A method for online setting configuration of the second stage of ground distance protection on the access side of distributed direct-drive wind power

Through the online calculation and judgment of the ground distance protection section II method, the adaptability problem of distance protection configuration after the distributed direct drive wind power is solved, and the full-length protection of 110kV lines and reliable fault handling of adjacent lines is achieved.

CN114123133BActive Publication Date: 2024-11-22SHENZHEN POWER SUPPLY BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111429852.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-29
Publication Date
2024-11-22
Estimated Expiration
2041-11-29

AI Technical Summary

Technical Problem

After the distributed direct drive wind power is connected to the power grid, the traditional distance protection configuration has adaptability problems, making it difficult to effectively protect the 110kV line. Especially in the case of failure, it is necessary to consider the fault characteristics of the distributed direct drive wind power and the coordination of adjacent line protection.

Method used

Provide a distributed direct drive wind power access side ground distance protection section II online tuning and configuration method, obtain the measured voltage and current after a fault occurs, calculate the measured impedance and output current, and conduct online calculation and judgment of the ground distance protection section II. The action delay is 0.3s to avoid misoperation.

Benefits of technology

It provides a setting basis and protection criterion for the 110kV line, so that the ground distance protection section II can be protected for full-length, increase the protection range of adjacent lines, ensure reliable operation of faults in the area, and avoid misoperation outside the area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114123133B_ABST
    Figure CN114123133B_ABST
Patent Text Reader

Abstract

The present invention discloses an online setting configuration method for ground distance protection section II on the access side of distributed direct-driven wind power, comprising: step S1, after a fault occurs, the protection start element is started, and the relay protection device at the distributed direct-driven wind power obtains the measured voltage and measured current at the protection installation location; step S2, the fault phase selection element determines whether the fault is a single-phase ground fault, and if so, the measured impedance is calculated according to the measured voltage and the measured current, and the output current of the distributed direct-driven wind power after the fault is calculated; step S3, according to the output current of the distributed direct-driven wind power, the ground distance protection section II constant is calculated online; step S4, according to the online calculation of the measured impedance and the ground distance protection section II constant, it is determined whether the ground distance protection section II is in action. The present invention provides a setting basis and protection criterion for the distance protection section II on the access side of the distributed direct-driven wind power of 110kV line, so that the ground distance protection section II on this side can protect the entire length of the line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of electric power systems, and in particular relates to an online setting configuration method for stage II ground distance protection at the access side of distributed direct-drive wind power. Background Art

[0002] In traditional power grids, distributed direct-drive wind power is generally not considered, and distance protection is not configured on the load side of the line. However, after distributed direct-drive wind power is connected to the power grid system, the system is no longer radial, and its current and power flow direction are no longer fixed. Distance protection needs to be configured on the distributed direct-drive wind power side of the line. Since distributed direct-drive wind power generally adopts a fault control strategy that suppresses negative sequence current, in the case of symmetrical and asymmetrical grid faults, distributed direct-drive wind power only outputs positive sequence current, without negative sequence current or zero sequence current. This fault characteristic is different from the fault characteristic of conventional AC synchronous motors, and the distance protection configuration based on the fault characteristics of conventional AC synchronous motors has adaptability problems. Therefore, for the analysis of distance protection on the distributed direct-drive wind power transmission line, the fault characteristics of distributed direct-drive wind power should be considered. In addition, the coordination of distance protection stage II and adjacent line protection should also be considered, and a new ground distance protection stage II setting scheme should be proposed accordingly. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an online setting configuration method for the ground distance protection stage II on the access side of distributed direct-driven wind power, so as to provide a setting basis and protection criterion for the distance protection stage II on the access side of distributed direct-driven wind power of 110kV line.

[0004] In order to solve the above technical problems, the present invention provides a method for online setting configuration of stage II ground distance protection on the access side of distributed direct-drive wind power, comprising:

[0005] Step S1, after a fault occurs, the protection start element is started, and the relay protection device at the distributed direct-drive wind power station obtains the measured voltage and measured current at the protection installation location;

[0006] Step S2, the fault phase selection element determines whether the fault is a single-phase grounding fault. If so, the measurement impedance is calculated according to the measured voltage and the measured current, and the output current of the distributed direct-drive wind power after the fault is calculated;

[0007] Step S3, performing online calculation of the ground distance protection stage II constant according to the output current of the distributed direct-drive wind power;

[0008] Step S4, judging whether the ground distance protection stage II is in operation based on the online calculation of the measured impedance and the set value of the ground distance protection stage II.

[0009] Furthermore, in step S2, according to the measured voltage and measure current Calculate the measured impedance Z m :

[0010]

[0011] in, and is the phase voltage and phase current of the fault phase, is the zero sequence current, k AB It is the zero-sequence compensation coefficient of tie line AB.

[0012] Furthermore, the calculation of the output current of the distributed direct-drive wind power after the fault specifically includes:

[0013] According to the measured voltage and measure current Calculate the voltage drop k at the protection installation location UT :

[0014] Calculate the output reactive current i of the direct-drive wind turbine q ;

[0015] Calculate the output active current i of the direct-drive wind turbine d ;

[0016] Calculate the output current I of distributed direct-drive wind power dg .

[0017] Furthermore, the voltage drop degree k at the protection installation is calculated UT The method is: in, is the phase voltage and phase current during normal operation, Z T is the 110kV transformer impedance.

[0018] Furthermore, the direct-drive wind turbine output reactive current i is calculated q The method is:

[0019] U T To protect the voltage at the installation location.

[0020] Furthermore, the direct-drive wind turbine output active current i is calculated d The method is: It is the maximum output current of distributed direct-drive wind power after a fault.

[0021] Furthermore, the online calculation of the ground distance protection II stage constant value in step S3 specifically includes:

[0022] Calculate the zero-sequence compensation coefficient k of tie line AB AB =(Z AB(0) -Z AB(1)) / (3Z AB(1) );

[0023] Calculate the zero-sequence compensation coefficient k of the downstream line BC BC =(Z BC(0) -Z BC(1) ) / (3Z BC(1) );

[0024] Calculate the positive sequence branch coefficient

[0025] Calculate the zero-sequence branch coefficient k b(0) =(Z S(0) +Z AB(0) +Z T ) / Z S(0) ;

[0026] Calculate the setting impedance of the ground distance protection stage II

[0027]

[0028] in, is the reliability coefficient, The setting impedance of the BC ground distance protection section I of the downstream line, E S is the equivalent power supply potential on the grid side, Z S(1) is the positive sequence equivalent impedance Z under the minimum operation mode of the power grid side S(1) , Z S(0) is the zero-sequence equivalent impedance under the minimum operation mode of the power grid side, Z AB(1) is the positive sequence impedance of tie line AB, Z AB(0) is the zero-sequence impedance of tie line AB, Z BC(1) is the positive sequence impedance of the downstream line BC, Z BC(0) is the zero-sequence impedance of the downstream line BC.

[0029] Furthermore, the step S4 specifically includes:

[0030] On the impedance plane, set the impedance When measuring impedance Z m When it falls outside the circle, the ground distance protection stage II does not operate; if the measured impedance Z m When it falls within the circle, it will be delayed by the ground distance protection stage II. After that, the ground distance protection stage II is activated and a trip command is issued to the circuit breaker.

[0031] Furthermore, the ground distance protection II stage delay It is 0.3s.

[0032] The implementation of the present invention has the following beneficial effects: the present invention provides a setting basis and protection criteria for the distance protection section II on the access side of the distributed direct-driven wind power of the 110kV line, so that the ground distance protection section II on this side can protect the entire length of the line, and has a larger protection range on adjacent lines, and can reliably operate in the event of a fault within the zone, and will not exceed false operation in the event of a fault outside the zone. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 This is a typical structural diagram of a distributed direct-drive wind power system.

[0035] Figure 2 It is a flow chart of an online setting configuration method of stage II ground distance protection on the access side of a distributed direct-drive wind power plant according to an embodiment of the present invention.

[0036] Figure 3 It is a specific flow chart of a method for online setting configuration of stage II ground distance protection on the access side of a distributed direct-drive wind power plant according to an embodiment of the present invention. DETAILED DESCRIPTION

[0037] The following descriptions of the embodiments refer to the accompanying drawings to illustrate specific embodiments in which the present invention may be implemented.

[0038] like Figure 1 As shown in the figure, a typical distributed direct-drive wind power system mainly includes grid-side equivalent power source (1), grid-side equivalent impedance (2), distributed direct-drive wind power (3), distributed direct-drive wind power local load (4), 110kV transformer (5), 110kV tie line AB (6), relay protection device (7), and downstream line BC (8). Distributed direct-drive wind power is connected to tie line AB through a 110kV transformer. The 110kV transformer adopts the YNd11 wiring method. After a fault, the distributed direct-drive wind power adopts a negative sequence current suppression control strategy.

[0039] The system parameters are as follows: The equivalent power supply potential E on the grid side S , positive sequence and zero sequence equivalent impedance Z under the minimum operation mode of the power grid side S(1) , Z S(0) , 110kV transformer impedance Z T , positive sequence and zero sequence impedance Z of tie line AB AB(1) , Z AB(0), the downstream line BC positive sequence and zero sequence impedance Z BC(1) , Z BC(0) , the maximum output current after the distributed direct-drive wind power fault is I dgmax .

[0040] The relay protection device (7) on the tie line is equipped with a ground distance protection section II, and its ground distance protection section II cooperates with the ground distance protection section I of the downstream line BC and does not exceed the protection range of the ground distance protection section I of the downstream line.

[0041] Please refer to Figure 2 As shown, an embodiment of the present invention provides a method for online setting configuration of stage II ground distance protection at the access side of distributed direct-drive wind power, including:

[0042] Step S1, after a fault occurs, the protection start element is started, and the relay protection device at the distributed direct-drive wind power station obtains the measured voltage and measured current at the protection installation location;

[0043] Step S2, the fault phase selection element determines whether the fault is a single-phase grounding fault. If so, the measurement impedance is calculated according to the measured voltage and the measured current, and the output current of the distributed direct-drive wind power after the fault is calculated;

[0044] Step S3, performing online calculation of the ground distance protection stage II constant according to the output current of the distributed direct-drive wind power;

[0045] Step S4, judging whether the ground distance protection stage II is in operation based on the online calculation of the measured impedance and the set value of the ground distance protection stage II.

[0046] Specifically, please combine Figure 3 As shown in the figure, after a fault occurs, the protection start element starts first. The relay protection device at the distributed direct-drive wind power station obtains the measured voltage at the protection installation location and measure current Then, the fault phase selection element determines whether the fault is a single-phase grounding fault. If not, it should be another fault type; if so, the fault phase selection element determines whether the fault is a single-phase grounding fault. If not, it should be another fault type. and measure current Calculate the measured impedance Z m :

[0047]

[0048] in, and is the phase voltage and phase current of the fault phase, is the zero sequence current.

[0049] After determining that the fault type is a single-phase grounding fault, further calculating the output current of the distributed direct-drive wind power after the fault mainly includes the following steps.

[0050] First calculate the voltage drop at the protection installation location:

[0051] By measuring the voltage and measure current The voltage drop degree k at the protection installation location can be obtained UT :

[0052] in It is the phase voltage and phase current during normal operation;

[0053] Calculate the output reactive current i of the direct-drive wind turbine q :

[0054]

[0055] Calculate the output active current of direct-drive wind turbine

[0056] Calculate the output current of distributed direct-drive wind power And standardize.

[0057] After completing the calculation of the output current of distributed direct-drive wind power, the next step is to perform online calculation of the set value of the ground distance protection stage II, which mainly includes the following steps:

[0058] Calculate the zero-sequence compensation coefficient k of tie line AB AB =(Z AB(0) -Z AB(1) ) / (3Z AB(1) );

[0059] Calculate the zero-sequence compensation coefficient k of the downstream line BC BC =(Z BC(0) -Z BC(1) ) / (3Z BC(1) )

[0060] Calculate the positive sequence branch coefficient

[0061] Calculate the zero-sequence branch coefficient k b(0) =(Z S(0) +Z AB(0) +Z T ) / Z S(0)

[0062] According to the above data, calculate the setting impedance of the ground distance protection stage II Calculated by the following formula:

[0063]

[0064] in, is the reliability coefficient; The impedance is set for the BC ground distance protection section I of the downstream line. When the protection length of the BC ground distance protection section I of the downstream line is 80%,

[0065] After completing the online calculation of the measured impedance and the set value of the ground distance protection stage II, the impedance is set on the impedance plane. When measuring impedance Z m When it falls outside the circle, the ground distance protection stage II does not operate; if the measured impedance Z m When it falls within the circle, it will be delayed by the ground distance protection stage II. After that, the ground distance protection stage II is activated and a trip command is issued to the circuit breaker. It can be taken as 0.3s.

[0066] From the above description, it can be seen that the beneficial effects brought by the present invention are: the present invention provides a setting basis and protection criteria for the distance protection section II on the access side of the distributed direct-drive wind power of the 110kV line, so that the ground distance protection section II on this side can protect the entire length of the line, and has a larger protection range on the adjacent lines, and can reliably operate in the event of faults within the area, and faults outside the area will not exceed false operation.

[0067] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope of the present invention.

Claims

1. A method for online setting configuration of the second stage of ground distance protection on the access side of distributed direct-drive wind power. It is characterized in that include: Step S1, after a fault occurs, the protection start element is started, and the relay protection device at the distributed direct-drive wind power station obtains the measured voltage and measured current at the protection installation location; Step S2, the fault phase selection element determines whether the fault is a single-phase grounding fault. If so, the measurement impedance is calculated according to the measured voltage and the measured current, and the output current of the distributed direct-drive wind power after the fault is calculated; Step S3, performing online calculation of the ground distance protection stage II constant according to the output current of the distributed direct-drive wind power; Step S4, judging whether the ground distance protection stage II is actuated according to the online calculation of the measured impedance and the set value of the ground distance protection stage II; In step S2, according to the measured voltage and measure current Calculate the measured impedance Z m : in, and is the phase voltage and phase current of the fault phase, is the zero sequence current, k AB is the zero-sequence compensation coefficient of tie line AB; The calculation of the output current of distributed direct-drive wind power after a fault specifically includes: According to the measured voltage and measure current Calculate the voltage drop k at the protection installation location UT : Calculate the reactive current i of distributed direct-drive wind power output q ; Calculate the active current i of distributed direct-drive wind power output d ; Calculate the output current I of distributed direct-drive wind power dg ; Calculate the voltage drop k at the protection installation location UT The method is: in, is the phase voltage and phase current during normal operation, Z T is the 110kV transformer impedance; Calculate the reactive current i of distributed direct-drive wind power output q The method is: U T To protect the voltage at the installation location; Calculate the active current i of distributed direct-drive wind power output d The method is: I dgmax It is the maximum output current after the distributed direct-drive wind power fails; Calculate the output current I of distributed direct-drive wind power dg The method is: And standardize.

2. The method according to claim 1, It is characterized in that The step S3 of performing online calculation of the set value of the ground distance protection II stage specifically includes: Calculate the zero-sequence compensation coefficient k of tie line AB AB =(Z AB(0) -Z AB(1) ) / (3Z AB(1) ); Calculate the zero-sequence compensation coefficient k of the downstream line BC BC =(Z BC(0) -Z BC(1) ) / (3Z BC(1) ); Calculate the positive sequence branch coefficient Calculate the zero-sequence branch coefficient k b(0) =(Z S(0) +Z AB(0) +Z T ) / Z S(0) ; Calculate the setting impedance of the ground distance protection stage II in, is the reliability coefficient, The setting impedance of the BC ground distance protection section I of the downstream line, E S is the equivalent power supply potential on the grid side, Z S(1) is the positive sequence equivalent impedance under the minimum operation mode of the grid side, Z S(0) is the zero-sequence equivalent impedance under the minimum operation mode of the power grid side, Z AB(1) is the positive sequence impedance of tie line AB, Z AB(0) is the zero-sequence impedance of tie line AB, Z BC(1) is the positive sequence impedance of the downstream line BC, Z BC(0) is the zero-sequence impedance of the downstream line BC.

3. The method according to claim 2, It is characterized in that The step S4 specifically includes: On the impedance plane, set the impedance When the impedance Z is measured, m When it falls outside the circle, the ground distance protection stage II does not operate; if the measured impedance Z m When it falls within the circle, it will be delayed by the ground distance protection stage II. After that, the ground distance protection stage II is activated and a trip command is issued to the circuit breaker.

4. The method according to claim 3, It is characterized in that Ground distance protection stage II delay is 0.3s.