Air curtain heat preservation system for tunnel construction period and control method thereof
By using an air curtain insulation system during the tunnel construction period, it isolates natural air and heats the construction environment, and frost damage problems and harmful substances in tunnel construction in extremely cold areas are solved, and a safe and healthy construction environment and high-efficiency energy consumption management are achieved.
Patent Information
- Application Number
- CN202411021465.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-12
AI Technical Summary
During the tunnel construction process in extremely cold areas, the extremely cold environment causes structural evacuation, volume shrinkage, cracks and other frost damage problems in the tunnel lining structure. In addition, existing insulation measures such as furnaces or hot air cannons are prone to produce harmful substances, threatening construction workers Safe and healthy.
The air curtain insulation system during the tunnel construction period is adopted, including insulation frame, multi-air air curtain device, mobile hot air curtain device, monitoring device and controller. The air flow is sprayed in front of the tunnel opening and lining trolley through an intelligent control system to isolate the air flow. Natural air and heated air maintain the construction ambient temperature and avoid the production of harmful substances.
Effectively prevent frost damage problems, increase the environmental temperature of tunnel construction, ensure the safety and health of construction workers, and at the same time improve the system's working efficiency and reduce energy consumption.
Smart Images

Figure CN118933960A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel insulation, and in particular to an air curtain insulation system during tunnel construction and a control method thereof. Background Art
[0002] Affected by the climate and environment of the tunnel site, tunnel construction in cold regions faces a series of challenges. The extremely cold ambient temperature can easily lead to frost damage problems such as structural loosening, volume shrinkage, and cracks in the tunnel lining structure construction process, seriously affecting the quality of the finished lining concrete and the safety of the tunnel structure.
[0003] In the related technology, insulation measures such as closing the hole and using a stove or hot air cannon to increase the temperature are often adopted. However, in a confined space, the coal in the stove or the diesel in the hot air cannon is prone to incomplete combustion, which will produce harmful substances such as carbon monoxide and smoke, posing a threat to the safety and health of construction workers.
[0004] Therefore, a new measure is urgently needed to solve the freezing damage problem of tunnel construction in winter in cold regions, so as to increase the working environment temperature of tunnel lining and ensure the safety and health of construction workers. Summary of the invention
[0005] The embodiment of the present invention provides an air curtain insulation system and a control method thereof during tunnel construction, so as to increase the working environment temperature of the tunnel lining and ensure the safety and health of construction workers at the same time.
[0006] In a first aspect, an embodiment of the present invention provides an air curtain insulation system during tunnel construction, including a thermal insulation frame, a multi-airflow air curtain device, a mobile hot air air curtain device, a monitoring device, a controller, and a power distribution device;
[0007] The thermal insulation frame is arranged at the tunnel entrance section, a driving passage is arranged on the thermal insulation frame, and the multi-airflow air curtain device is arranged on the thermal insulation frame above the driving passage;
[0008] The mobile hot air curtain device is arranged at the front end of the lining trolley in the tunnel;
[0009] The monitoring device includes a sensor outside the tunnel and a first temperature sensor arranged in the tunnel, and the sensor outside the tunnel includes a second temperature sensor and a wind speed sensor arranged outside the tunnel;
[0010] The controller is respectively connected to the multi-airflow air curtain device, the mobile hot air air curtain device and the monitoring device;
[0011] The power distribution device is electrically connected to the multi-airflow air curtain device, the mobile hot air air curtain device, the monitoring device and the controller respectively.
[0012] In a second aspect, an embodiment of the present invention provides a control method for an air curtain insulation system during tunnel construction, which is applied to a controller in the air curtain insulation system during tunnel construction as described in the first aspect or any possible implementation of the first aspect, the method comprising:
[0013] Acquire monitoring data of the monitoring device; wherein the monitoring data includes the outside temperature of the tunnel acquired by the second temperature sensor, the outside wind speed of the tunnel acquired by the wind speed sensor, and the first internal temperature of the tunnel acquired by the first temperature sensor;
[0014] Calculate the jet velocity of the multi-airflow air curtain device according to the external wind speed and the pre-acquired airflow trajectory model; wherein the airflow trajectory model is established based on the trajectory of the jet airflow of the multi-airflow air curtain device;
[0015] Calculate the expected air outlet temperature and the expected air outlet speed of the mobile hot air air curtain device according to the pre-acquired construction size parameters of the tunnel, the jet velocity, the outside temperature and the first internal temperature;
[0016] According to the jet velocity, the multi-airflow air curtain device is controlled to spray airflow at the tunnel entrance section, and according to the expected air outlet temperature and the expected air outlet velocity, the mobile hot air air curtain device is controlled to spray airflow in front of the lining trolley.
[0017] In a third aspect, an embodiment of the present invention provides a controller comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the method described in the first aspect or any possible implementation method of the first aspect are implemented.
[0018] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method described in the first aspect or any possible implementation method of the first aspect are implemented.
[0019] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0020] The air curtain insulation system for the tunnel construction period provided by the embodiment of the present invention includes an insulation frame, a multi-flow air curtain device, a mobile hot air air curtain device, a monitoring device, a controller and a power distribution device. By arranging an insulation frame at the tunnel entrance section, arranging a driving channel on the insulation frame, and arranging a multi-flow air curtain device on the insulation frame above the driving channel, the multi-flow air curtain device can be used to isolate the natural air outside the tunnel and reduce the natural air entering the tunnel. At the same time, the insulation frame is used for insulation to reduce the loss of hot air in the tunnel. A mobile hot air air curtain device is arranged at the front end of the lining trolley in the tunnel. The mobile hot air air curtain device can be used to heat the air in the tunnel at the front end of the lining trolley to meet the requirements of maintaining the ambient temperature of the tunnel construction and prevent construction-related freezing damage during the tunnel construction process. Moreover, the air in the tunnel is heated by the mobile hot air air curtain device without the need to use a stove or a hot air gun to heat the air, and no harmful substances will be generated, which can ensure the safety and health of construction workers. In addition, by setting up monitoring devices and controllers, the multi-airflow air curtain device and the mobile hot air air curtain device are intelligently controlled. During the heating and insulation process of the air in the tunnel, the multi-airflow air curtain device and the mobile hot air air curtain device can be adjusted in time to ensure good heating and insulation effects, improve the system's work efficiency, and reduce the system's operating energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0022] Figure 1 It is a structural schematic diagram of an air curtain insulation system during tunnel construction provided by an embodiment of the present invention;
[0023] Figure 2 is a schematic diagram of an air curtain formed by a multi-airflow air curtain device provided in an embodiment of the present invention;
[0024] Figure 3 is a structural schematic diagram of a multi-airflow air curtain device provided by an embodiment of the present invention;
[0025] Figure 4 It is a structural schematic diagram of a mobile hot air curtain device provided by an embodiment of the present invention;
[0026] Figure 5 This is a flow chart of a control method for an air curtain insulation system during tunnel construction provided by an embodiment of the present invention;
[0027] Figure 6 is a flowchart of the process of establishing an airflow trajectory model provided by an embodiment of the present invention;
[0028] Figure 7 is a schematic diagram of a model of airflow trajectories of a multi-airflow air curtain device provided in an embodiment of the present invention;
[0029] Figure 8 is a schematic diagram of airflow trajectories of a multi-airflow air curtain device at different jet velocities provided by an embodiment of the present invention;
[0030] Fig. 9 is a schematic diagram of a coordinate system based on heat conduction provided by an embodiment of the present invention;
[0031] Fig.10 is a schematic diagram of airflow trajectories of a multi-airflow air curtain device provided by an embodiment of the present invention at different natural wind speeds;
[0032] Fig.11 is a schematic diagram of the three-dimensional temperature field distribution of the tunnel surrounding rock provided by an embodiment of the present invention;
[0033] Fig.12 It is a structural schematic diagram of a control device of an air curtain insulation system during tunnel construction provided by an embodiment of the present invention;
[0034] Fig.13 is a schematic diagram of a controller provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0035] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0036] The inventors have found that extremely cold ambient temperatures can easily lead to freezing damage problems such as structural debonding, volume shrinkage, and cracks during the construction of tunnel lining structures, which seriously affect the quality of the finished lining concrete and the safety of the tunnel structure. When the tunnel site is located in a cold and cold area at high latitudes or high altitudes, during the tunnel excavation process, the air in the tunnel undergoes convection heat exchange with the cold air outside the tunnel, which causes the ambient temperature in the tunnel to drop sharply due to the influence of the ambient temperature, wind speed, and pressure difference between the inside and outside of the tunnel. The low temperature environment in the tunnel can easily lead to freezing damage problems such as groundwater condensing into ice in the surrounding rock during tunnel construction, shotcrete not bonding with the surrounding rock, the strength and density of the poured lining being damaged, and icicles and icefalls appearing on the wall.
[0037] Through drainage facilities such as cold-proof drainage holes, central deep-buried ditches and heat-insulating ditches, the problem of tunnel frost damage can be solved from the perspective of hydrological elements, and groundwater in the surrounding rock can be gathered and discharged from the tunnel through drainage holes or ditches. However, during tunnel construction, there is often a large amount of water and mud inside the tunnel. If the temperature environment inside the tunnel is not improved, it is difficult for drainage facilities to effectively solve the problem of frost damage during construction.
[0038] In order to keep the tunnel warm during construction, the tunnel entrance is usually closed and a stove or hot air gun is used to heat the tunnel. However, in a confined space, the coal in the stove or the diesel in the hot air gun is prone to incomplete combustion, which will produce harmful substances such as carbon monoxide and smoke, posing a threat to the safety and health of construction workers. Therefore, it is necessary to consider a solution to the frost damage problem in winter construction of tunnels in cold regions.
[0039] In order to increase the ambient temperature during the tunnel construction period and ensure the safety and health of construction workers, in the implementation mode of the present application, a thermal insulation frame, a multi-airflow air curtain device, a mobile hot air air curtain device, a monitoring device, a controller and a power distribution device are provided. By setting the thermal insulation frame at the tunnel portal section and setting the multi-airflow air curtain device on the thermal insulation frame, the multi-airflow air curtain device can be used to isolate the cold air outside the tunnel and reduce the cold air entering the tunnel; by setting a mobile hot air air curtain device at the front end of the lining trolley in the tunnel, the mobile hot air air curtain device can be used to heat the air in the tunnel, and the mobile hot air air curtain device can be moved with the lining trolley to ensure that the construction environment of the tunnel meets the construction requirements; at the same time, the mobile hot air air curtain device is used for heating, and carbon monoxide and smoke will not be generated to ensure the safety and health of construction workers.
[0040] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0041] Figure 1 The schematic diagram of the structure of the air curtain insulation system during tunnel construction provided by the embodiment of the present invention includes a heat insulation frame 11, a multi-airflow air curtain device 12, a mobile hot air air curtain device 13, a monitoring device 14, a controller 15 and a power distribution device 16. In addition, Figure 1 21 represents the lining of the tunnel, and 22 represents the surrounding rock of the tunnel.
[0042] In this embodiment, a heat preservation and heat insulation frame 11 is arranged at a tunnel entrance section, a driving passage is arranged on the heat preservation and heat insulation frame 11, and a multi-airflow air curtain device 12 is arranged on the heat preservation and heat insulation frame 11 above the driving passage.
[0043] Here, the driving passage can be set in the middle of the thermal insulation frame 11, and construction vehicles and related personnel can enter the tunnel through the driving passage. The driving passage can be set as Figure 1 As shown, both construction vehicles and related personnel use the driving channel; multiple driving channels can also be set up, and construction vehicles and related personnel use different driving channels respectively. The forward directions of construction vehicles and related personnel can also be distinguished, and construction vehicles and related personnel entering and exiting the tunnel use different driving channels respectively.
[0044] The multi-flow air curtain device 12 can be arranged above the driving passage and fixed on the heat insulation frame 11. Figure 2 The schematic diagram of the air curtain formed by the multi-airflow air curtain device shown is that the multi-airflow air curtain device 12 can spray airflow downward at a preset angle to form an air curtain at the driving channel. The air curtain can block the natural air outside the tunnel and reduce the air entering the tunnel, thereby keeping the air in the tunnel warm.
[0045] The jet velocity and jet angle of the multi-flow air curtain device 12 can be adjusted, and the jet angle is generally not changed after adjustment. With the vertical direction of the multi-flow air curtain device downward as 0°, the jet angle can range from -45° to 45°, wherein -45° is the angle toward the inside of the tunnel, and 45° is the angle toward the outside of the tunnel. For example, the jet angle can be 40°, 30°, 20°, and 15°.
[0046] The jet velocity of the multi-flow air curtain device 12 corresponds to a speed adjustment range, and the speed adjustment range can be set according to the ambient temperature and ambient wind speed of the tunnel location. For example, the ambient temperature and ambient wind speed in the preset period of the tunnel site area can be obtained, the ambient temperature can be fitted, and the ambient wind speed can be analyzed to determine the daily average and maximum values of the ambient wind speed, so as to determine the speed adjustment range of the multi-flow air curtain device 12 according to the ambient temperature and ambient wind speed, so as to ensure that the multi-flow air curtain device 12 is suitable for the current tunnel.
[0047] If there is only one driving channel, a multi-airflow air curtain device 12 can be set above the driving channel; if there are multiple driving channels, a multi-airflow air curtain device 12 can be set above each driving channel, or a multi-airflow air curtain device 12 can be set above all driving channels.
[0048] The height and width of the driving passage can be set according to the people or vehicles passing through. For example, a driving passage for construction vehicles can be set with a width of 5.5m and a height of 6m.
[0049] In this embodiment, the mobile hot air curtain device 13 is arranged at the front end of the lining trolley 23 in the tunnel.
[0050] Here, the mobile hot air curtain device 13 can spray air of a preset temperature, and by spraying air at a relatively high temperature, the air in the tunnel can be heated and kept warm, so as to maintain the ambient temperature required for construction in the tunnel.
[0051] Among them, the lining trolley 23 is a device for performing concrete lining operations on the inner wall of the tunnel during the tunnel construction process. During the construction of the tunnel, the lining trolley needs to be moved to different construction locations to perform corresponding lining operations. Correspondingly, the mobile hot air curtain device 13 in this embodiment is also movable and can move with the movement of the lining trolley 23 in the tunnel. By moving the mobile hot air curtain device 13, the construction location can be heated and insulated in a timely and efficient manner so that the ambient temperature at the construction location meets the requirements.
[0052] In addition, one or more mobile hot air curtain devices 13 can be set in the air curtain insulation system during the tunnel construction period. For example, when one mobile hot air curtain device 13 is set, it can be set at the front end of the lining trolley 23; when two mobile hot air curtain devices 13 are set, the two mobile hot air curtain devices 13 can be set at both ends in front of the lining trolley 23; or multiple mobile hot air curtain devices 13 can be set at multiple different positions of the tunnel.
[0053] The monitoring device 14 of this embodiment includes a sensor outside the tunnel and a first temperature sensor arranged in the tunnel. The sensor outside the tunnel includes a second temperature sensor and a wind speed sensor arranged outside the tunnel.
[0054] Here, the first temperature sensor in the tunnel is used to obtain the internal temperature in the tunnel, so as to determine whether the internal temperature of the tunnel meets the requirements of the ambient temperature of the construction. The second temperature sensor is used to obtain the external temperature outside the tunnel, and the wind speed sensor is used to obtain the external wind speed of the natural air outside the tunnel to monitor the natural air outside the tunnel, so as to intelligently control the multi-airflow air curtain device 12 and the mobile air curtain device 13 in the tunnel.
[0055] In this embodiment, the controller 15 is connected to the multi-airflow air curtain device 12, the mobile hot air air curtain device 13 and the monitoring device 14 respectively.
[0056] Here, the controller 15 can obtain the monitoring data obtained by each sensor in the monitoring device 14, such as internal temperature, external temperature and external wind speed, etc. By analyzing and calculating the monitoring data, the multi-airflow air curtain device 12 and the mobile hot air air curtain device 13 can be intelligently controlled according to the calculation results to achieve heating and insulation of the air in the tunnel to meet the ambient temperature requirements of tunnel construction.
[0057] Exemplarily, the controller 15 may be a programmable logic controller (PLC) controller, and the PLC controller is used to control the multi-airflow air curtain device 12 and the mobile hot air air curtain device 13 .
[0058] The power distribution device 16 of this embodiment is electrically connected to the multi-airflow air curtain device 12, the mobile hot air air curtain device 13, the monitoring device 14 and the controller 15 respectively, and can supply power to the multi-airflow air curtain device 12, the mobile hot air air curtain device 13, the monitoring device 14 and the controller 15 to test and use each device and equipment. Here, the power distribution device 16 can be set in the tunnel entrance section, or it can be set inside the tunnel. If it is set in the tunnel entrance section, it can be set on the outside of the thermal insulation frame, or it can be set on the inside of the thermal insulation frame. Exemplarily, the power distribution device 16 can be a primary distribution cabinet.
[0059] Optional, such as Figure 1 As shown, in this embodiment, the thermal insulation frame 11 is fitted with the wall surface of the lining 21 of the tunnel portal section. The thermal insulation frame 11 can be used to block the natural air outside the tunnel and the heated air inside the tunnel, thereby preventing natural air from entering the tunnel from locations outside the driving channel. At the same time, it can also prevent the heated air in the tunnel from escaping, thereby insulating the tunnel.
[0060] In addition, the thermal insulation frame 11 may include a structural frame and thermal insulation panels. The structural frame matches the cross-sectional dimensions of the tunnel to support the thermal insulation frame 11, and the thermal insulation panels are fixed to positions on the structural frame other than the driving passage to achieve the thermal insulation function of the thermal insulation frame 11. The structural frame may be a double-layer structural frame for stable support, and accordingly, thermal insulation panels may be provided on both sides of the double-layer structural frame to improve the thermal insulation effect.
[0061] Here, the structural frame may be constructed by welding I-beams, and the material of the thermal insulation board may be polyurethane.
[0062] In addition, a ventilation duct 17 may be provided in the tunnel, and the ventilation duct 17 may be used to ventilate the tunnel to avoid the space in the tunnel being closed.
[0063] Optionally, in this embodiment, a plurality of honeycomb outlets are provided at the bottom of the multi-airflow air curtain device 12 so that the multi-airflow air curtain device 12 can eject a plurality of airflows through the plurality of honeycomb outlets.
[0064] like Figure 3The structural schematic diagram of the multi-airflow air curtain device shown in the figure, the multi-airflow air curtain device 12 may include a shell 121 and a plurality of variable frequency motors 122, a plurality of square outlets 123 and a plurality of honeycomb outlets 124 are arranged at the bottom of the shell 121, each variable frequency motor 121 corresponds to a honeycomb outlet 124, and a square outlet 123 is arranged between two honeycomb outlets 124. By setting up the plurality of variable frequency motors 122 and alternatingly arranging the honeycomb outlets 124 and the square outlets 123, the formed airflow can be ejected through each outlet, thereby ensuring the speed of the airflow, reducing dispersion, and avoiding the situation where the air curtain cannot be formed below the tunnel section.
[0065] Optional, such as Figure 4 The structural schematic diagram of the mobile hot air air curtain device shown in the figure, the mobile hot air air curtain device 13 can be a cube, and each side thereof is provided with an air outlet 131 and an air inlet 132. A plurality of control panels 133 can also be provided on the mobile hot air air curtain 13, and the mobile hot air air curtain device 13 can be manually controlled through the control panel. The control panel 133 can adjust the temperature of the output hot air, set a preset temperature value, adjust the wind speed of the output hot air, adjust the gear of the wind speed, and control the emergency stop of the mobile hot air air curtain device, etc.
[0066] In addition, the mobile hot air air curtain device 13 may also be provided with a signal receiving unit, which can receive control signals sent by the controller and the mobile phone terminal, thereby controlling the mobile hot air curtain device 13 .
[0067] The air curtain insulation system for tunnel construction provided by the embodiment of the present invention comprises an insulation frame, a multi-flow air curtain device, a mobile hot air air curtain device, a monitoring device, a controller and a power distribution device. By arranging an insulation frame at the tunnel entrance section, arranging a driving passage on the insulation frame, and arranging a multi-flow air curtain device on the insulation frame above the driving passage, the multi-flow air curtain device can be used to isolate the natural air outside the tunnel and reduce the natural air entering the tunnel. At the same time, the insulation frame is used for heat preservation to reduce the loss of hot air in the tunnel. The lining trolley in the tunnel A mobile hot air curtain device is set at the front end, and the mobile hot air curtain device can be used to heat the air in the tunnel at the front end of the lining trolley to meet the requirements of maintaining the ambient temperature of the tunnel construction environment, and prevent the groundwater from condensing into ice in the surrounding rock, the sprayed concrete not bonding with the surrounding rock, the strength and density of the poured lining being damaged, and the icicles and icefalls on the wall during the tunnel construction process. In addition, the mobile hot air curtain device is used to heat the air in the tunnel, and there is no need to use a stove or hot air gun to heat up, and no harmful substances will be produced, which can ensure the safety and health of the construction workers. In addition, by setting up a monitoring device and a controller, the multi-airflow air curtain device and the mobile hot air curtain device are intelligently controlled. In the process of heating and heat preservation of the air in the tunnel, the multi-airflow air curtain device and the mobile hot air curtain device can be adjusted in time to ensure good heating and heat preservation effects, improve the system work efficiency, and reduce the system's operating energy consumption.
[0068] The above introduces the structure of the air curtain insulation system during the tunnel construction period. The following will introduce the control method of the air curtain insulation system during the tunnel construction period. For details not described in detail, please refer to the corresponding system embodiment mentioned above.
[0069] Figure 5 A flow chart of a control method for an air curtain insulation system during tunnel construction provided by an embodiment of the present invention is provided. The method is applied to a controller in an air curtain insulation system during tunnel construction in any of the above embodiments. The method can be described in detail as follows:
[0070] Step S501, acquiring monitoring data of a monitoring device; wherein the monitoring data includes an external temperature of the tunnel acquired by a second temperature sensor, an external wind speed of the tunnel acquired by a wind speed sensor, and a first internal temperature of the tunnel acquired by a first temperature sensor.
[0071] Step S502, calculating the jet velocity of the multi-airflow air curtain device according to the external wind speed and the pre-acquired airflow trajectory model; wherein the airflow trajectory model is established based on the trajectory of the jet airflow of the multi-airflow air curtain device.
[0072] In this embodiment, the multi-airflow air curtain device is used to block the natural air outside the tunnel, that is, the multi-airflow air curtain device needs to form an air curtain at the driving channel, and the size of the air curtain is the same as the interface size of the driving channel. That is, the airflow ejected by the multi-airflow air curtain device contacts the first position of the ground corresponding to the vertical direction of the multi-airflow air curtain device. The airflow trajectory model can analyze the trajectory of the airflow ejected by the multi-airflow air curtain device. Therefore, the airflow trajectory model can be used to solve the jet velocity of the multi-airflow air curtain device, thereby controlling the multi-airflow air curtain device.
[0073] Optionally, due to the limitations of the multi-flow air curtain device itself, there are limitations on the speed adjustment that can be set, such as the jet speed may only be an integer or one decimal place, etc. This results in the air curtain formed by the jet airflow of the multi-flow air curtain device not necessarily being able to accurately contact the first position of the ground corresponding to the vertical direction of the multi-flow air curtain device, but offsetting toward the tunnel inside and outside directions of the above-mentioned first position. When offsetting toward the tunnel outside direction of the first position, the airflow will hit the ground and then dissipate, that is, dissipate outside the air curtain insulation system; when offsetting toward the tunnel inside direction of the first position, the airflow will return to the air curtain insulation system. Therefore, after calculating the jet speed of the multi-flow air curtain device, the integer part of the calculated jet speed can be selected and the integer part can be used as the actual jet speed of the multi-flow air curtain device.
[0074] Step S503, calculating the expected outlet air temperature and the expected outlet air speed of the mobile hot air air curtain device according to the pre-acquired construction dimension parameters of the tunnel, the jet velocity, the outside temperature and the first inside temperature.
[0075] In this embodiment, the mobile hot air curtain device can heat the original air in the tunnel and the natural air entering the tunnel to ensure the temperature in the tunnel.
[0076] Here, the amount of air that needs to be heated in the tunnel can be calculated through the construction size parameters of the tunnel, the jet velocity, the outside temperature and the first internal temperature, and the mobile hot air curtain device is used for heating, so that the corresponding expected air outlet temperature and expected air outlet velocity can be calculated.
[0077] The construction dimension parameters may include the radial dimension of the tunnel, the cross-sectional dimension of the tunnel, the excavation depth, the height of the driving passage, the width of the driving passage, etc. The first internal temperature may be the temperature near the mobile hot air air curtain device, such as the temperature at the air inlet of the mobile hot air air curtain device, the temperature above the mobile hot air air curtain device, or the temperature at a preset position between the mobile hot air air curtain device and the multi-airflow air curtain device.
[0078] Step S504, controlling the multi-airflow air curtain device to spray airflow at the tunnel portal section according to the jet velocity, and controlling the mobile hot air air curtain device to spray airflow in front of the lining trolley according to the desired air outlet temperature and the desired air outlet velocity.
[0079] The embodiment of the present invention can obtain monitoring data related to tunnel heating and insulation by acquiring the outside temperature, outside wind speed and first internal temperature of the tunnel, and then can use the monitoring data to analyze and control the operation of the air curtain insulation system during the tunnel construction period; through the outside wind speed and airflow trajectory model, the jet velocity of the multi-flow air curtain device suitable for the current outside wind speed can be calculated, and by controlling the multi-flow air curtain device, the multi-flow air curtain device can just block the natural air outside the tunnel, and the power used by the multi-flow air curtain device can be reduced; through the construction size parameters of the tunnel, the jet velocity, the outside temperature and the first internal temperature, the expected air outlet temperature and the expected air outlet velocity of the mobile hot air air curtain device suitable for the current outside temperature and the first internal temperature can be calculated, and by controlling the mobile hot air air curtain device, the mobile hot air air curtain device can heat and insulate the tunnel efficiently and quickly, ensuring that the temperature in the tunnel meets the temperature requirements of the tunnel construction environment; and by controlling the mobile hot air air curtain device to heat the air in the tunnel, no harmful substances will be generated, and the safety and health of construction workers can be guaranteed. This embodiment controls the multi-airflow air curtain device and the mobile hot air air curtain device through monitoring data, and can timely adjust the air curtain device during operation according to the monitoring data to ensure the wind-blocking effect of the multi-airflow air curtain device and the thermal insulation effect of the mobile hot air curtain device.
[0080] The above describes the method for controlling the air curtain insulation system during the tunnel construction period. The following describes the process of establishing the airflow trajectory model for controlling the multi-airflow air curtain device and the specific method for controlling the mobile hot air air curtain device. The process of establishing the airflow trajectory model can refer to steps S601 to S603 below.
[0081] In one embodiment, see Figure 6 The implementation flow chart of the process of establishing the airflow trajectory model shown in the figure may further include the following steps before calculating the jet velocity of the multi-airflow air curtain device according to the external wind speed and the pre-acquired airflow trajectory model:
[0082] Step S601, establishing an average airflow velocity model of the multi-airflow air curtain device at different positions along the central axis of the airflow.
[0083] In this embodiment, the airflow of the multi-airflow air curtain device may be analyzed in a free advection state to determine the speed of the airflow of the multi-airflow air curtain device at different positions in the central axis direction.
[0084] Optionally, the airflow of the multi-airflow air curtain device can be ejected in the vertical direction in a free advection state, so as to analyze the speed of the airflow ejected by the multi-airflow air curtain device at different distances on the central axis. Correspondingly, the expression of the above-mentioned average airflow speed model can be: In the formula, v s represents the average velocity of the airflow in the direction of the central axis when the injection distance is s, s represents the injection distance of the airflow in the direction of the central axis away from the nozzle of the multi-airflow air curtain device, v represents the jet velocity of the multi-airflow air curtain device, that is, the velocity of the injected airflow when leaving the nozzle of the multi-airflow air curtain device, δ represents the turbulence coefficient, and b0 represents the nozzle thickness of the multi-airflow air curtain device.
[0085] Step S602, establishing a wind speed differential equation of the mixed airflow of the multi-airflow air curtain device and the natural air outside the tunnel according to the jet speed of the multi-airflow air curtain device and the external wind speed of the natural air outside the tunnel.
[0086] In this embodiment, when the multi-flow air curtain device ejects airflow to block the natural air outside the tunnel, the airflow ejected by the multi-flow air curtain device and the natural air outside the tunnel will form a mixed airflow. The wind speed and direction of the mixed airflow are the wind speed and direction of the actual movement corresponding to the airflow ejected by the multi-flow air curtain device, and the wind speed and direction of the natural air outside the tunnel when entering the tunnel hole, so that the multi-flow air curtain device can be used to block the natural air outside the tunnel.
[0087] Optional, such as Figure 7 The model schematic diagram of the airflow trajectory corresponding to the multi-airflow air curtain device shown in FIG. Figure 7 In the embodiment, the nozzle of the multi-flow air curtain device is taken as the origin of the coordinate axis, the horizontal direction is the y-axis, the vertical direction is the x-axis, the height of the driving channel is H, and the direction of the airflow ejected by the multi-flow air curtain device is the central axis. Here, assuming that the natural air outside moves into the tunnel at a horizontal wind speed, the wind speed differential equation in this embodiment is expressed as: In the formula, v y Indicates the wind speed of the airflow ejected by the multi-airflow air curtain device in the horizontal direction (y axis), v x represents the wind speed of the airflow ejected by the multi-airflow air curtain device in the vertical direction (x-axis), v s It represents the average velocity of the airflow in the direction of the central axis with a spray distance of s, v0 represents the external wind speed of the natural air outside the tunnel, and α represents the jet angle of the airflow of the multi-airflow air curtain device, that is, the angle between the airflow and the vertical direction when the ejected airflow leaves the nozzle of the multi-airflow air curtain device.
[0088] Here, the airflow of the multi-flow air curtain device is ejected at a certain angle α, and the central axis of the ejected airflow does not coincide with the x-axis corresponding to the vertical direction. Accordingly, the relationship between the ejection distance of the airflow and its mapping on the x-axis can be expressed as the following expression: The relationship between the jet distance of the airflow and its mapping on the x-axis can be expressed as follows: Wherein, x represents the vertical distance of the multi-airflow air curtain device when the injection distance of the airflow is s, and y represents the horizontal distance of the multi-airflow air curtain device when the injection distance of the airflow is s.
[0089] Step S603, based on the airflow average velocity model and the wind speed differential equation, an airflow trajectory model of the multi-airflow air curtain device is obtained.
[0090] In this embodiment, by combining the airflow average velocity model and the wind speed differential equation and integrating the wind speed differential equation, the trajectory of the airflow ejected by the multi-airflow air curtain device, ie, the airflow trajectory model, can be obtained.
[0091] Optionally, based on the above-mentioned airflow average velocity model and the expression of the wind speed differential equation, the expression of the airflow trajectory model of the multi-airflow air curtain device can be obtained, which can be specifically:
[0092]
[0093] Wherein, y represents the horizontal distance of the multi-airflow air curtain device, x represents the vertical distance of the multi-airflow air curtain device, α represents the jet angle of the multi-airflow air curtain device, b0 represents the nozzle thickness of the multi-airflow air curtain device, v0 represents the external wind speed, v represents the jet velocity of the multi-airflow air curtain device, and δ represents the turbulence coefficient.
[0094] At this point, it should be noted that Figure 6 In the schematic diagram, the example of performing step S601 first and then performing step S602 is used for illustration. However, in actual implementation, it is not limited to this. For example, step S602 may be performed first and then step S601, or step S601 and step S602 may be performed simultaneously.
[0095] Correspondingly, after obtaining the above airflow trajectory model, Figure 5In step S502 shown, the jet velocity of the multi-flow air curtain device is calculated based on the external wind speed and the pre-acquired airflow trajectory model. The jet velocity of the multi-flow air curtain device can be calculated when the airflow ejected by the multi-flow air curtain device contacts the first position of the ground corresponding to the vertical direction of the multi-flow air curtain device, that is, when the airflow range of the multi-flow air curtain device is the same as the height of the driving channel. The airflow range refers to the length of the airflow ejected by the multi-flow air curtain device in its vertical direction. That is, when y=0, solve for the value of x, see Figure 8 The schematic diagram of the airflow trajectory of the multi-airflow air curtain device at different jet velocities shown in the figure shows that one solution of x is 0, and the other solution is the point corresponding to the contact between the airflow ejected by the multi-airflow air curtain device and the first position of the ground corresponding to the vertical direction of the multi-airflow air curtain device. The value of the other solution is actually the airflow range.
[0096] That is, let y = 0, The jet velocity v of the multi-flow air curtain device is calculated, where H represents the height of the driving channel. Figure 8 The optimal wind-blocking airflow trajectory in is the required airflow trajectory, and the jet velocity of the airflow corresponding to the airflow trajectory is the calculated jet velocity v of the multi-airflow air curtain device.
[0097] In one embodiment, the expected air outlet temperature and the expected air outlet speed of the mobile hot air air curtain device are calculated according to the construction size parameters, the jet velocity, the outside temperature and the first internal temperature. If the first internal temperature is less than a preset temperature value, the first air outlet temperature and the first air outlet speed of the mobile hot air air curtain device are calculated according to the construction size parameters, the jet velocity, the outside temperature, the first internal temperature and a preset tunnel heating model; wherein the tunnel heating model is established based on the mobile hot air air curtain device heating the original air in the tunnel and the natural air invading the tunnel.
[0098] In this embodiment, if the first internal temperature is lower than the preset temperature value, it means that the air in the tunnel does not meet the temperature requirements of the construction environment, and the mobile hot air air curtain device needs to heat the air in the tunnel. Therefore, the tunnel heating model is used for calculation, so that the mobile hot air air curtain device can quickly heat the air and make the temperature in the tunnel reach the temperature requirements in a timely and efficient manner.
[0099] Optionally, this embodiment calculates the expected air outlet temperature and the expected air outlet speed of the mobile hot air air curtain device according to the construction dimension parameters, jet velocity, external temperature and the first internal temperature. It can also be that if the first internal temperature is greater than or equal to the preset temperature value, the second air outlet temperature and the second air outlet speed of the mobile hot air air curtain device are calculated according to the construction dimension parameters, jet velocity, external temperature, the first internal temperature and a preset tunnel insulation model; wherein the tunnel insulation model is established based on the mobile hot air air curtain device heating the natural air invading the tunnel.
[0100] In this embodiment, if the first internal temperature is greater than or equal to the preset temperature value, it means that the air in the tunnel meets the temperature requirements of the construction environment. The mobile hot air air curtain device only needs to heat the natural air entering the tunnel to maintain thermal balance. Therefore, the tunnel insulation model is used for calculation, so that the mobile hot air air curtain device heats the natural air entering the tunnel to ensure that the temperature in the tunnel always meets the temperature requirements.
[0101] Optionally, the tunnel heating model of the mobile hot air curtain device is expressed as:
[0102]
[0103] The expression of the tunnel insulation model of the mobile hot air curtain device is:
[0104]
[0105] Where Q1 represents the first heat model, Q2 represents the second heat model, Q3 represents the third heat model, and c p is the specific heat of air, γ c represents the air density of natural air outside the tunnel, γ a Indicates the air density of the original air in the tunnel, γ n Indicates the air specific gravity of the hot air released by the mobile hot air curtain device, Q in The air volume model representing the natural air intrusion into the tunnel per unit time, Q a It represents the air volume of the mobile hot air curtain device per unit time, Q a =A a ×v a , where v a Indicates the air outlet speed of the mobile hot air curtain device, A a Indicates the air outlet cross-sectional area of the mobile hot air curtain device; V t represents the air volume model, Δt represents the temperature difference between the target temperature inside the tunnel and the ambient temperature outside the tunnel, Δt = t m -t w , t wrepresents the external temperature outside the tunnel, t m represents the target temperature in the tunnel; Δt a Indicates the inlet and outlet temperature difference of the mobile hot air air curtain device, Δt a =t a -t1, where t a represents the outlet temperature of the mobile hot air air curtain device, t1 represents the first internal temperature in the tunnel; Δt′ represents the temperature difference between the target temperature in the tunnel and the first internal temperature in the tunnel, Δt′=t m -t1; τ is the time required for the air in the tunnel to reach the target temperature.
[0106] Here, the mobile hot air air curtain device can include two stages when in use, one is a tunnel heating stage for heating the air in the tunnel using a tunnel heating model, and the other is a tunnel insulation stage for insulating the air in the tunnel using a tunnel insulation model.
[0107] In specific use, before the mobile hot air air curtain device is turned on, if the first internal temperature in the tunnel is less than the preset temperature value, the mobile hot air air curtain device is controlled to enter the tunnel heating stage. When the first internal temperature is greater than or equal to the preset temperature value, the mobile hot air air curtain device is controlled to enter the tunnel insulation stage. Without changing the preset temperature value, the mobile hot air air curtain device can be maintained in the tunnel insulation stage. If the preset temperature value is increased, and the first internal temperature is less than the preset temperature value, the mobile hot air air curtain device can be controlled to re-enter the tunnel heating stage to heat the air in the tunnel.
[0108] In some embodiments, before calculating the desired outlet air temperature and the desired outlet air speed of the mobile hot air air curtain device according to the construction size parameter, the jet velocity, the outside temperature and the first inside temperature, the method may further include:
[0109] Step 1: According to the jet velocity and construction size parameters of the multi-flow air curtain device, an intrusion air volume model of the natural air intruding into the tunnel is established, and according to the construction size parameters, an air volume model of the original air in the tunnel is established.
[0110] Optionally, an airflow range model of the multi-airflow air curtain device can be established based on the jet velocity of the multi-airflow air curtain device, wherein the airflow range refers to the length of the airflow ejected by the multi-airflow air curtain device in its vertical direction. Then, an intrusion air volume model can be established based on the airflow range and construction size parameters of the multi-airflow air curtain device.
[0111] Here, the expression of the airflow range model can be: The expression of the intrusion air volume model can be: Q in=v0B(Hh), where h is the airflow range of the multi-airflow air curtain device, Q in is the amount of intruding air, H is the height of the driving channel, and B is the width of the driving channel.
[0112] Step 2: Establish a first heat model for heating the natural air invading the tunnel according to the invading air volume model, the outside temperature of the tunnel and the internal temperature of the tunnel.
[0113] Step three, establishing a second thermal model of the mobile hot air curtain device according to the first internal temperature of the tunnel, and the outlet air temperature and outlet air speed of the mobile hot air air curtain device.
[0114] Step 4: Establish a third heat model for heating the original air in the tunnel according to the air volume model and the first internal temperature of the tunnel.
[0115] Step five: establishing a tunnel heating model of the mobile hot air curtain device based on the first heat model, the second heat model and the third heat model.
[0116] In this embodiment, when heating the tunnel, it is necessary to heat the original air in the tunnel and the natural air from the outside that enters the tunnel, so it is necessary to balance the total heat of the airflow ejected by the mobile hot air air curtain device with the total heat of the original air in the tunnel and the natural air from the outside that enters the tunnel, that is, Q2 = Q1 + Q3.
[0117] Step six, based on the first heat model and the second heat model, establish a tunnel insulation model of the mobile hot air curtain device.
[0118] In this embodiment, when the tunnel is insulated, the air in the tunnel has actually reached the required temperature, that is, the first internal temperature detected is greater than or equal to the preset temperature value. At this time, only the natural air from the outside entering the tunnel needs to be heated. Accordingly, the total heat of the airflow ejected by the mobile hot air curtain device needs to be balanced with the total heat of the natural air from the outside entering the tunnel. That is, Q2 = Q1.
[0119] Illustratively, steps 2 to 6 here may be the first thermal model Q1 , the second thermal model Q2 , and the third thermal model Q3 as described in the above embodiment.
[0120] Here, in actual implementation, the order in which step five and step six are executed is not limited.
[0121] So far, the control method of the air curtain insulation system during the tunnel construction period and the model used in it have been introduced. Although the method in the above example can be used to heat and insulate the tunnel, there is no verification method to specifically determine whether the tunnel meets the temperature requirements of the construction environment. The following will further introduce the establishment of the three-dimensional temperature field distribution of the tunnel during the insulation process. By calculating the three-dimensional temperature field distribution, the temperature at each position in the tunnel can be obtained, thereby determining whether the tunnel meets the temperature requirements of the construction environment, which is convenient for construction workers to carry out construction.
[0122] In one embodiment, the control method of the air curtain insulation system during the tunnel construction period provided in this embodiment may also include: obtaining a second internal temperature at multiple different positions in the tunnel; and then calculating the three-dimensional temperature field distribution of the tunnel in the tunnel based on the tunnel temperature and the analytical solution of the three-dimensional temperature field distribution of the tunnel obtained in advance.
[0123] In this embodiment, the temperature at multiple different positions in the tunnel can also be measured to obtain the second internal temperature at each position. The second internal temperature is used for curve fitting, and combined with the analytical solution of the three-dimensional temperature field distribution of the tunnel, the temperature of each position point in the tunnel can be obtained, that is, the three-dimensional temperature field distribution of the tunnel when the air curtain insulation system is running during the tunnel construction period can be obtained.
[0124] Through the above three-dimensional temperature field distribution, it is possible to comprehensively and accurately judge whether the temperature at the location to be constructed in the tunnel meets the temperature requirements of the construction environment, so as to carry out tunnel construction or perform temperature adjustment.
[0125] Optionally, the process of establishing the analytical solution of the three-dimensional temperature field distribution of the tunnel can be as follows:
[0126] Based on the heat conduction theory, the heat transfer differential equation of the tunnel surrounding rock temperature field can be established first; then, based on the heat transfer differential equation of the tunnel surrounding rock temperature field and combining the superposition principle, separation of variables method and Bessel characteristic function, the analytical solution of the three-dimensional temperature field distribution of the tunnel can be obtained.
[0127] Schematically, the heat transfer differential equation of the tunnel surrounding rock temperature field can be expressed as:
[0128]
[0129] Where ρ is the density of the tunnel surrounding rock, and the unit can be kg·m -2 , c is the specific heat capacity of the tunnel surrounding rock, the unit can be J·kg -1 , t is the temperature of the tunnel surrounding rock, the unit can be ℃, τ is the time, the unit can be s, r is the radial distance of the tunnel, the unit can be m, λ is the thermal conductivity, the unit can be W·m -1 ℃ -1 , is the angular coordinate in the polar coordinate system, and z is the distance in the length direction of the tunnel, that is, the depth distance of the tunnel.
[0130] Here, a three-dimensional coordinate system can be established based on the tunnel radial distance r, the tunnel depth distance z and the time τ. For details, see Fig. 9 The schematic diagram of the coordinate system based on heat conduction is shown in FIG. The x-axis and y-axis of the two-dimensional coordinate system are established in the horizontal direction and vertical direction of the tunnel surrounding rock, respectively, and the coordinate system is transformed to obtain the corresponding polar coordinate system, that is, the radial coordinate in the polar coordinate system established with the radial distance r of the tunnel, and the angular coordinate Fig. 9 The coordinate axes corresponding to the tunnel radial distance r and the tunnel depth distance z in the three-dimensional coordinate system are also shown, where r0 represents the tunnel radius and r1 represents the tunnel radial depth.
[0131] The analytical solution of the three-dimensional temperature field distribution in the tunnel can be expressed as:
[0132]
[0133] Where t(r,z,τ) represents the analytical solution of the three-dimensional temperature field distribution of the tunnel, (r,z,τ) represents the coordinate system corresponding to the three-dimensional temperature field distribution of the tunnel, where r represents the coordinate axis corresponding to the radial distance of the tunnel, z represents the coordinate axis corresponding to the depth distance of the tunnel, τ represents the coordinate axis corresponding to the time of heating the air in the tunnel, and α represents the thermal diffusion coefficient of the tunnel surrounding rock. β m represents the mth first eigenvalue, η n represents the nth second eigenvalue, R(β m ,r) represents the function corresponding to the first eigenvalue, Z(η n ,z) represents the function corresponding to the second eigenvalue, c mn represents the unknown coefficient determined during the calculation process, r0 represents the tunnel radius, r1 represents the radial depth of the tunnel, and h represents the convective heat transfer coefficient, which can be in W·m -2 ℃ -1 , f(z,t) represents the fitting curve obtained by fitting the second internal temperature, and t0 represents the initial ground temperature of the tunnel surrounding rock.
[0134] The expression of the above unknown coefficients can be:
[0135]
[0136] In the formula, N(β m ) represents the norm corresponding to the first eigenvalue, N(η n ) represents the norm corresponding to the second eigenvalue, L represents the tunnel excavation depth, the unit can be m, R0(β m,r) represents the zero-order function corresponding to the first eigenvalue, and F(r,z) represents the temperature function of the tunnel surrounding rock.
[0137] In the above formula, function R0(β m ,r) is:
[0138] R0(β m ,r)=J0(β m r)Y0(β m r1)-J0(β m r1)Y0(β m r).
[0139] Function Z(η n ,z) is expressed as: Z(η n ,z)=cos(η n z).
[0140] The expression of the function F(r,z) is:
[0141] Norm N(β m ) is:
[0142]
[0143] Norm N(η n ) is:
[0144] And, according to the expression:
[0145] Calculate the eigenvalue β m .
[0146] According to the expression: sin(η n L)=0, calculate the eigenvalue η n .
[0147] In the above formula, J0 represents the solution of the first kind zero-order Bessel function, J1 represents the solution of the first kind first-order Bessel function, Y0 represents the solution of the second kind zero-order Bessel function, and Y1 represents the solution of the second kind first-order Bessel function.
[0148] In a specific embodiment, the tunnel radius of the severe cold tunnel is 4.2 m, the radial depth of the tunnel is 25 m, the tunnel excavation depth is 470 m, the initial ground temperature of the tunnel surrounding rock is 10 ° C, and the convection heat transfer coefficient is 15 W·m -2 ℃ -1 The surrounding rock density is 2800 kg·m -2 , the specific heat capacity of surrounding rock is 800 J·kg -1 The thermal conductivity of the surrounding rock is 3.42 W·m-1 ℃ -1 The daily average temperature and wind speed monitoring data of the local weather station in the tunnel in the past year were obtained, so that the outlet width of the multi-flow air curtain device can be designed to be 15cm, the jet angle can be designed to be 30°, and the controllable range of the jet speed can be 0.1-38m / s. When the natural wind speed is 2.79m / s, the airflow trajectory model of the multi-flow air curtain device can be calculated. Under different jet speed conditions, the airflow trajectory of the multi-flow air curtain device at different jet speeds is as follows Figure 8 The airflow trajectory and wind blocking efficiency of the multi-flow air curtain device under the conditions of an outlet width of 15 cm, a jet angle of 30°, and a jet speed of 38 m / s. The airflow trajectory of the multi-flow air curtain device at different natural wind speeds is shown in Fig.10 shown.
[0149] When the outside temperature of the tunnel is -18.6℃, according to the tunnel heating model of the mobile hot air curtain device, the running time of the heating stage is calculated to be about 52 minutes, and the air outlet speed and air outlet temperature are adjusted in real time according to the monitored ambient temperature during the insulation stage. After the tunnel heating stage of the mobile hot air curtain device is completed, the measured data of the temperature field in the tunnel are fitted with the curve f(z,t)=14.33-0.03z. The analytical solution of the three-dimensional temperature field distribution of the tunnel can be used to calculate the three-dimensional temperature field distribution law of the tunnel surrounding rock as follows: Fig.11 shown.
[0150] It can be seen that when the outlet width of the multi-flow air curtain device is 15cm and the jet angle is 30°, the optimal jet velocity is 6.8 times the outside wind speed. The multi-flow air curtain device can effectively prevent the cold air outside the tunnel from invading the tunnel construction area. When the outside temperature of the tunnel is -18.6℃, the multi-flow air curtain device effectively blocks the invasion of cold air from the outside. After the mobile hot air curtain device is heated for 52 minutes, the air curtain temperature in the tunnel is maintained above 0℃, which has a good insulation effect.
[0151] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0152] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.
[0153] Fig.12 The schematic diagram of the structure of the control device of the air curtain insulation system during the tunnel construction period provided by the embodiment of the present invention is shown. The device is applied to the controller of the air curtain insulation system during the tunnel construction period in any of the above embodiments. For the convenience of description, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:
[0154] like Fig.12 As shown, the control device 120 of the air curtain insulation system during tunnel construction period includes:
[0155] The acquisition module 1201 is used to acquire monitoring data of the monitoring device; wherein the monitoring data includes the outside temperature of the tunnel acquired by the second temperature sensor, the outside wind speed of the tunnel acquired by the wind speed sensor, and the first internal temperature of the tunnel acquired by the first temperature sensor;
[0156] A calculation module 1202 is used to calculate the jet velocity of the multi-airflow air curtain device according to the external wind speed and the pre-acquired airflow trajectory model; wherein the airflow trajectory model is established based on the trajectory of the jet airflow of the multi-airflow air curtain device; and calculate the expected outlet air temperature and expected outlet air velocity of the mobile hot air air curtain device according to the pre-acquired construction size parameters of the tunnel, the jet velocity, the external temperature and the first internal temperature;
[0157] The control module 1203 controls the multi-airflow air curtain device to spray airflow at the tunnel portal section according to the jet velocity, and controls the mobile hot air air curtain device to spray airflow in front of the lining trolley according to the desired air outlet temperature and the desired air outlet velocity.
[0158] Fig.13 is a schematic diagram of a controller provided by an embodiment of the present invention. Fig.13 As shown, the controller 15 of this embodiment includes: a processor 151, a memory 152, and a computer program 153 stored in the memory 152 and executable on the processor 151. When the processor 151 executes the computer program 153, the steps in the above-mentioned various method embodiments are implemented, for example Figure 5 Alternatively, when the processor 151 executes the computer program 153, the functions of each module in the above-mentioned device embodiments are implemented, for example Fig.12 Functions of modules 1201 to 1203 are shown.
[0159] Exemplarily, the computer program 153 may be divided into one or more modules / units, one or more modules / units are stored in the memory 152 and executed by the processor 151 to implement the present invention. One or more modules / units may be a series of computer program instruction segments that can implement specific functions, and the instruction segments are used to describe the execution process of the computer program 153 in the controller 150. For example, the computer program 153 may be divided into Fig.12 Modules 1201 to 1203 are shown.
[0160] The controller 150 may include, but is not limited to, a processor 151 and a memory 152. Those skilled in the art will appreciate that Fig.13It is only an example of the controller 150 and does not constitute a limitation of the controller 150. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the controller may also include input and output devices, network access devices, buses, etc.
[0161] The processor 151 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0162] The memory 152 may be an internal storage unit of the controller 150, such as a hard disk or memory of the controller 150. The memory 152 may also be an external storage device of the controller 150, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the controller 150. Further, the memory 152 may also include both an internal storage unit of the controller 150 and an external storage device. The memory 152 is used to store computer programs and other programs and data required by the controller. The memory 152 may also be used to temporarily store data that has been output or is to be output.
[0163] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0164] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0165] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0166] In the embodiments provided by the present invention, it should be understood that the disclosed devices / controllers and methods can be implemented in other ways. For example, the device / controller embodiments described above are only schematic, for example, the division of modules or units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0167] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0168] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0169] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media can include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc.
[0170] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. An air curtain insulation system during tunnel construction. It is characterized in that It includes a thermal insulation frame, a multi-airflow air curtain device, a mobile hot air air curtain device, a monitoring device, a controller and a power distribution device; The thermal insulation frame is arranged at the tunnel entrance section, a driving passage is arranged on the thermal insulation frame, and the multi-airflow air curtain device is arranged on the thermal insulation frame above the driving passage; The mobile hot air curtain device is arranged at the front end of the lining trolley in the tunnel; The monitoring device includes a sensor outside the tunnel and a first temperature sensor arranged in the tunnel, and the sensor outside the tunnel includes a second temperature sensor and a wind speed sensor arranged outside the tunnel; The controller is respectively connected to the multi-airflow air curtain device, the mobile hot air air curtain device and the monitoring device; The power distribution device is electrically connected to the multi-airflow air curtain device, the mobile hot air air curtain device, the monitoring device and the controller respectively.
2. The air curtain insulation system during tunnel construction according to claim 1, It is characterized in that The thermal insulation frame is fitted with the lining wall surface of the tunnel portal section; A plurality of honeycomb-shaped outlets are arranged at the bottom of the multi-airflow air curtain device, so that the multi-airflow air curtain device can spray a plurality of airflows through the plurality of honeycomb-shaped outlets.
3. A control method for the air curtain insulation system during tunnel construction. It is characterized in that The controller used in the air curtain insulation system during tunnel construction period according to claim 1 or 2, the method comprising: Acquire monitoring data of the monitoring device; wherein the monitoring data includes the outside temperature of the tunnel acquired by the second temperature sensor, the outside wind speed of the tunnel acquired by the wind speed sensor, and the first internal temperature of the tunnel acquired by the first temperature sensor; Calculate the jet velocity of the multi-airflow air curtain device according to the external wind speed and the pre-acquired airflow trajectory model; wherein the airflow trajectory model is established based on the trajectory of the jet airflow of the multi-airflow air curtain device; Calculate the expected air outlet temperature and the expected air outlet speed of the mobile hot air air curtain device according to the pre-acquired construction size parameters of the tunnel, the jet velocity, the outside temperature and the first internal temperature; According to the jet velocity, the multi-airflow air curtain device is controlled to spray airflow at the tunnel entrance section, and according to the desired air outlet temperature and the desired air outlet velocity, the mobile hot air air curtain device is controlled to spray airflow in front of the lining trolley.
4. The control method of the air curtain insulation system during tunnel construction according to claim 3, It is characterized in that Before calculating the jet velocity of the multi-airflow air curtain device according to the external wind velocity and the pre-acquired airflow trajectory model, the method further includes: Establishing an average airflow velocity model of the multi-airflow air curtain device at different positions in the central axis direction of the airflow; According to the jet velocity of the multi-airflow air curtain device and the external wind velocity of the natural air outside the tunnel, a wind velocity differential equation of the mixed airflow of the multi-airflow air curtain device and the natural air outside the tunnel is established; Based on the airflow average velocity model and the wind speed differential equation, an airflow trajectory model of the multi-airflow air curtain device is obtained.
5. The control method of the air curtain insulation system during tunnel construction according to claim 3, It is characterized in that The step of calculating the desired outlet air temperature and the desired outlet air speed of the mobile hot air air curtain device according to the construction size parameter, the jet velocity, the outside temperature and the first internal temperature includes: If the first internal temperature is lower than a preset temperature value, the first air outlet temperature and the first air outlet speed of the mobile hot air air curtain device are calculated according to the construction dimension parameters, the jet velocity, the external temperature, the first internal temperature and a preset tunnel heating model; wherein the tunnel heating model is established based on the mobile hot air air curtain device heating the original air in the tunnel and the natural air invading the tunnel.
6. The control method of the air curtain insulation system during tunnel construction according to claim 5, It is characterized in that The step of calculating the desired outlet air temperature and the desired outlet air speed of the mobile hot air air curtain device according to the construction size parameter, the jet velocity, the outside temperature and the first internal temperature includes: If the first internal temperature is greater than or equal to a preset temperature value, the second air outlet temperature and the second air outlet speed of the mobile hot air curtain device are calculated based on the construction size parameters, the jet velocity, the external temperature, the first internal temperature and a preset tunnel insulation model; wherein the tunnel insulation model is established based on the mobile hot air curtain device heating the natural air invading the tunnel.
7. The control method of the air curtain insulation system during tunnel construction according to claim 6, It is characterized in that Before calculating the expected air outlet temperature and the expected air outlet speed of the mobile hot air air curtain device according to the construction size parameter, the jet velocity, the outside temperature and the first internal temperature, the method further includes: Establishing an air volume model of natural air invading the tunnel according to the jet velocity of the multi-flow air curtain device and the construction size parameters, and establishing an air volume model of the original air in the tunnel according to the construction size parameters; Establishing a first heat model for heating the natural air invading the tunnel according to the invading air volume model, the outside temperature of the tunnel and the internal temperature of the tunnel; Establishing a second thermal model of the mobile hot air curtain device according to the first internal temperature of the tunnel, and the outlet air temperature and outlet air speed of the mobile hot air air curtain device; Establishing a third heat model for heating the original air in the tunnel according to the air volume model and the first internal temperature of the tunnel; Based on the first heat model, the second heat model and the third heat model, establishing a tunnel heating model of the mobile hot air curtain device; Based on the first heat model and the second heat model, a tunnel insulation model of the mobile hot air curtain device is established.
8. The control method of the air curtain insulation system during tunnel construction according to any one of claims 3 to 7, It is characterized in that The method further comprises: obtaining a second internal temperature at a plurality of different locations in the tunnel; The three-dimensional temperature field distribution in the tunnel is calculated according to the tunnel temperature and a pre-acquired analytical solution of the three-dimensional temperature field distribution in the tunnel.
9. The control method of the air curtain insulation system during tunnel construction according to any one of claims 3 to 7, It is characterized in that The expression of the airflow trajectory model of the multi-airflow air curtain device is: In the formula, y represents the horizontal distance of the multi-flow air curtain device, x represents the vertical distance of the multi-flow air curtain device, α represents the jet angle of the multi-flow air curtain device, and b 0 represents the nozzle thickness of the multi-flow air curtain device, v 0 represents the external wind speed, v represents the jet velocity of the multi-airflow air curtain device, and δ represents the turbulence coefficient.
10. The control method of the air curtain insulation system during tunnel construction according to claim 6, It is characterized in that The expression of the tunnel heating model of the mobile hot air curtain device is: The expression of the tunnel insulation model of the mobile hot air curtain device is: In the formula, Q 1 represents the first heat model, Q 2 represents the second thermal model, Q 3 represents the third thermal model, c p is the specific heat of air, γ c represents the air density of the natural air outside the tunnel, γ a Indicates the air density of the original air in the tunnel, γ n represents the air specific gravity of the hot air released by the mobile hot air air curtain device, Q in The air volume model representing the natural air intrusion into the tunnel per unit time, Q a It represents the air volume of the mobile hot air curtain device per unit time, Q a =A a ×v a , where v a represents the outlet air speed of the mobile hot air curtain device, A a V represents the air outlet cross-sectional area of the mobile hot air curtain device; t represents the air volume model, Δt represents the temperature difference between the target temperature in the tunnel and the ambient temperature outside the tunnel, Δt=t m -t w , t w represents the external temperature outside the tunnel, t m represents the target temperature in the tunnel; Δt a Indicates the inlet and outlet temperature difference of the mobile hot air air curtain device, Δt a =t a -t 1 , where t a represents the outlet air temperature of the mobile hot air curtain device, t 1 represents the first internal temperature in the tunnel; Δt′ represents the temperature difference between the target temperature in the tunnel and the first internal temperature in the tunnel, Δt′=t m -t 1 ; τ represents the time required for the air in the tunnel to reach the target temperature.
Citation Information
Cited By
Severe cold area underground water-sealed cave depot construction environment control system and control method thereof
CN121576119A
Cold region tunnel assembly type air curtain heat preservation room system and jet flow parameter design method
CN122408167A