A kind of excavation slope pre-reinforcement pile wall support structure and method
By adopting a combined structure of multiple sets of reinforced sheet piles, guard plates and stress frame components on the excavated slope, the shortcomings in stability and disassembly cost of temporary support structures for excavated slopes in the prior art are solved, and high efficiency is achieved support and easy disassembly.
Patent Information
- Application Number
- CN202411306745.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-09-19
AI Technical Summary
The existing temporary support structure for excavated slopes has difficulties in subsequent dismantling work and cost investment, and is insufficient in stability.
A structure including four-sided wall panel assembly, stress frame assembly and tension support frame is adopted. A support structure is formed by a multi-group of ribbed sheet piles arranged in a longitudinal direction and a transversely arranged guard plate, combined with the stress support of the stress frame assembly.
It achieves efficient support effect, ensures the stability and safety of the slope, and reduces cost investment during subsequent disassembly, simplifying the disassembly process.
Smart Images

Figure CN118814820B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building excavation structures, and more particularly to an excavation slope pre-reinforcement pile wall supporting structure and method. Background Art
[0002] In the construction process of building engineering, road engineering, water conservancy engineering and other fields, excavation is one of the key tasks in the construction preparation stage. It is necessary to excavate part of the soil and stone volume from the original ground to the design elevation (such as the roadbed surface, the bottom of the foundation pit, etc.) to ensure the smooth progress of subsequent construction and the quality of the project. Through excavation, the necessary construction space can be created to meet the requirements of the project design and ensure the stability and safety of the project structure.
[0003] Before excavation, detailed geological survey and assessment must be carried out. This includes identifying the geological structure, rock and soil properties, hydrogeological conditions, etc. of the construction area, and assessing the risk of geological disasters that may be encountered during excavation, such as landslides, collapses, mudslides, etc. After the excavation work is completed, it is necessary to install wall piles on the excavation slope for protection; the pre-reinforcement pile wall support of the excavation slope is an important means to ensure construction safety and control slope stability in civil engineering. Its design, construction and later maintenance must strictly follow scientific specifications; in today's excavation slope protection technology, it can be roughly divided into the following categories:
[0004] Gravity support: such as gravity retaining wall, which relies on its own weight to maintain stability and is suitable for medium and low height slopes;
[0005] Anchor support: including anchor support and anchor cable support, which uses prestressed anchor rods or anchor cables to tightly connect the support structure with the rock and soil to improve the overall stability;
[0006] Reinforced soil support: using reinforcing materials (such as geocells) and fill soil to enhance soil strength; forming reinforced soil retaining walls or reinforced soil slopes;
[0007] Pile-sheet support: such as anti-sliding piles and underground continuous walls, which resist the sliding force of the slope through the embedding effect of the pile body or wall and the friction with the soil;
[0008] Flexible support: including vegetation slope protection, ecological bags, etc., using the physical and chemical effects of vegetation roots or flexible materials to enhance slope stability and promote ecological restoration;
[0009] Among them, pile-board support is widely used as a temporary support scheme for excavation in conventional construction projects. As a temporary protective structure, it can be reused after subsequent disassembly, thereby reducing the investment cost of a single batch. However, it still has the disadvantage of insufficient stability during actual use. Therefore, during the construction process, concrete foundation piles or additional stability brackets are often used to maintain its support stability. However, this increases the difficulty and cost of subsequent disassembly work. Summary of the invention
[0010] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides a pre-reinforced pile wall support structure and method for an excavated slope. The technical problem to be solved by the present invention is: how to adaptively improve the temporary support structure of the excavated slope to adapt to subsequent disassembly work and cost investment.
[0011] To achieve the above-mentioned object, the present invention provides the following technical solutions: a pre-reinforced pile wall support structure for a cut slope, comprising four wall panel assemblies, two adjacent sets of wall panel assemblies are vertically arranged to form a boxway structure, the wall panel assemblies comprise a plurality of sets of rib sheet piles arranged longitudinally and guard plates arranged transversely between the rib sheet piles, the four sets of wall panel assemblies are stress-supported by stress frame assemblies, and a tensioning support frame is provided at the connection between the stress frame assemblies and each wall panel assembly;
[0012] The rib sheet pile comprises a square steel column, an L-shaped retaining frame is fixedly provided on the outer side of the square steel column, a fixing sheet is provided on the side of the connection between two longitudinally arranged square steel columns, and a positioning retaining convex column is fixedly provided on the inner wall of the square steel column;
[0013] The stress frame assembly includes a transverse support rod connected between the tension support frames corresponding to the single wall panel assembly, a longitudinal support rod is provided between the two longitudinal transverse support rods, and a stress support rod is vertically connected between the transverse support rods at the same plane height, and the connection between the transverse support rod, the longitudinal support rod and the stress support rod is provided with a fixing piece;
[0014] The tensioning support frame includes a supporting pile, one end of the supporting pile is fixedly provided with a casing column, the end of the supporting pile away from the casing column is fixedly provided with a plurality of supporting arms I and supporting arms II, the plurality of supporting arms I and supporting arms II are staggered, the end of the supporting arm II away from the supporting pile is fixedly provided with a supporting plate, the end of the supporting arm I away from the supporting pile is fixedly provided with a fixing plate, and a fixing groove is also provided on the fixing plate, the fixing groove is arranged in an arc shape, and the fixing groove is clamped with the positioning and retaining boss.
[0015] In a preferred embodiment, the guard plate includes a main body plate and a weight-reducing groove in a rectangular array on one side of the main body plate, and the depth of the weight-reducing groove is less than the thickness of the main body plate, and a micro through hole is also provided between the bottom end of the weight-reducing groove and the inner wall of the main body plate;
[0016] The slot formed between the two L-shaped retaining frames and the outer wall of the square steel column is equivalent to the thickness of the main body plate.
[0017] In a preferred embodiment, the square steel column and the fixing plate, and the L-shaped retaining frame and the main plate are fixed by fixing bolts, and the L-shaped retaining frame, the square steel column and the fixing plate are all provided with fixing holes matched with the fixing bolts.
[0018] In a preferred embodiment, a shelter base is also installed at the bottom of the rib sheet pile, and the shelter base is detachably connected to the bottom end of the square steel column;
[0019] The shelter base comprises a base body, a plug-in square column is fixedly arranged on the top of the base body, and the plug-in square column is adapted to the inner cavity of the square steel column, and the bottom end of the square steel column and the plug-in square column are fixed by bolts.
[0020] In a preferred embodiment, the fixing member includes a buckle body and an external fixing insert, and locking members are provided at the connection between the longitudinal support rod and the stress support rod and the external fixing insert, and at the connection between the external fixing insert and the buckle body. The locking member is configured as a bolt and nut combination, and the buckle body is fixed to the outer wall of the rod body at the connection.
[0021] In a preferred embodiment, the transverse support rod is plugged into the casing column, and the support pile, casing column, support arm I, support arm II and fixed plate are integrally formed.
[0022] The present invention also includes a method for pre-reinforced pile wall support of excavated slope, and the specific support steps are as follows:
[0023] Step S1: Clean and measure the excavation site according to the size of the excavation construction drawing to ensure the excavation design elevation and level and trim the side wall of the slope;
[0024] Step S2: assembling an appropriate number of rib sheet piles and guard plates into a wall panel assembly according to the size of the slope, and loading the shelter base onto the bottom end of the middle rib sheet pile of the wall panel assembly;
[0025] Step S3: The wall panel components assembled in step S2 are sequentially transferred to the slope positions after trimming, and a burial pit is excavated based on the position of the shelter base at the bottom of the wall panel components, and the shelter base is placed in the burial pit and backfilled with soil to fix it, and this is repeated to fit each wall panel component to each wall of the slope for preliminary installation;
[0026] Step S4: Select an appropriate amount of tension support frame, and fix the other steel column by the support arm I and the fixing plate through the locking groove and the positioning and holding convex column, and support the guard plate around the tension support frame in the installation position by the support arm II and the support plate;
[0027] Step S5: inserting the transverse support rods along the casing column at the same horizontal height, selecting stress support rods of appropriate length to be arranged horizontally and vertically with the transverse support rods, and fixing the connection points of each rod with fixing parts to form a rod-shaped support mesh structure composed of multiple rods;
[0028] Step S6: according to the steps in step S5, the tension support frame corresponding to the next layer of guard plate is fixed by the rod-shaped support mesh structure, and the longitudinal support rods and fixing parts are used to complete the limit fixation between the rod-shaped support mesh structures of each layer, so as to form a stress frame assembly with a mesh-shaped force relief at the force points;
[0029] Step S7: Conduct quality inspection and acceptance work, strengthen on-site safety management, set up safety warning signs and protective facilities; conduct regular safety inspections and potential hazard inspections, and promptly rectify any problems found.
[0030] In a preferred embodiment, when the guard plate is installed on the rib pile in step S2, the side of the guard plate with the weight reduction groove is set close to the slope, and when the guard plate is installed on the L-shaped retaining frame, the guard plate, the L-shaped retaining frame and the square steel column are fixed with fixing bolts.
[0031] Technical effects and advantages of the present invention:
[0032] 1. The present invention completes the support structure by assembling a stress frame assembly, a tension support frame and a wall panel assembly. The tension support frame is assembled at the position of the rib sheet pile to form a support arm I and the rib sheet pile to maintain the fixed position. The support plate below the position of the fixed plate contacts and supports the guard plate. When the wall panel assembly is subjected to the reverse force from the excavation slope and topples over, the force is transmitted to the stress support rod in this direction through the rib sheet pile, the tension support frame and the cross support rod. The stress generated by the stress support rod in this direction is limited by the position of the stress support rod in other directions by the excavation slope, forming an axial reverse stress support. The fixing parts assemble the stress support rods into a quadrilateral frame to form a stress point, so that each stress support rod forms an axial stress resistance, forming a stress force transmission line directly from the guard plate, the tension support frame to the stress frame assembly, so as to ensure a good support effect of the high support, ensure safety and stability in subsequent use, and prevent slipping. When accidents such as slope and collapse occur, when shallow-scale excavation is used for support, the guard plates can be set as wooden boards, and the stress frame components and tension support frames support each guard plate to ensure that the stress frame components support the wall panel components. When deep-scale excavation is used for support, the guard plates are set as metal support plates, which can ensure that the wall panel components do not shift sideways when assembling the wall panel components and the stress frame components. The force of the rib piles, tension support frames and cross support rods is transmitted to the stress support rods in this direction, and the stress frame components ensure the stability of the guard plate position of this layer, forming a good support and protection component. The overall support structure is not provided with fixed structures such as concrete and flexible fixings. In the subsequent disassembly, only the fixings need to be disassembled to simply complete the disassembly of the overall device, which is convenient for the subsequent disassembly of the temporary support structure and reduces the initial cost investment. Under the premise of ensuring safety and quality, the cost is reasonably controlled to improve the economic benefits of the project.
[0033] 2. The present invention not only provides weight-reducing grooves to reduce the overall weight of the guard plate through the structural setting of the guard plate and the addition of a shelter base, but also the setting of micro-through holes allows the guard plate to form a passage with the outside air, thereby avoiding the difficulty of disassembly caused by the pressure difference similar to that of a suction cup. The micro-sized through holes can also prevent soil and gravel from falling, and the large-sized base body can be buried to form support and protection, which can ensure that the wall panel assembly does not shift laterally when assembling the wall panel assembly and the stress frame assembly. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0035] Figure 2 It is a schematic diagram of the overall structure of the present invention from a second viewing angle.
[0036] Figure 3 It is a schematic structural diagram of the wall panel assembly (inside perspective) of the present invention.
[0037] Figure 4 It is a schematic structural diagram of the wall panel assembly (from an outside perspective) of the present invention.
[0038] Figure 5 It is a structural schematic diagram of the rib sheet pile assembly state of the present invention.
[0039] Figure 6 It is a schematic diagram of the rib sheet pile structure of the present invention.
[0040] Figure 7 It is a schematic diagram of the shelter base structure of the present invention.
[0041] Figure 8 It is a schematic diagram of the guard plate structure of the present invention.
[0042] Fig. 9 It is a schematic diagram of the tension support structure of the present invention.
[0043] Fig.10 It is a schematic structural diagram of the stress rack assembly of the present invention.
[0044] Fig.11 For the present invention Fig.10 Enlarged view of the structure of part A in the middle.
[0045] The reference numerals in the accompanying drawings are: 1 rib sheet pile, 2 guard plate, 3 stress frame assembly, 4 tension support frame, 5 shelter base;
[0046] 11 square steel column, 12 L-shaped retaining frame, 13 fixing bolt, 14 fixing plate, 15 positioning retaining boss;
[0047] 21 main body plate, 22 weight reduction groove;
[0048] 31 transverse support rod, 32 stress support rod, 33 longitudinal support rod, 34 fixing piece;
[0049] 41 supporting pile, 42 casing column, 43 supporting arm I, 44 supporting arm II, 45 supporting plate, 46 fixing plate, 47 fixing slide groove;
[0050] 51 is a base body, 52 is a plug-in square column;
[0051] 341 is a buckle body, 342 is an external fixing insert, and 343 is a locking piece. DETAILED DESCRIPTION
[0052] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Embodiment 1:
[0054] The present invention provides Figure 1-11 A pre-reinforced pile wall support structure for excavated slopes is shown in FIG. Figure 1-2 As shown in the loading diagram, the invention comprises four wall panel assemblies, and the four sets of wall panel assemblies are adjacently arranged vertically to form a box-shaped channel. The wall panel assemblies include a plurality of sets of rib sheet piles 1 arranged longitudinally and guard plates 2 arranged transversely between the rib sheet piles 1. The four sets of wall panel assemblies are stress-supported by stress frame assemblies 3, and a tensioning support frame 4 is provided at the connection between the stress frame assemblies 3 and each wall panel assembly;
[0055] like Figure 3-6 The rib sheet pile 1 comprises a square steel column 11, an L-shaped retaining frame 12 is fixedly arranged on the outer side of the square steel column 11, a fixing plate 14 is arranged on the side of the connection between the two longitudinally arranged square steel columns 11, and a positioning and retaining protrusion 15 is fixedly arranged on the inner wall of the square steel column 11. The square steel column 11 and the fixing plate 14, the L-shaped retaining frame 12 and the main plate 21 are all fixed by fixing bolts 13, and fixing holes matching the fixing bolts 13 are opened on the L-shaped retaining frame 12, the square steel column 11 and the fixing plate 14. According to the width of the excavation slope, an appropriate number of rib sheet piles 1 are selected, and after the guard plate 2 is loaded on the rib sheet pile 1, the position of the rib sheet pile 1 on the guard plate 2 is adjusted, and the tensioning support frame 4 is used to limit the position of the adjacent rib sheet piles 1, thereby completing the assembly of a single wall panel assembly;
[0056] When performing shallow excavation (about 0-2 meters) for support, insert the bottom of the square steel column 11 (i.e., the part of the square steel column 11 not loaded with the guard plate 2) where the bottom end of the assembled wall panel assembly does not overlap with the L-shaped retaining frame 12 into the bottom of the excavation as a temporary wall panel assembly support point to ensure that the guard plate 2 completely covers the inner wall of the slope, and the stress frame assembly 3 and the tension support frame 4 support each wall panel assembly to ensure that the stress frame assembly 3 supports the wall panel assembly to prevent it from tipping over;
[0057] like Fig.10 As shown, the stress rack assembly 3 includes a transverse support rod 31 connected between the tension support frames 4 corresponding to the single wall panel assembly, a longitudinal support rod 33 is provided between the two longitudinal transverse support rods 31, and a stress support rod 32 is vertically connected between the transverse support rods 31 at the same plane height, and a fixing piece 34 is provided at the connection between the transverse support rod 31, the longitudinal support rod 33 and the stress support rod 32;
[0058] like Fig.11As shown, the fixing member 34 includes a buckle body 341 and an external fixing insert 342. The longitudinal support rod 33 and the connection between the stress support rod 32 and the external fixing insert 342, and the connection between the external fixing insert 342 and the buckle body 341 are all provided with a locking member 343. The locking member 343 is configured as a bolt and a nut combination, and the buckle body 341 is fixed to the outer wall of the rod at the connection. The rod-shaped support mesh structure at the same horizontal height position is formed into a rod-shaped force mesh structure with different force directions for each stress support rod 32. When the wall panel assembly is subjected to the reverse force from the excavation slope and collapses, the wall panel assembly is prevented from collapsing. , the force transmitted through the rib pile 1, the tension support frame 4 and the transverse support rod 31 acts on the stress support rod 32 in this direction, and the stress generated by the stress support rod 32 in this direction is restricted by the position of the stress support rod 32 in other directions by the excavation slope, forming an axial reverse stress support. At this time, the stress support rods 32 are assembled into a quadrilateral frame through the fixing parts 34 to form a force point, so that each stress support rod 32 forms an axial stress resistance, which is similar to the stress synchronization between the supporting legs of the bench, so that the stress frame assembly 3 ensures the stability protection of the position of the layer of guard plate 2;
[0059] like Figure 3 and 9 As shown, the tension support frame 4 includes a support pile 41, one end of the support pile 41 is fixedly provided with a casing column 42, and the end of the support pile 41 away from the casing column 42 is fixedly provided with a plurality of support arms I 43 and support arms II 44, and the plurality of support arms I 43 and support arms II 44 are staggered, and the end of the support arm II 44 away from the support pile 41 is fixedly provided with a support plate 45, and the end of the support arm I 43 away from the support pile 41 is fixedly provided with a fixed plate 46, and the fixed plate 46 is also provided with a locking groove 47, and the locking groove 47 is set in an arc shape, and the locking groove 47 is engaged with the positioning and retaining protrusion 15; the horizontal support rod 31 is plugged with the casing column 42, and the support pile 41, the casing column 42, the support arm I 43, the support arm II 44 and the fixed plate 46 are integrally formed;
[0060] When assembling the tensioning support frame 4 to the position of the rib sheet pile 1, first align the end opening of the locking slot 47 with the positioning and retaining protrusion 15, rotate the supporting pile 41 to lock the positioning and retaining protrusion 15 at the end of the locking slot 47, so that the tensioning support frame 4 and the rib sheet pile 1 are locked in position. At this time, the support plate 45, which is lower than the position of the fixed plate 46, contacts and supports the guard plate 2, forming a stress force transmission line directly from the guard plate 2 and the tensioning support frame 4 to the stress frame assembly 3, so as to ensure a good support effect of high support.
[0061] Embodiment 2:
[0062] Based on the wall panel assembly proposed in Example 1, the present invention provides a further technical solution for the rib piles 1 and the guard plate 2.
[0063] See also Figure 4-8The guard plate 2 provided by the present invention includes a main body plate 21 and a weight-reducing groove 22 formed in a rectangular array on one side of the main body plate 21, and the depth of the weight-reducing groove 22 is less than the thickness of the main body plate 21, and a plurality of micro-through holes are also provided between the bottom end of the weight-reducing groove 22 and the inner wall of the main body plate 21, and the size of the micro-holes is set to 2-3 mm; the slot formed between the two L-shaped retaining frames 12 and the outer wall of the square steel column 11 is equivalent to the thickness of the main body plate 21, and when the main body plate 21 is attached to the excavation slope, not only the weight-reducing groove 22 is provided to reduce the overall weight of the guard plate 2, but also the excavation slope in a humid slope environment (clay, high-humidity soil) will adsorb the main body plate 21, and the setting of the micro-through holes can form a passage between the guard plate 2 and the external air, avoiding the difficulty of disassembly caused by the pressure difference similar to that of a suction cup, and the setting of the micro-sized through holes can prevent soil and gravel from falling;
[0064] A shelter base 5 is also installed at the bottom of the rib sheet pile 1, and the shelter base 5 is detachably connected to the bottom end of the square steel column 11; the shelter base 5 includes a base body 51, and a plug-in square column 52 is fixedly provided on the top of the base body 51, and the plug-in square column 52 is adapted to the inner cavity of the square steel column 11, and the bottom end of the square steel column 11 is fixed to the plug-in square column 52 by bolts;
[0065] When supporting deep excavation (pit depth exceeding 2 meters), after the rib sheet piles 1 and the guard plates 2 are assembled, an appropriate number of shelter bases 5 are selected and loaded on the bottom of the rib sheet piles 1. After the loaded wall panel assembly is aligned with the excavation slope, a burial trench is excavated by the shelter base 5 in alignment with the excavation site, and then the shelter base 5 together with the rib sheet piles 1 are settled in the burial trench and backfilled with soil to fix them. The large-sized base body 51 is buried to form support protection, which can ensure that the wall panel assembly does not shift laterally when assembling the wall panel assembly and the stress frame assembly 3.
[0066] Specifically, the present invention also includes a method for pre-reinforced pile wall support of excavated slope, and the specific support steps are as follows:
[0067] Step S1: Clean and measure the excavation site according to the size of the excavation construction drawing to ensure the excavation design elevation, and level and trim the side walls of the slope to avoid affecting the installation effect of the wall panel components due to the unevenness of the slope;
[0068] Step S2: according to the size of the slope, assemble an appropriate number of rib sheet piles 1 and guard plates 2 into a wall panel assembly, reasonably determine the number and position of the rib sheet piles 1 to ensure the overall support effect, and load the shelter base 5 on the bottom end of the middle rib sheet pile 1 of the wall panel assembly. When installing the guard plate 2 on the rib sheet pile 1, set the side of the guard plate 2 with the weight reduction groove 22 close to the slope, and when installing the guard plate 2 on the L-shaped retaining frame 12, use the fixing bolts 13 to fix the guard plate 2, the L-shaped retaining frame 12 and the square steel column 11;
[0069] Step S3: The wall panel components assembled in step S2 are sequentially transferred to the slope positions after trimming, and a burial pit is excavated based on the position of the shelter base 5 at the bottom of the wall panel components, and the shelter base 5 is placed in the burial pit and backfilled with soil to fix it, and this is repeated to fit each wall panel component to each wall of the slope for preliminary installation;
[0070] Step S4: Select an appropriate amount of tension support frame 4, and fix the other steel column 11 by the support arm I 43 and the fixing plate 46 through the locking of the locking groove 47 and the positioning and holding protruding column 15, and support the guard plate 2 around the tension support frame 4 in the installation position by the support arm II 44 and the support plate 45;
[0071] Step S5: insert the transverse support rod 31 along the casing column 42 at the same horizontal height, select the stress support rod 32 of appropriate length to be arranged horizontally and vertically with the transverse support rod 31, and use the fixing member 34 to fix the connection between the rods to form a rod-shaped support mesh structure composed of multiple rods;
[0072] Step S6: According to the steps in step S5, the tension support frame 4 corresponding to the next layer of guard plate 2 is fixed by the rod-shaped support mesh structure, and the longitudinal support rods 33 and the fixing parts 34 are used to complete the limit fixation between the rod-shaped support mesh structures of each layer, and the tension prestress is generated at the intersection of each stress support rod 32 and the fixing part 34, so as to form a stress frame assembly 3 with a mesh-shaped force relief at the force point, and the prestress applied to each other between the stress support rods 32 is used to offset the external load acting on the guard plate 2 by the slope, thereby improving the bearing capacity and stability of the support structure, and the longitudinal support rods 33 are added to form a connection between the rod-shaped support mesh structures of each layer;
[0073] Step S7: Conduct quality inspection and acceptance work, strengthen on-site safety management, set up safety warning signs and protective facilities; conduct regular safety inspections and potential hazard inspections, and promptly rectify any problems found.
[0074] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0075] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
[0076] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pre-reinforced pile wall support structure for a cut slope, comprising four wall panel assemblies, wherein the four sets of wall panel assemblies are adjacently and vertically arranged to form a box-shaped channel, characterized in that: The wall panel assembly comprises a plurality of groups of rib sheet piles (1) arranged longitudinally and guard plates (2) arranged transversely between the rib sheet piles (1); the four groups of wall panel assemblies are stress-supported by stress frame assemblies (3), and a tension support frame (4) is provided at the connection between the stress frame assemblies (3) and each wall panel assembly; The rib sheet pile (1) comprises a square steel column (11), an L-shaped retaining frame (12) is fixedly provided on the outer side surface of the square steel column (11), a fixing plate (14) is provided on the side surface of the connection between two longitudinally arranged square steel columns (11), and a positioning retaining protrusion (15) is fixedly provided on the inner wall of the square steel column (11); The stress frame assembly (3) comprises a transverse support rod (31) connected between tension support frames (4) corresponding to a single wall panel assembly, a longitudinal support rod (33) is provided between two longitudinal transverse support rods (31), and a stress support rod (32) is vertically connected between transverse support rods (31) at the same plane height, and fixing parts (34) are provided at the connection points between the transverse support rod (31), the longitudinal support rod (33) and the stress support rod (32); The tensioning support frame (4) comprises a support pile (41), one end of the support pile (41) is fixedly provided with a casing column (42), the transverse support rod (31) is plugged with the casing column (42), the end of the support pile (41) away from the casing column (42) is fixedly provided with a plurality of support arms I (43) and support arms II (44), the plurality of support arms I (43) and support arms II (44) are arranged alternately, the end of the support arm II (44) away from the support pile (41) is fixedly provided with a support plate (45), the end of the support arm I (43) away from the support pile (41) is fixedly provided with a fixing plate (46), and the fixing plate (46) is also provided with a locking groove (47), the locking groove (47) is arranged in an arc shape, and the locking groove (47) is locked with the positioning and retaining protrusion (15); The guard plate (2) comprises a main body plate (21) and weight-reducing grooves (22) arranged in a rectangular array on one side of the main body plate (21), wherein the depth of the weight-reducing grooves (22) is less than the thickness of the main body plate (21), and micro through holes are arranged between the bottom ends of the weight-reducing grooves (22) and the inner wall of the main body plate (21), and a support plate (45) located below the position of the fixing plate (46) contacts and supports the guard plate (2); The slot formed between the two L-shaped retaining frames (12) and the outer wall of the square steel column (11) has a thickness equivalent to that of the main plate (21); A shelter base (5) is also installed at the bottom of the rib sheet pile (1), and the shelter base (5) is detachably connected to the bottom end of the square steel column (11); The shelter base (5) comprises a base body (51), a plug-in square column (52) is fixedly provided on the top of the base body (51), and the plug-in square column (52) is adapted to the inner cavity of the square steel column (11), and the bottom end of the square steel column (11) and the plug-in square column (52) are fixed by bolts.
2. The excavation slope pre-reinforcement pile wall support structure according to claim 1, characterized in that: The square steel column (11) and the fixing plate (14), and the L-shaped retaining frame (12) and the main body plate (21) are fixed by fixing bolts (13), and fixing holes matching the fixing bolts (13) are provided on the L-shaped retaining frame (12), the square steel column (11) and the fixing plate (14).
3. The excavation slope pre-reinforcement pile wall support structure according to claim 1, characterized in that: The fixing member (34) comprises a buckle body (341) and an external fixing insert (342); locking members (343) are provided at the connection between the longitudinal support rod (33) and the stress support rod (32) and the external fixing insert (342), and at the connection between the external fixing insert (342) and the buckle body (341); the locking member (343) is configured as a bolt and nut combination, and the buckle body (341) is fixed to the outer wall of the rod body at the connection.
4. A method for pre-reinforced pile wall support for excavated slopes, applicable to the pre-reinforced pile wall support structure for excavated slopes according to any one of claims 1 to 3, characterized in that: The specific support steps are as follows: Step S1: Clean and measure the excavation site according to the size of the excavation construction drawing to ensure the excavation design elevation and level and trim the side wall of the slope; Step S2: assembling an appropriate number of rib sheet piles (1) and guard plates (2) into a wall panel assembly according to the size of the slope, and loading the shelter base (5) onto the bottom end of the middle rib sheet pile (1) of the wall panel assembly; Step S3: the wall panel components assembled in step S2 are sequentially transferred to the slope positions after trimming, and a burial pit is excavated based on the position of the shelter base (5) at the bottom of the wall panel components, and the shelter base (5) is placed in the burial pit and backfilled with soil to fix it, and this process is repeated to fit each wall panel component to each wall of the slope for preliminary installation; Step S4: Select an appropriate amount of tension support frame (4), and fix the other steel column (11) by the support arm I (43) and the fixing plate (46) through the locking of the locking groove (47) and the positioning and holding protruding column (15), and support the guard plate (2) around the tension support frame (4) in the installation position by the support arm II (44) and the support plate (45); Step S5: inserting the transverse support rod (31) along the casing column (42) at the same horizontal height, selecting stress support rods (32) of appropriate length to be arranged horizontally and vertically with the transverse support rod (31), and fixing the connection points of each rod using fixing members (34) to form a rod-shaped support mesh structure composed of multiple rods; Step S6: according to the steps in step S5, the tension support frame (4) corresponding to the next layer of guard plate (2) is fixed by the rod-shaped support mesh structure, and the longitudinal support rods (33) and the fixing members (34) are used to complete the position fixing between the rod-shaped support mesh structures of each layer, thereby forming a stress frame assembly (3) with a mesh-shaped force relief at the force points; Step S7: Conduct quality inspection and acceptance work, strengthen on-site safety management, set up safety warning signs and protective facilities; conduct regular safety inspections and potential hazard inspections, and promptly rectify any problems found.
5. The method for pre-reinforcement of excavated slope by pile wall according to claim 4, characterized in that: When the guard plate (2) is installed on the rib pile (1) in step S2, the side of the guard plate (2) having the weight-reducing groove (22) is arranged close to the slope, and when the guard plate (2) is installed on the L-shaped retaining frame (12), the guard plate (2), the L-shaped retaining frame (12) and the square steel column (11) are fixed using fixing bolts (13).