A composite slab joint construction measure and construction method

By setting up a truss structure and additional steel bars at the joints of the laminated panels, the problem of insufficient stiffness at the joints was solved, and the shear resistance and overall performance were improved.

CN117587976BActive Publication Date: 2024-10-15BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO LIMITED
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311781425.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-22
Publication Date
2024-10-15
Estimated Expiration
2043-12-22

AI Technical Summary

Technical Problem

The joints of existing laminated panels have poor stiffness and are prone to cracking.

Method used

The structural measures of prefabricated base plate, reserved grooves, truss structure and additional steel bars are adopted. The truss structure is set up inside the cast-in-place concrete layer and placed on the reserved grooves from bottom to top. The truss structure is located in the joints. Above, and fixedly connected with additional steel bars to form higher shear resistance and stiffness.

Benefits of technology

It improves the shear resistance and stiffness of the joints, weakens the stress effect of the joints on the laminated panels, and enhances the overall performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117587976B_ABST
    Figure CN117587976B_ABST
Patent Text Reader

Abstract

The present invention provides a joint construction measure and construction method of a composite slab, which relates to the field of prefabricated composite slabs in construction engineering. The joint construction measure includes: a prefabricated bottom plate, a reserved groove, a truss structure, a joint and additional steel bars. A cast-in-place concrete layer is arranged on the upper surface of the prefabricated bottom plate, and a reserved groove is arranged at the end of the prefabricated bottom plate. Two adjacent prefabricated bottom plates are spliced ​​with each other, and a joint is formed at the joint of the two adjacent prefabricated bottom plates. Additional steel bars and a truss structure are arranged inside the cast-in-place concrete layer. The additional steel bars and the truss structure are sequentially placed on the reserved groove from bottom to top. The left and right ends of the additional steel bars are fixedly connected to the left and right ends of the bottom of the truss structure respectively, and the truss structure is located above the joint. The present invention arranges a truss structure at the joint, which improves the stiffness at the joint while ensuring the shear resistance of the connection between adjacent prefabricated bottom plates, makes it easier to transmit bending moments, weakens the influence of the joint on the stress of the composite slab, and further improves the overall performance of the composite slab.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of prefabricated composite floor slabs in construction engineering, and in particular to a composite slab joint construction measure and a construction method. Background Art

[0002] Prefabricated buildings have the advantages of saving resources, reducing construction pollution, improving safety levels and increasing construction speed, and are a popular direction for the development of my country's construction. Among them, the floor structure is one of the prefabricated components, which is mainly divided into two forms: prefabricated panels and composite panels; the wet operation and maintenance of prefabricated panels can be completed completely in the factory, and the final assembly can be achieved on the construction site; the composite panel combines the prefabricated panel and cast-in-place panel processes, and is an assembled integral component formed by pouring a concrete composite layer on the upper part of the prefabricated base plate.

[0003] For example, Chinese patent document CN111980400A discloses an aluminum alloy formwork and construction method for the joints of composite plates. The aluminum alloy formwork and construction method disclosed therein can fix the top plate to the bottom of the composite plate by tension bolts, and support the support plate by a disc-type scaffolding. The disc-type scaffolding supports the second plate body and pushes the pin into the slot, so that multiple first plate bodies can be spliced ​​into a whole, avoiding uneven deformation or damage of the formwork support caused by unevenness, and the joints of the composite plates are sealed by the assembled formwork, which can effectively avoid leakage problems.

[0004] However, in the above structure, the disc-type scaffolding will be dismantled after the concrete of the composite slab solidifies, and it cannot support the weak stress-bearing part of the composite slab joints, resulting in the composite slab being unable to withstand too much force in the vertical direction at the joints. The composite slab joints have poor rigidity and are prone to cracking. Summary of the invention

[0005] The invention provides a composite plate joint structural measure and a construction method, which are used to solve the technical problems that the joints of existing composite plates have poor rigidity and are prone to cracking.

[0006] In order to solve the above technical problems, the present invention discloses a composite plate joint construction measure, including: a prefabricated base plate, a reserved groove, a truss structure, a joint and additional steel bars, a cast-in-place concrete layer is arranged on the upper surface of the prefabricated base plate, a reserved groove is arranged at the end of the prefabricated base plate, two adjacent prefabricated base plates are spliced ​​with each other, and a joint is formed at the splicing point of the two adjacent prefabricated base plates, additional steel bars and a truss structure are arranged inside the cast-in-place concrete layer, and the additional steel bars and the truss structure are placed on the reserved grooves in sequence from bottom to top, and the left and right ends of the additional steel bars are fixedly connected to the left and right ends of the bottom of the truss structure respectively, and the truss structure is located above the joint.

[0007] Preferably, the truss structure is any one of a triangular truss or a quadrangular truss.

[0008] Preferably, a bottom steel bar layer is provided in the prefabricated base plate, the bottom steel bar layer is formed by cross-binding a number of first transverse steel bars and first longitudinal steel bars arranged at equal intervals, truss steel bars are provided on the bottom steel bar layer, the truss steel bars extend into the cast-in-place concrete layer and are connected to the upper steel bar layer, the upper steel bar layer is arranged in the cast-in-place concrete layer, the upper steel bar layer is formed by cross-binding a number of second transverse steel bars and second longitudinal steel bars arranged at equal intervals, and the upper end of the truss structure is connected to the upper steel bar layer.

[0009] Preferably, the thickness of the cast-in-place concrete layer is consistent with the thickness of the prefabricated base plate, and the height of the truss structure is higher than the depth of the reserved groove.

[0010] The present invention also provides a construction method for a composite plate joint structural measure, which is used to construct the composite plate joint structural measure. The construction method comprises the following steps:

[0011] Step 1: A base plate mold of the prefabricated base plate is manufactured according to the design requirements, and convex blocks corresponding to the reserved grooves are arranged at both ends of the base plate mold;

[0012] Step 2: Make a bottom steel bar layer in the bottom plate mold, and place the truss steel bars on the bottom steel bar layer, check the position and type of the bottom steel bar layer and the truss steel bars, pour concrete in the bottom plate mold to make a prefabricated bottom plate, and form a reserved groove at the corresponding position of the prefabricated bottom plate and the protrusion;

[0013] Step 3: transport multiple prefabricated bottom plates to the construction site for installation, assemble the prefabricated bottom plates, ensure that the reserved grooves of two adjacent prefabricated bottom plates are aligned, and form a joint between the two adjacent prefabricated bottom plates;

[0014] Step 4: Place the additional steel bars horizontally on the reserved grooves, and ensure that the distance between the additional steel bars at both ends of the joints is consistent. Place the truss structure on the additional steel bars, and tie the bottom of the truss structure to the additional steel bars placed horizontally.

[0015] Step 5: Arrange steel bars on the truss structure in a staggered manner to make an upper steel bar layer, pour cast-in-place concrete on the prefabricated base plate to prepare a cast-in-place concrete layer.

[0016] Preferably, in step five, the cast-in-place concrete layer is scraped and leveled by a surface scraping mechanism, the surface scraping mechanism comprising a guide rail, the guide rail being mounted above the cast-in-place concrete layer, a driving wheel being slidably arranged on the upper surface of the guide rail, the driving wheel being arranged at the lower end of the base, the driving wheel being slidably connected to the guide rail, a fixed frame being arranged on one side wall of the base, and a track being arranged on the lower surface of the horizontal section of the fixed frame, a propulsion assembly being arranged under the fixed frame, the propulsion assembly comprising: a propulsion motor, the propulsion motor being fixedly connected to the side wall of the base, a reciprocating screw being arranged at the output end of the propulsion motor, the reciprocating screw being rotatably connected to the vertical section of the fixed frame at one end away from the base, a propulsion plate being sleeved on the reciprocating screw, the propulsion plate being threadedly connected to the reciprocating screw, the upper end of the propulsion plate being slidably connected to the lower side of the track, a scraping assembly being arranged at the lower end of the propulsion plate, and the scraping assembly being used to scrape and level the upper surface of the cast-in-place concrete layer.

[0017] Preferably, the scraping assembly includes: a support plate, the support plate is fixedly connected to the lower end of the propulsion plate, one side of the support plate is fixedly connected to a horizontal plate, a rotating motor is arranged on the lower surface of the horizontal plate, a semicircular gear is arranged on the output end of the rotating motor, a vertical plate is arranged on the end of the horizontal plate away from the support plate, a rotating shaft is rotatably arranged between the vertical plate and the support plate, a columnar gear is arranged on the rotating shaft, the semicircular gear is meshed with the columnar gear, the rotating shaft extends to the outer side wall of the vertical plate away from the support plate at one end and is fixedly connected to a rotating disk, a connecting rod is arranged on a side wall of the rotating disk away from the vertical plate, one end of the connecting rod is hingedly connected to the eccentric position of the rotating disk, and the other end of the connecting rod is hingedly connected to the side wall of the slider, the slider is slidably arranged on the side wall of the vertical plate, and a scraper assembly is arranged at the bottom of the slider.

[0018] Preferably, the scraper assembly comprises: a connecting rod, one end of the connecting rod is fixedly connected to the bottom of the slider, and scrapers are hinged on both sides of the other end of the connecting rod, an inner cavity is opened in the connecting rod, through holes are opened on both sides of the inner cavity, pulleys are provided on both sides of the connecting rod, an adjusting knob is rotatably set on the outer wall of the connecting rod, an adjusting shaft is provided in the inner cavity of the connecting rod, one end of the adjusting shaft is rotatably connected to the inner wall of the connecting rod, the other end of the adjusting shaft extends to the outer wall of the connecting rod and is fixedly connected to the adjusting knob, return springs are respectively provided between the two sides of the connecting rod and the scraper, one end of the return spring is connected to the connecting rod, and the other end is connected to the scraper, the end of the scraper away from the connecting rod is provided with a fixing hook, the fixing hook is connected to one end of the adjusting rope, and the other end of the adjusting rope passes around the pulley, passes through the through hole and is fixedly connected to the adjusting shaft.

[0019] Preferably, a locking frame is provided at one end of the adjusting knob, the locking frame is fixedly connected to the connecting rod, a threaded hole is provided on one side of the locking frame, and the locking frame is threadedly connected to the locking bolt.

[0020] Preferably, a dust cover is provided on a side of the vertical plate away from the support plate, an opening is provided at the lower end of the dust cover, and the dust cover is arranged outside the scraper assembly.

[0021] The technical solution of the present invention has the following advantages: the joint construction measures include: a prefabricated base plate, a reserved groove, a truss structure, a joint and additional steel bars, a cast-in-place concrete layer is arranged on the upper surface of the prefabricated base plate, a reserved groove is arranged at the end of the prefabricated base plate, two adjacent prefabricated base plates are spliced ​​together, and a joint is formed at the splicing of two adjacent prefabricated base plates, additional steel bars and a truss structure are arranged inside the cast-in-place concrete layer, and the additional steel bars and the truss structure are placed on the reserved groove in sequence from bottom to top, and the left and right ends of the additional steel bars are fixedly connected to the left and right ends of the bottom of the truss structure respectively, and the truss structure is located above the joint. The present invention arranges a truss structure at the joint, which improves the stiffness at the joint while ensuring the shear resistance of the connection between adjacent prefabricated base plates, makes it easier to transmit bending moments, weakens the influence of the joint on the stress of the composite plate, and further improves the overall performance of the composite plate.

[0022] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the devices particularly pointed out in the written description and the drawings of the description.

[0023] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0025] Figure 1 This is a schematic diagram of the joint structure;

[0026] Figure 2 This is a cross-sectional view of the triangular truss joint structure;

[0027] Figure 3 This is a schematic diagram of the four-corner truss joint structure;

[0028] Figure 4 This is a cross-sectional view of the joint structure of the four-corner truss;

[0029] Figure 5 This is a cross-sectional view of the triangular truss joint structure constructed using another construction method;

[0030] Figure 6 This is a structural diagram of the four-corner truss joint structure constructed using another construction method;

[0031] Figure 7 It is a schematic diagram of the surface scraping mechanism;

[0032] Figure 8 for Figure 7 Partial cross-section at AA in the middle;

[0033] Fig. 9 for Figure 7 Partial cross-section at the middle BB

[0034] Fig.10 for Figure 8 Top view of the middle scraper assembly;

[0035] Fig.11 is a side view of the scraper assembly;

[0036] Fig.12 This is a schematic diagram of the construction of the surface scraping mechanism;

[0037] In the figure: 1. Truss reinforcement; 2. Bottom reinforcement layer; 3. Prefabricated bottom plate; 4. Cast-in-place concrete layer; 5. Upper reinforcement layer; 6. Reserved groove; 7. Triangular truss; 8. Additional reinforcement; 9. Joint; 10. Four-corner truss; 11. Guide rail; 12. Propelling wheel; 13. Base; 14. Fixed frame; 15. Track; 16. Propelling motor; 17. Reciprocating screw; 18. Propelling plate; 19. Support plate; 20. Rotating Moving shaft; 21. Rotating motor; 22. Rotating disk; 23. Connecting rod; 24. Sliding block; 25. Connecting rod; 26. Horizontal plate; 27. Vertical plate; 28. Semicircular gear; 29. ​​Column gear; 30. Scraper; 31. Pulley; 32. Return spring; 33. Through hole; 34. Adjusting shaft; 35. Fixing hook; 36. Adjusting rope; 37. Locking frame; 38. Locking bolt; 39. Dust cover; 40. Adjusting knob. DETAILED DESCRIPTION

[0038] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0039] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions and technical features between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0040] Embodiment 1:

[0041] The embodiment of the present invention provides a composite plate joint construction measure, such as Figure 1-3 As shown, it includes: a prefabricated base plate 3, a reserved groove 6, a truss structure, a joint 9 and additional steel bars 8. A cast-in-place concrete layer 4 is arranged on the upper surface of the prefabricated base plate 3. A reserved groove 6 is arranged at the end of the prefabricated base plate 3. Two adjacent prefabricated base plates 3 are spliced ​​with each other, and a joint 9 is formed at the splicing position of the two adjacent prefabricated base plates 3. The additional steel bars 8 and the truss structure are arranged inside the cast-in-place concrete layer 4. The additional steel bars 8 and the truss structure are placed on the reserved groove 6 in sequence from bottom to top. The left and right ends of the additional steel bars 8 are fixedly connected to the left and right ends of the bottom of the truss structure respectively, and the truss structure is located above the joint 9.

[0042] The working principle and beneficial effects of the above technical solution are as follows: during construction, the prefabricated bottom plate 3 is first transported to the construction site and hoisted into place to ensure that the reserved grooves 6 of the two adjacent prefabricated bottom plates 3 are aligned. The width of the reserved groove 6 at the end of the prefabricated bottom plate 3 can be selected to be 100mm-200mm, and the depth of the groove can be selected to be 40mm-100mm. A joint 9 is formed at the joint of the two adjacent prefabricated bottom plates 3, and then additional steel bars 8 are placed horizontally on the reserved groove 6, and the truss structure is placed on the additional steel bars 8 so that the joint 9 is located at the lower midpoint of the truss structure, and the bottom of the truss structure is tied to the additional steel bars 8. The length of the additional steel bars 8 is less than twice the width of the reserved groove 6 at the end of a single prefabricated bottom plate 3, ensuring that the distance between the additional steel bars 8 at both ends of the joint 9 is consistent, and placing the truss structure at the joint 9 improves the stiffness at the joint 9 while ensuring the shear resistance of the connection between the plates, making it easier to transmit bending moments and weakening the influence of the joint 9 on the stress of the composite plate.

[0043] Example 2

[0044] On the basis of the above-mentioned embodiment 1, Figure 2 and Figure 4 As shown, the truss structure is any one of a triangular truss 7 or a quadrangular truss 10 .

[0045] The working principle and beneficial effects of the above technical solution are as follows: the four-corner truss 10 can be made into a flat type, and the height of the four-corner truss 10 is greater than the depth of the reserved groove 6. The triangular truss 7 or the four-corner truss 10 is placed above the reserved groove 6, so that the joint 9 is located at the midpoint of the bottom of the triangular truss 7 or the four-corner truss 10, and concrete is poured on the upper part of the prefabricated bottom plate 3. The four-corner truss 10 and the triangular truss 7 can be replaced and can be freely selected according to the thickness of the cast-in-place concrete.

[0046] Example 3

[0047] On the basis of Example 1 or 2, Figure 2 or Figure 4 As shown, the prefabricated base plate 3 is provided with a bottom steel bar layer 2, which is formed by a number of first transverse steel bars and first longitudinal steel bars arranged at equal intervals and cross-bound. A truss steel bar 1 is provided on the bottom steel bar layer 2, which extends into the cast-in-place concrete layer 4 and is connected to the upper steel bar layer 5. The upper steel bar layer 5 is arranged in the cast-in-place concrete layer 4, and is formed by a number of second transverse steel bars and second longitudinal steel bars arranged at equal intervals and cross-bound. The upper end of the truss structure is connected to the upper steel bar layer 5.

[0048] The working principle and beneficial effects of the above technical solution are as follows: a bottom steel bar layer 2 is arranged in a prefabricated bottom plate mold, and a truss steel bar 1 is arranged on the bottom steel bar layer 2. A prefabricated bottom plate 3 is obtained by pouring concrete in the bottom plate mold. After multiple prefabricated bottom plates 3 are assembled at the construction site, an upper steel bar layer 5 is arranged above the prefabricated bottom plate 3, and the truss steel bar 1 is connected to the upper steel bar layer 5. The upper end of the truss structure is connected to the upper steel bar layer 5. The bottom steel bar layer 2 and the truss steel bar 1 support the structure of the prefabricated bottom plate 3. After the prefabricated bottom plate 3 is assembled, the truss steel bar 1 supports the overall structure of the upper steel bar layer 5. The upper steel bar layer 5 can fix the position of the truss structure to avoid displacement of the truss structure during the concrete pouring process. While ensuring the shear resistance of the connection between the plates, the stiffness of the joints 9 is improved.

[0049] Example 4

[0050] On the basis of any one of Examples 1-3, Figure 2 or Figure 4 As shown, the thickness of the cast-in-place concrete layer 4 is consistent with the thickness of the prefabricated bottom plate 3 , and the height of the truss structure is higher than the depth of the reserved groove 6 .

[0051] The working principle and beneficial effects of the above technical solution are as follows: pouring cast-in-place concrete on top of the prefabricated base plate 3 to form a cast-in-place concrete layer 4, ensuring that the thickness of the cast-in-place concrete layer 4 is consistent with the thickness of the prefabricated base plate 3 during the pouring process, and the height of the truss structure is higher than the depth of the reserved groove 6, so that the truss structure can be connected to the upper steel bar layer 5, fixing the position of the truss structure, and avoiding displacement of the truss structure during the concrete pouring process.

[0052] Example 5

[0053] On the basis of any one of Examples 1-4, the present invention further provides a construction method for a composite plate joint construction measure, which is used to construct the above composite plate joint construction measure, such as Figure 1-4 As shown, the construction method includes the following steps:

[0054] Step 1: A base plate mold of the prefabricated base plate 3 is manufactured according to the design requirements, and convex blocks corresponding to the reserved grooves 6 are arranged at both ends of the base plate mold;

[0055] Step 2: Make a bottom steel bar layer 2 in the bottom plate mold, and place the truss steel bar 1 on the bottom steel bar layer 2, check the position and type of the bottom steel bar layer 2 and the truss steel bar 1, pour concrete in the bottom plate mold to make a prefabricated bottom plate 3, and form a reserved groove 6 at the corresponding position of the prefabricated bottom plate 3 and the protrusion;

[0056] Step 3: transport multiple prefabricated bottom plates 3 to the construction site for installation, assemble the prefabricated bottom plates 3, ensure that the reserved grooves 6 of two adjacent prefabricated bottom plates 3 are aligned, and form a joint 9 between the two adjacent prefabricated bottom plates 3;

[0057] Step 4: Place the additional steel bars 8 transversely on the reserved grooves 6, and ensure that the distances between the additional steel bars 8 at both ends of the joints 9 are consistent, place the truss structure on the additional steel bars 8, and tie the bottom of the truss structure to the transversely placed additional steel bars 8;

[0058] Step 5: Arrange steel bars in a staggered manner above the truss structure to make an upper steel bar layer 5 , and pour cast-in-place concrete above the prefabricated bottom plate 3 to prepare a cast-in-place concrete layer 4 .

[0059] The working principle and beneficial effects of the above technical solution are as follows: the prefabricated bottom plate 3 is assembled at the construction site to form the bottom plate of the rear-line floor slab, a joint 9 is formed at the connection of the prefabricated bottom plate 3, a truss structure is placed above the joint 9, the truss structure is connected and fixed to the additional steel bars 8, the midpoint of the additional steel bars 8 is located directly above the joint 9, and the steel bars are staggered above the truss structure to form an upper steel bar layer 5. While ensuring the shear resistance of the connection between the plates, the stiffness at the joint 9 is improved, the bending moment is more easily transmitted, the influence of the joint 9 on the force of the composite plate is weakened, and the overall performance of the composite plate is further improved.

[0060] Example 6

[0061] On the basis of any one of Examples 1-4, Figure 5 and Figure 6 As shown, the present invention also provides another construction method of composite plate joint construction measures, which is used to construct the above composite plate joint construction measures. The construction method includes the following steps:

[0062] Step 1: A base plate mold of the prefabricated base plate 3 is manufactured according to the design requirements, and a convex block corresponding to the reserved groove 6 is provided at one end of the base plate mold;

[0063] Step 2: Make a bottom steel bar layer 2 in the bottom plate mold, place the truss steel bar 1 on the bottom steel bar layer 2, place the additional steel bar 8 horizontally on the reserved groove 6, place the truss structure on the additional steel bar 8, check the position and model of the bottom steel bar layer 2 and the truss steel bar 1, pour concrete in the bottom plate mold to make a prefabricated bottom plate 3, and form a reserved groove 6 at the corresponding position of the prefabricated bottom plate 3 and the protrusion;

[0064] Step 3: transport multiple prefabricated bottom plates 3 to the construction site for installation, assemble the prefabricated bottom plates 3, and connect the ends of a single prefabricated bottom plate 3 to form a joint 9, ensuring that the joints 9 of two adjacent prefabricated bottom plates are aligned;

[0065] Step 4: Make the joint 9 located at the bottom midpoint of the truss structure;

[0066] Step 5: Arrange steel bars in an alternating manner above the truss structure to make an upper steel bar layer 5, and pour cast-in-place concrete on top of the precast base plate 3. When pouring concrete, first pour the reserved groove 6 area to the thickness of the precast base plate 3, and then complete the pouring of cast-in-place concrete to the designed thickness to obtain a cast-in-place concrete layer 4.

[0067] The working principle and beneficial effects of the above technical solution are as follows: the truss structure and the bottom steel bar layer 2 are cast together with the prefabricated bottom plate 3 in advance. During construction, the prefabricated bottom plate 3 is assembled at the construction site to form a composite floor bottom plate. The midpoint of the additional steel bar 8 is located directly above the joint 9. First, the reserved groove 6 area is cast to the thickness of the prefabricated bottom plate 3, and then the cast-in-place concrete is poured to the designed thickness. There is no need to install additional steel bars 8 and the truss structure at the construction site, which simplifies the construction process and avoids the position of the truss structure from changing during the concrete pouring process.

[0068] Example 7

[0069] On the basis of Example 5, Figure 7 and Fig.12As shown, in step five, the cast-in-place concrete layer 4 is scraped and leveled by a surface scraping mechanism, the surface scraping mechanism includes a guide rail 11, the guide rail 11 is mounted above the cast-in-place concrete layer 4, a driving wheel 12 is slidably arranged on the upper surface of the guide rail 11, the driving wheel 12 is arranged at the lower end of a base 13, the driving wheel 12 is slidably connected to the guide rail 11, a fixing frame 14 is arranged on one side wall of the base 13, and a track 15 is arranged on the lower surface of the horizontal section of the fixing frame 14, a propulsion assembly is arranged below the fixing frame 14, and the propulsion assembly includes: a propulsion motor Machine 16, the propulsion motor 16 is fixedly connected to the side wall of the base 13, and a reciprocating screw 17 is arranged at the output end of the propulsion motor 16. The reciprocating screw 17 is rotatably connected to the vertical section of the fixed frame 14 at one end away from the base 13, and a propulsion plate 18 is sleeved on the reciprocating screw 17. The propulsion plate 18 is threadedly connected to the reciprocating screw 17, and the upper end of the propulsion plate 18 is slidably connected to the lower side of the track 15. A scraping component is arranged at the lower end of the propulsion plate 18, and the scraping component is used to scrape the upper surface of the cast-in-place concrete layer 4.

[0070] The working principle and beneficial effects of the above technical solution are as follows: after the concrete pouring is completed, the surface scraping mechanism moves on the guide rail 11 under the push of manpower, the propulsion motor 16 rotates to drive the reciprocating screw 17 to rotate, and the propulsion plate 18 mounted on the reciprocating screw 17 reciprocates along the track 15 on the fixed frame 14 as the reciprocating screw 17 rotates, driving the scraping assembly to make a linear reciprocating motion along the track 15, the surface scraping mechanism can move forward along the guide rail 11, and the propulsion plate 18 makes a linear motion along the track 15 on the fixed frame 14, so that the scraping assembly at the lower end of the propulsion plate 18 can scrape the cast-in-place concrete layer 4 in the direction of the track 15.

[0071] Example 8

[0072] On the basis of Example 7, Figure 7-9As shown, the scraping assembly includes: a support plate 19, the support plate 19 is fixedly connected to the lower end of the propulsion plate 18, a horizontal plate 26 is fixedly connected to one side of the support plate 19, a rotating motor 21 is arranged on the lower surface of the horizontal plate 26, a semicircular gear 28 is arranged at the output end of the rotating motor 21, a vertical plate 27 is arranged at the end of the horizontal plate 26 away from the support plate 19, a rotating shaft 20 is rotatably arranged between the vertical plate 27 and the support plate 19, a columnar gear 29 is arranged on the rotating shaft 20, the semicircular gear 28 is meshed and connected with the columnar gear 29, the rotating shaft 20 extends to the outer side wall of the vertical plate 27 away from the support plate 19 and is fixedly connected to the rotating disk 22, a connecting rod 23 is arranged on the side wall of the rotating disk 22 away from the vertical plate 27, one end of the connecting rod 23 is hingedly connected to the eccentric position of the rotating disk 22, and the other end of the connecting rod 23 is hingedly connected to the side wall of the slider 24, the slider 24 is slidably arranged on the side wall of the vertical plate 27, and a scraper assembly is arranged at the bottom of the slider 24.

[0073] The working principle and beneficial effects of the above technical solution are as follows: the rotating motor 21 rotates to drive the semicircular gear 28 to rotate. During the rotation process, the semicircular gear 28 drives the columnar gear 29 and the rotating shaft 20 fixedly connected to the columnar gear 29 to rotate intermittently. The rotating shaft 20 drives the rotating disk 22 to rotate. The connecting rod 23 hinged to the rotating disk 22 drives the slider 24 to make intermittent up and down linear reciprocating motion on the vertical plate 27. The scraper assembly obliquely connected to the slider 24 makes intermittent up and down linear reciprocating motion under the drive of the slider 24, and is intermittently lifted up during the process of leveling the surface of the cast-in-place concrete layer 4, so as to avoid a large amount of concrete from accumulating on the scraper assembly and hindering the concrete leveling operation, so as to better level the surface of the cast-in-place concrete layer 4.

[0074] Example 9

[0075] On the basis of Example 8, Fig.10 and Fig.11As shown, the scraper assembly includes: a connecting rod 25, one end of the connecting rod 25 is fixedly connected to the bottom of the slider 24, and the two sides of the other end of the connecting rod 25 are respectively hinged with scrapers 30, an inner cavity is opened in the connecting rod 25, through holes 33 are opened on both sides of the inner cavity, pulleys 31 are arranged on both sides of the connecting rod 25, an adjusting knob 40 is rotatably arranged on the outer wall of the connecting rod 25, an adjusting shaft 34 is arranged in the inner cavity of the connecting rod 25, and one end of the adjusting shaft 34 is rotatably connected to the inner wall of the connecting rod 25. The other end of the adjusting shaft 34 extends to the outer wall of the connecting rod 25 and is fixedly connected to the adjusting knob 40. Reset springs 32 are respectively provided between the two sides of the connecting rod 25 and the scraper 30. One end of the reset spring 32 is connected to the connecting rod 25, and the other end is connected to the scraper 30. A fixing hook 35 is provided at the end of the scraper 30 away from the connecting rod 25. The fixing hook 35 is connected to one end of the adjusting rope 36. The other end of the adjusting rope 36 passes around the pulley 31, passes through the through hole 33 and is fixedly connected to the adjusting shaft 34.

[0076] The working principle and beneficial effects of the above technical solution are as follows: when it is necessary to reduce the working length of the scraper 30, the adjusting knob 40 is rotated clockwise, the adjusting shaft 34 fixedly connected to the adjusting knob 40 rotates, and the adjusting rope 36 fixed on the fixed hook 35 passes through the pulley 31, passes through the through hole 33, is wound around the adjusting shaft 34, and pulls the scraper 30 to rotate, and the angle between the two scrapers 30 is reduced. When it is necessary to reduce the working length of the scraper 30, the adjusting knob 40 is rotated counterclockwise to loosen the adjusting rope 36 wound around the adjusting shaft 34, and the scraper 30 is reset under the action of the reset spring 32. By rotating the adjusting knob 40, the angle between the scraper 30 and the connecting rod 25 is changed, and then the working length of the scraper 30 is changed, so that the scraper assembly can adjust the scraping range of the scraper 30 according to the needs of the construction site.

[0077] Example 10

[0078] On the basis of Example 9, Fig.10 As shown, a locking frame 37 is provided at one end of the adjusting knob 40 , and the locking frame 37 is fixedly connected to the connecting rod 25 . A threaded hole is provided on one side of the locking frame 37 , and the locking frame 37 is threadedly connected to the locking bolt 38 .

[0079] The working principle and beneficial effects of the above technical solution are as follows: after rotating the adjustment shaft 34 to adjust the scraper 30 to the working length required at the construction site, tighten the locking bolt 38 to lock the adjustment shaft 34, and the locking frame 37 and the locking bolt 38 lock the adjustment shaft 34 to prevent the working length of the scraper 30 from changing suddenly during the scraping work.

[0080] Embodiment 11

[0081] On the basis of Example 8, Figure 7As shown, a dust cover 39 is provided on the side of the vertical plate 27 away from the support plate 19, an opening is provided at the lower end of the dust cover 39, and the dust cover 39 is provided outside the scraper assembly.

[0082] The working principle and beneficial effects of the above technical solution are as follows: a dust cover 39 for the scraper assembly is provided on the vertical plate 27 to prevent dust from entering the structure of the scraper assembly. The dust cover 39 can ensure that the transmission structure of the scraper assembly is not affected by dust and other debris, thereby maintaining the normal operation of the transmission structure.

[0083] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A composite slab joint construction measure, It is characterized in that include: A prefabricated bottom plate (3), a reserved groove (6), a truss structure, a joint (9) and additional steel bars (8); a cast-in-place concrete layer (4) is arranged on the upper surface of the prefabricated bottom plate (3); a reserved groove (6) is arranged at the end of the prefabricated bottom plate (3); two adjacent prefabricated bottom plates (3) are spliced ​​together, and a joint (9) is formed at the joint of the two adjacent prefabricated bottom plates (3); additional steel bars (8) and a truss structure are arranged inside the cast-in-place concrete layer (4); the additional steel bars (8) and the truss structure are placed on the reserved groove (6) in sequence from bottom to top; the left and right ends of the additional steel bars (8) are respectively fixedly connected to the left and right ends of the bottom of the truss structure; and the truss structure is located above the joint (9); The construction method includes the following steps: Step 1: A base plate mold of the prefabricated base plate (3) is manufactured according to design requirements, and convex blocks corresponding to the reserved grooves (6) are arranged at both ends of the base plate mold; Step 2: making a bottom steel bar layer (2) in the bottom plate mold, placing the truss steel bar (1) on the bottom steel bar layer (2), checking the position and type of the bottom steel bar layer (2) and the truss steel bar (1), pouring concrete in the bottom plate mold to make a prefabricated bottom plate (3), and forming a reserved groove (6) at the position corresponding to the protrusion of the prefabricated bottom plate (3); Step 3: transporting a plurality of prefabricated bottom plates (3) to the construction site for installation, assembling the prefabricated bottom plates (3), ensuring that the reserved grooves (6) of two adjacent prefabricated bottom plates (3) are aligned, and forming a joint (9) between the two adjacent prefabricated bottom plates (3); Step 4: Place the additional steel bars (8) transversely on the reserved groove (6), and ensure that the distance between the additional steel bars (8) at both ends of the joint (9) is consistent, place the truss structure on the additional steel bars (8), and tie the bottom of the truss structure to the transversely placed additional steel bars (8); Step 5: staggeredly arranging steel bars on the truss steel bars (1) to produce an upper steel bar layer (5), pouring cast-in-place concrete on the prefabricated bottom plate (3) to prepare a cast-in-place concrete layer (4); The upper surface of the cast-in-place concrete layer (4) is scraped and leveled by a surface scraping mechanism, the surface scraping mechanism comprising a guide rail (11), the guide rail (11) being erected above the cast-in-place concrete layer (4), a driving wheel (12) being slidably arranged on the upper surface of the guide rail (11), the driving wheel (12) being arranged at the lower end of a base (13), the driving wheel (12) being slidably connected to the guide rail (11), a fixing frame (14) being arranged on a side wall of the base (13), a track (15) being arranged on the lower surface of a horizontal section of the fixing frame (14), a propulsion assembly being arranged below the fixing frame (14), the propulsion assembly comprising: a propulsion motor (16 ), the propulsion motor (16) is fixedly connected to the side wall of the base (13), a reciprocating screw (17) is arranged at the output end of the propulsion motor (16), the end of the reciprocating screw (17) away from the base (13) is rotatably connected to the vertical section of the fixed frame (14), a propulsion plate (18) is sleeved on the reciprocating screw (17), the propulsion plate (18) is threadedly connected to the reciprocating screw (17), the upper end of the propulsion plate (18) is slidably connected to the lower side of the track (15), and a scraping component is arranged at the lower end of the propulsion plate (18), and the scraping component is used to scrape the upper surface of the cast-in-place concrete layer (4); The scraping assembly comprises: a support plate (19), the support plate (19) is fixedly connected to the lower end of the propulsion plate (18), a horizontal plate (26) is fixedly connected to one side of the support plate (19), a rotating motor (21) is arranged on the lower surface of the horizontal plate (26), a semicircular gear (28) is arranged at the output end of the rotating motor (21), a vertical plate (27) is arranged at one end of the horizontal plate (26) away from the support plate (19), a rotating shaft (20) is rotatably arranged between the vertical plate (27) and the support plate (19), a columnar gear (29) is arranged on the rotating shaft (20), and the horizontal plate (26) is provided with a plurality of rotating shafts (20). The semicircular gear (28) is meshedly connected with the columnar gear (29); one end of the rotating shaft (20) away from the support plate (19) extends to the outer wall of the vertical plate (27) and is fixedly connected to the rotating disk (22); a connecting rod (23) is arranged on a side wall of the rotating disk (22) away from the vertical plate (27); one end of the connecting rod (23) is hingedly connected to an eccentric position of the rotating disk (22); the other end of the connecting rod (23) is hingedly connected to the side wall of a slider (24); the slider (24) is slidably arranged on the side wall of the vertical plate (27); a scraper assembly is arranged at the bottom of the slider (24).

2. A composite plate joint construction measure according to claim 1, It is characterized in that The truss structure is any one of a triangular truss (7) or a quadrangular truss (10).

3. A composite plate joint construction measure according to claim 1, It is characterized in that The prefabricated bottom plate (3) is provided with a bottom steel bar layer (2), the bottom steel bar layer (2) is formed by a plurality of first transverse steel bars and first longitudinal steel bars arranged at equal intervals and cross-bound, a truss steel bar (1) is provided on the bottom steel bar layer (2), the truss steel bar (1) extends into the cast-in-place concrete layer (4) and is connected to the upper steel bar layer (5), the upper steel bar layer (5) is arranged in the cast-in-place concrete layer (4), the upper steel bar layer (5) is formed by a plurality of second transverse steel bars and second longitudinal steel bars arranged at equal intervals and cross-bound, and the upper end of the truss structure is connected to the upper steel bar layer (5).

4. A composite plate joint construction measure according to claim 1, It is characterized in that The thickness of the cast-in-place concrete layer (4) is consistent with the thickness of the prefabricated base plate (3), and the height of the truss structure is higher than the depth of the reserved groove (6).

5. A composite plate joint construction measure according to claim 1, It is characterized in that The scraper assembly comprises: a connecting rod (25), one end of the connecting rod (25) is fixedly connected to the bottom of the slider (24), the other end of the connecting rod (25) is hinged with scrapers (30) on both sides, an inner cavity is provided in the connecting rod (25), through holes (33) are provided on both sides of the inner cavity, pulleys (31) are provided on both sides of the connecting rod (25), an adjusting knob (40) is rotatably provided on the outer wall of the connecting rod (25), an adjusting shaft (34) is provided in the inner cavity of the connecting rod (25), one end of the adjusting shaft (34) is rotatably connected to the inner wall of the connecting rod (25), and the adjusting shaft The other end of the connecting rod (34) extends to the outer wall of the connecting rod (25) and is fixedly connected to the adjusting knob (40). Return springs (32) are respectively provided between the two sides of the connecting rod (25) and the scraper (30). One end of the return spring (32) is connected to the connecting rod (25), and the other end is connected to the scraper (30). The end of the scraper (30) away from the connecting rod (25) is provided with a fixing hook (35). The fixing hook (35) is connected to one end of the adjusting rope (36). The other end of the adjusting rope (36) passes around the pulley (31), passes through the through hole (33) and is fixedly connected to the adjusting shaft (34).

6. A composite plate joint construction measure according to claim 5, It is characterized in that A locking frame (37) is provided at one end of the adjusting knob (40), the locking frame (37) is fixedly connected to the connecting rod (25), a threaded hole is provided on one side of the locking frame (37), and the locking frame (37) is threadedly connected to a locking bolt (38).

7. A composite plate joint construction measure according to claim 6, It is characterized in that A dust cover (39) is provided on one side of the vertical plate (27) away from the support plate (19), an opening is provided at the lower end of the dust cover (39), and the dust cover (39) is arranged outside the scraper assembly.