Non-redundant updating method of regional geological model based on excavation record information
By integrating geological excavation models and excavation body hollow families, the geological model update process is optimized, and the efficiency and accuracy of geological model updates in large areas under the construction of multiple projects is solved, and efficient and convenient geological information model updates are achieved.
Patent Information
- Application Number
- CN202210197217.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-03-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-03-01
AI Technical Summary
In the multi-project construction scenario, it is difficult for the existing technology to efficiently update the large-area geological model, resulting in large workloads in updating the geological information model, insufficient accuracy, and the difficulty of repeated cuts and processing during dynamic updates.
The non-redundant update method of regional geological model based on excavation record information is adopted. By integrating geological excavation models, foundation pit design edge lines and excavation body hollow families, the model processing process is optimized, redundant updates are reduced, and update efficiency and accuracy are improved.
On the basis of ensuring the calculation accuracy of the excavation geological model of the new project, frequent updates of the excavation models of all projects are avoided, the update efficiency and data quality of the geological information model are improved, redundant processing is reduced, and the overall update efficiency and accuracy are improved.
Smart Images

Figure CN114817202B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geological information models, and in particular to a non-redundant updating method of a regional geological model based on excavation record information. Background Art
[0002] Underground space development is a key part of urban and regional construction and sustainable development. A large number of deep, large and difficult urban underground space construction projects are increasing day by day. The high concealment and high water and soil risks make the development and management of urban underground space difficult. At the same time, due to the lack of digital results management methods for macro geological status information in urban areas and management, it is difficult to provide strong data support and decision-making support for later engineering construction, operation and maintenance.
[0003] In recent years, digital technologies represented by city information model (CIM), building information model (BIM), and geotechnical engineering information model (GEIM) have developed rapidly, providing an effective means for the digitization of underground space information. Analyzing and sharing geological information and integrating it into the dynamic risk prevention and control of engineering projects can not only establish a model of dynamic information linkage, provide a full-dimensional, three-dimensional, and dynamically updated digital base, and achieve more efficient and convenient data management and sharing, but also realize the three-dimensional and dynamic expression of the existence conditions and potential risks of all underground elements, and provide support for the grasp of underground status information in regional construction and the full-dimensional and in-depth analysis of underground space development safety.
[0004] However, in the context of multiple project construction in actual regional development, the city-level / large-region geological models have the problem of phased creation and dynamic updating. The conventional geological information model creation mode has certain limitations and shortcomings: (1) Because regional development is implemented in stages, engineering survey work is not completed in one go. After adding new survey data to the regional survey database, the overall regional geological model needs to be re-interpolated and calculated based on the updated database and generated as a whole. There are frequent updates and creations, which brings a large workload. (2) For specific construction plots in the region, because they contain a lot of survey drilling data, the accuracy of their geological models does not change significantly during the dynamic update process, but it brings difficulties in repeated sectioning in subsequent construction applications such as foundation pit excavation simulation and site condition analysis. Therefore, ensuring the update accuracy of regional development geological models and reducing the update workload of large-region geological information models in multi-project construction scenarios is a necessary development direction in this technical field. Summary of the invention
[0005] In view of the deficiencies in the above-mentioned prior art, the present invention provides a non-redundant updating method for regional geological models based on excavation record information, which solves the problem of continuous updating of geological models in the context of multiple projects in the region by integrating regional geological models, geological excavation models within foundation pit design boundaries, and hollow families of excavated bodies, as well as optimizing the technical processing process of the model. It is conducive to improving the problem of repeated processing of foundation pit excavation models of multiple projects after the update of new data of the geological information model of a large region, and improves the processing and updating efficiency and quality of geological information models in the scenario of large-scale development and multi-project construction.
[0006] In order to achieve the above object, the present invention provides a method for non-redundant updating of regional geological models based on excavation record information, comprising the steps of:
[0007] S1: Create an initial geological information model of a large area based on the survey data of the first project in a large area;
[0008] S2: Create a geological model of the pit for the first project;
[0009] S3: Creating a foundation pit excavation model of the first project;
[0010] S4: creating a regional model of the first project, wherein the regional model includes foundation pit excavation information of the first project;
[0011] S5: Creating the large regional geological information model based on updated data of a newly added project;
[0012] S6: Creating the in-pit geological model based on the updated data;
[0013] S7: Creating the foundation pit excavation model including the first project and the newly added project;
[0014] S8: updating the regional model including the first project and the newly added project;
[0015] S9: Steps for continuous updating of regional geological models in a multi-project context.
[0016] Preferably, in the step S1:
[0017] The initial survey data of the large area and the fine drilling data of the first project in the database are used, and Revit software is used to interpolate the drilling data to form an initial geological information model of the large area.
[0018] Preferably, in the step S2:
[0019] On the basis of the initial large-area geological information model, a new conventional model family component is created in the project, and the large-area geological information model is subjected to layered excavation processing using the foundation pit design boundary line of the first project. The cut-out layered excavation geological model is stored separately in the form of a project to obtain the in-pit geological model.
[0020] Preferably, in the step S3:
[0021] Creating a new conventional model family component in the Revit software, establishing an excavation body hollow family using the foundation pit design edge line and bottom plate depth of the first project, and obtaining the foundation pit excavation body model;
[0022] Preferably, in the step S4:
[0023] The large-area geological information model is opened in the Revit software, and the layered excavation geological model and the excavation body hollow family are loaded through the city coordinate system, and the shear Boolean operation is performed on the large-area geological information model using the excavation body hollow family; the designated corresponding control points are selected for the peripheral model of the large-area geological information model that has completed the shearing process and the contour of the layered excavation geological model, and the layered excavation geological model is embedded in a point-to-point moving manner, and it is ensured that the peripheral contour lines remain parallel and aligned to obtain the regional model, and the regional model is stored in the form of a project.
[0024] Preferably, in the step S5:
[0025] For the newly added projects in the large area, the detailed drilling data of the newly added projects are added to the database, and the large area geological information model with updated data is recalculated and generated.
[0026] Preferably, in the step S6:
[0027] On the basis of the large-area geological information model of the updated data, a new conventional model family is created in the Revit software, and the large-area geological information model of the updated data is subjected to layered excavation processing using the foundation pit design boundary line of the newly added project. Meanwhile, the existing project model is no longer excavated, and only the currently cut-out layered excavation geological model is stored separately in the form of a project; and the in-pit geological model based on the updated data is obtained.
[0028] Preferably, in the step S7:
[0029] A new conventional model family is created in the Revit software, and the foundation pit design boundary line and the bottom plate depth of the newly added project are used to add it to the hollow family of the excavated body of the first project.
[0030] Preferably, in the step S8:
[0031] A shear Boolean operation is performed on the large regional geological information model of the updated data using the current hollow family of the excavated body, and the layered excavation geological model obtained in step S6 is embedded with unified coordinate information to obtain the regional model of the newly added project, and the regional model of the newly added project is stored in the form of a project.
[0032] Preferably, in the step S9:
[0033] Repeat steps S5 to S8 for subsequent newly added items in the large area.
[0034] The present invention adopts the above technical solution, so it has the following beneficial effects:
[0035] (1) While ensuring the calculation accuracy of the excavation geological model for new projects, it avoids the problem of having to produce excavation models for all existing projects every time the geological information model of a large area is updated.
[0036] (2) The efficiency of geological information model processing and updating in large-scale regional development and multi-project construction scenarios has been improved.
[0037] (3) The accuracy and data quality of the geological information model in large scenarios are improved by adding and continuously updating refined drilling data.
[0038] Under the traditional conventional update method, after the overall update of the regional geological model, the contour lines of each project in the region (including existing projects, which have been subjected to model excavation processing in the previous stage) will continue to be used for excavation processing. In this mode, the interpolation structure of the layered excavation geological model in the existing project has not been improved, but with the advancement of regional construction, the geological models of existing completed projects are frequently updated and replaced, and the amount of repeated work is becoming increasingly large. In the present invention, for example, in S2 and S6 and subsequent similar operations, while maintaining the interpolation calculation accuracy of the excavation geological model of the existing project, only the layered excavation model of the newly added project is stored separately, which not only ensures that the geological model of the built project meets the construction analysis application, but also does not bring redundant processing to the overall update of the regional geological model, and in subsequent similar operations in steps S4, S8 and S9, the stored ready-made series of layered excavation models are embedded, thereby improving the overall update efficiency.
[0039] For the layered excavation processing of a single project, in the previous global update mode of the regional geological model, it was necessary to separately store the intermediate model for Boolean operation for the outline of the single project, and each Boolean operation needed to process these intermediate models one by one. In the present invention, both step S3 and step S7 use the unique excavation body hollow family accompanying the regional construction. On the one hand, a unified model is used to store the newly added project outline data. On the other hand, only a single excavation body hollow family needs to be calculated each time, which improves the convenience of modeling and the efficiency of software processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 The present invention is a flowchart of a method for non-redundant updating of a regional geological model based on excavation record information according to an embodiment of the present invention. DETAILED DESCRIPTION
[0041] According to the attached figure Figure 1 , give the preferred embodiments of the present invention, and describe them in detail so that the functions and features of the present invention can be better understood.
[0042] See also Figure 1 , a method for non-redundant updating of a regional geological model based on excavation record information according to an embodiment of the present invention comprises the steps of:
[0043] S1: Create an initial large regional geological information model A1 based on the survey data of the first project P1 in a large region;
[0044] Using the initial survey data of the large area in the database and the fine drilling data of the first project P1, Revit software was used to interpolate the drilling data to form the initial large-area geological information model A1.
[0045] S2: Create a first project in-pit geological model;
[0046] To support the specific construction analysis of the first project P1, a new conventional model family component B1 was created in the project based on the initial large-area geological information model A1. The large-area geological information model was excavated layer by layer using the foundation pit design boundary of the first project P1. The cut-out layered excavation geological model was stored separately in the form of project B1 to obtain the geological model in the pit. Since the borehole distribution of the first project P1 is concentrated within the scope of project B1, this part of the model is generated by fine drilling deduction to ensure that the model accuracy is not easily affected after the subsequent data is added.
[0047] S3: Create the foundation pit excavation model of the first project;
[0048] Create a new general model family component in Revit software, use the foundation pit design edge and bottom plate depth of the first project P1 to establish the excavation body hollow family C, and obtain the foundation pit excavation body model;
[0049] S4: Create a regional model for the first project, where the regional model includes foundation pit excavation information for the first project;
[0050] Open the large-area geological information model A1 in Revit software, load the project B1 and the excavation hollow family C through the city coordinate system, and perform the shear Boolean operation on the large-area geological information model A1 with the excavation hollow family C; select the designated corresponding control points for the outer model of the large-area geological information model A1 that has completed the shearing process and the contour of the layered excavation geological model B1, embed the layered excavation geological model B1 through a point-to-point moving method, and ensure that the outer contour lines remain parallel and aligned. At this time, the outer regional geological model and the embedded excavation geological model have been accurately connected to obtain the regional model, and the regional model is stored in the form of project H1.
[0051] S5: Creating a large regional geological information model A2 based on updated data of a newly added project P2;
[0052] For the newly added project P2 in the large area, the detailed drilling data of the newly added project P2 is added to the database, and the large area geological information model A2 with updated data is recalculated.
[0053] S6: Create a geological model of the pit based on the updated data;
[0054] On the basis of the large-area geological information model A2 of the updated data, a new conventional model family is created in the Revit software, and the large-area geological information model of the updated data is subjected to layered excavation processing using the foundation pit design boundary line of the newly added project P2. Meanwhile, the existing project model is no longer excavated, and only the currently cut-out layered excavation geological model is stored separately in the form of project B2; thus, the in-pit geological model based on the updated data is obtained.
[0055] S7: Create a foundation pit excavation model including the first project and the newly added projects;
[0056] Create a new general model family in Revit software, and use the foundation pit design edge and bottom plate depth of the newly added project P2 to add it to the excavation body hollow family C in step S3.
[0057] S8: Update the regional model including the first project and the newly added projects;
[0058] The large regional geological information model A2 of the updated data is subjected to a shear Boolean operation using the current excavation body hollow family C, and the layered excavation geological model B2 obtained in step S6 is embedded with the unified coordinate information to obtain the regional model of the newly added project P2, which is stored in the form of project H2. Project H2 contains not only a more refined large regional geological information model but also the refined excavation geological models of the aforementioned projects.
[0059] S9: Steps for continuous updating of regional geological models in a multi-project context.
[0060] For subsequent new projects in the large area i (i is greater than or equal to 2), repeat steps S5 to S8 to obtain an updated regional geological model project file Hi.
[0061] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A non-redundant updating method for a regional geological model based on excavation record information, comprising the steps of: S1: Create an initial geological information model of a large area based on the survey data of the first project in a large area; S2: Create a geological model of the pit for the first project; S3: Creating a foundation pit excavation model of the first project; S4: creating a regional model of the first project, wherein the regional model includes foundation pit excavation information of the first project; S5: creating the large-area geological information model based on the updated data of a newly added project; for the newly added project in the large area, adding the fine drilling data of the newly added project to the database, and recalculating and generating the large-area geological information model with the updated data; S6: creating the in-pit geological model based on the updated data; creating a new conventional model family in the Revit software based on the large-area geological information model of the updated data, using the foundation pit design boundary line of the newly added project to perform layered excavation processing on the large-area geological information model of the updated data, and no longer excavating the existing project model, only storing the currently cut-out layered excavation geological model separately in the form of a project; obtaining the in-pit geological model based on the updated data; S7: creating the foundation pit excavation body model including the first project and the newly added project; creating the conventional model family in the Revit software, and adding the foundation pit design edge line and bottom plate depth of the newly added project to the excavation body hollow family of the first project; S8: updating the regional model including the first project and the newly added project; performing a shear Boolean operation on the large regional geological information model of the updated data using the current hollow family of the excavated body, and embedding the layered excavation geological model obtained in step S6 using unified coordinate information to obtain the regional model of the newly added project, and storing the regional model of the newly added project in the form of a project; S9: a step of continuously updating the regional geological model under the background of multiple projects; repeating steps S5 to S8 for subsequent newly added projects in the large area.
2. The non-redundant updating method of regional geological model based on excavation record information according to claim 1, characterized in that: In the step S1: The initial survey data of the large area and the fine drilling data of the first project in the database are used, and Revit software is used to interpolate the drilling data to form an initial geological information model of the large area.
3. The non-redundant updating method of regional geological model based on excavation record information according to claim 2 is characterized in that: In the step S2: On the basis of the initial large-area geological information model, a new conventional model family component is created in the project, and the large-area geological information model is excavated in layers using the foundation pit design boundary line of the first project. The cut-out layered excavation geological model is stored separately in the form of a project to obtain the in-pit geological model.
4. The non-redundant updating method of regional geological model based on excavation record information according to claim 3 is characterized in that: In the S3 step: The conventional model family component is newly created in the Revit software, and the excavation body hollow family is established using the foundation pit design edge line and bottom plate depth of the first project to obtain the foundation pit excavation body model.
5. The non-redundant updating method of regional geological model based on excavation record information according to claim 4 is characterized in that: In the step S4: The large-area geological information model is opened in the Revit software, and the layered excavation geological model and the excavation body hollow family are loaded through the city coordinate system, and the shear Boolean operation is performed on the large-area geological information model using the excavation body hollow family; the designated corresponding control points are selected for the peripheral model of the large-area geological information model that has completed the shearing process and the contour of the layered excavation geological model, and the layered excavation geological model is embedded in a point-to-point moving manner, and it is ensured that the peripheral contour lines remain parallel and aligned to obtain the regional model, and the regional model is stored in the form of a project.
Citation Information
Patent Citations
BIM-based foundation pit support engineering profile drawing method
CN110782522A
Foundation and foundation subdivision engineering analysis and model selection method based on BIM + GIS
CN111125821A
Foundation pit excavation construction method based on BIM
CN111460560A
Three-dimensional design method for landslide control project based on BIM technology
CN112052495A
3D geological model generating method and system thereof
KR101985371B1