A large-span composite structure underground station and construction method thereof

Through the design of a large-span composite structure underground station, the combined structure of multiple cables and telescopic connecting rods is used to solve the problem of the impact of intermediate structural columns in the construction of rectangular frame structures, and the construction safety and convenience of transportation are improved, and the construction safety is simplified. The construction process is saved and costs are saved.

CN111074941BActive Publication Date: 2024-11-08CRRC CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911412368.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-31
Publication Date
2024-11-08
Estimated Expiration
2039-12-31

AI Technical Summary

Technical Problem

During the construction process of the existing rectangular frame structure underground station, there are intermediate structural columns that affect operations and passage, and the construction is complex and difficult to control quality. Especially during the reverse construction, the process is complicated and the support is instable.

Method used

A large-span composite structure underground station is adopted, including the top floor, side wall and bottom floor. The top floor consists of a top board, a first cable, a second cable and a connecting rod. The connecting rod is retractable and the roof panel is reduced through multi-channel cables and support structures. The tension and deflection of the roof and bottom plates can realize the safe construction of the roof and bottom plates, and there are no intermediate structural columns in the station, simplifying pedestrian traffic.

Benefits of technology

The construction speed is improved, the time and cost of intermediate structure columns are reduced, construction safety and convenience of transportation are ensured, progress is accelerated through multi-working surface construction, and the stressed structure is adjusted through telescopic connecting rods to adapt to different construction needs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111074941B_ABST
    Figure CN111074941B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of rail transit or underground stations, and specifically to a large-span composite structure underground station, in which a row of fixed points extending along the driving direction of the station are arranged on both side areas of the middle of the top plate, a fixed point on the lower side surface of the top plate is fixed to one end of a first cable, and the other end of the first cable is fixed to a fixed point corresponding to the one fixed point, a connecting rod is arranged between the lower side surface of the top plate and the first cable, one end of the connecting rod is fixed to the lower side surface of the top plate, and the other end of the connecting rod is fixed to the cable; the fixed point on the side surface of the top plate is fixedly connected to one end of a second cable, and the other end of the second cable is fixedly connected to an extended section, the first cable reduces the tension and deflection of the lower surface of the center of the top plate, and the second cable reduces the tensile stress of the upper surface near the end of the top plate, thereby ensuring the safe construction of processes such as excavation and pouring of the bottom plate below the top plate, accelerating the construction speed, not hindering the passage of pedestrians, and saving time and cost for constructing intermediate structural columns.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rail transit or underground stations, and in particular to a large-span composite structure underground station and a construction method thereof. Background Art

[0002] Existing underground stations generally use concealed arch tunnels or open-cut rectangular frame structures. For the open-cut rectangular structure construction method, the station span is small and there are many structural columns in the middle of the station. On the one hand, it affects the construction work and there is a problem of construction collision and damage to the middle structural columns. On the other hand, it will also affect the use of the station after construction is completed. In particular, the middle structural columns will affect pedestrians and the layout of the pedestrian passage in the station, which may cause pedestrians to detour.

[0003] In addition, its construction is also very troublesome. Specifically, when the forward construction method is used, on the one hand, when the foundation pit is excavated, supports need to be laid, which is difficult to lay, requires many procedures, and takes a long time. Instability of supports is a major safety risk during construction. On the other hand, there are many structural columns in the construction, which have complex construction procedures. When the reverse construction method is used, it is also necessary to construct structural columns from the ground, and the construction procedures are complicated, and the construction quality is difficult to be effectively controlled. Summary of the invention

[0004] The purpose of the present invention is to provide a large-span composite structure underground station and its construction method in order to solve the problem that the construction of underground stations in the form of rectangular frame structures requires intermediate structural columns, which causes construction troubles and makes it difficult to ensure the construction quality, and causes problems for pedestrians after the station is built.

[0005] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0006] A large-span composite structure underground station comprises a top floor, side walls and a bottom floor, wherein the top floor, the bottom floor and the two side walls are arranged in a "mouth" shape.

[0007] The top layer includes a top plate, a first cable, a second cable and a connecting rod, and both side areas of the middle part of the top plate are arranged with a row of fixing points extending along the running direction of the station, and each row of fixing points corresponds to each other, and the fixing points are arranged on the upper side and the lower side of the top plate, the fixing point of the lower side of the top plate is fixed to one end of the first cable, and the other end of the first cable is fixed to the corresponding fixing point, and every two fixing points on the lower side of the top plate correspond to one of the first cables, so that a plurality of cables are arranged in the running direction of the station, and a connecting rod is arranged between the lower side of the top plate and the first cable, one end of the connecting rod is fixed to the lower side of the top plate, and the other end of the connecting rod is fixed to the first cable; the top of the side wall is extended out of the top plate to form an extended section, and the fixing point on the side of the top plate is fixedly connected to one end of the second cable, and the other end of the second cable is fixedly connected to the extended section;

[0008] A connecting rod is also provided between the upper side of the top plate and the cable on the top plate;

[0009] The connecting rod is arranged in a telescopic manner.

[0010] Preferably, a row of cable holes are arranged at intervals on both sides of the middle part of the top plate along the driving direction, and the cable holes penetrate the top plate. The cable holes are arranged obliquely, and each cable hole in a row corresponds to the cable holes in another row one by one. A steel cable passes through a cable hole from top to bottom on the top plate and is placed under the top plate. The steel cable then passes through the cable hole corresponding to the cable hole from bottom to top and is placed on the top plate. The top of the side wall extends out of the top plate to form an extended section, and both ends of the steel cable are respectively fixed on the extended sections of the two side walls. Fillers are arranged in the cable holes to fix the steel cable to the top plate, so that the steel cable under the top plate forms the first cable, and the two sections of the steel cable above the top plate form the two second cables.

[0011] Preferably, a connecting rod is also provided between the upper side of the top plate and the cable located above the top plate.

[0012] Preferably, the connecting rod is V-shaped, the two free ends of the connecting rod are fixedly arranged on the top plate, and the pointed end of the connecting rod is fixedly arranged on the cable.

[0013] Preferably, a connecting rod is arranged in the middle of the top plate and the middle of the cable, and a connecting rod is arranged between the 1 / 4 portion of the top plate and the cable.

[0014] Preferably, a straight threaded sleeve is provided at the connection between the side wall and the top plate, so as to connect the top plate to the side wall through steel bars.

[0015] Preferably, the distance between the cable hole and the nearest side wall is between 0.2L and 0.3L, where L is the span of the station.

[0016] Preferably, the connecting rod is arranged in a telescopic manner.

[0017] The present application discloses a construction method of a large-span composite structure underground station, wherein the large-span composite structure underground station is the large-span composite structure underground station described above, and comprises the following steps:

[0018] S1, excavating a trench for placing the side wall, and forming the side wall by cast-in-place or prefabricated assembly method;

[0019] S2, excavating the soil layer on the top of the station to the height of the top plate, and excavating holes for placing the connecting rods;

[0020] S3, compacting the soil layer, laying the formwork of the top plate, tying the steel bars, the connecting rods are arranged on the steel bars and the parts of the connecting rods used for connecting the cables are exposed;

[0021] S4, after pouring the top plate concrete, curing, after the concrete reaches the required level to form the top plate, excavate the soil below the top plate to a height of 1.5 to 2.5 meters from the lower side of the top plate, pass the cable through the cable hole of the top plate, match it with the connecting rod at the bottom of the top plate and pass it through another cable hole, respectively set the two ends of the cable on the extension sections of the two side walls, tighten and anchor them;

[0022] S5. Continue to excavate the soil below the top plate until the height of the bottom plate, apply a cushion layer, lay a brick membrane, tie steel bars and pour concrete to form the bottom plate.

[0023] The present application also discloses a method for constructing a large-span composite structure underground station, wherein the large-span composite structure underground station is a large-span composite structure underground station in which the connecting rod can be retracted, the construction steps are the same as the above-mentioned construction steps, and in the step S4, the size of the connecting rod is adjusted so that the distance between the cable and the top plate reaches the preset requirement; and after step S5, other buildings required for the station are constructed.

[0024] Compared with the prior art, the present invention has the following beneficial effects: multiple connecting rod supports and multiple cables are provided at the bottom of the structural top plate of a conventional underground station, thereby forming a new type of force-bearing structure of top plate + multiple supports + multiple cables. The first cable can reduce the tension and deflection of the lower surface of the center of the top plate, and the second cable can reduce the tensile stress of the upper surface near the end of the top plate. The top plate + multiple supports + multiple cables force-bearing structure formed by the cooperation of the first cable and the second cable can ensure the safe construction of processes such as excavation and pouring of the bottom plate below the top plate. Because it is a large span, generally in this field, a span greater than 25 meters is considered a large span. Due to the large span, multi-operation surface construction can be achieved, thereby speeding up the construction speed. In addition, since there is no intermediate structural column under the top plate after completion, it will not hinder the passage of pedestrians, and there is no need to set up intermediate structural columns, thereby saving time and cost for constructing intermediate structural columns. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 This is a schematic diagram of the structure of the large-span composite structure underground station in this application;

[0026] Figure 2 for Figure 1 A partial enlarged view of middle C;

[0027] Figure 3 This is a cross-sectional schematic diagram of the large-span composite structure underground station of this application;

[0028] Figure 4 for Figure 3 A partial enlarged view of the middle A;

[0029] Figure 5 This is a schematic diagram of the structure of the connecting rod of this application;

[0030] Markings in the figure: 1. Top plate; 3. Side wall; 31. Extended end of side wall; 32. Connection between side wall and top plate; 33. Connection between side wall and bottom plate; 34. Foundation of side wall; 4. Bottom plate; 5. Cable; 6. Connecting rod under the top plate; 7. Anchoring end of anchor cable; 8. Cable hole; 9. Connecting rod above the top plate, 61. Free end of connecting rod, 62. Pointed end of connecting rod, 63. Screw, 64. Grommet, 65. Through hole, 81. Filler. DETAILED DESCRIPTION

[0031] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0032] like Figure 1-4 As shown, a large-span composite structure underground station includes a top floor, side walls and a bottom floor. The top floor, the bottom floor and two side walls are arranged in a "mouth" shape.

[0033] The top layer includes a top plate, a first cable, a second cable and a connecting rod. A row of fixing points extending along the station's driving direction are arranged on both side areas of the middle part of the top plate, and each row of fixing points corresponds to each other. The fixing points are arranged on the upper and lower sides of the top plate. The fixing points on the lower side of the top plate are fixed to one end of the first cable, and the other end of the first cable is fixed to the corresponding fixing points. Every two fixing points on the lower side of the top plate correspond to one of the first cables, so that a plurality of cables are arranged in the station's driving direction. A connecting rod is arranged between the lower side of the top plate and the first cable, one end of the connecting rod is fixed to the lower side of the top plate, and the other end of the connecting rod is fixed to the cable; the top of the side wall extends out of the top plate to form an extended section, and the fixing points on the upper side of the top plate are fixedly connected to one end of the second cable, and the other end of the second cable is fixedly connected to the extended section.

[0034] Through the above scheme, multiple connecting rod supports and multiple cables are set at the bottom of the structural top plate of the conventional underground station, thereby forming a new type of force-bearing structure of top plate + multiple supports + multiple cables. The first cable can reduce the tension and deflection of the lower surface of the center of the top plate, and the second cable can reduce the tensile stress of the upper surface near the end of the top plate. The top plate + multiple supports + multiple cables force-bearing structure formed by the cooperation of the first cable and the second cable can ensure the safe construction of processes such as excavation and pouring of the bottom plate below the top plate. Because it is a large span, generally, a span greater than 25 meters in this field is considered a large span. Due to the large span, multi-operation surface construction can be achieved, thereby speeding up the construction speed. In addition, since there is no intermediate structural column under the top plate after completion, it will not hinder the passage of pedestrians, and there is no need to set up intermediate structural columns, thereby saving time and cost for constructing intermediate structural columns.

[0035] A row of cable holes are arranged at intervals on both sides of the middle part of the top plate along the driving direction, and the cable holes penetrate the top plate. The cable holes are arranged obliquely, and each cable hole in a row corresponds to the cable holes in another row one by one. A steel cable passes through a cable hole from top to bottom on the top plate and is placed under the top plate. The steel cable then passes through the cable hole corresponding to the cable hole from bottom to top and is placed on the top plate. The top of the side wall extends out of the top plate to form an extended section, and the two ends of the steel cable are respectively fixed on the extended sections of the two side walls. Fillers are arranged in the cable holes to fix the steel cable to the top plate, so that the steel cable under the top plate forms the first cable, and the two sections of the steel cable above the top plate form two second cables. The cable holes form fixed points, thereby, the overall force is better.

[0036] In addition, the connecting rod of the present application is V-shaped, and the two free ends of the connecting rod are fixedly set on the top plate. The pointed end of the connecting rod cooperates with the cable. Specifically, the pointed end of the connecting rod is provided with a through hole allowing the cable to pass through. As long as the cable is tensioned, the connecting rod can play a supporting role. Preferably, the connecting rod can be in the shape of a support rod, or other shapes, as long as it can support the cable. More preferably, the connecting rod is arranged in a telescopic manner. There are many schemes for telescopic rods. As long as they can be telescopic, the present application will not go into details about the telescopic method of the connecting rod. Arranging the connecting rod in a telescopic manner can adjust the tension of the cable. Most importantly, it can change the stress of the entire top layer, especially the stress of the top plate, and has better adaptability. See Figure 5 The connecting rod is V-shaped, and in particular, the two free ends of the connecting rod cooperate to form an isosceles trapezoidal structure, or the entire connecting rod is arranged in the form of an equilateral triangle, thereby better stress-bearing. For the telescopic method, a grommet is arranged at the sharp end of the connecting tube, and the grommet and the sharp end of the connecting rod are matched in the form of a hexahedron to allow the grommet to be able to telescope relative to the connecting rod but not to rotate. At the same time, the connecting rod and the grommet are connected by screws, and the screws, the grommet and the connecting rod are all threaded, so that the height of the grommet can be adjusted by turning the screw.

[0037] In order to better bear the gravity, in the span direction of the station, that is, Figure 1 In the left and right directions, Figure 3 In the up and down directions, connecting rods are arranged between the middle of the top plate and the middle of the cable, and between the 1 / 4 part of the top plate and the cable. Of course, connecting rods can also be arranged between the upper side of the top plate and the cable at the upper part of the top plate to withstand the tension brought by the compression of the top plate.

[0038] Preferably, the distance between the cable hole and the nearest side wall is between 0.2L and 0.3L, where L is the span of the station. Preferably, the cable hole is set at 0.25L from the nearest side wall. Generally, there is an inflection point after the top plate is compressed, which is generally at 0.25L, but it moves slightly according to the slight change of material or force. Setting it at this position can make the entire top layer bear better force. A straight threaded sleeve is set at the connection between the side wall and the top plate to connect the top plate to the side wall through steel bars.

[0039] A construction method for the above-mentioned large-span composite structure underground station comprises the following steps:

[0040] S1. Dig a trench for placing the side wall, and form the side wall by cast-in-place or prefabricated assembly method;

[0041] S2, excavate the soil layer on the top of the station to the height of the top plate, and excavate holes for placing connecting rods;

[0042] S3, compact the soil layer, lay the formwork of the top plate, tie the steel bars, arrange the connecting rods on the steel bars and expose the part of the connecting rods used to connect the cables. Specifically, the top of the bottom support of the slab is tied to the steel bars and the bottom is exposed to the bottom surface of the top plate; the support on the top plate is tied to the steel bars and the top is exposed to the top surface of the top plate; and the cable holes for passing the cables are arranged at the inflection points of the slab;

[0043] S4. After pouring the top plate concrete, curing is performed. After the concrete reaches the required height to form the top plate, the soil below the top plate is excavated to a height of 1.5 to 2.5 meters from the lower side of the top plate. The size of the connecting rod is adjusted so that the distance between the cable and the top plate after the cable is set meets the preset requirements. Then, the cable is passed through the cable hole of the top plate, matched with the connecting rod at the bottom of the top plate and passed through another cable hole. The two ends of the cable are respectively set on the extension sections of the two side walls, and anchored after being tightened.

[0044] S5. Continue to excavate the soil below the top plate until the bottom plate height is reached, construct a cushion layer, lay brick membrane, tie steel bars and pour concrete to form the bottom plate, and adjust the size of the connecting rod so that the distance between the cable and the top plate meets the preset requirements.

Claims

1. A large-span composite structure underground station, comprising a top floor, side walls and a bottom floor, wherein the top floor, the bottom floor and the two side walls are arranged in a "mouth" shape, characterized in that: The top layer includes a top plate, a first cable, a second cable and a connecting rod. A row of fixing points extending along the running direction of the station are arranged on both side areas of the middle part of the top plate, and each row of fixing points corresponds to each other. The fixing points are arranged on the upper side and the lower side of the top plate. The fixing point on the lower side of the top plate is fixed to one end of the first cable, and the other end of the first cable is fixed to the corresponding fixing point. Every two fixing points on the lower side of the top plate correspond to one of the first cables, so that a plurality of cables are arranged in the running direction of the station. A connecting rod is arranged between the lower side of the top plate and the first cable, and one end of the connecting rod is fixed to the lower side of the top plate, and the other end of the connecting rod is fixed to the first cable. The top of the side wall extends out of the top plate to form an extended section, a fixed point on the side of the top plate is fixedly connected to one end of the second cable, and the other end of the second cable is fixedly connected to the extended section; A connecting rod is also provided between the upper side of the top plate and the cable on the top plate; The connecting rod is arranged in a telescopic manner; A row of cable holes are arranged at intervals along the driving direction on both sides of the middle part of the top plate, the cable holes penetrate the top plate, the cable holes are arranged obliquely, each cable hole in a row of cable holes corresponds to the cable holes in another row one by one, a steel cable passes through a cable hole from top to bottom from the top plate and is placed under the top plate, the steel cable then passes through the cable hole corresponding to the cable hole from bottom to top and is placed on the top plate, the top of the side wall extends out of the top plate to form an extended section, the two ends of the steel cable are respectively fixedly arranged on the extended sections of the two side walls, fillers are arranged in the cable holes to fix the steel cable to the top plate, so that the steel cable under the top plate forms the first cable, and the two sections of the steel cable on the top plate form the two second cables; The connecting rod is V-shaped, the two free ends of the connecting rod are fixedly arranged on the top plate, and the pointed end of the connecting rod is fixedly arranged on the cable; A connecting rod is arranged between the middle part of the top plate and the middle part of the cable, and a connecting rod is arranged between the 1 / 4 part of the top plate and the cable.

2. The large-span composite structure underground station according to claim 1, characterized in that: A straight threaded sleeve is provided at the connection between the side wall and the top plate, so as to connect the top plate with the side wall through steel bars.

3. The large-span composite structure underground station according to claim 2, characterized in that: The distance between the cable hole and the nearest side wall is between 0.2L and 0.3L, where L is the span of the station.

4. A method for constructing a large-span composite structure underground station, characterized in that: The large-span composite structure underground station is the large-span composite structure underground station according to any one of claims 1 to 3, comprising the following steps: S1, excavating a trench for placing the side wall, and forming the side wall by cast-in-place or prefabricated assembly method; S2, excavating the soil layer on the top of the station to the height of the top plate, and excavating holes for placing the connecting rods; S3, compacting the soil layer, laying the formwork of the top plate, tying the steel bars, arranging the connecting rod on the steel bars and exposing the part of the connecting rod used for connecting the cable; S4, after pouring the top plate concrete, curing, after the concrete reaches the required level to form the top plate, excavate the soil below the top plate to a height of 1.5 to 2.5 meters from the lower side of the top plate, pass the cable through the cable hole of the top plate, match it with the connecting rod at the bottom of the top plate and pass it through another cable hole, respectively set the two ends of the cable on the extension sections of the two side walls, tighten and anchor them; S5. Continue to excavate the soil below the top plate until the height of the bottom plate, apply a cushion layer, lay a brick membrane, tie steel bars and pour concrete to form the bottom plate.