali solution into the cool water tank, so that the cool water can be used as spray water to play the role of dust reduction and adsorption.
[0018] Furthermore, the assembled pyrolysis gasification furnace includes an insulation shell, a reactor, a chain-discharge hot air furnace and a dryer, the reactor being rotatably installed in the insulation shell, one end of the reactor extending out of the insulation shell and having a feed inlet, the side wall of the reactor having a carbon slag discharge port connected to the chain-discharge hot air furnace, the insulation shell being detachably connected to the upper end of the chain-discharge hot air furnace, the insulation shell being composed of a plurality of insulation plates detachably connected; the dryer being rotatably installed in the insulation shell and being located above the reactor, both ends of the dryer extending out of the insulation shell, one end of the dryer having a dryer inlet connected to the feeding device, and the other end having a dryer outlet, the dryer outlet being connected to the feed inlet; one end of the reactor having the pyrolysis gas outlet, the top wall of the insulation shell also having an insulation shell pyrolysis gas outlet, the pyrolysis gas outlet and the insulation shell pyrolysis gas outlet are both connected to the inlet of the secondary combustion quenching heat exchange box.
[0019] The beneficial effects of adopting the above further scheme are: multiple insulation boards, reactors and chain-discharge hot air furnaces can be transported separately, assembled on site, and can be dismantled and transported away after temporary use without affecting the next use. The dryer uses the temperature in the insulation shell to dry and preheat the material before entering the reactor, so that the material processing efficiency is high and the combustion is sufficient. The material is pyrolyzed in the reactor, and the carbon slag after pyrolysis enters the chain-discharge hot air furnace for combustion and heat for the insulation shell, and the pyrolysis gas enters the tail gas treatment equipment for treatment.
[0020] Furthermore, there are two reactors, which are arranged side by side, the feed inlets of the two reactors are connected to the dryer outlet, and the carbon slag discharge ports of the two reactors are connected to the chain-discharge hot air furnace.
[0021] The beneficial effect of adopting the above further solution is that: by adopting two reaction kettles, a large amount of materials can be processed, and the processing efficiency is improved. The large-scale garbage disposal machine of the present invention can process 500 tons or even more materials at a time.
[0022] Furthermore, the assembled pyrolysis gasification furnace also includes a distributor, the dryer outlet and the feed inlet are correspondingly arranged at one end of the insulation shell, the distributor is installed below the dryer outlet and above the feed inlet, and feeds the material discharged from the dryer outlet into the feed inlet of the reactor.
[0023] The beneficial effect of adopting the above further solution is that the distributor allows the material discharged from a dryer to enter one or more reaction kettles.
[0024] Furthermore, the secondary combustion rapid cooling heat exchanger box includes a secondary combustion chamber and a heat exchanger which are arranged in the secondary combustion heat exchanger box body and are interconnected. The secondary combustion heat exchanger box body is provided with a secondary combustion box inlet and a secondary combustion box outlet which are respectively connected to the secondary combustion chamber and the heat exchanger. The interior of the secondary combustion chamber is divided into a plurality of chambers which are connected in sequence by a partition. A flow channel is formed between the end of the partition and the side wall of the secondary combustion chamber, or the partition has a flow channel, and two adjacent chambers are connected through the flow channel. The flow channel is filled with heat storage ceramic porous bricks, and the heat storage ceramic porous bricks have a plurality of flow holes, and two adjacent chambers are connected through the flow holes.
[0025] The beneficial effect of adopting the above further scheme is that the secondary combustion quenching heat exchange box is a box structure, which can be installed in a modular manner and has a compact structure. The secondary combustion chamber adopts multiple chambers, which can increase the gas residence time, increase the heat storage area, and facilitate full reaction and combustion. Multiple chambers share partition walls, saving material investment. In addition, there is no need to connect the secondary combustion chamber and the secondary combustion chamber and the heat exchanger with air ducts, eliminating system wind resistance and reducing pressure loss. The heat storage ceramic porous bricks serve as gas channels on the partitions, which are conducive to dispersing and evenly distributing airflow and uniform reaction. At the same time, they increase the contact surface between the gas and the heat storage body, which is conducive to heat storage and heat release, so as to balance the combustion temperature of the secondary combustion chamber and adapt to the heterogeneity and instability of the raw materials. When processing heterogeneous materials, the heat generated by garbage from different places after treatment is different. For example, the garbage transported from the community is mainly plastic products, which generates a lot of heat; the garbage transported from the vegetable market is mainly vegetable leaves, which generates less heat. When processing garbage, different types of garbage are processed successively, making the temperature in the secondary combustion chamber unstable and the gas treatment effect poor. If the heat after the previous batch of garbage is processed is large, the heat storage ceramics can absorb the heat and keep the temperature constant. If the heat after the subsequent garbage is processed is small, the heat storage ceramics release heat to raise the temperature of the gas and balance the heat. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a structural schematic diagram of a large-scale garbage disposal machine of the present invention;
[0027] Figure 2 It is a schematic diagram of the structure of the feeding device of the present invention;
[0028] Figure 3 This is a schematic diagram of the lifting drive mechanism of the feeding device of the present invention;
[0029] Figure 4 It is a principle diagram of the positioning hydraulic cylinder of the feeding device of the present invention;
[0030] Figure 5 It is a schematic structural diagram of the material pressing mechanism of the feeding device of the present invention;
[0031] Figure 6 It is a schematic diagram of another material pressing mechanism structure of the feeding device of the present invention;
[0032] Figure 7 A top view of the lifting drive mechanism of the feeding device of the present invention;
[0033] Figure 8 It is a structural diagram of the assembled pyrolysis gasification furnace of the present invention;
[0034] Fig. 9 It is a structural diagram of the heat-insulating shell of the present invention;
[0035] Fig.10 An exploded view of the thermal insulation shell of the present invention;
[0036] Fig.11 It is a structural diagram of the chain-discharge hot air stove of the present invention;
[0037] Fig.12 It is a structural diagram of the dryer of the present invention;
[0038] Fig.13 It is a structural diagram of the support frame of the present invention;
[0039] Fig.14 It is a structural diagram of the distributor of the present invention;
[0040] Fig.15 It is a structural diagram of the reaction kettle of the present invention;
[0041] Fig.16 AA sectional view of the reactor of the present invention;
[0042] Fig.17 It is a BB cross-sectional view of the reactor of the present invention;
[0043] Fig.18 It is a schematic diagram of the discharge door structure of the reactor of the present invention;
[0044] Fig.19 It is a working principle diagram of the discharge door of the reactor of the present invention;
[0045] Fig. 20 It is a front view of a schematic structural diagram of a combination mode of a single mode of the present invention;
[0046] Fig.21 It is a front view of a structural schematic diagram of another combination mode of the single mode of the present invention;
[0047] Fig. 22 A top view of the dual-mode installation of the present invention;
[0048] Fig.23 A top view of the three-mode installation of the present invention;
[0049] Fig.24 It is a front view of the secondary combustion quenching heat exchange box of the present invention;
[0050] Fig.25 It is a CC cross-sectional view of the secondary combustion quenching heat exchange box of the present invention;
[0051] Fig.26 This is a front view of the flue gas spray water comprehensive treatment box of the present invention;
[0052] Fig. 27 It is a right view of the flue gas spray water comprehensive treatment box of the present invention;
[0053] Fig.28 It is a left view of the flue gas spray water comprehensive treatment box of the present invention.
[0054] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0055] 1. Feeding device, 11. Box, 1101. Feeding port, 1102. Feeding port, 12. Lifting frame, 13. Lifting drive mechanism, 131. Lifting hydraulic cylinder, 132. Transmission chain, 133. Sprocket, 14. Material hopper, 141. Material hopper body, 142. Material hopper bottom plate, 15. Horizontal drive mechanism, 16. Storage hopper, 17. Shredder, 18. Feeder, 19. Pressing mechanism, 191. Pressing block, 1911. Pressing surface, 1912. Matching surface, 192. Pressing drive mechanism, 110. Positioning hydraulic cylinder, 111. Electronic floor scale, 112. Main control cabinet, 113. Hydraulic station, 114. Lifting slide rail, 115. Bottom plate slide rail, 116. Hopper slide rail;
[0056] 2. Assembled pyrolysis gasification furnace, 21. Insulation shell, 211. Lower end plate, 212. Lower side plate, 213. Middle end plate, 214. Middle side plate, 215. Upper end plate, 216. Curved top plate; 22. Reactor, 221. Reactor barrel, 2211. Feed inlet, 2212. Pyrolysis gas outlet, 2213. Carbon slag discharge port, 222. Feed mechanism, 2221. Feed barrel, 22211. Material input port, 2222. Pushing mechanism, 2223. Feed hopper, 22 3. Reactor driving mechanism, 224. Discharging door, 225. Pyrolysis gas guide barrel, 226. Anti-leakage net, 227. Lifting plate, 228. Reactor roller; 23. Chain hot air furnace, 231. Hot air outlet, 232. Anti-leakage guard plate, 233. Chain rack, 234. Rectifier shell, 235. Chain transmission motor, 236. Chain combustion fan; 24. Dryer, 241. Dryer roller, 242. Dryer gear ring; 25. Distributor; 26. Support frame, 261. Support wheel;
[0057] 3. Tail gas treatment equipment, 31. Secondary combustion quenching heat exchange box, 311. Secondary combustion heat exchange box, 312. Secondary combustion chamber, 313. Heat exchanger, 314. Partition, 315. Thermal storage ceramic porous brick; 32. Dust removal, desulfurization and denitrification box, 33. Wet electrostatic precipitator and demisting box, 34. Activated carbon adsorption box, 35. Smoke exhaust fan;
[0058] 4. Chimney;
[0059] 5. Flue gas spray water comprehensive treatment box, 51. Oily hot water inlet, 52. Oil-water separation device, 53. Sewage hot water tank, 54. Filter press device, 55. Fresh hot water tank, 56. Plate heat exchanger, 57. Fresh cooling water tank, 58. Tar tank, 59. Cooling tower, 510. Alkali liquid tank, 511. Sewage hot water pump, 512. Fresh hot water pump, 513. Fresh cooling water pump;
[0060] 6. Skid-mount the frame. DETAILED DESCRIPTION
[0061] The principles and features of the present invention are described below. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0062] like Figure 1-Figure 28 As shown, this embodiment provides a large-scale garbage disposal machine, including a feeding device 1, an assembled pyrolysis gasification furnace 2, an exhaust gas treatment equipment 3 and a chimney 4 connected in sequence, the exhaust gas treatment equipment 3 includes a two-fuel quenching heat exchange box 31, a dust removal, desulfurization and denitrification box 32 and a wet electrostatic precipitator and demisting box 33 connected in sequence, the two-fuel box inlet of the two-fuel quenching heat exchange box 31 is connected to the pyrolysis gas outlet 2212 of the assembled pyrolysis gasification furnace 2, and the outlet of the wet electrostatic precipitator and demisting box 33 is connected to the chimney 4.
[0063] Specifically, the dust removal, desulfurization and denitrification box 32 includes a first container and a spray pipe arranged inside the first container, or the existing desulfurization and denitrification equipment is installed in the first container. The wet electrostatic precipitator and demisting box 33 includes a second container and a wet electrostatic precipitator and demisting device arranged in the second container.
[0064] As a further solution of this embodiment, Figure 2-Figure 7 As shown, the feeding device 1 of the present invention can adopt a non-homogeneous organic solid waste feeding device as disclosed in patent CN201910722670.7, or a feeding device of other structural forms. The feeding device 1 of the present invention comprises: a box body 11, wherein the upper part of one side wall of the box body 11 has a feed port 1101, and the other side wall has a feeding port 1102; a lifting frame 12, wherein the lifting frame 12 is vertically slidably connected to the outer side wall of the box body 11 corresponding to the feed port, and a lifting drive mechanism 13, wherein the lifting drive mechanism 13 is fixed to the outer side wall of the box body 11 and drives the lifting frame 12 to reciprocate vertically between the lower part of the box body 11 and the feed port 1101; a hopper 14, wherein the hopper 14 comprises a cylindrical hopper body 141 open at the top and bottom and a hopper bottom plate 142, wherein the hopper body 141 It is slidably connected to the hopper bottom plate 142, and the hopper bottom plate 142 is installed on the lifting frame 12, and the feed port 1101 is adapted to the hopper body 141; a horizontal driving mechanism 15, the horizontal driving mechanism 15 is fixedly connected to the lifting frame 12, and drives the hopper body 141 to enter the box body 11 or exit the box body 11 through the feed port 1101; a feeding assembly, the feeding assembly is fixedly arranged in the box body 11 and correspondingly arranged on the inner side of the feeding port 1102, and the feeding assembly crushes the material brought into the hopper body 141 and sends it out from the feeding port 1102.
[0065] Specifically, the box body 11 is preferably a container. Figure 4 As shown, the horizontal drive mechanism 15 is a horizontal hydraulic cylinder. There are two lifting drive mechanisms 13, and the two lifting drive mechanisms 13 are respectively arranged on both sides of the lifting frame 12. Figure 2 In the direction shown, the two lifting drive mechanisms 13 are respectively located at the front and rear sides of the lifting frame 12 .
[0066] As a further solution of this embodiment, it also includes a bottom plate baffle, the hopper bottom plate 142 is slidably connected to the lifting frame 12, and the bottom plate baffle is fixedly connected to the inner side wall of the box body 11 corresponding to the lower end of the feed port 1101, and the bottom plate baffle blocks the sliding of the hopper bottom plate 142; the hopper bottom plate 142 has a vertical plate on the side away from the box body 11, and after the hopper body 141 exits the box body 11, the vertical plate abuts against the side wall of the hopper body 141.
[0067] Specifically, the bottom plate baffle is fixed to the inner side of the lower edge of the feed inlet 1101, so that the hopper bottom plate 142 is moved to the inner side of the feed inlet 1101 and is blocked, the hopper body 141 enters the box body 11, the bottom of the hopper body 141 is opened, and the material enters the box body 11 without spilling into the feed inlet 1101. Figure 2 As shown, the inner walls on both sides of the lifting frame 12 are respectively fixed with horizontal bottom plate slide rails 115, and the bottom plate rollers are respectively rotatably connected to the two sides of the hopper bottom plate 142, and the bottom plate rollers cooperate with the bottom plate slide rails 115 to achieve horizontal sliding connection between the hopper bottom plate 142 and the lifting frame 12. The inner walls on both sides of the lifting frame 12 are respectively fixed with horizontal hopper slide rails 116, and the hopper slide rails 116 are located above the bottom plate slide rails 115. The two opposite inner walls in the feed port 1101 of the box body 11 are also provided with second hopper slide rails. When the hopper 14 is lifted to the outside of the feed port 1101, the second slide rails are correspondingly arranged with the hopper slide rails 116 and connected with each other. The two sides of the hopper body 141 are rotatably connected with hopper rollers, and the hopper rollers cooperate with the second slide rail and the hopper slide rail 116 to achieve a horizontal sliding connection between the hopper body 141 and the lifting frame 12. Figure 2 As shown, the hopper bottom plate 142 includes a horizontally arranged bottom plate and a vertically arranged vertical plate, and the vertical plate is fixedly connected to the side of the bottom plate away from the box body 11. After the hopper body 141 retreats to the outside of the box body 11, the vertical plate abuts against the side wall of the hopper body 141 and moves with the hopper body 141.
[0068] As a further solution of this embodiment, the feeding assembly includes a storage hopper 16, a shredder 17 and a feeder 18. The storage hopper 16, the shredder 17 and the feeder 18 are fixedly connected to the box body 11 from top to bottom in sequence. The storage hopper 16 is arranged below the feed port 1101, and the feeder 18 is correspondingly arranged on the inner side of the feed port 1102.
[0069] Specifically, the shredder 17 is a prior art and is used to crush materials. Those skilled in the art can select a shredder 17 of a suitable model and size according to the size of the box 11. The specific structure and principle of the shredder 17 are not the content claimed for protection by the present invention and will not be described here for the sake of brevity.
[0070] As a further solution of this embodiment, the feeding assembly also includes a pressing mechanism 19, the side wall of the storage hopper 16 has a pressing port, the pressing mechanism 19 is rotatably connected to the side wall of the storage hopper 16 and is located in the pressing port, and the pressing mechanism 19 presses the material from the storage hopper 16 into the shredder 17.
[0071] As a further solution of this embodiment, the pressing mechanism 19 includes a pressing block 191 and a pressing drive mechanism 192. The pressing block 191 is rotatably connected to the storage hopper 16. The pressing drive mechanism 192 drives the pressing block 191 to rotate. The pressing block 191 has a pressing surface 1911 and a mating surface 1912. The pressing surface 1911 pushes the material in the storage hopper 16 into the shredder 17. The mating surface 1912 abuts against the side wall of the pressing port during the rotation of the pressing block 191.
[0072] Specifically, Figure 2 , Figure 5 and Figure 6 As shown, the material pressing block 191 is a column with a fan-shaped cross section, or a column with a fan-shaped cross section and one straight side being an arc. The outer arc surface of the material pressing block 191 and the fan-shaped end surfaces at both ends are the matching surfaces 1912, one of the side surfaces is the material pressing surface 1911, and the straight side opposite to the outer arc surface is rotatably connected to the storage hopper 16.
[0073] Specifically, Figure 5 As shown, the material pressing driving mechanism 192 can be a material pressing hydraulic cylinder, the output end of the material pressing hydraulic cylinder is hinged to the other side of the material pressing block 191, the cylinder body of the material pressing hydraulic cylinder is hinged to the box body 11, and the material pressing hydraulic cylinder extends or retracts to drive the material pressing block 191 to rotate. Figure 6As shown, the pressing drive mechanism 192 can also be a pressing motor, which is fixedly connected to the outer wall of the storage hopper 16, and the output shaft of the pressing motor is fixedly connected with a gear. The outer arc surface of the pressing block 191 is fixedly connected with an arc-shaped rack, and the gear is meshed with the arc-shaped rack. The pressing motor drives the gear to rotate, thereby rotating the pressing block 191.
[0074] As a further solution of this embodiment, the pressing block 191 is a cylinder with a fan-shaped cross section, and the pressing surface 1911 is a plane or a concave arc surface.
[0075] Specifically, Figure 5 and Figure 6 As shown, when the pressing surface 1911 is an arc surface, the arc surface is concave toward the side away from the material. When the pressing surface 1911 rotates toward the shredder 17, the pressing surface 1911 generates pressure toward the center of curvature, which can better solve the material bridging phenomenon and is particularly suitable for pressing heterogeneous organic solid waste.
[0076] As a further solution of this embodiment, it also includes a feed bottom plate, which is fixedly arranged at the lower end of the box body 11 corresponding to the feed port 1102, and the feeder 18 includes a feed hydraulic cylinder and a feed push plate, the feed hydraulic cylinder is fixed in the box body 11, and the output end of the feed hydraulic cylinder is fixedly connected to the feed push plate, and the feed push plate pushes the material on the feed bottom plate out of the box body 11 from the feed port 1102. Specifically, the feed bottom plate is horizontally fixed to the inner side of the box body 11, the upper end surface of the feed bottom plate is flush with the lower edge of the feed port 1102, and the feed push plate is vertically arranged.
[0077] As a further solution of this embodiment, Figure 3 As shown, it also includes a lifting rail 114, the lifting rail 114 is fixedly connected to the outer wall of the box body 11, the side wall of the lifting frame 12 is rotatably connected to the lifting frame guide wheel, and the lifting frame guide wheel slides in the lifting rail 114, the lifting drive mechanism 13 includes a lifting hydraulic cylinder 131, a transmission chain 132 and a sprocket 133, the sprocket 133 is rotatably connected to the output end of the lifting hydraulic cylinder 131, one end of the transmission chain 132 is fixedly connected to the lifting frame 12, and the other end bypasses the sprocket 133 and is fixedly connected to the side wall of the lifting hydraulic cylinder 131. Specifically, as Figure 7 As shown, the side wall of the lifting frame 12 is rotatably connected with a lifting frame guide wheel, and the lifting frame guide wheel moves with the lifting frame 12 and slides and guides along the lifting rail 114.
[0078] As a further solution of this embodiment, it also includes a positioning hydraulic cylinder 110, which is fixedly connected to the lifting frame 12. The upper side wall of the box body 11 has a positioning hole, which is adapted to the output end of the positioning hydraulic cylinder 110. When the lifting frame 12 moves to the feed port 1101, the output end of the positioning hydraulic cylinder 110 extends into the positioning hole to achieve positioning. Specifically, the positioning hole is conical, and the output end of the positioning hydraulic cylinder 110 is conical.
[0079] As a further solution of this embodiment, an electronic floor scale 111 is further included, and the electronic floor scale 111 is correspondingly arranged below the lifting frame 12 and fixedly connected to the box body 11. Specifically, when the lifting frame 12 moves to the bottom, all the weight falls on the electronic floor scale 111, which is convenient for weighing the weight of the heterogeneous organic solid waste added to the hopper 14.
[0080] As a further solution of this embodiment, the feeding device 1 also includes a main control cabinet 112 and a hydraulic station 113, wherein the main control cabinet 112 is provided with a controller and a power supply, and the hydraulic station 113 is provided with a hydraulic pump. The hydraulic pump is connected to the horizontal hydraulic cylinder, the lifting hydraulic cylinder 131, the positioning hydraulic cylinder 110, the pressing hydraulic cylinder and the feeding hydraulic cylinder through hydraulic pipelines, and electromagnetic switch valves are provided on the hydraulic pipelines. The controller is electrically connected to the power supply, the controller is electrically connected to the shredder 17 and controls the start and stop of the shredder 17, and the controller is electrically connected to the electromagnetic switch valve to control the opening and closing of the hydraulic pipeline, thereby controlling the operation of the heterogeneous organic solid waste feeding device. The connection relationship between the above-mentioned hydraulic pump and the hydraulic cylinder and the control method of the controller can be realized by using existing technologies. The hydraulic connection relationship and the control method are not the technical solutions to be protected by the present invention. For the sake of simplicity, they will not be repeated here.
[0081] As a further solution of this embodiment, the exhaust gas treatment equipment 3 also includes a flue gas spray water comprehensive treatment box 5, and the wastewater outlets of the dust removal, desulfurization and denitrification box 32 and the wet electrostatic precipitator and demisting box 33 are both connected to the oily hot water inlet 51 of the flue gas spray water comprehensive treatment box 5, and the spray water outlet of the flue gas spray water comprehensive treatment box 5 is respectively connected to the dust removal, desulfurization and denitrification box 32 and the spray pipes in the wet electrostatic precipitator and demisting box 33.
[0082] As a further solution of this embodiment, the exhaust gas treatment equipment 3 further includes an activated carbon adsorption box 34 and a smoke exhaust fan 35, and the outlet of the wet electric precipitator and mist removal box 33, the activated carbon adsorption box 34, the smoke exhaust fan 35 are sequentially connected to the chimney 4. Specifically, the activated carbon adsorption box 34 includes a third container and activated carbon disposed therein.
[0083] As a further solution of this embodiment, there are at least two tail gas treatment devices 3, the secondary fuel box inlets of at least two secondary fuel quenching heat exchange boxes 31 are connected to the pyrolysis gas outlet of the assembled pyrolysis gasification furnace 2, and at least two exhaust fans 35 are connected to the chimney 4.
[0084] Specifically, the exhaust gas treatment equipment 3 may be one, two, three, four or more, such as Fig. 22 and Fig.23 The exhaust gas treatment equipment 3 is shown as Fig.21 The top view of the combination shown, Fig. 22 and Fig.23 The tail gas treatment equipment 3 can also be used Fig. 20 In the combination shown, when there are multiple tail gas treatment devices 3, the multiple tail gas treatment devices 3 are connected in parallel, the inlets of the multiple secondary combustion rapid cooling heat exchange boxes 31 are all connected to the pyrolysis gas outlet of the assembled pyrolysis gasification furnace 2, and the outlets of the exhaust fans 35 are all connected to the chimney 4 through pipelines.
[0085] Specifically, Fig. 20 and Fig.21 As shown, the secondary combustion quenching heat exchange box 31, the dust removal, desulfurization and denitrification box 32, the wet electrostatic precipitator and mist removal box 33 and the flue gas spray water comprehensive treatment box 5 are arranged in sequence from top to bottom; or the secondary combustion quenching heat exchange box 31, the dust removal, desulfurization and denitrification box 32 and the wet electrostatic precipitator and mist removal box 33 are arranged in sequence from bottom to top, and the flue gas spray water comprehensive treatment box 5 is located below the secondary combustion quenching heat exchange box 31.
[0086] Specifically, when using Fig. 20 In the combination shown in FIG. 1 , the activated carbon adsorption box 34 is vertically arranged, the inlet of the activated carbon adsorption box 34 is located above one side and connected to the wet electric dust removal and demisting box 33, and the outlet of the activated carbon adsorption box 34 is located below the other side and connected to the smoke exhaust fan 35. Fig.21 In the combination shown, the activated carbon adsorption box 34 is arranged horizontally, the inlet of the activated carbon adsorption box 34 is located at one end thereof and connected to the wet electric dust removal and mist removal box 33, and the outlet of the activated carbon adsorption box 34 is located at the other end and connected to the smoke exhaust fan 35.
[0087] As a further solution of this embodiment, Fig. 20 and Fig.21 As shown, it also includes a skid-mounted frame 6, on which the secondary combustion quenching heat exchange box 31, the dust removal, desulfurization and denitrification box 32, the wet electrostatic precipitator and demisting box 33 and the flue gas spray water comprehensive treatment box 5 are fixedly installed. Specifically, the secondary combustion quenching heat exchange box 31, the dust removal, desulfurization and denitrification box 32 and the wet electrostatic precipitator and demisting box 33 can be Fig. 20or Fig.21 The arrangement shown is mounted on a skid-mounted frame 6, such as Fig. 22 and Fig.23 As shown, according to the amount of exhaust gas to be treated, two or three exhaust gas treatment devices 3 can be arranged side by side. If a larger amount of exhaust gas needs to be treated, more exhaust gas treatment devices 3 can be arranged.
[0088] As a further solution of this embodiment, Figure 26-Figure 28 As shown, the flue gas spray water comprehensive treatment box 5 includes a treatment box body and an oil-water separation device 52, a waste hot water tank 53, a filter press device 54, a clear hot water tank 55, a heat exchange device and a clear cold water tank 57 arranged in the treatment box body; the side wall of the treatment box body has the oil-water hot water inlet 51, and the oil-water hot water inlet 51 is connected with the oil-water separation device 52, the waste hot water outlet of the oil-water separation device 52 is connected with the inlet of the filter press device 54 through the waste hot water tank 53, the outlet of the filter press device 54 is connected with the heat medium inlet of the heat exchange device through the clear hot water tank 55, and the heat medium outlet of the heat exchange device is connected with the spray water outlet of the treatment box body through the clear cold water tank 57.
[0089] As a further solution of this embodiment, the flue gas spray water comprehensive treatment box 5 also includes a tar tank 58 and an alkali liquid tank 510, the tar tank 58 is connected to the tar outlet of the oil-water separation device 52; the outlet of the alkali liquid tank 510 is connected to the cooling water tank 57.
[0090] Specifically, the oil-water separation device 52 can be an oil-water separation tank, or an oil-water separation zone separated by a partition in the treatment box body, and water and oil are separated by natural sedimentation. The bottom of the oil-water separation zone is connected to the filter press device 54, and the upper part of the oil-water separation zone has a pipeline for discharging tar.
[0091] Specifically, a switch valve is provided on the pipeline connecting the alkali liquid tank 510 and the cooling water tank 57, and the switch valve is electrically connected to the controller. The controller opens the switch valve at regular intervals, adds a certain amount of alkali liquid into the cooling water tank 57, and then closes the switch valve. Ensure that the alkali liquid content in the spray water is sufficient so that the spray water can be recycled. It should be noted that the controller controls the opening and closing of the switch valve, and those skilled in the art can use existing technologies to achieve this. For the sake of brevity, it will not be repeated here.
[0092] Specifically, the waste hot water tank 53, the clear hot water tank 55, the cool water tank 57, the tar tank 58 and the alkali liquid tank 510 are all independent boxes, or are areas separated by partitions in the treatment tank body for accommodating corresponding liquids. Specifically, the treatment tank body is a container. Specifically, it also includes a waste hot water pump 511, a cool water pump 512 and a cool water pump 513. The waste hot water tank 53 is connected to the filter press device 54 through the waste hot water pump 511, the cool water tank 55 is connected to the heat exchange device through the cool water pump 512, and the cool water tank 57 is connected to the spray water outlet of the treatment tank body through the cool water pump 513.
[0093] As a further solution of this embodiment, the heat exchange device includes a plate heat exchanger 56 and a cooling tower 59, the outlet of the filter press 54 is connected to the heat medium inlet of the plate heat exchanger 56, the heat medium outlet of the plate heat exchanger 56 is connected to the spray water outlet of the box, the refrigerant outlet of the plate heat exchanger 56 is connected to the inlet of the cooling tower 59, and the outlet of the cooling tower 59 is connected to the refrigerant inlet of the plate heat exchanger 56. Specifically, the cooling tower 59 is a small cooling tower with a small volume, which can be integrated into the processing box body.
[0094] As a further solution of this embodiment, Figure 26-Figure 28 As shown, the oil-water separation device 52 is located above one end of the treatment tank body, the waste hot water tank 53, the clean hot water tank 55 and the cool water tank 57 are sequentially arranged below one end of the treatment tank body, the tar tank 58 and the alkali liquid tank 510 are arranged at one end of the treatment tank body and located between the oil-water separation device 52 and the cool water tank 57, and the filter press device 54 and the plate heat exchanger 56 are arranged at the other end of the treatment tank body.
[0095] As a further solution of this embodiment, the waste hot water pump 511, the fresh hot water pump 512 and the fresh cold water pump 513 are respectively arranged above the waste hot water tank 53, the fresh hot water tank 55 and the fresh cold water tank 57.
[0096] As a further solution of this embodiment, the filter press device 4 is a filter press tank. Specifically, preferably, a bag filter press tank is used, and the mesh size of the filter press bag can be selected according to the usage.
[0097] As a further solution of this embodiment, Figure 8-Figure 19As shown, the assembled pyrolysis gasification furnace 2 includes an insulation shell 21, a reactor 22, a chain-discharge hot air furnace 23 and a dryer 24. The reactor 22 is rotatably installed in the insulation shell 21. One end of the reactor 22 extends out of the insulation shell 21 and has a feed inlet 2211. The side wall of the reactor 22 has a carbon slag discharge port 2213 connected to the chain-discharge hot air furnace 23. The insulation shell 21 is detachably connected to the upper end of the chain-discharge hot air furnace 23. The insulation shell 21 is composed of a plurality of detachable insulation plates. The dryer 24 is rotatable. It is installed in the insulation shell 21 and is located above the reactor 22. Both ends of the dryer 24 extend out of the insulation shell 21, one end of which has a dryer inlet connected to the feeding device 1, and the other end has a dryer outlet, and the dryer outlet is connected to the feed port 2211; one end of the reactor 22 has the pyrolysis gas outlet 2212, and the top wall of the insulation shell 21 also has an insulation shell pyrolysis gas outlet, and the pyrolysis gas outlet 2212 and the insulation shell pyrolysis gas outlet are both connected to the inlet of the secondary combustion quenching heat exchange box 31.
[0098] Specifically, the side wall of the insulation shell 21 also has an insulation shell pyrolysis gas outlet, and the pyrolysis gas discharged from the carbon slag discharge port 2213 is discharged through the insulation shell pyrolysis gas outlet and enters the subsequent secondary combustion rapid cooling heat exchange box 31.
[0099] Specifically, Fig.12 As shown, the dryer 24 is a cylindrical barrel structure, and the inner wall of the dryer 24 is provided with a guide thread, so when the dryer 24 rotates, the material will move from the dryer inlet to the dryer outlet along the guide thread. Since the dryer 24 rotates continuously and is heated evenly, the dryer 24 made of ordinary steel will not bend or deform in the high-temperature insulation shell 21.
[0100] Specifically, a dryer gear ring 242 is sleeved on the outer side of one end of the dryer 24, a dryer drive motor is arranged outside the heat preservation shell 21, a dryer transmission gear is fixed to the output end of the dryer drive motor, and the dryer transmission gear meshes with and transmits the dryer gear ring 242. The dryer transmission gear and the dryer gear ring 242 can also be connected by a gear set. Specifically, dryer rollers 24 are sleeved on both ends of the dryer 24.
[0101] As a further solution of this embodiment, there are two reactors 22, and the two reactors 22 are arranged side by side. The feed inlets 2211 of the two reactors 22 are connected to the dryer outlet, and the carbon slag discharge ports 2213 of the two reactors 22 are connected to the chain-discharge hot air furnace 23.
[0102] As a further solution of this embodiment, the assembled pyrolysis gasification furnace 2 also includes a distributor 25. The dryer outlet and the feed inlet are arranged at one end of the insulation shell 21 correspondingly. The distributor 25 is installed below the dryer outlet and above the feed inlet 2211, and delivers the material discharged from the dryer outlet into the feed inlet 2211 of the reactor 22.
[0103] like Figure 15-19 As shown, the reactor 22 includes a reactor barrel body 221, a feeding mechanism 222 and a reactor driving mechanism 223. The reactor barrel body 221 is a horizontally arranged cylindrical barrel body. One end of the reactor barrel body 221 has the feeding port 2211 and the pyrolysis gas outlet 2212. The side wall of the reactor barrel body 221 has the carbon slag discharge port 2213. The feeding mechanism 222 is rotatably connected and communicated with the feeding port 2211. The reactor driving mechanism 223 is transmission-connected to the reactor barrel body 221 and drives the reactor barrel body 221 to rotate axially.
[0104] The reactor 22 is a horizontal countercurrent pyrolysis reactor, which is particularly used for the pyrolysis treatment of heterogeneous organic solid waste (solid waste). It avoids the need for a vertical pyrolysis reactor to perform pre-homogenization treatment on the heterogeneous organic solid waste, thereby reducing the treatment cost. Its countercurrent feed and gas outlet design also has the thermal energy utilization advantage of a vertical reactor (furnace).
[0105] Specifically, the reactor drive mechanism 223 is a motor. The reactor drive mechanism 223 is connected to the reactor barrel 221 through gear transmission. Specifically, the output shaft fixed sleeve of the reactor drive mechanism 223 is provided with a first gear, and the outer fixed sleeve of the other end of the reactor barrel 221 is provided with a ring-shaped second gear. The first gear and the second gear are meshed and driven to drive the reactor barrel 221 to rotate around its axis. A transmission gear set can also be set between the first gear and the second gear. The first gear and the second gear are both meshed with the transmission gear set, and the first gear transmits power to the second gear through the transmission gear set. The reactor drive mechanism 223 and the reactor barrel 221 can also be connected through belt drive or chain drive.
[0106] Specifically, both ends of the reactor barrel 221 extend out of the insulation shell 21 and can rotate relative to the insulation shell 21, and both ends of the reactor barrel 221 are respectively sleeved with reactor rollers 228. In order to prevent the high temperature in the insulation shell from affecting the movement of the mechanism, the reactor roller 228, the first gear, the second gear and the reactor driving mechanism 223 are all located outside the insulation shell 21.
[0107] As a further solution of this embodiment, the carbon slag discharge port 2213 is arranged on the side wall of the reactor barrel body 221 close to the other end thereof.
[0108] As a further solution of this embodiment, a discharge door 224 is further included, and one end of the discharge door 224 is hinged to one side of the carbon slag discharge port 2213 along the circumference of the reactor barrel body 221.
[0109] As a further solution of this embodiment, the discharge door 224 has a plurality of sieve holes.
[0110] Specifically, Fig.16 , Fig.18 and Fig.19 As shown, one end of the discharge door 224 is hinged to the reactor barrel 221, and the discharge door 224 is opened or closed as the reactor barrel 221 rotates. Fig.19 As shown, 1-1 to 1-4 in the figure show the states of the discharge door 224 at four positions during the counterclockwise rotation of the reactor barrel 221. The counterclockwise rotation of the reactor barrel 221 is the pyrolysis state of the horizontal countercurrent pyrolysis reactor. The counterclockwise rotation means that the hinge point of the discharge door 224 is located at the rear of the rotation direction. When the discharge door 224 rotates to the bottom, that is, at the position shown in 1-3, the discharge door 224 is closed. Fig.19 As shown, 2-1 to 2-4 in the figure represent the states of the discharge door 224 at four positions during the clockwise rotation of the reactor barrel 221. The clockwise rotation of the reactor barrel 221 is the discharge state of the horizontal countercurrent pyrolysis reactor. The clockwise rotation indicates that the hinge point of the discharge door 224 is located in front of the rotation direction. When the discharge door 224 rotates to the bottom, that is, at the position shown in 2-3, the discharge door 224 is opened.
[0111] Specifically, in the material processing process, the non-homogeneous materials include inorganic materials that cannot be pyrolyzed and organic materials that can be pyrolyzed, wherein the organic materials include materials that are easy to pyrolyze and materials that are not easy to pyrolyze. The materials that are not easy to pyrolyze include furniture and wood, and the materials that are easy to pyrolyze include plastic films and plastic lunch boxes. Since the non-homogeneous materials are not classified and homogenized before being put into the reactor barrel 221, the materials that are easy to pyrolyze will be pyrolyzed into carbon slag first, and the materials that are not easy to pyrolyze will be pyrolyzed into carbon slag after a longer pyrolysis period. Therefore, in the pyrolysis state, when the reactor barrel 221 rotates to Fig.19 In the state 1-3, the carbon slag can be directly discharged through the sieve holes on the discharge door 224 during the pyrolysis process. If a large amount of inorganic materials that cannot be pyrolyzed are accumulated in the reactor barrel 221, the reactor drive mechanism 223 drives the reactor barrel 221 to rotate clockwise. In the discharge state, the reactor barrel 221 rotates to Fig.19In the 2-3 state, the material that cannot be pyrolyzed is discharged from the carbon slag discharge port 2213. The beneficial effect is that the reactor barrel 221 needs to work at high temperature. If it is set as a closed discharge door, it is necessary to wait for the reactor barrel 221 to cool down before it can be opened manually when discharging is required. This not only greatly reduces the production efficiency, but also wastes heat energy. After restarting the pyrolysis reactor, it still needs to be reheated, and the heat energy loss is large. The discharge door 224 of the present invention can be used to discharge materials without stopping the machine, and the production efficiency is high. And after a large number of experiments, it has been proved that in the 1-1, 1-2, 1-4, 2-1, 2-2 and 2-4 states, the material will not fall out of the reactor barrel 221, which solves the problem of discharging non-homogeneous materials during pyrolysis in the reactor.
[0112] As a further solution of this embodiment, a pyrolysis gas guide barrel 225 is further included, wherein the pyrolysis gas guide barrel 225 is coaxially arranged with the reactor barrel body 221 and one end of the pyrolysis gas guide barrel 225 is fixedly connected and communicated with one end of the reactor barrel body 221, the other end of the pyrolysis gas guide barrel 225 has the feed inlet 2211, and the side wall of the pyrolysis gas guide barrel 225 has the pyrolysis gas outlet 2212. Specifically, the pyrolysis gas guide barrel 225 extends out of the insulation shell 21, and the reactor roller 228 located at one end of the reactor barrel body 221 is sleeved on the outside of the pyrolysis gas guide barrel 225.
[0113] As a further solution of this embodiment, the feeding mechanism 222 includes a feeding barrel 2221 and a pushing mechanism 2222. One end of the feeding barrel 2221 is open and extends into the feeding port 2211, and the pushing mechanism 2222 is fixedly arranged on the inner side of the other end. The pushing mechanism 2222 is used to push the material from the feeding barrel 2221 into the reactor barrel body 221. The middle side wall of the feeding barrel 2221 has a material input port 22211. Specifically, the feeding mechanism 222 is fixed, one end of the feeding barrel 2221 is rotatably connected to the feeding port 2211 through a bearing and sealed by a seal, and the pyrolysis gas guide barrel 225 rotates on the outside of the feeding barrel 2221 along with the reactor barrel body 221.
[0114] As a further solution of this embodiment, the pushing mechanism 2222 includes a hydraulic cylinder and a pushing plate. The hydraulic cylinder is fixedly arranged at the other end of the feed barrel 2221, and the output end of the hydraulic cylinder is fixedly connected to the pushing plate, and drives the pushing plate to push the material from the feed barrel 2221 into the reactor barrel body 221.
[0115] As a further solution of this embodiment, the feeding mechanism 222 further includes a feeding hopper 2223 , and the feeding hopper 2223 is fixedly connected to the feeding barrel 2221 and is correspondingly arranged above the material input port 22211 .
[0116] As a further solution of this embodiment, a leakage prevention net 226 is also included. The leakage prevention net 226 is detachably connected to the pyrolysis gas guide barrel 225 and is correspondingly arranged at the pyrolysis gas outlet 2212.
[0117] Specifically, the anti-leakage net 226 can be a metal net, which can discharge the pyrolysis gas and prevent the material from leaking out of the pyrolysis gas outlet 2212. If the anti-leakage net 226 is blocked by the material, the anti-leakage net 226 can be removed for cleaning. Specifically, the pyrolysis gas outlet 2212 is connected to the secondary combustion quenching heat exchange box 31 through a pipeline. Further, a pyrolysis gas exhaust fan is provided on the pipeline connected to the pyrolysis gas outlet 2212. The pyrolysis gas exhaust fan extracts the pyrolysis gas at the pyrolysis gas outlet 2212 and sends it to the secondary combustion quenching heat exchange box 31.
[0118] As a further solution of this embodiment, a plurality of material lifting plates 227 are further included, and the plurality of material lifting plates 227 are fixedly disposed on the inner side of the reactor barrel body 221 .
[0119] Specifically, Figure 15-17 As shown, a plurality of lifting plates 227 are evenly distributed in the circumferential direction of the reactor barrel 221 to form a lifting plate group, and a plurality of lifting plate groups are arranged side by side along the axis direction of the reactor barrel 221. In order not to affect the opening and closing of the discharge door 224, the lifting plates 227 are not arranged within the rotation range of the discharge door 224. Fig.16 As shown, the lifting plate 227 is plate-shaped, one end of the lifting plate 227 is fixedly connected to the inner wall of the reactor barrel 221, one end of the lifting plate 227 is arranged along the radial direction of the reactor barrel 221, and the other end forms an angle α with the radial direction of the reactor barrel 221, and the angle α is 0-90°. The bending direction of the other end of the lifting plate 227 is toward the rotation direction of the reactor barrel 221.
[0120] As a further solution of this embodiment, two support frames 26 are further included, and the two support frames 26 are respectively fixed to the two ends of the outside of the heat preservation shell 21, and each support frame 26 is rotatably connected to six support wheels 261, and two support wheels 261 form a group, and three groups of support wheels 261 are respectively abutted against the bottom of the two reaction kettle rollers 228 and the dryer roller 241. Figure 8 and Fig.13 As shown, Fig.13 The two support wheels 261 in the middle and upper part are respectively in contact with the two sides below the dryer roller ring 241. Fig.13 The two supporting wheels 261 at the lower left of the middle are respectively in contact with the two sides below the reactor roller ring 228 of one of the reactors 22. Fig.13The two supporting wheels 261 at the lower right center are respectively in contact with the two sides below the reactor roller 228 of another reactor 22. The supporting frame 26 and the supporting wheels 261 are used to support the reactor 22 and the dryer 24.
[0121] As a further solution of this embodiment, the insulation shell 21 includes a lower insulation plate assembly, a middle insulation plate assembly and an upper insulation plate assembly. The lower insulation plate assembly, the middle insulation plate assembly and the upper insulation plate assembly are detachably connected in sequence from bottom to top to form a horizontal hollow cylindrical structure with an open lower end. The lower insulation plate assembly is detachably connected to the upper end of the chain-discharge hot air furnace 23, the reactor 22 is installed between the lower insulation plate assembly and the middle insulation plate assembly, and the dryer 24 is installed between the middle insulation plate assembly and the upper insulation plate assembly.
[0122] As a further solution of this embodiment, the lower insulation panel assembly includes two lower end panels 211 and two lower side panels 212, and the two lower end panels 211 and the two lower side panels 212 are detachably connected end to end; the middle insulation panel assembly includes two middle end panels 213 and two middle side panels 214, and the two middle end panels 213 and the two middle side panels 214 are detachably connected end to end; the upper insulation panel assembly includes two upper end panels 215 and an arc-shaped top panel 216, and the two upper end panels 215 are detachably connected to the two ends of the arc-shaped top panel 216 respectively.
[0123] Specifically, the lower end plate 211, the middle end plate 213 and the upper end plate 215 are all flat insulation plates. Fig. 9 and Fig.10 As shown, the upper end of the lower end plate 211 has a first reactor half hole adapted to the reactor 22, and the lower end of the middle end plate 213 has a second reactor half hole adapted to the reactor 22. The first reactor half hole and the second reactor half hole form a reactor hole, and the end of the reactor 22 is rotatably disposed in the reactor hole. Specifically, the number of the first reactor half hole and the second reactor half hole corresponds to the number of the reactor 22. In this embodiment, the number of the first reactor half hole and the second reactor half hole are both two.
[0124] Specifically, the upper end of the middle end plate 213 has a first dryer half hole, the lower end of the upper end plate 215 has a second dryer half hole, the first dryer half hole and the second dryer half hole form a dryer hole, and the end of the dryer 24 is rotatably arranged in the dryer hole.
[0125] Specifically, the lower side plate 212, the middle side plate 214 and the arc-shaped top plate 216 are all arc-shaped insulation plates, and the arc diameters of the lower side plate 212, the middle side plate 214 and the arc-shaped top plate 216 are the same, and can be surrounded as follows: Fig. 9 The cylindrical shell shown.
[0126] Specifically, the edges of the lower end plate 211, the lower side plate 212, the middle end plate 213, the middle side plate 214, the upper end plate 215 and the arc-shaped top plate 216 all have connecting parts, two adjacent connecting parts are connected by bolts, and a sealing strip is sandwiched between two adjacent connecting parts.
[0127] As a further solution of this embodiment, it also includes a distributor 25. The dryer outlet and the feed inlet are correspondingly arranged at one end of the insulation shell 21. The distributor 25 is installed below the dryer outlet and above the feed inlet, and delivers the material discharged from the dryer outlet into the feed inlet of the reactor 22.
[0128] As a further solution of this embodiment, Figure 8 and Fig.14 As shown, the distributor 25 is a conveyor chain plate, and the conveyor chain plate rotates forward or reversely to respectively deliver the materials discharged from the dryer outlet to the feed ports of the two reaction kettles 22.
[0129] Specifically, when the distributor 25 is a conveyor chain plate, the conveyor chain plate is driven by a distributor motor and rotates forward for a period of time to feed the material into one of the reactors 22; when one of the reactors 22 is full, or after a period of feeding time, the distributor motor reverses and continuously feeds the material into the other reactor 22; the two reactors 22 are fed alternately.
[0130] Alternatively, the distributor 25 may be a Y-shaped pipe having a distributor inlet and two distributor outlets, wherein the distributor inlet is connected to the dryer outlet, and the two distributor outlets are respectively connected to the feed inlets 2211 of the two reactors 22. The reactor 22 may also be provided in plurality, and the Y-shaped pipe is provided with a plurality of distributor outlets, and the plurality of distributor outlets correspond to and are connected to the feed inlets 2211 of the plurality of reactors 22 in a one-to-one manner.
[0131] As a further solution of this embodiment, it also includes an insulation cover that is detachably connected to one end of the insulation shell 21, and the insulation cover and one end of the insulation shell 21 form a closed insulation cover chamber, and the dryer outlet, the feed inlet and the distributor 25 are all located in the insulation cover chamber.
[0132] As a further solution of this embodiment, the top wall of the chain-row hot air furnace 23 has a hot air outlet 231 connected to the interior of the insulation shell 21 .
[0133] As a further solution of this embodiment, the top wall of the chain-type hot air furnace 23 has a hot air furnace inlet correspondingly arranged below the carbon slag discharge port 2213, and the hot air furnace inlet is surrounded by a leak-proof protective plate 232. The upper end of the leak-proof protective plate 232 is adapted to the side wall of the reactor 22 and is rotatably abutted against the reactor 22.
[0134] Specifically, Fig.11 As shown, the chain hot blast furnace 23 includes a chain rack 233, a rectifying shell 234, a chain transmission motor 235 and a chain grate. The chain rack 233 is a shell with an open top, and the rectifying shell 234 is an arc-shaped shell protruding upward. The rectifying shell 234 is installed at the upper end of the chain rack 233 and closes the opening. The rectifying shell 234 has the hot air port 231 and the hot blast furnace inlet. The hot air port 231 is one, two or more, and the anti-leakage guard plate 232 is fixedly connected to the rectifying shell 234. The chain grate is installed in the chain rack 233, and the feeding end of the chain grate is correspondingly arranged below the hot blast furnace inlet. The bottom or side wall of the chain rack 233 has a hot blast furnace outlet corresponding to the discharge end of the chain grate, and the chain transmission motor 235 drives the chain grate to rotate. The side wall of the chain rack 233 is also equipped with a chain combustion-supporting fan 236 connected to the inside thereof. The chain hot air furnace 23 is also called a chain furnace, which is a type of layer-burning furnace and a mechanical combustion grate. Working principle: The chain grate is driven by the chain transmission motor to rotate, so that the carbon slag is ignited from the feeding end and burned out at the discharge end. Compared with the fixed grate, it can improve the combustion efficiency and is a better combustion equipment in the layer-burning furnace. The combusted gas enters the upper cavity through the hot air port 231 and heats and keeps the reactor 21 warm.
[0135] The installation process of the assembled pyrolysis gasification furnace is as follows: first install the chain-discharge hot air furnace 23, install the two lower end plates 211 and the lower side plates 212 on the chain-discharge hot air furnace 23, then install two reaction kettles 2, and then connect the two middle end plates 213 to the two lower end plates 211 respectively, and the two middle side plates 214 to the two lower side plates 212 respectively, then install the dryer 24, and finally connect the two upper end plates 215 to the two middle end plates 213 respectively, and the two ends of the arc-shaped top plate 216 are respectively connected to the two upper end plates 215, and the two sides of the arc-shaped top plate 216 are respectively connected to the middle side plates 214 on both sides.
[0136] The disassembly process of the assembled pyrolysis gasification furnace is opposite to the above-mentioned installation process, that is, first remove the upper end plate 215 and the curved top plate 216, then remove the dryer 24, then remove the middle end plate 213 and the middle side plate 214, then remove the reactor 22, then remove the lower end plate 211 and the lower side plate 212, and finally remove the chain-discharge hot air furnace 23.
[0137] As a further scheme of this embodiment, the secondary combustion rapid cooling heat exchange box 31 includes a secondary combustion chamber 312 and a heat exchanger 313 which are arranged in the secondary combustion heat exchange box body 311 and are interconnected. The secondary combustion heat exchange box body 311 is provided with a secondary combustion box inlet and a secondary combustion box outlet which are respectively connected to the secondary combustion chamber 312 and the heat exchanger 313. The interior of the secondary combustion chamber 312 is divided into a plurality of chambers which are connected in sequence by a partition 314; a flow channel is formed between the end of the partition 314 and the side wall of the secondary combustion chamber 312, or the partition 314 has a flow channel, and two adjacent chambers are connected through the flow channel; the flow channel is filled with heat storage ceramic porous bricks 315, and the heat storage ceramic porous bricks 315 have a plurality of flow holes, and two adjacent chambers are connected through the flow holes.
[0138] like Figure 24-25 As shown, specifically, the inlet of the secondary combustion chamber 312 is aligned with and directly connected to the inlet of the secondary combustion box of the secondary combustion heat exchange box 311, the outlet of the secondary combustion chamber 312 is directly connected to and connected to the heat source inlet of the heat exchanger 313, and the heat source outlet of the heat exchanger 313 is aligned with and directly connected to the outlet of the secondary combustion box of the secondary combustion heat exchange box 311. Further, two adjacent flow channels are staggered. Further, a plurality of flow channels are staggered up and down. Further, the side wall of the secondary combustion chamber 312 and the partition 314 are made of heat storage ceramic bricks. Further, there are four chambers. Further, the secondary combustion heat exchange box 311 is a container. Further, a burner is provided on the side wall of the secondary combustion chamber 312 near the inlet of the secondary combustion box.
[0139] The secondary combustion quenching heat exchange box 31 is made of a container, and is provided with a secondary combustion chamber 312 and a heat exchanger 313 inside. The secondary combustion chamber 312 is a rectangular box made of heat storage ceramic bricks, and has an inlet and an outlet of the secondary combustion chamber at both ends. The interior of the secondary combustion chamber 312 is divided into four chambers by three vertically arranged partitions 314, and the plurality of partitions 314 are parallel to the end wall where the inlet of the secondary combustion chamber is located. The adjacent two flow passages are staggered, that is, Fig.24As shown, if the first partition 314 is fixedly connected to the top wall of the secondary combustion chamber 312, then the second partition 314 is fixedly connected to the bottom wall of the secondary combustion chamber 312, the third partition 314 is fixedly connected to the top wall of the secondary combustion chamber 312, and so on. The arrangement of multiple partitions can also be: the first partition 314 is fixedly connected to the front inner wall of the secondary combustion chamber 312, the second partition 314 is fixedly connected to the rear inner wall of the secondary combustion chamber 312, the third partition 314 is fixedly connected to the front inner wall of the secondary combustion chamber 312, and so on. If the partition 314 is fixedly connected to the top wall, the flow passage is formed between the lower end of the partition 314 and the bottom wall. A heat storage ceramic porous brick 315 is installed in the flow channel. The heat storage ceramic porous brick 315 in the prior art has a plurality of honeycomb-shaped hexagonal through holes. When the heat storage ceramic porous brick 315 is installed, the through holes are arranged perpendicular to the partition 314. In this way, the heat storage ceramic porous brick 315 naturally forms a channel for gas to pass through.
[0140] The working process of the present invention is as follows: the feeding device 1 uses a container or a steel structure support as a support, and two vertical lifting slide rails 114 are arranged on the outside. An electronic floor scale 111 is arranged at the bottom of the lifting slide rail 114, and the electronic floor scale 111 is used for weighing and is electrically connected to the controller. The lifting frame 12 is slidably connected to the lifting slide rail 114 through the lifting frame guide wheel. A hopper 14 is arranged on the lifting frame 12. Non-homogeneous organic solid waste materials are added to the hopper 14 by a forklift, a grab bucket, etc., and the weighed hopper 14 is lifted by the lifting hydraulic cylinder 131 or the winding machine along the lifting slide rail 114 to the outside of the feed port 1101 of the box body 11, and is positioned by the positioning hydraulic cylinder 110, so that the hopper slide rail 116 of the lifting frame 12 and the second slide rail of the box body 11 are accurately positioned. The hopper 14 is provided with a movable hopper bottom plate 142. The hopper body 141 with wheels drives the hopper bottom plate 142 to move horizontally by one end under the action of the horizontal hydraulic cylinder. The hopper body 141 enters above the storage hopper 16 in the box 11. The hopper bottom plate 142 is restricted by the box 11 and stops moving, remaining outside the box 11. The bottom of the hopper body 141 opens, and the material falls into the storage hopper 16. A crusher or shredder 17 is provided below the storage hopper 16, and a pressing mechanism 19 is provided on the side wall of the storage hopper 16. Under the triple action of pulling force, gravity and pressure, the material in the storage hopper 16 is crushed, falls into the feeder 18 below, and is pushed out of the feeding port 1102 to enter the dryer 24.
[0141] The material enters the dryer 24 from the dryer inlet, is dried in the dryer 24 and discharged from the dryer outlet. The material passes through the distributor 25 and enters the two reactors 22 respectively. The material is pyrolyzed in the reactor 22, and the pyrolysis gas is discharged from the pyrolysis gas outlet 2212. When the reactor 22 is discharged, the carbon slag enters the chain exhaust hot air furnace 23 from the carbon slag discharge port 2213 for further combustion and heat supply to the reactor 22 and the dryer 24, making full use of energy. No external fuel needs to be added after the reaction starts. The burned carbon slag is discharged from the chain exhaust hot air furnace 23. The pyrolysis gas discharged from the pyrolysis gas outlet 2212 and the insulation shell pyrolysis gas outlet are connected to the secondary combustion quenching heat exchange box 31 through a pipeline, and passes through the secondary combustion quenching heat exchange box 31, the dust removal, desulfurization and denitrification box 32, the wet electrostatic precipitator and mist removal box 33, the activated carbon adsorption box 34 and the exhaust fan 35 in sequence for flue gas treatment, and then discharged to the chimney 4.
[0142] The use process of the flue gas spray water comprehensive treatment box 5 of the present invention is as follows: the oily hot water generated in the dust removal, desulfurization and denitrification box 32 and the wet electrostatic precipitator and demisting box 33 enters the treatment box body from the oily hot water inlet 51, the oily hot water is separated into water and oil in the oil-water separation device 52, the separated tar enters the tar tank 58 along the pipeline, the separated waste hot water enters the waste hot water tank 53, the waste hot water in the waste hot water tank 53 is pumped into the filter press device 54 through the waste hot water pump 511, the filter press device 54 separates the waste hot water into sludge and clear hot water, wherein the sludge needs to be cleaned regularly or discharged to an external sludge collection device, the clear hot water enters the plate heat exchanger 56 to cool down and become clear cold water, the clear cold water enters the clear cold water tank 57, the alkali liquid tank 510 regularly adds alkali liquid into the clear cold water tank 57, and the clear cold water is pumped into the spray pipe of the dust removal, desulfurization and denitrification box 32 and the wet electrostatic precipitator and demisting box 33 through the clear cold water pump 513.
[0143] In the description of the present invention, it should be noted that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In the description of the present invention, "multiple" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0144] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0145] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0146] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A large garbage disposal machine, characterized in that: The invention comprises a feeding device (1), an assembled pyrolysis gasification furnace (2), an exhaust gas treatment device (3) and a chimney (4) which are connected in sequence, wherein the exhaust gas treatment device (3) comprises a two-fuel quenching heat exchange box (31), a dust removal, desulfurization and denitrification box (32) and a wet electric precipitator and demisting box (33) which are connected in sequence, wherein the two-fuel box inlet of the two-fuel quenching heat exchange box (31) is connected to the pyrolysis gas outlet (2212) of the assembled pyrolysis gasification furnace (2), and the outlet of the wet electric precipitator and demisting box (33) is connected to the chimney (4); The assembled pyrolysis gasification furnace (2) comprises an insulation shell (21), a reaction kettle (22), a chain-discharge hot air furnace (23) and a dryer (24); the reaction kettle (22) is rotatably installed in the insulation shell (21); one end of the reaction kettle (22) extends out of the insulation shell (21) and has a feed inlet (2211); the side wall of the reaction kettle (22) has a carbon slag discharge port (2213) connected to the chain-discharge hot air furnace (23); the insulation shell (21) is detachably connected to the upper end of the chain-discharge hot air furnace (23); the insulation shell (21) is composed of a plurality of insulation plates that are detachably connected; the dryer (24) 4) rotatably mounted in the insulation shell (21) and located above the reactor (22), both ends of the dryer (24) extend out of the insulation shell (21), one end of the dryer (24) has a dryer inlet connected to the feeding device (1), and the other end has a dryer outlet, the dryer outlet is connected to the feed inlet (2211); one end of the reactor (22) has the pyrolysis gas outlet (2212), the top wall of the insulation shell (21) also has an insulation shell pyrolysis gas outlet, the pyrolysis gas outlet (2212) and the insulation shell pyrolysis gas outlet are both connected to the inlet of the secondary combustion quenching heat exchange box (31); The chain-type hot blast furnace (23) comprises a chain-type frame (233), a rectifying shell (234), a chain-type transmission motor (235) and a chain grate, wherein the chain-type frame (233) is a shell with an open top, the rectifying shell (234) is an arc-shaped shell protruding upward, the rectifying shell (234) is mounted on the upper end of the chain-type frame (233) and closes the opening, the rectifying shell (234) is provided with a hot blast outlet (231) and a hot blast furnace inlet, and the hot blast outlet (231) is communicated with the interior of the heat-insulating shell (21); The hot blast furnace inlet is correspondingly arranged below the carbon slag discharge port (2213), and a leak-proof guard plate (232) is provided around the hot blast furnace inlet, and the upper end of the leak-proof guard plate (232) is adapted to the side wall of the reaction kettle (22) and is rotatably abutted against the reaction kettle (22), and the leak-proof guard plate (232) is fixedly connected to the rectifier shell (234); The chain grate is installed in the chain grate frame (233), the feeding end of the chain grate is arranged correspondingly below the hot blast furnace inlet, the bottom or side wall of the chain grate frame (233) has a hot blast furnace outlet corresponding to the discharging end of the chain grate, and the chain grate transmission motor (235) drives the chain grate to rotate.
2. A large garbage disposal machine according to claim 1, characterized in that: The exhaust gas treatment equipment (3) also includes a flue gas spray water comprehensive treatment box (5), the wastewater outlets of the dust removal, desulfurization and denitrification box (32) and the wet electrostatic precipitator and demisting box (33) are both connected to the oily hot water inlet (51) of the flue gas spray water comprehensive treatment box (5), and the spray water outlet of the flue gas spray water comprehensive treatment box (5) is respectively connected to the dust removal, desulfurization and denitrification box (32) and the spray pipe in the wet electrostatic precipitator and demisting box (33).
3. A large garbage disposal machine according to claim 2, characterized in that: The exhaust gas treatment equipment (3) further comprises an activated carbon adsorption box (34) and a smoke exhaust fan (35); the outlet of the wet electrostatic precipitator and mist removal box (33), the activated carbon adsorption box (34), the smoke exhaust fan (35) and the chimney (4) are sequentially connected.
4. A large garbage disposal machine according to claim 3, characterized in that: There are at least two tail gas treatment devices (3), the secondary fuel box inlets of at least two secondary fuel quenching heat exchange boxes (31) are connected to the pyrolysis gas outlet of the assembled pyrolysis gasification furnace (2), and at least two exhaust fans (35) are connected to the chimney (4).
5. A large garbage disposal machine according to claim 2, characterized in that: The flue gas spray water comprehensive treatment box (5) comprises a treatment box body and an oil-water separation device (52), a waste hot water tank (53), a filter press device (54), a clean hot water tank (55), a heat exchange device and a cool water tank (57) arranged in the treatment box body; the side wall of the treatment box body has the oil-water separation device (52) inlet (51), the oil-water separation device (52) inlet (51) is connected to the oil-water separation device (52), the waste hot water outlet of the oil-water separation device (52) is connected to the inlet of the filter press device (54) through the waste hot water tank (53), the outlet of the filter press device (54) is connected to the heat medium inlet of the heat exchange device through the cool water tank (55), and the heat medium outlet of the heat exchange device is connected to the spray water outlet of the treatment box body through the cool water tank (57).
6. A large garbage disposal machine according to claim 5, characterized in that: The flue gas spray water comprehensive treatment box (5) also includes a tar tank (58) and an alkali liquid tank (510), wherein the tar tank (58) is connected to the tar outlet of the oil-water separation device (52); and the outlet of the alkali liquid tank (510) is connected to the cool water tank (57).
7. A large garbage disposal machine according to claim 1, characterized in that: There are two reaction kettles (22), which are arranged side by side. The feed inlets (2211) of the two reaction kettles (22) are both connected to the dryer outlet, and the carbon slag discharge ports (2213) of the two reaction kettles (22) are both connected to the chain-discharge hot air furnace (23).
8. A large garbage disposal machine according to claim 7, characterized in that: The assembled pyrolysis gasification furnace (2) also includes a distributor (25), the dryer outlet and the feed inlet are correspondingly arranged at one end of the insulation shell (21), the distributor (25) is installed below the dryer outlet and above the feed inlet (2211), and feeds the material discharged from the dryer outlet into the feed inlet (2211) of the reactor (22).
9. A large garbage disposal machine according to any one of claims 1 to 8, characterized in that: The secondary combustion quenching heat exchange box (31) comprises a secondary combustion chamber (312) and a heat exchanger (313) which are arranged in a secondary combustion heat exchange box body (311) and are interconnected. The secondary combustion heat exchange box body (311) is provided with a secondary combustion box inlet and a secondary combustion box outlet which are respectively connected to the secondary combustion chamber (312) and the heat exchanger (313). The interior of the secondary combustion chamber (312) is divided into a plurality of chambers which are connected in sequence by a partition (314); a flow passage is formed between the end of the partition (314) and the side wall of the secondary combustion chamber (312), or the partition (314) has a flow passage, and two adjacent chambers are connected through the flow passage; the flow passage is filled with heat storage ceramic porous bricks (315), and the heat storage ceramic porous bricks (315) have a plurality of flow holes, and two adjacent chambers are connected through the flow holes.
Citation Information
Patent Citations
A non-homogeneous organic solid waste feeding device
CN110342275B
A rotary reactor for pyrolysis of coal or garbage organic waste
CN104140827A
Near-zero emission treatment process and complete equipment for waste tire thermal cracking waste gas pollution
CN109022015A
Sled dress formula integrates flue gas desulfurization and dust removal device
CN205832963U
Waste gas catalytic combustion device
CN208832485U