Fabricated building beam column anti-seismic joint and construction method thereof
By connecting multiple pairs of beam connectors and bolt assemblies of precast columns and beams, combined with anti-seismic rubber pads and diagonal brace dampers, the problem of poor seismic performance of beam-column joints in prefabricated buildings is solved, simplifying the construction process and improving efficiency. and quality.
Patent Information
- Application Number
- CN202410958838.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure CN118727933A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building nodes, and more specifically, to an assembled building beam-column seismic node and a construction method thereof. Background Art
[0002] Prefabricated buildings are an important structural form to promote the industrialization of construction and green buildings due to their advantages such as short construction period, simple construction, and material saving. They will definitely play an important role in the future construction industry. At present, in order to meet the seismic requirements, prefabricated buildings mostly use wet connection for beam-column joints. The wet connection is to complete the production of beam-column components in the factory in advance, and then assemble and hoist them after transporting them to the site, tie the steel bars at the nodes and support the formwork, and then pour concrete on the beam-column nodes, and then pour the integral structure after completion. Since the concrete at the node solidifies after the prefabricated concrete solidifies, the two cannot be truly integrated, the tensile strength at the interface is low, forming a weak link, and reducing the seismic performance of the building. In addition, concrete still needs to be poured on site, and the assembly rate is low.
[0003] In order to meet the requirements of structural seismic resistance, the connection of prefabricated beam-column components is mostly based on the principle of equivalent cast-in-place. This connection method requires precise placement of components during construction, steel bar connection, mortar pouring or concrete pouring at the construction site, and sometimes prestressed steel bar tensioning at the construction site, which has the disadvantages of low construction efficiency, poor node ductility, and difficulty in ensuring node quality.
[0004] The invention patent with the publication number CN115324199A proposes "a prefabricated reinforced concrete beam for assembled buildings connected by tie plates". The invention provides a prefabricated reinforced concrete beam for assembled buildings, which is connected by embedded steel plates and energy-absorbing tie plates, and anti-seismic rubber is arranged at the connection, which enhances the seismic performance and energy-absorbing capacity of the building. However, in this technical solution, tie plates are used to connect the left and right beams. This method cannot ensure that there will be no deviation in the left and right directions of the butt joint beams under the action of earthquake loads, and the horizontal load generated by the earthquake will be transmitted through the tie plates. Therefore, the tie plates are easily broken in an earthquake, causing structural damage. The invention patent with publication number CN112376687A proposes an "earthquake-resistant prefabricated beam-column node of prefabricated buildings and its construction method". By setting a buffer gap, the lateral impact of the prefabricated beam-column node is buffered. At the same time, by setting the structure of a rotating sleeve rod and a rotating sleeve and limiting their connection, the longitudinal impact of the prefabricated beam-column node is buffered, thereby improving the seismic performance of the prefabricated beam-column node of the prefabricated building and enhancing the stability of the overall structure. However, because the horizontal load generated by the earthquake cannot act directly on the rotating sleeve, but is transferred to the column through two toothed bolts, the seismic resistance of the structure is not necessarily ideal. Summary of the invention
[0005] In view of the above-mentioned defects in the prior art, the present invention provides a seismic-resistant node of prefabricated building beams and columns and a construction method thereof, so as to solve a series of problems existing in the current prefabricated building beam-column nodes, such as poor structural seismic performance, complicated construction process, low construction efficiency and high construction cost.
[0006] To achieve the above-mentioned purpose, on the one hand, the present invention provides an anti-seismic node of assembled building beams and columns, comprising a prefabricated column, a first prefabricated beam and a second prefabricated beam; the tongue-and-groove connection of the first prefabricated beam and the second prefabricated beam is connected by two pairs of beam connectors and bolt assemblies matching the beam connectors; it is characterized in that the prefabricated column and the first prefabricated beam are prefabricated as a whole; the connecting surfaces of the tongue-and-groove connection are provided with anti-seismic rubber pads; a plurality of pairs of circular bolt holes and a pair of strip bolt holes are respectively opened on both sides of each beam connector; the first bolt passes through the circular bolt hole, and the beam connector is fixed to the first prefabricated beam and the second prefabricated beam by fastening with a nut, and the second bolt passes through the strip bolt hole, and the connection between the first prefabricated beam and the second prefabricated beam is realized by fastening with a nut; a seismic damper with an oblique brace is used to connect the first embedded part of the outer wall of the prefabricated column and the second embedded part under the second prefabricated beam.
[0007] Furthermore, the seams at the tongue-and-groove joints are filled with foam fillers.
[0008] Furthermore, each pair of beam connectors is symmetrically arranged on two side surfaces of the tongue-and-groove connection between the first prefabricated beam and the second prefabricated beam.
[0009] Furthermore, each beam connecting member is provided with two pairs of upper and lower circular bolt holes.
[0010] On the other hand, the present invention provides a construction method of an assembled building beam-column seismic node, characterized in that the implementation of the assembled building beam-column seismic node as described above comprises the following steps:
[0011] Step S1, the prefabricated column including the first prefabricated beam is hoisted and installed;
[0012] Step S2, installing the anti-vibration rubber pad;
[0013] Step S3, hoisting the second prefabricated beam and overlapping it with the tongue and groove of the first prefabricated beam;
[0014] Step S4, using a first bolt to pass through the circular bolt hole on the beam connector, and fastening the pair of beam connectors to the first prefabricated beam and the second prefabricated beam by nuts; using a second bolt to pass through the strip bolt hole on the beam connector, and fastening the first prefabricated beam and the second prefabricated beam by nuts;
[0015] Step S5, using a diagonal braced seismic damper to connect the first embedded part of the outer wall of the prefabricated column and the second embedded part under the second prefabricated beam, and connecting the prefabricated column and the second prefabricated beam to complete the node construction.
[0016] Furthermore, after step S4, foam filling material is filled in the joints of the prefabricated beams to seal the joints between the two prefabricated beams.
[0017] Compared with the prior art, the above invention has the following advantages or beneficial effects:
[0018] (1) The integral node structure of the present invention achieves good earthquake resistance through a variety of measures: the beam connector is fixed by a circular bolt hole and a bolt-nut assembly, and the connection between the first precast beam and the second precast beam is achieved by a strip bolt hole and a bolt-nut assembly, which prevents the precast beams from being misaligned under the action of an earthquake after being connected, and can satisfy the requirement that the precast beams make a small displacement along the beam axis to offset part of the horizontal load generated by the earthquake. The embedded parts on the precast column and the second precast beam are connected by an earthquake-resistant damper, which can offset part of the horizontal load generated by the earthquake and ensure that the structure has good earthquake resistance. The earthquake-resistant rubber pad at the tongue-and-groove connection between the first precast beam and the second precast beam also prevents horizontal sliding and earthquake resistance.
[0019] (2) The beam-column seismic node structure of the present invention is easy to construct and has a simple and reasonable structural connection, which is conducive to improving construction efficiency and enhancing project quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.
[0021] Figure 1 It is a front left view of a beam-column seismic node structure according to an embodiment of the present invention;
[0022] Figure 2 for Figure 1 A schematic diagram of the structure of a pair of beam connectors;
[0023] Figure 3 for Figure 1 Front right view of the center beam-column seismic node structure;
[0024] Figure 4 for Figure 1 Left view of the center beam-column seismic node structure;
[0025] Figure 5 for Figure 1 Bottom view of the center beam-column seismic node structure;
[0026] Among them, 1. prefabricated column; 2. first prefabricated beam; 3. beam connector; 31. circular bolt hole; 32. strip bolt hole; 4. bolt assembly; 41. first bolt; 42. second bolt; 5. second prefabricated beam; 6. seismic rubber pad; 7. seismic damper; 81. first embedded part; 82. second embedded part; 9. foam filling material. DETAILED DESCRIPTION
[0027] The following is a further description of the structure of the present invention in conjunction with the accompanying drawings and specific embodiments, but it is not intended to limit the present invention. The execution order of actions, steps, etc. in the devices and methods shown in the claims, specifications and drawings of the present invention can be implemented in any order as long as there is no special explicit limitation on the order and the output of the previous processing is not used in the subsequent processing.
[0028] It should also be noted that in the description of this application, the directions or positional relationships indicated by the terms "up", "down", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they should not be understood as limitations on the present invention.
[0029] It should be understood that the terms "first" and "second" described in this application are only used for descriptive purposes and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.
[0030] The technical solution of the present invention is described in detail below with specific embodiments and examples.
[0031] Example
[0032] See also Figures 1 to 5 The present embodiment relates to an anti-seismic node of beams and columns of an assembled building, comprising a prefabricated column 1, a first prefabricated beam 2 and a second prefabricated beam 5; the tongue-and-groove connection of the first prefabricated beam 2 and the second prefabricated beam 5 is connected by two pairs of beam connectors 3 and bolt assemblies 4 matched with the beam connectors. The prefabricated column 1 and the first prefabricated beam 2 are prefabricated as one piece. Anti-seismic rubber pads 6 are provided on the connection surfaces of the tongue-and-groove connection. A plurality of pairs of circular bolt holes 31 and a pair of strip bolt holes 32 are respectively provided on both sides of each beam connector 3. Preferably, each beam connector 3 is respectively provided with two pairs of upper and lower circular bolt holes 31.
[0033] The first bolt 41 passes through the circular bolt hole 31 and is fastened with a nut to fix the beam connector 3 on the first precast beam 2 and the second precast beam 5; the second bolt 42 passes through the strip bolt hole 32 and is fastened with a nut to achieve the connection between the first precast beam 2 and the second precast beam 5; the seismic damper 7 of the diagonal brace is used to connect the first embedded part 81 of the outer wall of the precast column 1 and the second embedded part 82 under the second precast beam 5.
[0034] As a preferred technical solution, further: the joints at the tongue-and-groove joints are filled with foam fillers 9 to make the beam look structurally intact and beautiful.
[0035] As a preferred technical solution, further: each pair of beam connectors 3 are symmetrically arranged on two sides of the tongue-and-groove connection of the first precast beam 2 and the second precast beam 5 to prevent the left and right precast beams from being misaligned when connected under the action of an earthquake after installation.
[0036] The construction method of the above-mentioned prefabricated building beam-column seismic node comprises the following steps:
[0037] Step S1, the prefabricated column 1 including the first prefabricated beam 2 is hoisted and installed;
[0038] Step S2, installing the anti-vibration rubber pad 6;
[0039] Step S3, hoisting the second prefabricated beam 5 and overlapping it with the tongue and groove of the first prefabricated beam 2;
[0040] Step S4, using a first bolt 41 to pass through the circular bolt hole 31 on the beam connector 3, and fastening the pair of beam connectors 3 to the first precast beam 2 and the second precast beam 5 by nuts; using a second bolt 42 to pass through the strip bolt hole 32 on the beam connector 3, and fastening the first precast beam 2 and the second precast beam 5 by nuts;
[0041] Step S5: Use the diagonal braced seismic damper 7 to connect the first embedded part 81 of the outer wall of the prefabricated column 1 and the second embedded part 82 below the second prefabricated beam 5, and connect the prefabricated column 1 and the second prefabricated beam 5 to complete the node construction. The seismic damper 7 is an existing product available on the market.
[0042] As a preferred technical solution, further: after step S4, the joints of the prefabricated beams are filled with foam filling material 9 to seal the joints between the two prefabricated beams.
[0043] The following is an exemplary description of the construction process of the above-mentioned prefabricated building beam-column seismic nodes.
[0044] After the prefabricated column (including the first prefabricated beam) is hoisted, the seismic rubber pad is installed. After the second prefabricated beam is hoisted and overlapped with the first prefabricated beam, the prefabricated beams on both sides are connected by connecting screws and connectors to make them one body. The joints of the prefabricated beams on both sides are filled with foam filling materials to seal the joints between the prefabricated beams on both sides. Finally, the seismic damper is used to connect the embedded parts on the prefabricated column and the second prefabricated beam. The prefabricated column and the second prefabricated beam are connected to realize the seismic node construction of the beam column. More specifically, the four connectors are arranged in groups of two, symmetrically on both sides of the prefabricated beam connection groove, and connected by screws. While fixing the connectors, the left and right prefabricated beams are also fixed together to prevent the left and right prefabricated beams from being misaligned after installation under the action of earthquake. Each connector has 4 circular and 2 strip holes, a total of 6 bolt holes, of which 4 circular holes pass through screws to fix the connector on the prefabricated beam, and two strip holes pass through screws to fix the right prefabricated beam, so that it can only make a small displacement along the beam axis.
[0045] To ensure that the structure has good seismic performance, after the left and right prefabricated beams are connected through connectors, the prefabricated columns and embedded parts on the right prefabricated beams are connected through seismic dampers to offset part of the horizontal load generated by the earthquake.
[0046] From the above description, it can be seen that the beam-column seismic node structure provided by the present invention achieves good seismic effect through a variety of measures: fixing the beam connector through circular bolt holes and bolt-nut assemblies, and realizing the connection between the first prefabricated beam and the second prefabricated beam through strip bolt holes and bolt-nut assemblies, preventing the deviation of the docking under the action of earthquake after the prefabricated beams are connected, and can satisfy the prefabricated beams to make a small displacement along the beam axis to offset part of the horizontal load generated by the earthquake. Connecting the embedded parts on the prefabricated column and the second prefabricated beam through a seismic damper can offset part of the horizontal load generated by the earthquake and ensure that the structure has good seismic performance. The seismic rubber pads at the tongue-and-groove connection between the first prefabricated beam and the second prefabricated beam also play a role in preventing horizontal sliding and seismic resistance. The beam-column seismic node structure of the present invention has a convenient construction process, and the structural connection is simple and reasonable, which is conducive to improving construction efficiency and improving project quality.
[0047] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.
[0048] The preferred embodiments of the present invention are described above. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.
Claims
1. An assembled building beam-column seismic node, comprising a prefabricated column (1), a first prefabricated beam (2) and a second prefabricated beam (5); the tongue-and-groove joints of the first prefabricated beam (2) and the second prefabricated beam (5) are connected by two pairs of beam connectors (3) and bolt assemblies (4) matched with the beam connectors; characterized in that: The prefabricated column (1) and the first prefabricated beam (2) are prefabricated as a whole; the connection surfaces of the tongue-and-groove connection are provided with anti-seismic rubber pads (6); a plurality of pairs of circular bolt holes (31) and a pair of strip bolt holes (32) are respectively provided on both sides of each beam connector (3); a first bolt (41) passes through the circular bolt hole (31) and is fixed to the first prefabricated beam (2) and the second prefabricated beam (5) by tightening with a nut; a second bolt (42) passes through the strip bolt hole (32) and is connected to the first prefabricated beam (2) and the second prefabricated beam (5) by tightening with a nut; and an anti-seismic damper (7) of the diagonal brace connects a first embedded part (81) on the outer wall of the prefabricated column (1) and a second embedded part (82) below the second prefabricated beam (5).
2. The seismic node of an assembled building beam-column according to claim 1, characterized in that: The seam at the tongue-and-groove joint is filled with foam filling material (9).
3. The seismic node of a prefabricated building beam column according to claim 1, characterized in that: Each pair of beam connectors (3) is symmetrically arranged on two side surfaces of the tongue-and-groove connection between the first prefabricated beam (2) and the second prefabricated beam (5).
4. The seismic node of a prefabricated building beam column according to claim 1, characterized in that: Each beam connecting member (3) is respectively provided with two pairs of upper and lower circular bolt holes (31).
5. A construction method for seismic nodes of prefabricated building beams and columns, characterized in that: Implementing the prefabricated building beam-column seismic node according to any one of claims 1 to 4 comprises the following steps: Step S1, the prefabricated column (1) including the first prefabricated beam (2) is hoisted and installed; Step S2, installing the anti-vibration rubber pad (6); Step S3, hoisting the second prefabricated beam (5) and overlapping it with the tongue and groove of the first prefabricated beam (2); Step S4, using a first bolt (41) to pass through the circular bolt hole (31) on the beam connector (3), and fastening the pair of beam connectors (3) to the first prefabricated beam (2) and the second prefabricated beam (5) by nuts; using a second bolt (42) to pass through the strip bolt hole (32) on the beam connector (3), and fastening the first prefabricated beam (2) and the second prefabricated beam (5) by nuts; Step S5, using a diagonally braced seismic damper (7) to connect the first embedded part (81) of the outer wall of the prefabricated column (1) and the second embedded part (82) below the second prefabricated beam (5), and connecting the prefabricated column (1) and the second prefabricated beam (5) to complete the node construction.
6. The construction method of the seismic node of the assembled building beam column according to claim 5 is characterized in that: After step S4, the joints of the prefabricated beams are filled with foam filling material (9) to seal the joints between the two prefabricated beams.
Citation Information
Patent Citations
Anti-seismic prefabricated beam-column joint of fabricated building and construction method of anti-seismic prefabricated beam-column joint
CN112376687A
Fabricated building prefabricated reinforced concrete beam connected by batten plates
CN115324199A
Self-restoring precast concrete beam-column joint device with top and bottom friction energy dissipation
CN108678166A
Precast prestressed beam-column joint torsion-resistant structure and installation method
CN110453778A
Joint structure of concrete building, and its construction method
JP2009281011A
Cited By
Prefabricated beam-column connecting structure
CN118621902A
UHPC (Ultra High Performance Concrete) pouring connection method for built-in T-shaped steel joints of fabricated beam columns
CN120666839A