Construction device and method for controlling restrained cracks in large-volume pier concrete
By using reserved holes, prestressed ribs and tension jacks in the concrete construction of large-volume pier, the constraint crack problem caused by the out-synchronization of concrete shrinkage during the pouring process is solved, and the synchronous shrinkage and strength matching of concrete are achieved, improving the Concrete quality.
Patent Information
- Application Number
- CN202111621010.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-28
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2041-12-28
AI Technical Summary
In dock project, due to the large thickness and pile bearing capacity of large pier concrete, the concrete poured in primary cast shrinks during the maturation process, while the concrete poured in secondary cast has not yet reached the design strength and cannot shrink simultaneously, which is easy to generate constraints. Cracks affect the quality of concrete.
Design a construction device, including reserved holes, prestressed ribs, force-transmitting steel beams and tensioning jacks, install force-transmitting steel beams and tensioning by presetting reserved holes and buried prestressed ribs in the first pouring pier. When pulling the jack, the first pouring pier is compressed by using the tensile jack to keep it close to the shrinkage of the second pouring pier, and ensure that the two concrete shrinks simultaneously.
The synchronous shrinkage of the two poured concrete was achieved, reducing or even avoiding the occurrence of constraint cracks, improving the quality of the concrete, and ensuring that the concrete of the second poured pier can resist the constraint cracking force when the strength is reached.
Smart Images

Figure CN114319362B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a construction device for restraining cracks in concrete, and more particularly to a construction device and method for controlling restrained cracks in large-volume pier concrete. Background Art
[0002] There are many large-volume piers in wharf projects. Due to their large thickness and considering the bearing capacity of the clamped piles, large-volume piers are generally cast in layers. The thickness of the first-cast pier concrete is generally controlled at 500-600mm, and the thickness of the second-cast pier concrete is the remaining pier height. The time interval between the first and second castings of the pier is generally about 10 days. When the second-cast pier concrete is cast, the concrete strength of the first-cast pier basically reaches the design strength, and the curing and shrinkage of the concrete is basically completed. At this time, the second-cast pier concrete will continue to shrink during the curing process after casting. However, the shrinkage of the first-cast pier concrete is basically completed in the early stage, and the concrete of the two casts cannot shrink synchronously. The first-cast pier concrete will limit the shrinkage of the second-cast pier concrete. At this time, the strength of the second-cast pier concrete is low, and it cannot resist the restrained cracking force. If no measures are taken, the second-cast pier concrete will produce restrained cracks, affecting the quality of the concrete. By actively compressing the once-cast pier concrete, the concrete of the once-cast pier and the concrete of the second-cast pier can shrink synchronously, greatly reducing the constraint of the once-cast pier concrete on the second-cast pier concrete, and reducing or even completely avoiding the constraint cracks of the once-cast pier concrete on the second-cast pier concrete. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a construction device and method for controlling restrained cracks in large-volume pier concrete, which can avoid restrained cracks in secondary pier concrete and improve the quality of pier concrete.
[0004] The technical solution adopted by the present invention to solve its technical problems is: constructing a construction device for controlling the restrained cracks of large-volume pier concrete, including a pile, a pile clamp is arranged on the upper part of the pile, a supporting steel beam is arranged on the upper part of the pile clamp, a distribution beam is arranged on the upper part of the supporting steel beam, a pier bottom form is laid on the upper part of the distribution beam, a first casting pier is arranged on the upper part of the pier bottom form, a second casting pier is arranged on the upper part of the first casting pier, a pier compression module is arranged in the first casting pier, the pier compression module includes prestressed tendons, a force-transmitting steel beam and a tensioning jack, a reserved hole is preset in the first casting pier, the prestressed tendons are arranged in the reserved hole, the force-transmitting steel beam is arranged on the side of the first casting pier, the tensioning jack passes through the end of the prestressed tendons and is fixed on the side of the force-transmitting steel beam, and the tensioning jack is connected to an oil pump.
[0005] According to the above solution, the reserved hole is located at a position half the height of the first casting pier.
[0006] According to the above scheme, wooden squares are provided in the gap between the force-transmitting steel beam of the double I-beam and the pier bottom formwork.
[0007] According to the above scheme, the prestressed tendons are made of precision-rolled threaded steel bars or steel wire ropes.
[0008] According to the above solution, adjacent prestressed tendons are connected and fixed by joint nuts.
[0009] According to the above scheme, the center of the tensioning jack is aligned with the center of the prestressed tendon, a wooden square is provided in the gap between the lower side of the tensioning jack and the pier bottom formwork, and the tensioning jack is fixed to the side of the force-transmitting steel beam by a pad and a nut.
[0010] The present invention also provides a construction method for controlling restrained cracks in large-volume pier concrete, comprising the following steps:
[0011] S1. Construct the first pouring pier concrete, use PVC pipe to reserve holes for prestressed tendons in the concrete, and remove the side formwork after the concrete strength of the first pouring pier is greater than 5MPa;
[0012] S2, installing the force transmission steel beam, passing the prestressed tendons through the reserved holes of the first casting pier, and the length of the exposed ends of the prestressed tendons on both sides is greater than the sum of the lengths of the tensioning jack and the anchoring section;
[0013] S3. When the prestressed tendons are made of finely rolled threaded steel, they are fixed by pads and nuts; when steel wire ropes are used, they are fixed by sleeve anchors;
[0014] S4. Connect the lines and pipelines, calculate the aging shrinkage rate of the second pouring pier and the deformation of the concrete squeeze and compression, and determine the pressure value applied daily;
[0015] S5, construct the second pouring pier concrete;
[0016] S6. After the second pouring pier is finally set, as the second pouring pier continues to mature and shrink, the tensioning jack is started to compress the concrete of the first pouring pier, and the number of compressions per day is not less than 2 times, so that the compression amount of the concrete of the first pouring pier is kept close to the shrinkage amount of the concrete of the second pouring pier;
[0017] S7. After seven days of compression, when the concrete strength of the second poured pier is sufficient to resist the restraining tension, the tension can be gradually relaxed and the related equipment can be dismantled.
[0018] The construction device and method for controlling the restrained cracks of large-volume pier concrete of the present invention have the following beneficial effects:
[0019] The construction device and method for controlling restrained cracks in large-volume pier concrete of the present invention can realize synchronous shrinkage of concrete poured twice, the concrete of the first poured pier cannot limit the shrinkage of the concrete of the second poured pier, will not affect the strength of the concrete of the second poured pier, can resist the restrained cracking force, and in the case of no measures taken, the concrete of the second poured pier will not produce restrained cracks, will not affect the quality of the concrete, and can make the concrete of the first poured pier and the concrete of the second poured pier shrink synchronously, greatly reducing the constraint of the concrete of the first poured pier on the concrete of the second poured pier, reducing or even completely avoiding the restrained cracks of the concrete of the first poured pier on the concrete of the second poured pier. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:
[0021] Figure 1 It is a structural schematic diagram of a construction device and method for controlling restrained cracks in large-volume pier concrete according to the present invention;
[0022] Figure 2 It is the plan view of the massive pier;
[0023] Figure 3 yes Figure 2 Vertical section view of . DETAILED DESCRIPTION
[0024] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.
[0025] like Figure 1-3 As shown, the construction device for controlling the restrained cracks of large-volume pier concrete of the present invention comprises a pile 1, a pile clamp 2 is arranged on the upper part of the pile 1, a supporting steel beam 3 is arranged on the upper part of the pile clamp 2, a distribution beam 4 is arranged on the upper part of the supporting steel beam 3, a pier bottom formwork 5 is laid on the upper part of the distribution beam 4, a first casting pier 601 is arranged on the upper part of the pier bottom formwork 5, a second casting pier 602 is arranged on the upper part of the first casting pier 601, a pier compression module is arranged in the first casting pier 601, and the pier compression module comprises a prestressed tendon 7, a force transmission steel beam 10 and a tensioning jack 11, and the prestressed tendon 7 adopts fine-rolled threaded steel or a steel wire rope. A reserved hole 8 is preset in the first casting pier 601, and the prestressed tendon 7 is arranged in the reserved hole 8. Adjacent prestressed tendons 7 are connected and fixed by joint nuts 9, and the reserved hole 8 is located at a position half the height of the first casting pier 601. The force-transmitting steel beam 10 is arranged on the side of the first casting pier 601 , and a wooden square is arranged in the gap between the force-transmitting steel beam 10 made of double I-beams and the pier bottom formwork 5 .
[0026] The tensioning jack 11 passes through the end of the prestressed tendon 7 and is fixed on the side of the force transmission steel beam 10. The tensioning jack 11 is connected to the oil pump. The center of the tensioning jack 11 is aligned with the center of the prestressed tendon 7. A wooden square is provided in the gap between the lower side of the tensioning jack 11 and the pier bottom mold 5. The tensioning jack 11 is fixed to the side of the force transmission steel beam 10 through a pad 12 and a nut 13.
[0027] The pier 6 is constructed by pouring in two times, first pouring the first pouring 601, and then pouring the second pouring pier 602. When pouring the first pouring pier 601, the reserved hole 8 for the prestressed tendon 7 is buried. The reserved hole 8 is located at a position half the height of the first pouring pier 601. After the concrete strength of the first pouring pier 601 meets the requirements of its upper concrete construction, the second pouring pier 602 is poured. The pier compression system is installed after the side form of the first pouring pier 601 is removed. First install the force transmission steel beam 10, generally using double I-beams, the force transmission steel beam 10 is close to the side of the first pouring pier 601, and the gap with the pier bottom form 5 is filled with wooden planks. The prestressed tendon 7 can be made of finely rolled threaded steel or steel wire rope. This embodiment uses steel wire rope as prestressed tendons. Both ends are anchored with extrusion sleeves after passing through the tensioning jack 11. The prestressed tendons 7 pass through the reserved holes 8 of the first casting pier 601, and the two ends are left with enough jack length and anchoring length. The tensioning jack 11 is passed through the prestressed tendons 7 and fixed on the side of the force-transmitting steel beam 10. The center of the tensioning jack 11 is aligned with the center of the prestressed tendons 7. The lower side of the tensioning jack 11 is fixed on the pier bottom mold 5 with wooden blocks, etc., the pad 12 is placed, and the rear nut 13 is installed. When the steel wire rope is used as the prestressed tendon, the steel sleeve needs to be anchored. The tensioning jack 11 is connected to the oil pump with a parallel pipeline, and the concrete ripening shrinkage change curve is calculated and determined according to the mix ratio of the concrete of the second casting pier 602.
[0028] The pier 6 includes a concrete pier compression module, a first cast pier 601 and a second cast pier 602. The pier compression module includes a force transmission steel beam 10, a tensioning jack 11, a jack steel, a pad 12 and a nut 13. Prestressed tendons 7 are used for the connector of the two cast pier compressions. The prestressed tendons 7 are mainly made of finely rolled threaded steel bars, and steel wire ropes can also be used. In order to connect the two sides of the pier 6, holes for prestressed tendons 7 need to be buried on the first cast pier 601. During the construction of the first pouring pier 601, a PVC pipe is buried in the corresponding position according to the plan. When the strength of the first pouring pier 601 meets the construction requirements of the second pouring pier 602, the pier compression module is installed. After the second pouring pier 602 is completed, according to the ripening shrinkage rate of the second pouring pier 602, the pier compression module applies compression force to the first pouring pier 601, so that the plane size of the first pouring pier 601 shrinks synchronously with the second pouring pier 602 at the same rate. After the strength of the second pouring pier 602 rises to be sufficient to resist the restraint force of the first pouring pier 601, the pier compression module is released. The present invention can avoid the generation of restraint cracks in the secondary concrete of the pier 6 and improve the quality of the concrete of the pier 6.
[0029] The present invention also provides a construction method for controlling restrained cracks in large-volume pier concrete, comprising the following steps:
[0030] S1, construct the concrete of the first pouring pier 601, reserve the holes 8 for the prestressed tendons 7 in the concrete with a PVC pipe, and remove the side formwork after the concrete strength of the first pouring pier 601 is greater than 5MPa;
[0031] S2, install the force transmission steel beam 10, pass the prestressed tendon 7 through the reserved hole 8 of the first casting pier 601, and the length of the exposed ends of the prestressed tendon 7 on both sides is greater than the sum of the length of the tensioning jack 11 and the anchoring section;
[0032] S3. When the prestressed tendon 7 is made of finely rolled threaded steel, it is fixed by a pad 12 and a nut 13. When a steel wire rope is used, it is fixed by a sleeve anchor.
[0033] S4, connect the lines and pipelines, calculate the aging shrinkage rate of the second pouring pier 602 and the deformation of the concrete extrusion and compression, and determine the pressure value applied daily;
[0034] S5, constructing the second pouring concrete of the pier 602;
[0035] S6. After the second pouring pier 602 is finally set, as the second pouring pier 602 continues to mature and shrink, the tensioning jack 11 is started to compress the concrete of the first pouring pier 601, and the number of compressions per day is not less than 2 times, so that the compression amount of the concrete of the first pouring pier 601 is kept similar to the shrinkage amount of the concrete of the second pouring pier 602;
[0036] S7. After seven days of compression, when the concrete strength of the second pouring pier 602 is sufficient to resist the restraining tension, the tension can be gradually relaxed and the related equipment can be dismantled.
[0037] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation modes, which are merely illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the present invention and the claims, all of which are within the protection of the present invention.
Claims
1. A construction method for controlling restrained cracks in large-volume pier concrete, characterized in that: The steps include: S1. Construct the first pouring pier concrete, use PVC pipe to reserve holes for prestressed tendons in the concrete, and remove the side formwork after the concrete strength of the first pouring pier is greater than 5MPa; S2, installing the force transmission steel beam, passing the prestressed tendons through the reserved holes of the first casting pier, and the length of the exposed ends of the prestressed tendons on both sides is greater than the sum of the lengths of the tensioning jack and the anchoring section; S3. When the prestressed tendons are made of finely rolled threaded steel, they are fixed by pads and nuts; when steel wire ropes are used, they are fixed by sleeve anchors; S4. Connect the lines and pipelines, calculate the aging shrinkage rate of the second pouring pier and the deformation of the concrete squeeze and compression, and determine the pressure value applied daily; S5, construct the second pouring pier concrete; S6. After the second pouring pier is finally set, as the second pouring pier continues to mature and shrink, the tensioning jack is started to compress the concrete of the first pouring pier, and the number of compressions per day is not less than 2 times, so that the compression amount of the concrete of the first pouring pier is kept close to the shrinkage amount of the concrete of the second pouring pier; S7. After seven days of compression, when the strength of the second cast pier concrete is sufficient to resist the restraining tension, the tension can be gradually relaxed and the related equipment can be dismantled; The construction device for controlling the restrained cracks of large-volume pier concrete comprises a pile, a pile clamp is arranged on the upper part of the pile, a supporting steel beam is arranged on the upper part of the pile clamp, a distribution beam is arranged on the upper part of the supporting steel beam, a pier bottom form is laid on the upper part of the distribution beam, a first casting pier is arranged on the upper part of the pier bottom form, a second casting pier is arranged on the upper part of the first casting pier, a pier compression module is arranged in the first casting pier, the pier compression module comprises a prestressed tendon, a force-transmitting steel beam and a tensioning jack, a reserved hole is preset in the first casting pier, the prestressed tendon is arranged in the reserved hole, the force-transmitting steel beam is arranged on the side of the first casting pier, the tensioning jack passes through the end of the prestressed tendon and is fixed on the side of the force-transmitting steel beam, and the tensioning jack is connected to an oil pump; The reserved hole is located at a position half the height of the first pouring pier; A wooden square is arranged in the gap between the force-transmitting steel beam using double I-beams and the bottom formwork of the pier; The prestressed tendons are made of precision-rolled threaded steel bars or steel wire ropes; Adjacent prestressed tendons are connected and fixed via joint nuts.
Citation Information
Patent Citations
Process for reinforcing adjustable and controllable capping beam of piers
CN102383379A
Long-span concrete frame beam bonded prestressed post-cast strip inside stretching construction method
CN106522561A
Construction method and system for pier bottom rotation of wide-plate type pier
CN108374352A
Pre-bending construction method for steel-concrete combined girders
CN108457195A
Bridge pier capping beam hoop steel beam template system and construction method thereof
CN108505448A