Segmented filling well completion pipe string structure and operation method thereof
The thermal expansion of the isolation ring made of morphological memory material makes close contact with the inner wall of the wellbore. Combined with multiple filter screens and segmented isolation components, the problem of poor filling effect and high pressure caused by the collapse of the mudstone section in the existing technology is solved. A more efficient and safe segmented isolation and support effect is achieved.
Patent Information
- Application Number
- CN202411050616.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-10-15
AI Technical Summary
The existing staged filling and completion technology has poor filling effect when the mudstone section collapses, the pressure is high, and there is a risk of sand stuck, making it difficult to effectively prevent sand and improve the development efficiency of oil and gas wells.
The isolation ring made of morphological memory material is in close contact with the inner wall of the wellbore through thermal expansion to achieve segmented isolation. The combined structure of multiple filter screens and segmented isolation components improves the isolation effect and support capacity. , to avoid bypass channel restrictions.
It significantly improves the staged isolation effect and ensures the safety and efficiency of well completion operations. It is suitable for complex well trajectories and large well deviations. It does not require high-pressure liquid injection and setting tools, and reduces the risk of sand stuck.
Smart Images

Figure CN118774670A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of petroleum engineering, and in particular relates to a segmented filling completion pipe string structure and an operation method thereof. Background Art
[0002] The development of marine oil and gas resources is the hot spot and focus of the current development of the world's marine economy. Marine oil and gas resources not only have large reserves, but modern science and technology have already possessed tremendous capabilities for their development. The marine oil and gas industry has developed into an emerging, high-value-added leading industry in the marine economy.
[0003] At present, drilling and completion of offshore oil fields are difficult and costly. With the improvement of drilling technology and capabilities, the horizontal well sections are long and the trajectories are complex. In addition to oil and water layers, the production sections may also have more mudstone sections. During the open hole filling and sand control completion stage, the risk of mudstone section collapse is high, which can easily lead to poor filling effect, premature sand removal and other complex downhole problems.
[0004] In general open-hole gravel-filled completion, the sand control string is not connected to the packer. The annulus between the completion string and the open-hole well wall relies on proppant to achieve the purpose of support and filtration of sand, which cannot effectively deal with the problems caused by the collapse of the mudstone section. The open-hole segmented sand control completion is to connect the completion string to the expansion packer and use the expansion packer to achieve segmented isolation of the horizontal well section. However, for oil and gas wells that need to improve sand control capabilities, the sand control effect is weak and the number of segments is limited.
[0005] At present, domestic oil fields have begun to adopt segmented packer segmented filling technology, using a packer with a bypass filling channel, placed at both ends of the mudstone section to achieve cross-packer filling. When completing the well, the expandable rubber cartridge is first set, and the filling sand-carrying fluid moves to the toe end through the bypass channel inside the packer. After the filling is completed, the bypass channel is closed using a switch tool.
[0006] However, due to the small size of the bypass channel, as the only channel for the sand-carrying fluid to flow through the packer during the filling process, the flow friction is large, resulting in high filling pressure, and poor filling effect when the wellhead pressure and the string pressure resistance are limited. In addition, when the remote filling is screened out, a higher pressure will be generated near the bypass channel, causing the bypass channel to be filled with densely packed proppant. When the service string is lifted, there is a high risk of sand jamming in the bypass channel closing tool.
[0007] It can be seen that improving the staged isolation effect, ensuring the safety of completion operations, and improving the efficiency of completion operations are of great significance to improving the exploration and development of oil and gas resources. Summary of the invention
[0008] In order to solve all or part of the above problems, the purpose of the present invention is to provide a segmented filling completion string structure and an operation method thereof, which can improve the segmented isolation effect, ensure the safety of completion operations, and improve the efficiency of completion operations.
[0009] In a first aspect, the present invention provides a segmented packing completion string structure, comprising a top isolation assembly, a filter screen, a segmented isolation component and a guide shoe, wherein the filter screen and the segmented isolation component are provided in plurality, the plurality of filter screens and the plurality of segmented isolation components are arranged at intervals and connected to each other, the top isolation assembly is connected to the filter screen at the uppermost position, and the guide shoe is connected to the filter screen at the lowermost position;
[0010] Each of the segmented isolation assemblies includes an isolation tube and two blind pipe short sections, and the two blind pipe short sections are respectively connected to the corresponding ends of the isolation tube. Each of the isolation tubes is respectively fixedly sleeved with an isolation ring, which is made of a shape-memory material and can expand due to heat and tightly abut against the inner wall of the wellbore to achieve isolation.
[0011] Optionally, the outer side wall of the isolation ring is provided with a protective sleeve, and the protective sleeve is made of a soluble material.
[0012] Optionally, the thermal expansion temperature of the sealing ring is 60°C-100°C.
[0013] Optionally, the filter screen located between two adjacent segmented isolation assemblies may be replaced by a blind pipe section.
[0014] Optionally, the top isolation assembly includes a center pipe and a top isolation device, the bottom end of the center pipe is connected to the filter screen at the uppermost position, and the top isolation device is fixed to the top end of the center pipe and is used to be seated on the inner wall of the wellbore.
[0015] In a second aspect, the present invention provides a method for performing segmented filling of a completion string structure, comprising the following steps:
[0016] S1, select the required isolation ring according to the demand, and fix the isolation ring on the isolation cylinder, and then connect the top isolation assembly, multiple filter screens, multiple segmented isolation components and guide shoes to form a completion string structure;
[0017] S2, use the service tool to set the top isolation assembly;
[0018] S3, lowering the filling service tool and performing gravel filling operations;
[0019] S4, utilizing the wellbore temperature or circulating hot water at 60°C-100°C into the wellbore to heat and expand the isolation ring until the isolation ring is fully expanded;
[0020] S5, pull out the filling service tool and end the segmented filling and sand control completion operation.
[0021] Optionally, in S1, the isolation ring is compressed to a preset size using a mold under low temperature conditions, and the isolation ring is mounted on the isolation tube, and then the protective sleeve is installed on the isolation ring, or a protective material is coated on the outer wall of the isolation ring to form a protective sleeve.
[0022] Optionally, in S1, according to the running time of the completion string structure and the gravel packing operation time, a delayed foaming agent is added to the material of the expansion ring as required to suppress the deformation time of the expansion ring and provide sufficient time for downhole operations;
[0023] According to the running time of the completion string structure and the gravel packing operation time, the thickness of the protective sleeve and the amount of soluble material are changed as required to control the dissolution time of the protective sleeve and ensure that the protective sleeve is completely dissolved before the expansion ring expands.
[0024] Optionally, in S3, during the gravel packing operation, a reverse circulation test is first performed, and then 0.25-0.45 m 3 / min, 0.55-0.75m 3 / min, 0.85-1.05m 3 / min, 1.15-1.35m 3 / min displacement to conduct positive circulation test, and then inject sand-carrying fluid into the wellbore;
[0025] Optionally, in S3, during the gravel packing operation, a density of 0.8-1.2 g / cm is selected as required. 3 The proppant should be 1.0-1.5g / cm 3 , seawater or salt water with a viscosity of 1.0-2.0 mPa·s is used as the sand-carrying liquid, and sand filling is performed at a sand ratio of 4.5%-5.5%.
[0026] It can be seen from the above technical solutions that the segmented filling completion string structure and the operation method thereof provided by the present invention have the following advantages:
[0027] The device achieves isolation between the completion string and the wellbore by using a sealing ring made of a shape memory material to expand when heated. Compared with the existing segmented packing packer filling technology, this design does not have a bypass channel or other shrinkage, the filling process is safer, and a higher filling displacement can be used, significantly improving the operating efficiency. During the thermal expansion of the sealing ring, the proppant in the annulus between the completion string and the wellbore can be embedded in the sealing ring, which can not only improve the sealing effect, but also effectively support the inner wall of the wellbore.
[0028] At the same time, the size of the isolation ring is comparable to that of the completion string, and is suitable for segmented isolation in special situations such as large well deviation, large dogleg, and complex wellbore trajectory. It is easy to put in and has no quantity limit. In addition, the isolation method of this design is simpler. Compared with traditional expansion packers, this design does not require the insertion of sealing tools or the injection of high-pressure liquids, and the operation is safer and more efficient.
[0029] Other features and advantages of the present invention will be set forth in the description which follows. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The accompanying drawings are used to provide a further understanding of the technical solution of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the technical solution of the present invention and do not constitute a limitation on the technical solution of the present invention.
[0031] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present invention;
[0032] Figure 2 A schematic diagram of a use state of an embodiment of the present invention;
[0033] Figure 3 It is a structural schematic diagram of a completion string in an embodiment of the present invention;
[0034] Figure 4 It is a cross-sectional view of a segmented isolation assembly in an embodiment of the present invention.
[0035] Description of reference numerals:
[0036] 1. Top packer assembly; 11. Center pipe; 12. Top packer; 2. Filter screen; 3. Segmented packer assembly; 31. Packer cylinder; 32. Blind pipe nipple; 33. Packer ring; 34. Protective sleeve; 35. Blind pipe section; 4. Guide shoe. DETAILED DESCRIPTION
[0037] To make the purpose, technical solution and advantages of the present invention more clear, the embodiments of the present invention will be described in detail with reference to the accompanying drawings. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other arbitrarily without conflict.
[0038] like Figure 1 , Figure 2 , Figure 3 , Figure 4An embodiment of the present invention is shown, in which a segmented filling completion tubular structure is disclosed, including a top isolation assembly 1, a filter screen 2, a segmented isolation component 3 and a guide shoe 4, wherein the filter screen 2 and the segmented isolation component 3 are respectively provided with a plurality of filter screens 2 and a plurality of segmented isolation components 3, which are arranged at intervals and connected to each other, the top isolation assembly 1 is connected to the filter screen 2 at the uppermost position, and the guide shoe 4 is connected to the filter screen 2 at the lowermost position.
[0039] In one embodiment, Figure 1 , Figure 2 As shown, each segmented isolation assembly 3 comprises an isolation tube 31 and two blind tube short sections 32, and the two blind tube short sections 32 are respectively connected to the corresponding ends of the isolation tube 31. An isolation ring 33 is fixedly sleeved on each isolation tube 31, and the isolation ring 33 is made of a shape memory material, and the isolation ring 33 can expand under heat and abut tightly against the inner wall of the wellbore to achieve isolation.
[0040] In other embodiments, the isolation tube 31 may also be replaced by a packer, that is, the isolation tube 31 is pressed onto the outer sleeve of the packer.
[0041] When the completion string is lowered and during the gravel packing process, the isolation ring 33 does not expand. After the gravel packing is completed, the annulus between the completion string and the wellbore is filled with sand-carrying fluid. When the isolation ring 33 expands due to heat, the proppant in the sand-carrying fluid can be embedded in the interior of the isolation ring 33, which can not only ensure the isolation effect and achieve effective isolation, but also achieve effective support for the inner wall of the wellbore.
[0042] The segmented filling completion string structure in this embodiment achieves isolation between the completion string and the wellbore by using a sealing ring 33 made of a shape memory material to expand when heated. Compared with the existing segmented filling packer filling technology, this design has no bypass channel or other shrinkage, so the filling process is safer and a higher filling displacement can be used, which significantly improves operating efficiency.
[0043] In this embodiment, both ends of the isolation tube 31 are connected to the blind pipe short joints 32 respectively. The purpose is to prevent the liquid from filtering into the completion string from the vicinity of the isolation tube 31 during the filling process, and always exist in the wellbore annulus in the form of sand-carrying liquid, so as to avoid the densely filled proppant limiting the radial expansion capacity of the isolation ring 33, so as to ensure the stable sealing of the isolation ring 33.
[0044] In one embodiment, Figure 1 , Figure 4 As shown, a protective sleeve 34 is provided on the outer wall of the isolation ring 33 to isolate and protect the expansion ring and reduce the risk of scratching or falling off of the isolation ring. At the same time, the protective sleeve 34 is made of soluble material and can be dissolved in water to ensure that the expansion ring can expand smoothly when heated.
[0045] In this embodiment, the thermal expansion temperature of the sealing ring 33 is 60° C.-100° C., and the expansion ring is made of polyester material or nickel-titanium alloy material, etc. Of course, in other embodiments, other irreversibly deformable polymers or alloy materials can also be used.
[0046] In this embodiment, the protective layer is made of soluble materials such as soluble aluminum alloy or lithium-magnesium alloy. Of course, in other embodiments, other soluble materials can also be used. The soluble alloy coating can also be directly coated on the expansion ring. After the soluble alloy coating is cured, a membrane structure will be formed, that is, a protective cover 34 will be automatically formed.
[0047] In one embodiment, Figure 1 , Figure 2 As shown, the top isolation assembly 1 includes a central pipe 11 and a top isolation device 12. The bottom of the central pipe 11 is connected to the filter screen 2 at the uppermost position. The top isolation device 12 is fixed to the top of the central pipe 11 and is used to be seated on the inner wall of the wellbore.
[0048] In one embodiment, Figure 2 , Figure 3 As shown, the filter screen 2 between two adjacent segmented isolation assemblies 3 can also be replaced by a blind pipe section 35. The filter screen 2 or the blind pipe section 35 can be installed between two adjacent isolation assemblies according to the actual length of the wellbore or actual needs. At the same time, the filter screen 2 can be a long whole-segment structure, or it can be formed by two shorter filter screens 2 connected by a blind pipe. In this embodiment, except for the filter screen 2 at the uppermost position, the remaining filter screens 2 all adopt a long whole-segment structure.
[0049] The embodiment of the present invention also discloses a method for performing segmented filling of a well completion string structure, comprising the following steps:
[0050] S1, select the required isolation ring 33 as required, and fix the isolation ring 33 on the isolation tube 31, then connect the top isolation assembly 1, multiple filter screens 2, multiple segmented isolation components 3 and guide shoes 4 to form a completion string structure, and then lower the completion string structure into the wellbore.
[0051] S2, control the top isolation assembly 1 to set through the service tool.
[0052] S3, lower the filling service tool and carry out gravel filling operations.
[0053] S4, utilizing the wellbore temperature or circulating hot water at 60° C.-100° C. into the wellbore to heat and expand the isolation ring 33 until the isolation ring 33 is fully expanded.
[0054] S5, pull out the filling service tool and end the segmented filling and sand control completion operation.
[0055] In S1, the isolation ring 33 is compressed to a preset size using a mold under low temperature conditions, and the isolation ring 33 is mounted on the isolation tube 31, and then the protective cover 34 is installed on the isolation ring 33, or a protective material is coated on the outer wall of the isolation ring 33 to form the protective cover 34.
[0056] In S1, according to the running time of the completion string structure and the gravel filling operation time, a polyurethane delayed foaming agent is added to the material of the expansion ring as required to suppress the deformation time of the expansion ring and provide sufficient time for downhole operations.
[0057] In S1, according to the running time of the completion string structure and the gravel packing operation time, the thickness of the protective sleeve 34 and the amount of soluble material are changed as required to control the dissolution time of the protective sleeve 34 and ensure that the protective sleeve 34 is completely dissolved before the expansion ring expands.
[0058] In S3, during the gravel filling operation, a reverse circulation test was first performed, and then 0.25-0.45m 3 / min, 0.55-0.75m 3 / min, 0.85-1.05m 3 / min, 1.15-1.35m 3 A positive circulation test is carried out with a displacement of 1 / min, and then sand-carrying fluid is injected into the wellbore.
[0059] In S3, during the gravel filling operation, the density is selected as 0.8-1.2g / cm 3 The proppant should be 1.0-1.5g / cm 3 , seawater or salt water with a viscosity of 1.0-2.0 mPa·s is used as the sand-carrying liquid, and sand filling is performed at a sand ratio of 4.5%-5.5%.
[0060] The sand-carrying fluid used in this method allows the proppant in the sand-carrying fluid to always be in a suspended state during the filling process. Compared with conventional expanded clay filling, there is no obvious α wave filling stage, which can avoid the proppant from accumulating in the annulus due to gravity during horizontal well filling, thereby ensuring the sealing effect of the isolation ring 33.
[0061] In order to more fully explain the structure of the staged filling completion string and its operation method, take a long horizontal well as an example:
[0062] Well A12H is a horizontal well with a horizontal production section length of 996m, a maximum well inclination of 90°, a maximum dogleg of 4.6° / 30m, and a production layer of loose sandstone bottom water reservoir. There is a mudstone section in the middle. The horizontal well toe trajectory sinks, and there is a risk of flooding. The initial daily liquid production of Well A12H is designed to be 1000m 3 / d, the maximum daily liquid production in the medium term is 3000m 3 / d.
[0063] Due to the long horizontal section of the wellbore, the reverse circulation friction resistance of conventional ceramsite filling exceeds the limit pressure. After comparison, the preferred 3 The lightweight proppant has a density of 1.1 g / cm 3 The filtered seawater is used as the sand carrying fluid.
[0064] Since the horizontal section of the wellbore is relatively long, the isolation assembly is set to four groups, and the isolation ring 33 and the blind pipe short section 32 at both ends of the isolation tube 31 form a blind section with a length of 17m. The sand-carrying fluid cannot filter into the completion string at this blind section, and is more likely to circulate back through the dogleg end filter screen 2.
[0065] After the completion string structure is lowered into place and the top packer 12 is set, the gravel packing operation procedure is started. After the reverse circulation test is completed, 0.32m 3 / min, 0.64m 3 / min, 0.96m 3 / min、1.27m 3 The positive cycle test was started with gradually increasing displacement of 1.04 l / min. During filling, sand was added at a sand ratio of 5%.
[0066] The safety pressure during filling is designed to be 8.27MPa according to the filling friction, net liquid column pressure, formation fracture pressure, etc. During filling, the lightweight proppant has good suspension and gradually accumulates from the toe end to the heel end of the completion string. Therefore, during the filling process, when the pressure is close to the safety pressure, the sand-carrying fluid is 0.08m 3 / min, and gradually reduce the displacement in steps until the sand removal pressure is reached.
[0067] The A12H well has a large daily liquid production, and there is a risk of collapse in the middle mudstone section, which causes the migration of particles to block the wellbore. The segmented filling sand control can use a blind section in the mudstone section to isolate it, so that the particles in the mudstone section will not enter the completion string, ensuring smooth production of the wellbore.
[0068] As can be seen from the above, the completion string structure achieves isolation between the completion string and the wellbore by using the isolation ring 33 made of shape memory material to expand when heated. Compared with the existing segmented packing packer filling technology, this design does not have a bypass channel or other shrinkage, the filling process is safer, and a higher filling displacement can be used, which significantly improves the operating efficiency. During the thermal expansion of the isolation ring 33, the proppant in the annulus between the completion string and the wellbore can be embedded in the isolation ring 33, which can not only improve the isolation effect, but also achieve effective support for the inner wall of the wellbore.
[0069] At the same time, the size of the isolation ring 33 is comparable to that of the completion string, and is suitable for segmented isolation in special situations such as large well inclination, large doglegs, and complex wellbore trajectories. It is easy to put in and there is no limit on the number of wells. In addition, the isolation method of this design is simpler. Compared with traditional expansion packers, this design does not require the insertion of sealing tools or the injection of high-pressure liquids, and the operation is safer and more efficient. For long water wells across mudstone sections, cross-isolation plugging can be achieved to avoid blockage of the wellbore caused by the migration of particles in the mudstone section during long-term production, thereby extending the life of the oil well.
[0070] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in the present invention should have the common meanings understood by those skilled in the art to which the present invention belongs.
[0071] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. In the description of the present invention, the meaning of "plurality" is more than two, unless otherwise clearly and specifically defined.
[0072] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention. In particular, as long as there is no structural conflict, the various technical features mentioned in each embodiment can be combined in any way. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
Claims
1. A segmented filling completion string structure, characterized in that: The invention comprises a top isolation assembly (1), a filter screen (2), a segmented isolation component (3) and a guide shoe (4), wherein a plurality of the filter screen (2) and the segmented isolation component (3) are respectively provided, and the plurality of the filter screens (2) and the plurality of the segmented isolation components (3) are arranged at intervals and connected to each other, the top isolation assembly (1) is connected to the filter screen (2) at the uppermost position, and the guide shoe (4) is connected to the filter screen (2) at the lowermost position; Each of the segmented isolation assemblies (3) comprises an isolation tube (31) and two blind tube short sections (32), and the two blind tube short sections (32) are respectively connected to the corresponding ends of the isolation tube (31), and an isolation ring (33) is fixedly sleeved on each of the isolation tubes (31). The isolation ring (33) is made of a shape memory material, and the isolation ring (33) can expand due to heat and tightly abut against the inner wall of the wellbore to achieve isolation.
2. The segmented filling completion string structure according to claim 1 is characterized in that: The outer side wall of the sealing ring (33) is provided with a protective sleeve (34), and the protective sleeve (34) is made of a soluble material.
3. The segmented filling completion string structure according to claim 1 is characterized in that: The thermal expansion temperature of the sealing ring (33) is 60°C-100°C.
4. The segmented filling completion string structure according to claim 1, characterized in that: The filter screen tube (2) located between two adjacent segmented isolation assemblies (3) can be replaced by a blind pipe section (35).
5. The segmented filling completion string structure according to claim 1, characterized in that: The top isolation assembly (1) comprises a central pipe (11) and a top isolation device (12); the bottom end of the central pipe (11) is connected to the filter screen (2) at the uppermost position; the top isolation device (12) is fixed to the top end of the central pipe (11) and is used for being seated on the inner wall of the wellbore.
6. An operation method for segmented filling and completion of a tubular structure according to any one of claims 1 to 5, characterized in that: The steps include: S1, selecting a required isolation ring (33) as required, and fixing the isolation ring (33) on the isolation tube (31), and then connecting the top isolation assembly (1), a plurality of filter screens (2), a plurality of segmented isolation components (3) and a guide shoe (4) to form a completion string structure; S2, setting the top isolation assembly (1) by using the service tool; S3, lowering the filling service tool and performing gravel filling operations; S4, utilizing the wellbore temperature or circulating hot water at 60° C. to 100° C. into the wellbore to heat and expand the isolation ring (33) until the isolation ring (33) is fully expanded; S5, pull out the filling service tool and end the segmented filling and sand control completion operation.
7. The operation method according to claim 6, characterized in that: In S1, the isolation ring (33) is compressed to a preset size using a mold under low temperature conditions, and the isolation ring (33) is mounted on the isolation tube (31), and then the protective sleeve (34) is installed on the isolation ring (33), or a protective material is coated on the outer wall of the isolation ring (33) to form the protective sleeve (34).
8. The operation method according to claim 7, characterized in that: In S1, according to the running time of the completion string structure and the gravel packing operation time, a delayed foaming agent is added to the material of the expansion ring as required to suppress the deformation time of the expansion ring and provide sufficient time for downhole operations; According to the time of running the completion string structure and the time of gravel packing operation, the thickness of the protective sleeve (34) and the amount of soluble material are changed as required to control the dissolution time of the protective sleeve (34) and ensure that the protective sleeve (34) is completely dissolved before the expansion ring expands.
9. The operation method according to claim 6, characterized in that: In S3, during the gravel filling operation, a reverse circulation test was first performed, and then 0.25-0.45m 3 / min, 0.55-0.75m 3 / min, 0.85-1.05m 3 / min, 1.15-1.35m 3 A positive circulation test is carried out with a displacement of 1 / min, and then sand-carrying fluid is injected into the wellbore.
10. The operation method according to claim 9, characterized in that: In S3, during the gravel filling operation, the density is selected as 0.8-1.2g / cm 3 The proppant should be 1.0-1.5g / cm 3 , seawater or salt water with a viscosity of 1.0-2.0 mPa·s is used as the sand-carrying liquid, and sand filling is performed at a sand ratio of 4.5%-5.5%.
Citation Information
Patent Citations
Open-hole horizontal well bottom reverse packing multi-layer sand control tubular column and method
CN107100594A
Thermo-sensitive shape memory material and packer prepared from thermo-sensitive shape memory material
CN114057988A
Thermal expansion type packer
CN217950320U
Methods and apparatus for attaching accessories to sand screen assemblies
US20090229823A1
Support tube for a swell packer, swell packer, method of manufacturing a well packer, and method for using a swell packer
US20100116496A1
Cited By
Infinitely-segmented sand control and water control well completion process pipe column and method
CN119900516A
An infinite segmented sand control and water control well completion process string and method
CN119900516B