A reinforcement device and method for shear wall corners

By designing the conversion components and casing structure, a T-shaped pulling screw connection is formed, which solves the problem of reinforcement of the corners of the shear wall, and achieves an efficient and safe reinforcement effect, avoiding the increased workload and safety hazards of welding.

CN113293988BActive Publication Date: 2024-12-06CHINA MCC5 GROUP CORP LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202110659594.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-15
Publication Date
2024-12-06
Estimated Expiration
2041-06-15

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively reinforce the corners of the shear wall, resulting in quality problems such as mold expansion, slurry leakage, and unstable yin and yang angles after the wall column is poured, which poses safety hazards. Common treatment plans have disadvantages. If welding is required, it may not be effective. Reinforce thicker walls.

Method used

Design a reinforcement device including conversion components, connect the pulling screw through blind holes and channels to form a T-shaped structure, and use a sleeve to pass through the conversion components to achieve reinforcement of the corners of the shear wall, avoid welding and extending the pulling screw, and simplify Installation process.

Benefits of technology

It realizes effective reinforcement of the corners of the shear wall, ensures the quality of the casting forming of the structure, reduces the cost of post-grinding and repair, improves construction efficiency and safety, and is suitable for thicker corners of the shear wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113293988B_ABST
    Figure CN113293988B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of building construction technology, and aims to solve the problem in the prior art that the corner part of a structural wall cannot be effectively reinforced due to the corner wall being too thick and the shear wall being too long, which may lead to quality problems such as mold expansion, slurry leakage, and uneven corners after the wall column is poured in the later stage, and there are safety hazards. A reinforcement device and method for the corner part of a shear wall are provided, wherein a reinforcement device for the corner part of a shear wall comprises a conversion component, a blind hole is provided on the conversion component, one end of a tension screw is installed in the blind hole, and the other end extends out of the shear wall formwork; a channel is provided inside the conversion component, the channel passes through the conversion component, the axis of the blind hole and the axis of the channel are perpendicular to each other, a sleeve is provided in the channel, both ends of the sleeve respectively extend out of the shear wall formworks on both sides, and a tension screw is provided in the sleeve; the conversion component can be prefabricated in batches in a factory, is easy to install on site, has a good molding effect after pouring, and reduces the cost of later grinding and repair.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to a reinforcement device and method for a shear wall corner. Background Art

[0002] With the booming construction industry, the height of buildings is also increasing. The core tube structure is the main shear component of the building. As the height of the structure increases, the wall thickness is also increasing. However, since the tie screws in the wall column formwork are conventional standardized components, the corners of the structural wall that exceed the length of the tie screws cannot be effectively reinforced. The consequences may lead to quality problems such as mold expansion, slurry leakage, and irregular corners after the wall column is poured. If there are major problems with the reinforcement, there is even a risk of safety accidents. Based on this situation, the construction unit has also made several commonly used technical treatment solutions:

[0003] 1. For the shorter corners of the structural shear wall, the corner ends are reinforced by lengthening the tension screws.

[0004] Disadvantages: a. This process is mainly used for shorter shear walls. If the shear wall is too long, the tension screws will not be easy to penetrate and pull; b. It increases the welding workload and has high requirements for welding quality, otherwise the weld will be cracked or broken during the reinforcement process.

[0005] 2. At the corner, the end of the main purlin is reinforced by locking it to the main purlin on the other side with tension screws (adding a fixing device to the steel pipe).

[0006] Disadvantages: Since it is necessary to increase the stress points from the lateral main purlin, in order to prevent slipping, the stress points added in the vertical direction will be arranged after the first tension screw. If the shear wall is thicker, the length of the tension screw will be increased first (most processes use welding). Secondly, after reinforcement in this way, the shear wall is still stressed at both ends of the corner. If the wall is thicker, there will be a greater risk of mold expansion in the middle of the corner wall.

[0007] 3. Use inclined support to reinforce the bottom of the primary structure shear wall, use the anchor ring reserved on the floor slab as the stress point, and reinforce the side wall's reinforcement support system to the anchor ring.

[0008] Disadvantages: It has a better reinforcement effect on the lower part of the wall, but cannot effectively reinforce the higher part of the wall.

[0009] In summary, the corner part of the structural wall cannot be reinforced by penetrating tension screws because the corner wall is too thick and the shear wall is too long. As a result, the corner of the structural wall cannot be effectively reinforced. In the later stage, it may cause quality problems such as mold expansion, slurry leakage, and uneven corners after the wall column is poured, which poses a safety hazard. In addition, some commonly used treatment solutions still have various disadvantages. The external formwork reinforcement method cannot effectively reinforce thicker walls and may cause excessive lateral displacement of the wall. Summary of the invention

[0010] The present invention aims to provide a reinforcement device and method for the corner parts of shear walls, so as to solve the problem that the corner parts of the structural walls cannot be effectively reinforced due to the corner walls being too thick and the shear walls being too long, which may lead to quality problems such as mold expansion, slurry leakage, and irregular corners after the wall columns are poured in the later stage, posing a safety hazard.

[0011] The embodiment of the present invention is achieved as follows:

[0012] A reinforcing device for a shear wall corner, comprising a conversion component, wherein a blind hole is provided on the conversion component, one end of a tension screw is installed in the blind hole, and the other end extends out of the shear wall formwork;

[0013] A channel is provided inside the conversion component, and the channel runs through the conversion component. The axis of the blind hole is perpendicular to the axis of the channel. A sleeve is provided in the channel, and both ends of the sleeve extend out of the shear wall formworks on both sides respectively. A tension screw is provided in the sleeve.

[0014] When in use, first install one end of the tension screw in the blind hole of the conversion component. After the tension screw and the conversion component are installed in place, insert the casing and insert the tension screw in the casing. Therefore, the two tension screws will form a T-shaped structure. The two are connected by the conversion component. The conversion component is just located inside the corner of the shear wall, so that the corner can be effectively reinforced. There is no need to weld and extend the tension screw, which ensures the quality of the one-time structure casting, reliable structure, no safety hazards, and reduces the cost of later grinding and repair. In addition, the conversion component can be prefabricated in batches in the factory, and the on-site installation is simple and quick, which is convenient for workers to implement, and the molding effect is good after the casting is completed.

[0015] The reinforcement device for the corner part of the shear wall described in the present invention has a more significant effect on the corner part of the thicker shear wall, effectively reinforces the corner part, reduces costs, and is easy to implement.

[0016] In one embodiment:

[0017] The conversion component can be made of a polymer material with good tensile strength.

[0018] Ensure good reinforcement effect.

[0019] In one embodiment:

[0020] The cross sections of the blind hole and the channel are both circular.

[0021] It is convenient to install the tension screw and casing.

[0022] In one embodiment:

[0023] The inner wall of the blind hole is provided with threads, and the tension screw is connected to the blind hole threads.

[0024] It is convenient to screw the tension screw into the blind hole, and the tension screw is reliably connected to the conversion component.

[0025] In one embodiment:

[0026] A plurality of main keels are arranged on the outside of the shear wall formwork, and the main keels are arranged horizontally.

[0027] Used to support the shape, fix the structure, and bear the load brought by the wall.

[0028] In one embodiment:

[0029] A plurality of wooden beams are arranged between the main keel and the shear wall formwork.

[0030] In one embodiment:

[0031] The tension screw rods extend out of the main keel outside the shear wall formwork and are fixed by fasteners.

[0032] Ensure good reinforcement effect.

[0033] In one embodiment:

[0034] The main keel is a steel pipe.

[0035] In one embodiment:

[0036] The sleeve is a PVC sleeve.

[0037] Easy to obtain and economical.

[0038] A reinforcement method for a shear wall corner portion, using the reinforcement device for a shear wall corner portion to reinforce the shear wall corner portion, comprising the following steps:

[0039] S1: Fix one end of the tension screw into the blind hole of the conversion component;

[0040] S2: Tie up the primary structural shear wall reinforcement;

[0041] S3: Install the primary structural shear wall formwork;

[0042] S4: Place the tension screws in S1 into the corner wall reinforcement part;

[0043] S5: inserting a sleeve through the channel of the conversion component and inserting a tension screw into the sleeve;

[0044] S6: Correct the verticality and flatness of the formwork system, and then reinforce it.

[0045] By arranging a tension screw with a conversion component at the corner, passing a sleeve in the conversion component, and passing the tension screw in the sleeve, the two tension screws form a T-shaped structure, which can give full play to the role of the tension screws and effectively reinforce the corner. This ensures the quality of one-time structure casting, a reliable structure, no safety hazards, and reduces the cost of later grinding and repair. In addition, the tension screw in the sleeve can be taken out and reused, which is economical.

[0046] The construction steps are simple, easy to operate, and the construction efficiency is high. The completed wall is stable and of high quality.

[0047] In one embodiment:

[0048] In S4, when there are multiple conversion components, the tension screws connected thereto are arranged at intervals and / or crosswise.

[0049] Forming multiple T-shaped structures is more conducive to improving the reinforcement effect of corner parts.

[0050] In one embodiment:

[0051] The reinforcement step in S6 includes installing the main keel on the outside of the shear wall formwork with wooden planks.

[0052] Used to support the formwork on the outside to resist the load of pouring concrete.

[0053] In summary, due to the adoption of the above technical solution, the beneficial effects of the reinforcement device for the corner of the shear wall according to the present invention are:

[0054] When in use, first install one end of the tension screw in the blind hole of the conversion component, and after the tension screw and the conversion component are installed in place, insert the casing, and insert the tension screw in the casing, so that the two tension screws will form a T-shaped structure, and the two are connected by the conversion component. The conversion component is just located inside the corner of the shear wall, so that the corner can be effectively reinforced, and there is no need to weld and extend the tension screw, which ensures the quality of the one-time structure casting, reliable structure, no safety hazards, and reduces the cost of later grinding and repair. In addition, the on-site installation is simple and quick, which is convenient for workers to implement, and the molding effect is good after the casting is completed.

[0055] The beneficial effects of the reinforcement method for the corner portion of the shear wall described in the present invention are:

[0056] By arranging a tension screw with a conversion component at the corner, passing a sleeve in the conversion component, and passing the tension screw in the sleeve, the two tension screws form a T-shaped structure, which can give full play to the role of the tension screws and effectively reinforce the corner. This ensures the quality of one-time structure casting, a reliable structure, no safety hazards, and reduces the cost of later grinding and repair. In addition, the tension screw in the sleeve can be taken out and reused, which is economical.

[0057] The construction steps are simple, easy to operate, and the construction efficiency is high. The completed wall is stable and of high quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings mentioned in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0059] Figure 1 This is a schematic diagram of the reinforcement device for the corner portion of a shear wall according to the present invention being used for an L-shaped corner wall.

[0060] Figure 2 This is a schematic diagram of the reinforcement device for the corner portion of a shear wall according to the present invention being used for a T-shaped corner wall.

[0061] Figure 3 It is a top view of the conversion component described in the present invention.

[0062] Figure 4 It is a front view of the conversion component described in the present invention.

[0063] Figure 5 It is a side view of the conversion component described in the present invention.

[0064] Figure 6 It is a cross-sectional view of the conversion component described in the present invention.

[0065] Icons: 1-conversion component; 11-blind hole; 12-channel; 13-thread; 2-tension screw; 3-casing; 4-main keel; 5-wood; 6-fastener; 7-shear wall formwork; 8-primary structure. DETAILED DESCRIPTION

[0066] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0067] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0069] Example

[0070] See also Figure 1-Figure 6 This embodiment provides a reinforcement device for a shear wall corner, comprising a conversion component 1, wherein the conversion component 1 is provided with a blind hole 11, one end of a tension screw 2 is installed in the blind hole 11, and the other end extends out of the shear wall formwork 7;

[0071] A channel 12 is provided inside the conversion component 1, and the channel 12 passes through the conversion component 1. The axis of the blind hole 11 is perpendicular to the axis of the channel 12. A sleeve 3 is provided in the channel 12, and a tension screw 2 is provided in the sleeve 3. Both ends of the tension screw 2 extend out of the shear wall formwork 7 on both sides respectively.

[0072] Among them, the cross-sections of the blind hole 11 and the channel 12 are both circular, which is convenient for installing the tension screw 2 and the sleeve 3, and the inner wall of the blind hole 11 is provided with a thread 13. The tension screw 2 is threadedly connected to the blind hole 11 to ensure that the tension screw 2 and the conversion component 1 are reliably connected.

[0073] In this embodiment, the sleeve 3 is a PVC sleeve, which is easy to obtain and economical.

[0074] A plurality of main purlins 4 are provided on the outside of the shear wall formwork 7. The main purlins 4 are arranged horizontally and have multiple layers. The main purlins 4 at the same height are fixedly connected at the corners. The main purlins 4 support the shear wall formwork 7 at the side to withstand the load brought by the wall after pouring concrete.

[0075] A plurality of longitudinal secondary purlins may also be provided as required to support the shear wall formwork 7 to form a stable support and reinforcement system.

[0076] A plurality of wooden beams 5 are arranged between the main keel 4 and the shear wall formwork 7. The wooden beams 5 are long strips and arranged longitudinally, which are equivalent to the role of the secondary keel. The wooden beams 5 are more economical.

[0077] The tension screw rod 2 extends out of the main keel 4 outside the shear wall formwork 7 and is fixed by a fastener 6. It is used to effectively reinforce the corner part and give full play to the role of the tension screw rod 2.

[0078] In this embodiment, the main keel 4 is a steel pipe, which has high strength and good supporting effect.

[0079] A reinforcement method for a shear wall corner portion, using the reinforcement device for a shear wall corner portion to reinforce the shear wall corner portion, comprising the following steps:

[0080] S1: Fix one end of the tension screw 2 into the blind hole 11 of the conversion component 1;

[0081] S2: Tie up the steel bars of the shear wall of the primary structure 8;

[0082] S3: Install the primary structure 8 shear wall formwork 7;

[0083] S4: placing the tension screws 2 in S1 into the corner wall reinforcement part, and when there are multiple conversion components 1, arranging the tension screws 2 connected thereto at intervals and / or crosswise to form multiple T-shaped structures at the corner part;

[0084] S5: inserting the sleeve 3 through the channel 12 of the conversion component 1 and inserting the tension screw 2 into the sleeve 3;

[0085] S6: Correct the verticality and flatness of the formwork system, and then reinforce it, and install the main keel 4 on the wooden square 5 outside the shear wall formwork 7.

[0086] The reinforcement device for the shear wall corner provided in this embodiment has a simple structure. The conversion component 1 can be prefabricated and assembled with the tension screws 2 on site. The tension screws 2 are arranged according to the designed intervals to fully reinforce the shear wall corner, ensure the casting quality of the one-time structure 8, and reduce the cost of later grinding and repair.

[0087] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A reinforcement method for a shear wall corner, characterized in that: The shear wall corner portion is reinforced using a reinforcement device for the shear wall corner portion, the reinforcement device for the shear wall corner portion comprising a conversion component (1), the conversion component (1) being provided with a blind hole (11), one end of a tension screw (2) being installed in the blind hole (11), and the other end extending out of the shear wall formwork (7); A channel (12) is provided inside the conversion component (1), the channel (12) passes through the conversion component (1), the axis of the blind hole (11) and the axis of the channel (12) are perpendicular to each other, a sleeve (3) is provided inside the channel (12), two ends of the sleeve (3) respectively extend out of the shear wall formworks (7) on both sides, and a tension screw (2) is provided inside the sleeve (3); A thread (13) is provided on the inner wall of the blind hole (11), and the tension screw (2) is threadedly connected to the blind hole (11); A plurality of main keels (4) are arranged on the outside of the shear wall formwork (7), and the main keels (4) are arranged horizontally; A plurality of wooden beams (5) are provided between the main keel (4) and the shear wall formwork (7); The tension screw rod (2) extends out of the main keel (4) outside the shear wall formwork (7) and is fixed by a fastener (6); The main keel (4) is a steel pipe; the casing (3) is a PVC casing; The reinforcement method includes the following steps: S1: Fixing one end of the tension screw (2) in the blind hole (11) of the conversion component (1); S2: Tie up the steel bars of the primary structural shear wall; S3: Install the primary structural shear wall formwork (7); S4: insert the tension screw (2) in S1 into the corner wall reinforcement part; S5: inserting a sleeve (3) through the channel (12) of the conversion component (1), and inserting the tension screw (2) into the sleeve (3); S6: Correct the verticality and flatness of the formwork system, and then reinforce it; In S4, when there are multiple conversion components (1), the tension screws (2) connected thereto are arranged at intervals and / or crosswise.

2. The reinforcement method for the corner of a shear wall according to claim 1, characterized in that: The reinforcement step in S6 includes installing the main keel (4) on the outer wooden spacers (5) of the shear wall formwork (7).

Citation Information

Patent Citations

  • Shear wall template is to drawing connecting piece and template reinforced structure thereof

    CN206233579U

  • Shear force wall corner template consolidates system

    CN207526099U

  • Reinforcing device for corner part of shear wall

    CN217268826U

  • FORMWORK OVERLAPPING DEVICE

    FR2913999A1

  • Coupling beam of coupled shear wall to increase strength of the anchorage

    KR101808058B1