Power distribution network source network load storage coordinated optimization scheduling method and system containing heat storage type industrial load

By establishing a mathematical model for flexible carbon capture gas turbines and thermal storage industrial loads, the problem of ineffective utilization of thermal storage industrial loads and carbon capture devices in existing technologies has been solved, achieving efficient consumption of new energy and economical system operation.

CN118970939AActive Publication Date: 2024-11-15NANJING SUYI IND +1

Patent Information

Application Number
CN202411121966.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-15
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

Existing technologies fail to effectively consider the uncertainties in distribution network operation caused by the adjustment capacity and increased penetration of new energy sources resulting from the participation of thermal storage industrial loads in demand response, and do not take into account the flexibility of carbon capture devices, leading to increased complexity of scheduling models and uneconomical system operation.

Method used

A mathematical model for the demand response of flexible carbon capture gas turbines and thermal storage industrial loads is established. The non-convexity of the model is handled by convex relaxation and linearization. Typical prediction error scenarios are extracted by combining a fast search density clustering algorithm. A coordinated optimization scheduling model for power generation, grid, load and storage of distribution network is constructed.

Benefits of technology

It has improved the utilization rate of new energy sources, reduced carbon emissions, enhanced the economy and flexibility of system operation, and resolved peak-shaving pressure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970939A_ABST
    Figure CN118970939A_ABST
Patent Text Reader

Abstract

The invention provides a source-network-load-storage coordinated optimization scheduling method and system for a power distribution network containing a heat storage type industrial load. The method comprises the steps of obtaining new energy and load historical prediction error data; establishing a mathematical model of the gas turbine additionally provided with the flexible carbon capture device, and performing convex relaxation treatment aiming at the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable; constructing a heat storage type industrial load demand response mathematical model considering daily regulation capacity, daily regulation times and daily output constraints, and performing piecewise linearization processing on daily production task nonlinear constraints of the heat storage type industrial load; obtaining a typical prediction error scene set according to the obtained new energy and load historical prediction error data; and constructing a power distribution network source network load storage coordinated optimization scheduling model containing the heat storage type industrial load demand response. According to the method, flexible resources in multiple links of source load storage are excavated, the new energy consumption rate and the economical efficiency of system operation are improved, and carbon emission is reduced, so that assistance is provided for realization of a dual-carbon target and social sustainable development.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of electric power systems, relates to distribution network dispatching technology, and specifically relates to a distribution network source-grid-load-storage coordinated optimization dispatching method and system containing thermal storage type industrial loads. Background Art

[0002] The power industry is the main source of carbon emissions. The use of carbon capture technology on its power generation side to reduce direct CO2 emissions and the use of renewable energy to replace fossil energy are of great significance in reducing emissions. However, the output of renewable energy is uncertain and even has certain anti-peak characteristics, that is, the power generation of renewable energy is low during peak load periods and high during low load periods, resulting in a low utilization rate of renewable energy. Moreover, if the power generation of renewable energy is low during peak load periods, it will inevitably lead to an increase in the power generation and carbon emissions of fossil fuel units, requiring the capture and treatment of more CO2. However, this also means that the power consumption of the carbon capture device increases, resulting in the unfavorable phenomenon of "peak on peak", which brings huge peak-shaving pressure to the system operation. By adding a liquid storage tank, the capture and treatment of CO2 can be decoupled, and the flexibility of the carbon capture device can be increased, thereby alleviating this situation. At the same time, heat storage-type industrial load resources have large thermal inertia. After installing energy storage equipment, they have great potential to participate in the flexible adjustment of the system. If they can be promoted to participate in demand response plans, the system peak regulation pressure can be alleviated to a great extent. However, the large-scale exploration of flexible resources of source, load and storage will inevitably lead to an increase in the complexity of the system optimization scheduling model. Unreasonable modeling methods and optimization scheduling algorithms will not only fail to improve the economy of the scheduling plan, but even threaten the safety of system operation and load power consumption.

[0003] In recent years, energy conservation, carbon reduction and clean energy use have gradually become a consensus; to this end, the power system needs to work simultaneously from multiple angles of source, load and storage; the source end can use carbon capture devices to store and utilize CO2 emitted by traditional fossil energy units, and vigorously promote new energy power generation; the load end can fully mobilize the load, especially the heat storage type industrial load with huge potential to participate in demand response projects; the storage end promotes the installation and utilization of user-side energy storage through mechanisms such as two-part electricity prices, optimizes the electricity consumption curve and consumes new energy power locally. However, the mathematical models of flexible carbon capture devices and heat storage type industrial loads participating in demand response have different degrees of non-convex and nonlinear characteristics, and directly incorporating them into the distribution network optimization dispatching model will bring about the problem of difficulty in solving; in addition, the distribution network operation uncertainty caused by the increase in the penetration rate of new energy also needs to be taken into account in its optimization dispatching model.

[0004] CN202011490794.6A discloses a coordinated control method for wind power consumption based on fused magnesium load, including: predicting the wind power output curve of the day before, combining the actual production and operation status of the fused magnesium load, treating the fused magnesium load as a controllable load during the day-ahead dispatch, regulating the high energy-consuming load during the wind abandonment period, taking the minimum sum of the wind abandonment volume throughout the next day as the optimization target, introducing the upper and lower limits of the fused magnesium load power, the adjustment time constraint, and the adjustment number constraint, as well as the operation constraints of wind power and thermal power in the constraint conditions, and obtaining the adjustment amount of the fused magnesium load in each period through optimization calculation to realize the consumption of wind power. This method does not take into account the actual situation of adding carbon capture devices to fossil fuel generators in the construction of low-carbon power systems, so it is not taken into account in the dispatching model. At the same time, it considers the prediction errors of new energy power generation and load power by reserving spare capacity, and the characterization of the uncertainty of the source and load of the power system is not detailed enough.

[0005] CN202110554949.6A provides a source-load interactive peak-shaving strategy based on active control of fused magnesium, including: predicting the wind power output curve and conventional load power curve of the next day in advance, operating the conventional units at the minimum output of the units, and considering the fused magnesium load as a controllable load in combination with the actual operating characteristics of the fused magnesium load. By adjusting the fused magnesium load power and the output of conventional units during the wind abandonment period, the goals of wind power consumption and relieving the peak-shaving pressure of the power grid can be achieved. This invention does not take into account the actual situation of adding carbon capture devices to fossil fuel generators in the construction of low-carbon power systems, and therefore fails to take this into account in the scheduling model; the method adopts a deterministic optimization model, does not consider the prediction errors of renewable energy generation and load power, and cannot be directly applied to the optimization scheduling problem of high-uncertainty power systems. In addition, the impact of the fused magnesium load power adjustment on its yield and output is not taken into account.

[0006] CN202211267772.2A proposes a wind-solar-hydrogen comprehensive energy optimization method taking into account methanation and carbon capture, which belongs to the field of energy optimization. It includes the following steps: establishing a wind-solar-hydrogen comprehensive energy architecture taking into account carbon capture and methanation; based on the wind-solar-hydrogen comprehensive energy architecture taking into account carbon capture and methanation, establishing a mathematical model of each energy flow conversion and storage device; based on the mathematical model of each energy flow conversion and storage device, establishing a scheduling model objective function and a capacity configuration objective function, and establishing constraints for the scheduling model objective function and the capacity configuration objective function, wherein the scheduling model objective function is the minimum value of the sum of the energy purchase cost, the amount of wind and solar power abandoned, and the operation and maintenance cost, and the capacity configuration objective function is the minimum value of the sum of the construction, operation and maintenance cost, and the carbon emission cost; using the CPLEX solver to obtain the optimal scheduling plan and the optimal capacity configuration plan.

[0007] The above patents do not consider the adjustable capacity brought by the participation of thermal storage type industrial loads in demand response in the comprehensive energy optimization scheduling model, nor do they consider the adjustable flue gas diversion ratio of the carbon capture device and the flexible adjustment capability brought by the installation of a liquid storage tank.

[0008] Therefore, there is an urgent need for an optimized dispatching method for distribution networks that considers the adjustable capacity brought by the participation of thermal storage industrial loads in demand response, while taking into account the uncertainty of distribution network operation caused by the increase in the penetration rate of new energy. Summary of the invention

[0009] In order to solve the deficiencies in the prior art, the present invention provides a method for coordinated optimization scheduling of sources, grids, loads and storage for a distribution network containing heat storage type industrial loads. By establishing a mathematical model of demand response of a flexible carbon capture gas turbine and heat storage type industrial loads, a model and solution algorithm for coordinated optimization scheduling of sources, grids, loads and storage for a distribution network containing heat storage type industrial loads is established, providing theoretical and technical support for the optimized operation of future distribution networks.

[0010] The present invention adopts the following technical solution.

[0011] A method for coordinated optimization and dispatching of a distribution network source-grid-load-storage containing thermal storage type industrial loads, the method comprising the following steps:

[0012] S1, obtain new energy and load historical forecast error data;

[0013] S2, establish a mathematical model of a gas turbine equipped with a flexible carbon capture device, and perform convex relaxation on the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable;

[0014] S3, construct a mathematical model of demand response of thermal storage type industrial load taking into account daily regulation capacity, daily regulation times and daily production constraints, and perform piecewise linearization on the nonlinear constraints of daily production tasks of thermal storage type industrial load;

[0015] S4, obtaining a typical prediction error scenario set based on the new energy and load historical prediction error data obtained in S1;

[0016] S5, based on the day-ahead forecast curves of new energy and load power provided by the distribution network dispatching center and the typical forecast error scenario set obtained in S4, a distribution network source-grid-load-storage coordinated optimization dispatching model with thermal storage type industrial load demand response is constructed.

[0017] The present invention further includes the following preferred embodiments:

[0018] In S1, the historical forecast error data of new energy and load include their respective hourly power forecast error data for at least one year before the day of scheduling.

[0019] In S2, the flexible carbon capture device installed on the gas turbine includes an absorption tower, a liquid storage tank, and a regeneration tower. During peak load periods, the liquid storage tank stores the CO2 absorbed by the absorption tower without processing it temporarily, reducing the carbon capture power of the gas turbine during peak load periods and increasing the online power; during low load periods, the liquid storage tank releases the stored CO2 into the regeneration tower and consumes the gas turbine power for subsequent carbon capture processing.

[0020] In S2, the mathematical model of the gas turbine equipped with a flexible carbon capture device is constructed as follows:

[0021]

[0022] Among them, P t CCGT is the total output power of the gas turbine with flexible carbon capture device during period t, is the grid-connected power of the gas turbine during period t, P t CC is the carbon capture operation energy consumption of the carbon capture equipment during period t, P t Y is the fixed energy consumption of the carbon capture equipment during period t, χ is the operating energy consumption of the carbon capture equipment per unit CO2 captured, is the total mass of CO2 captured during period t, is the CO2 mass entering the carbon capture device after the flue gas bypass system diverts during period t, The CO2 supply to the rich liquid tank equipped for the carbon capture device during period t, is the CO2 absorption capacity of the rich liquid tank in period t, δ is the flue gas split ratio, is the maximum carbon capture level, is the total mass of CO2 actually produced by the gas turbine during period t γ CCGT CO2 produced per unit of electricity generated by the gas turbine, is the net carbon emission of the gas turbine, that is, the mass of CO2 emitted into the air after the flue gas bypass system diverts during period t.

[0023] In S2, the convex relaxation process includes constructing the constraints of the mathematical model of the gas turbine according to the following formula:

[0024]

[0025] Among them, δ represents the flue gas split ratio, P t CCGT represents the total output power of the carbon capture gas turbine during period t, denote the lower and upper limits of the carbon capture gas turbine output, respectively, and ω denotes the value used to replace δ t P t CCGTAuxiliary variables for the bilinear terms.

[0026] In S3, the piecewise linearization of the nonlinear constraints of the production task includes introducing auxiliary variables for piecewise linearization transformation according to the following formula:

[0027]

[0028] Among them, x1, x2, and x3 are three 0-1 auxiliary variables introduced for piecewise linearization. m,t,k is the output of the mth thermal storage type industrial load at time t in the kth prediction error scenario, O m is the production demand of the mth thermal storage type industrial load, λ1, λ2, and λ3 are the product yields of the thermal storage type industrial load equipment under the power reduction state, rated power, and power increase state, respectively. It is the benchmark power for the operation of thermal storage type industrial load equipment. is the optimization variable corresponding to the power increase and decrease of the mth thermal storage type industrial load at time t under the kth day-ahead forecast error scenario.

[0029] In S4, based on the historical forecast error data of new energy and load obtained in S1, a typical forecast error scenario set is obtained, including:

[0030] Step S401: Calculate the Euclidean distance between any two source-load historical prediction error vectors;

[0031] Step S402: Calculate the local density of the source load historical prediction error data corresponding to the historical prediction error vector;

[0032] Step S403: determining the cluster center distance of the source-load historical prediction error data;

[0033] Step S404: using the normalized values ​​of the local density and the cluster center distance as the horizontal and vertical coordinates, traversing all the historical prediction error data of new energy sources and loads, and drawing the corresponding points of the source-load historical prediction error data in the two-dimensional space;

[0034] Step S405: Arrange the products of the horizontal and vertical coordinates in the two-dimensional space drawn in step S404 from high to low, and take a set consisting of samples corresponding to the points ranked in the top 5% as a typical prediction error scenario set.

[0035] In S5, the distribution network source-grid-load-storage coordinated optimization dispatching model with thermal storage type industrial load demand response is constructed, including:

[0036] Step S501: constructing an objective function of a distribution network optimization dispatch model including a flexible carbon capture gas turbine, a thermal storage type industrial load demand response and an energy storage device;

[0037] Step S502: Construct constraint conditions of a distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial loads.

[0038] In step S501, the objective function of the distribution network optimization dispatch model including the flexible carbon capture gas turbine, the thermal storage type industrial load demand response and the energy storage device is constructed as follows:

[0039]

[0040] Among them, C CCGT represents the gas turbine startup and shutdown cost, represents the operating cost of the carbon capture gas turbine under the kth typical scenario, represents the energy purchase cost of the distribution network in the kth typical scenario, represents the subsidy cost of the distribution network for paying thermal storage type industrial loads to participate in demand response in the kth typical scenario, represents the carbon emission cost under the kth typical scenario, represents the penalty cost of wind and solar power abandonment in the kth typical scenario, represents the load shedding cost in the kth typical scenario.

[0041] In step S502, the constraints for constructing a coordinated optimization scheduling model for the distribution network source, grid, load and storage containing thermal storage type industrial loads include: constructing power balance constraints; constructing line transmission capacity constraints; constructing wind and solar power abandonment and load shedding constraints; constructing carbon capture gas turbine output constraints, climbing constraints and minimum start and stop time constraints; and constructing power and energy constraints of energy storage devices.

[0042] At the same time, the present invention also provides a distribution network source-grid-load-storage optimization scheduling system containing heat storage type industrial loads, the system includes a data acquisition module, a gas turbine mathematical model construction module, a demand response mathematical model construction module, a prediction error scenario set acquisition module and an optimization scheduling model construction module;

[0043] A data acquisition module is used to acquire new energy and load historical data, obtain new energy and load historical prediction error data based on the acquired historical data, and cluster the new energy and load historical prediction error data to obtain a typical prediction error scenario set;

[0044] The gas turbine mathematical model building module is used to establish the mathematical model of the gas turbine equipped with a flexible carbon capture device, and to perform convex relaxation processing on the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable;

[0045] The demand response mathematical model construction module is used to construct a thermal storage type industrial load demand response mathematical model that takes into account the daily regulation capacity and daily regulation number constraints, and to perform piecewise linearization processing on the nonlinear constraints of its daily production tasks;

[0046] A prediction error scenario set acquisition module is used to acquire a typical prediction error scenario set based on new energy and load historical prediction error data;

[0047] The optimization dispatching model building module is used to build a distribution network source-grid-load-storage coordinated optimization dispatching model containing thermal storage type industrial loads based on the day-ahead forecast curves of new energy and load power provided by the distribution network dispatching center and the typical forecast error scenario set obtained.

[0048] A terminal comprises a processor and a storage medium; the storage medium is used to store instructions; the processor is used to operate according to the instructions to execute the steps of any one of the methods.

[0049] A computer-readable storage medium stores a computer program, which implements the steps of any one of the methods when executed by a processor.

[0050] The beneficial effect of the present invention is that, compared with the prior art, the present invention first establishes a mathematical model of flexible carbon capture devices and thermal storage type industrial loads participating in demand response, and performs convex transformation and linearization on it; then uses a fast search density clustering algorithm to extract typical prediction error scenarios from the historical samples of source-load day-ahead prediction errors, and combines the basic data of day-ahead prediction to construct a typical day-ahead operation scenario set; finally, on the basis of the above, a distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial loads is constructed and solved. The method proposed in the present invention can improve the new energy consumption rate and the economy of system operation, and reduce carbon emissions by tapping into the flexible resources of source-load-storage, under the premise of fully taking into account the uncertainty of new energy load forecasting. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] Figure 1 It is a flow chart of a method for coordinated optimization of source-grid-load-storage scheduling of a distribution network containing thermal storage type industrial loads according to the present invention;

[0052] Figure 2 A schematic diagram of a test distribution network designed based on the IEEE-33 node standard system in one embodiment of the present invention;

[0053] Figure 3 A wind power and load forecast power curve diagram in one embodiment of the present invention;

[0054] Figure 4 The present invention is a block diagram of a distribution network source-grid-load-storage coordinated optimization dispatching system containing thermal storage type industrial loads. DETAILED DESCRIPTION

[0055] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only embodiments of a part of the present invention, rather than all embodiments. Based on the spirit of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.

[0056] The present application provides a method for coordinated optimization of the dispatching of the distribution network source-grid-load-storage containing thermal storage type industrial loads, such as Figure 1 The flowchart of the coordinated optimization dispatching method of the distribution network source-grid-load-storage containing thermal storage type industrial load of the present invention is shown, and the method comprises the following steps:

[0057] S1, obtain new energy and load historical prediction error data.

[0058] In one embodiment of the present invention, in S1, the new energy and load historical data include respective hourly power forecast error data of at least one year from the day of scheduling.

[0059] S2, a mathematical model of a gas turbine equipped with a flexible carbon capture device is established, and a convex relaxation treatment is performed on the non-convex problem of the model when the flue gas diversion ratio of the carbon capture device is adjustable.

[0060] In one embodiment of the present invention, in S2, the flexible carbon capture device installed on the gas turbine includes an absorption tower, a liquid storage tank, and a regeneration tower. During peak load periods, the liquid storage tank stores the CO2 absorbed by the absorption tower without processing it temporarily, thereby reducing the carbon capture power of the gas turbine during peak load periods and increasing the online power. During low load periods, the liquid storage tank releases the stored CO2 into the regeneration tower and consumes the power of the gas turbine for subsequent carbon capture processing.

[0061] In one embodiment of the present invention, step S2 further includes:

[0062] Step S201, construct a mathematical model of a gas turbine equipped with flexible carbon capture according to the following formula:

[0063]

[0064] Among them, P t CCGT is the total output power of the gas turbine with flexible carbon capture device during period t, is the grid-connected power of the gas turbine during period t, P t CC is the carbon capture operation energy consumption of the carbon capture equipment during period t, P t Y is the fixed energy consumption of the carbon capture equipment during period t, χ is the operating energy consumption of the carbon capture equipment per unit CO2 captured, is the total mass of CO2 captured during period t, is the CO2 mass entering the carbon capture device after the flue gas bypass system diverts during period t, The amount of CO2 supplied to the rich liquid tank equipped for the carbon capture device during period t; is the CO2 absorption capacity of the rich liquid tank in period t, δ is the flue gas split ratio, δ min , δ max Respectively represent the minimum and maximum values ​​of the flue gas split ratio, is the maximum carbon capture level, is the total mass of CO2 actually produced by the gas turbine during period t γ CCGT CO2 produced per unit of electricity generated by the gas turbine, is the net carbon emission of the gas turbine, that is, the mass of CO2 emitted into the air after the flue gas bypass system diverts during period t.

[0065] Step S202 further supplements the model of the liquid storage tank, which is a key equipment of the flexible carbon capture device; after the flue gas generated by the carbon capture gas turbine enters the absorption tower according to a certain diversion ratio, it undergoes an absorption reaction with the ethanolamine solution, and the ethanolamine solution absorbs a larger proportion of CO2 in the flue gas through elution to form a rich liquid with a higher CO2 concentration. Subsequently, the rich liquid is pumped to the regeneration tower, where a reverse reaction occurs to achieve the analysis of CO2 and the regeneration of the ethanolamine solution. The analyzed CO2 is sent to the compressor for reuse or sealing, and the regenerated lean liquid is returned to the absorption tower to complete the recycling of the solution; the above process follows the constraints shown in the following formula:

[0066]

[0067] Where η is the maximum operating efficiency of the regeneration tower and compressor, is the upper limit of the total output power of the carbon capture gas turbine, is a 0-1 variable that reflects the change in the capacity of the lean liquid tank and the rich liquid tank during period t. When the capacity of the lean liquid tank increases, the corresponding is positive, when the capacity of the rich liquid tank increases, the corresponding Is positive.

[0068] It should be noted that since the CO2 in the rich solution is free in the ethanolamine solution in the form of a compound, the relationship between the volume of the stored ethanolamine solution and the mass of CO2 needs to be taken into account. The expression is as follows:

[0069]

[0070] Among them, V t in V is the volume of solution required for the rich liquid tank to absorb CO2 during period t, tout M is the volume of solution required to release CO2 from the rich liquid tank during period t, MEA , are the molar masses of MEA and CO2, respectively, ψ is the amount of CO2 that can be absorbed by 1 mol of MEA solution, in mol / mol; are the solution concentration and solution density at time period t respectively;

[0071] The liquid storage tank model expression is as follows:

[0072]

[0073] Among them, V t FL 、V t WL are the solution volumes in the rich liquid tank and the lean liquid tank during period t, are the solution volumes in the rich liquid tank and the lean liquid tank during period t-1, are the solution volumes in the rich liquid tank and the lean liquid tank at the initial moment, are the solution volumes in the rich liquid tank and the lean liquid tank after one scheduling cycle, V t FL 、V t WL are the solution volumes in the rich liquid tank and the lean liquid tank at time t, V L is the volume of the liquid storage tank.

[0074] Step S203: The model of the flexibly operated carbon capture gas turbine is non-convex, and there is an adjustable flue gas split ratio δ and the total output power P of the carbon capture gas turbine during time period t. t CHP To ensure the solvability of the model, the McCormick envelope is used to relax the non-convex problem into a convex problem. The relaxed constraints are:

[0075]

[0076] Substituting equation (5) into equation (1), the convex relaxation of the flexible carbon capture gas turbine model can be achieved.

[0077] S3, construct a mathematical model of demand response of thermal storage type industrial load taking into account daily regulation capacity, daily regulation times and daily output constraints, and perform piecewise linearization on the nonlinear constraints of daily production tasks of thermal storage type industrial load.

[0078] In one embodiment of the present invention, in step S3, constructing a thermal storage type industrial load demand response mathematical model taking into account constraints such as daily regulation capacity and daily regulation times includes: constructing a thermal storage type industrial load daily regulation capacity constraint; constructing a thermal storage type industrial load daily regulation times constraint; and constructing a thermal storage type industrial load daily output constraint.

[0079] The constraint formula of daily regulation capacity of thermal storage type industrial load is as follows:

[0080]

[0081] Among them, P m,t,k is the adjusted operating power of the mth thermal storage type industrial load at time t under the kth day-ahead forecast error scenario, is the benchmark power for thermal storage type industrial load operation. is the optimization variable corresponding to the power increase and decrease of the mth thermal storage type industrial load at time t under the kth day-ahead forecast error scenario, su m,t,k 、sd m,t,k is a 0-1 variable reflecting the power up and down state of the mth thermal storage type industrial load equipment at time t in the kth day-ahead forecast error scenario. It is the maximum power increase and decrease for thermal storage type industrial loads under the premise of ensuring safe operation.

[0082] The constraint formula for the daily regulation times of thermal storage type industrial load is as follows:

[0083]

[0084] Among them, y m,t,k and z m,t,k are the power up and down state transition variables of the mth thermal storage type industrial load equipment at time t under the kth day-ahead forecast error scenario; that is, y m,t,k (z m,t,k ) is 1, which means that the mth thermal storage type industrial load equipment changes from other states to the power up (down) adjustment state in the kth prediction error scenario; when it is 0, it means that no such state change occurs; M is the maximum adjustment times set for the thermal storage type industrial load; su m,(t-1),k A 0-1 variable indicating that the mth thermal storage type industrial load device is in the power increase state at time (t-1) in the kth day-ahead forecast error scenario.

[0085] The daily output constraint formula of thermal storage type industrial load is as follows:

[0086]

[0087] Among them, O m is the target output value of thermal storage industrial load, P m,t,k is the adjusted operating power of the mth thermal storage type industrial load equipment at time t under the kth day-ahead forecast error scenario, λ(P m,t,k ) is a piecewise linear function of product yield with respect to power, that is:

[0088]

[0089] Among them, λ1, λ2, and λ3 are the product yields of the thermal storage type industrial load in the power reduction state, rated power, and increase state, respectively.

[0090] In one embodiment of the present invention, the production constraint formed by equations (8) and (9) is a conditional constraint, which results in that the model cannot be directly solved by a commonly used commercial solver; performing piecewise linearization processing on the nonlinear constraint of the production task includes introducing auxiliary variables according to the following formula for piecewise linearization conversion:

[0091]

[0092] Among them, x1, x2, and x3 are three 0-1 auxiliary variables introduced for piecewise linearization. m,t,k is the output of the mth thermal storage industrial equipment at time t in the kth prediction error scenario.

[0093] S4, obtaining a set of typical prediction error scenarios based on the new energy and load historical prediction error data obtained in S1.

[0094] In the process embodiment of the present invention, obtaining a typical prediction error scenario set includes:

[0095] Step S401, calculating the Euclidean distance between any two source load historical prediction error vectors.

[0096] First, the historical prediction error data of any new energy source and any load is recorded as:

[0097] v sl =[v1,…,v x ,…,v y ,…v N ] (11)

[0098] In the formula, v sl is the matrix composed of historical data of source load prediction error; v1, v x 、v y 、v N are the 1st, xth, yth and Nth historical samples of source load day-ahead prediction error respectively; N is the total number of historical samples of source load prediction error.

[0099] Then, with v x and v y As an example, give the Euclidean distance between two prediction error samples:

[0100] d xy =||v x -v y ||2 (12)

[0101] Where, d xy v x and v y The Euclidean distance between them, ||·||2 represents the second norm.

[0102] Step S402, calculating the local density of the source load historical prediction error data corresponding to the historical prediction error vector.

[0103] In one embodiment of the present invention, a Gaussian kernel function method is used to calculate the sample v x The local density δ x , the specific formula is as follows:

[0104]

[0105] In the formula, δ x For sample v x The local density of c is the cutoff distance selected according to the set standard. The set standard is to ensure that the distance from each data point to other data points is less than d c The average number is about 1% to 2% of the total data.

[0106] Step S403: determining the cluster center distance of the source load historical prediction error data.

[0107] In one embodiment of the present invention, the sample v x The cluster center distance is defined as v x V x The minimum value of the Euclidean distance of all historical samples with large local density can be expressed as:

[0108]

[0109] Among them, v z is the zth historical forecast error sample, μ x For sample v x The cluster center distance.

[0110] Step S404, using the normalized values ​​of the local density and the cluster center distance as the horizontal and vertical coordinates, traversing all the historical prediction error data of new energy sources and loads, and drawing the corresponding points of the source-load historical prediction error data in the two-dimensional space.

[0111] In one embodiment of the present invention, after all the points corresponding to the samples are drawn, the products of the horizontal and vertical coordinates of all the points in the figure are arranged from high to low, and the set consisting of the samples corresponding to the points ranked in the top 5% is taken as the typical prediction error scene; the remaining samples are assigned to the cluster of the nearest typical scene according to the Euclidean distance from these typical scenes; after all the samples are assigned, the probability of any typical scene is calculated as:

[0112]

[0113] Among them, p k is the probability corresponding to the kth typical scene, and n(k) is the number of all samples belonging to the cluster where the kth typical scene belongs.

[0114] S5, based on the day-ahead forecast curves of new energy and load power provided by the distribution network dispatching center and the typical forecast error scenario set obtained in S4, a distribution network source-grid-load-storage optimization dispatching model containing thermal storage type industrial loads is constructed.

[0115] In one embodiment of the present invention, constructing a distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial loads includes:

[0116] Step S501, the typical forecast error scenarios of all new energy sources and loads are added to the basic scenarios represented by the day-ahead forecast curve to obtain a typical day-ahead operation scenario set, and based on this, the objective function of the distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial loads is constructed as follows:

[0117]

[0118] Among them, n sce is the total number of typical day-ahead operation scenarios, C CCGT is the gas turbine startup and shutdown cost, is the operating cost of the carbon capture gas turbine under the kth typical scenario, is the energy purchase cost of the distribution network in the kth typical scenario, is the subsidy cost of the distribution network for paying thermal storage type industrial loads to participate in demand response in the kth typical scenario, is the carbon emission cost in the kth typical scenario, is the penalty cost of wind and solar power abandonment in the kth typical scenario, is the load shedding cost in the kth typical scenario.

[0119] In this embodiment, the calculation formula of the gas turbine start-up and shutdown cost is as follows:

[0120]

[0121] Among them, N CCGT The number of carbon capture gas turbines; SU i , SD i are the startup and shutdown costs of the i-th unit respectively; I i,t ,I i,t-1 are the start / stop state variables of the i-th unit at time t and time t-1 respectively.

[0122] In this embodiment, the calculation formula of the operating cost of the carbon capture gas turbine in the kth typical scenario is as follows:

[0123]

[0124] Among them, c CCGT 、c ccus are the unit operating costs of the carbon capture gas turbine power generation equipment and the carbon capture equipment, respectively; is the electric power produced by the i-th carbon capture gas turbine at time t under the k-th typical scenario; is the operating energy consumption of the carbon capture equipment at time t under the kth typical scenario.

[0125] In this embodiment, the calculation formula of the energy purchase cost of the distribution network in the kth typical scenario is as follows:

[0126]

[0127] Among them, c grid,t is the electricity price purchased from the main grid at time t during the dispatch period, The amount of electricity purchased from the main grid at time t in the kth typical scenario.

[0128] In this embodiment, the calculation formula for the subsidy cost of the distribution network for paying the thermal storage type industrial load to participate in the demand response in the kth typical scenario is as follows:

[0129]

[0130] Among them, c m1 、c m2 They are the unit response electricity subsidies for a single increase or decrease in thermal storage type industrial load; The unit power increase and decrease of the mth heat storage type industrial load equipment at time t in the kth typical scenario; They are respectively the charging and discharging powers of the energy storage device installed at the mth thermal storage type industrial load equipment in period t under the kth typical scenario.

[0131] In this embodiment, the calculation formula of the carbon emission cost in the kth typical scenario is as follows:

[0132]

[0133] in, is the unit carbon emission cost, is the net carbon emissions in period t under the kth typical scenario; e is the carbon emission factor per unit of electricity purchased.

[0134] In this embodiment, the calculation formula for the wind and solar power abandonment penalty cost in the kth typical scenario is as follows:

[0135]

[0136] Among them, c cur is the penalty coefficient for the amount of wind and solar power abandoned, They are the power abandonment of the w-th wind farm and the v-th photovoltaic power station in period t under the k-th typical scenario.

[0137]

[0138] In this embodiment, the calculation formula of the load shedding cost in the kth typical scenario is as follows:

[0139] Among them, c L is the unit load shedding penalty coefficient; is the load shedding amount at node b during period t in the kth typical scenario.

[0140] Step S502, the constraints of the distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial load are as follows:

[0141] 1) The power balance constraints are as follows:

[0142]

[0143] in, are the predicted power generation of the w-th wind farm and the v-th photovoltaic power station connected to the system in period t under the k-th typical scenario; is the total system load at node b during period t.

[0144] 2) The line transmission capacity constraints are as follows:

[0145]

[0146] Among them, K lb is the power flow distribution transfer factor of system node b with respect to line l. lmax is the maximum transmission power of line l. i∈b, w∈b, v∈b and m∈b indicate that unit i, wind farm w, photovoltaic power station v, thermal storage type industrial equipment m are connected to system node b to access the distribution network.

[0147] 3) The constraints on wind and solar power abandonment and load shedding are as follows:

[0148]

[0149] 4) The output constraints of the carbon capture gas turbine are as follows:

[0150]

[0151] in, and are the lower and upper limits of the output of the i-th carbon capture gas turbine respectively.

[0152] 5) The ramping constraints of the carbon capture gas turbine are as follows:

[0153]

[0154] Among them, DR i , UR i are the up and down ramp rates of carbon capture gas turbine i, respectively.

[0155] 6) The minimum start and stop time constraints of the carbon capture gas turbine are as follows:

[0156]

[0157] in, are the durations of continuous startup and shutdown of the carbon capture gas turbine i during period t-1, respectively; are the minimum startup and shutdown durations of the carbon capture gas turbine i, respectively.

[0158] 7) The power and energy constraint formulas of the energy storage device are as follows:

[0159]

[0160] in, They are the charging and discharging status indicator variables of the energy storage device installed at the mth thermal storage type industrial load equipment in the kth typical scenario during the t period, and both are 0-1 variables; η m is the maximum charge and discharge power, maximum energy storage capacity and charge and discharge efficiency of the energy storage device installed at the mth thermal storage type industrial load equipment; is the real-time storage energy of the energy storage device installed at the mth thermal storage type industrial load equipment in the kth typical scenario during the tth period; S mmin , S mmax are the minimum and maximum state of charge coefficients of the energy storage device installed at the mth thermal storage type industrial load equipment.

[0161] Considering equations (17)-(23) as objective functions, and equations (1)-(7), (10), and (24)-(31) as constraints, the distribution network source-grid-load-storage coordinated optimization scheduling model for thermal storage type industrial loads proposed in this application is constructed.

[0162] In one embodiment of the present invention, after step 5, the method further includes using a CPLEX commercial solver to solve the model algorithm.

[0163] In one embodiment of the present invention, the improved IEEE-33 node distribution network system standard test system design example is used, and its network structure is as follows: Figure 2 As shown; the distribution network is connected to three gas turbines of the same model, namely GT1-GT3, which are connected to nodes 22, 25 and 33 respectively. The specific technical parameters are shown in Table 1; the three gas turbines are equipped with the same carbon capture device, and the relevant parameters are shown in Table 2; a wind farm is connected to node 18, and its output prediction curve is shown in Figure 3 As shown in Table 3, the penalty cost per unit wind curtailment is 700 yuan / MW·h; the proportion of active load of each node to the total active load of the distribution network is consistent with the IEEE-33 node standard system; the load of the fused magnesium enterprise is selected as the representative of the thermal storage type industrial load. The enterprise is connected to node 18. In the case of not participating in demand response, its power curve within a day is a horizontal line with a value equal to the rated power. Its related parameters are shown in Table 3; in addition to the aforementioned fused magnesium enterprise load, the total active power prediction curve of all remaining loads in the distribution network is as follows Figure 3 The electricity price purchased by the distribution network from the main grid adopts the time-of-use electricity price, according to Figure 3 The load curve shown is divided into peak, flat and valley periods. The corresponding electricity prices for each period are shown in Table 4. The average carbon emission factor corresponding to purchased electricity is 0.65t / MW·h.

[0164] Table 1 Gas turbine parameters

[0165]

[0166] Table 2 Carbon capture device parameters

[0167]

[0168] Table 3 Related parameters of fused magnesium enterprises

[0169]

[0170]

[0171] Table 4 Time division and electricity price

[0172]

[0173] Based on the above example parameters, in order to verify the ability of introducing gas turbines with flexible carbon capture devices, fused magnesium demand response and user-side energy storage devices to improve the economic efficiency, low carbon and flexibility of distribution network operation, three different scenarios were set up for comparative analysis. The scenarios are:

[0174] 1) Scenario 1: GT1-GT3 are equipped with traditional carbon capture devices (without liquid storage tanks and fixed flue gas diversion ratio), and the participation of fused magnesium enterprises in demand response is not considered.

[0175] 2) Scenario 2: Convert GT1-GT3 into gas turbines with adjustable flue gas diversion ratio and flexible carbon capture devices, without considering the participation of fused magnesium enterprises in demand response.

[0176] 3) Scenario 3: Convert GT1-GT3+ into gas turbines with adjustable flue gas diversion ratio and flexible carbon capture devices, and consider the participation of fused magnesium enterprises in demand response.

[0177] Among them, scenario 3 corresponds to the optimization scheduling method proposed in the present invention. The above three scenarios all use MATLAB software to call the YALMIP toolbox to build mathematical models, and use the CPLEX solver to solve them. The results are shown in Table 5.

[0178] Table 5 Comparison of distribution network operation costs under different scenarios

[0179]

[0180] As can be seen from Table 5, scenario 1 has the highest comprehensive cost, carbon emissions and load shedding, followed by scenario 2 and scenario 3. Comparative analysis of the dispatch results shows that gas turbines with flexible carbon capture devices with adjustable flue gas diversion ratios, fused magnesium loads participating in demand response and energy storage devices installed on the user side can have beneficial effects on total carbon emissions, renewable energy consumption and system dispatch costs.

[0181] At the same time, the present invention also provides a distribution network source-grid-load-storage coordinated optimization dispatching system containing thermal storage type industrial loads, such as Figure 4 The block diagram of the distribution network source-grid-load-storage optimization scheduling system containing heat storage type industrial loads of the present invention is shown, and the system includes a data acquisition module, a gas turbine mathematical model construction module, a demand response mathematical model construction module, a prediction error scenario set acquisition module and an optimization scheduling model construction module;

[0182] The data acquisition module is used to acquire new energy and load historical data;

[0183] The gas turbine mathematical model building module is used to establish a mathematical model of a gas turbine equipped with a flexible carbon capture device, and to perform convex relaxation processing on the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable;

[0184] The demand response mathematical model construction module is used to construct a thermal storage type industrial load demand response mathematical model taking into account the constraints of daily regulation capacity and daily regulation times, and to perform piecewise linearization processing on the nonlinear constraints of its daily production tasks;

[0185] The prediction error scenario set acquisition module is used to acquire a typical prediction error scenario set based on new energy and load historical prediction error data;

[0186] The optimization scheduling model construction module is used to construct a distribution network source-grid-load-storage coordinated optimization scheduling model and solution algorithm for thermal storage type industrial loads based on the day-ahead prediction curves of new energy and load power provided by the distribution network dispatching center and the typical prediction error scenario set obtained.

[0187] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.

[0188] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. More specific examples of computer-readable storage media (a non-exhaustive list) include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the foregoing. As used herein, a computer-readable storage medium is not to be interpreted as a transient signal per se, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.

[0189] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.

[0190] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), may be customized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present disclosure.

[0191] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A method for coordinated optimization of distribution network source, grid, load and storage for heat storage type industrial load, characterized in that: The method comprises the following steps: S1, obtain new energy and load historical forecast error data; S2, establish a mathematical model of a gas turbine equipped with a flexible carbon capture device, and perform convex relaxation on the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable; S3, construct a mathematical model of demand response of thermal storage type industrial load taking into account daily regulation capacity, daily regulation times and daily production constraints, and perform piecewise linearization on the nonlinear constraints of daily production tasks of thermal storage type industrial load; S4, obtaining a typical prediction error scenario set based on the new energy and load historical prediction error data obtained in S1; S5, based on the day-ahead forecast curves of new energy and load power provided by the distribution network dispatching center and the typical forecast error scenario set obtained in S4, a distribution network source-grid-load-storage coordinated optimization dispatching model with thermal storage type industrial load demand response is constructed.

2. A method for coordinated optimization of distribution network source, grid, load and storage for heat storage type industrial load according to claim 1, characterized in that: In S1, the historical forecast error data of new energy and load include their respective hourly power forecast error data for at least one year before the day of scheduling.

3. The coordinated optimization scheduling method for distribution network source-grid-load-storage containing heat storage type industrial load according to claim 1 is characterized in that: In S2, the flexible carbon capture device installed on the gas turbine includes an absorption tower, a liquid storage tank, and a regeneration tower. During peak load periods, the liquid storage tank stores the CO2 absorbed by the absorption tower without processing it temporarily, reducing the carbon capture power of the gas turbine during peak load periods and increasing the online power; during low load periods, the liquid storage tank releases the stored CO2 into the regeneration tower and consumes the gas turbine power for subsequent carbon capture processing.

4. The method for coordinated optimization of source-grid-load-storage scheduling of a distribution network containing thermal storage type industrial loads according to claim 1 is characterized in that: In S2, the mathematical model of the gas turbine equipped with a flexible carbon capture device is constructed as follows: Among them, P t CCGT is the total output power of the gas turbine with flexible carbon capture device during period t, is the grid-connected power of the gas turbine during period t, P t CC is the carbon capture operation energy consumption of the carbon capture equipment during period t, P t Y is the fixed energy consumption of the carbon capture equipment during period t, χ is the operating energy consumption of the carbon capture equipment per unit CO2 captured, is the total mass of CO2 captured during period t, is the CO2 mass entering the carbon capture device after the flue gas bypass system diverts during period t, The CO2 supply to the rich liquid tank equipped for the carbon capture device during period t, is the CO2 absorption capacity of the rich liquid tank in period t, δ is the flue gas split ratio, is the maximum carbon capture level, is the total mass of CO2 actually produced by the gas turbine during period t γ CCGT CO2 produced per unit of electricity generated by the gas turbine, is the net carbon emission of the gas turbine, that is, the mass of CO2 emitted into the air after the flue gas bypass system diverts during period t.

5. A method for coordinated optimization of source, grid, load and storage in a distribution network containing thermal storage type industrial loads according to claim 1 or 4, characterized in that: In S2, the convex relaxation process includes constructing the constraints of the mathematical model of the gas turbine according to the following formula: Among them, δ represents the flue gas split ratio, P t CCGT represents the total output power of the carbon capture gas turbine during period t, denote the lower and upper limits of the carbon capture gas turbine output, respectively, and ω denotes the value used to replace δ t P t CCGT Auxiliary variables for the bilinear terms.

6. The method for coordinated optimization of source-grid-load-storage scheduling of a distribution network containing thermal storage type industrial loads according to claim 1 is characterized in that: In S3, the piecewise linearization of the nonlinear constraints of the production task includes introducing auxiliary variables for piecewise linearization transformation according to the following formula: Among them, x1, x2, and x3 are three 0-1 auxiliary variables introduced for piecewise linearization. m,t,k is the output of the mth thermal storage type industrial load at time t in the kth prediction error scenario, O m is the production demand of the mth thermal storage type industrial load, λ1, λ2, and λ3 are the product yields of the thermal storage type industrial load equipment under the power reduction state, rated power, and power increase state, respectively. It is the benchmark power for the operation of thermal storage type industrial load equipment. is the optimization variable corresponding to the power increase and decrease of the mth thermal storage type industrial load at time t under the kth day-ahead forecast error scenario.

7. The method for coordinated optimization of source, grid, load and storage in a distribution network containing thermal storage type industrial loads according to claim 1 is characterized in that: In S4, based on the historical forecast error data of new energy and load obtained in S1, a typical forecast error scenario set is obtained, including: Step S401: Calculate the Euclidean distance between any two source-load historical prediction error vectors; Step S402: Calculate the local density of the source load historical prediction error data corresponding to the historical prediction error vector; Step S403: determining the cluster center distance of the source-load historical prediction error data; Step S404: using the normalized values ​​of the local density and the cluster center distance as the horizontal and vertical coordinates, traversing all the historical prediction error data of new energy sources and loads, and drawing the corresponding points of the source-load historical prediction error data in the two-dimensional space; Step S405: Arrange the products of the horizontal and vertical coordinates in the two-dimensional space drawn in step S404 from high to low, and take a set consisting of samples corresponding to the points ranked in the top 5% as a typical prediction error scenario set.

8. The method for coordinated optimization of source-grid-load-storage scheduling of a distribution network containing thermal storage type industrial loads according to claim 1 is characterized in that: In S5, the distribution network source-grid-load-storage coordinated optimization dispatching model with thermal storage type industrial load demand response is constructed, including: Step S501: constructing an objective function of a distribution network optimization dispatching model including a flexible carbon capture gas turbine, a thermal storage type industrial load demand response and an energy storage device; Step S502: Construct constraint conditions of a distribution network source-grid-load-storage coordinated optimization scheduling model containing thermal storage type industrial loads.

9. A method for coordinated optimization of distribution network source, grid, load and storage for heat storage type industrial load according to claim 8, characterized in that: In step S501, the objective function of the distribution network optimization dispatch model including the flexible carbon capture gas turbine, the thermal storage type industrial load demand response and the energy storage device is constructed as follows: Among them, C CCGT represents the gas turbine startup and shutdown cost, represents the operating cost of the carbon capture gas turbine under the kth typical scenario, represents the energy purchase cost of the distribution network in the kth typical scenario, represents the subsidy cost of the distribution network for paying thermal storage type industrial loads to participate in demand response in the kth typical scenario, represents the carbon emission cost under the kth typical scenario, represents the penalty cost of wind and solar power abandonment in the kth typical scenario, represents the load shedding cost in the kth typical scenario.

10. A method for coordinated optimization and dispatching of a distribution network source, grid, load and storage containing a thermal storage type industrial load according to claim 8, characterized in that: In step S502, the constraints for constructing a coordinated optimization dispatching model of the distribution network source-grid-load-storage containing thermal storage type industrial loads include: Construct power balance constraints; Construct line transmission capacity constraints; Construct constraints on wind and solar power abandonment and load shedding; Construct the output constraints, ramp constraints and minimum start-stop time constraints of the carbon capture gas turbine; and the power and energy constraints for constructing energy storage devices.

11. A distribution network source-grid-load-storage optimization scheduling system containing heat storage type industrial loads using the method described in any one of claims 1 to 10, the system comprising a data acquisition module, a gas turbine mathematical model construction module, a demand response mathematical model construction module, a prediction error scenario set acquisition module and an optimization scheduling model construction module, characterized in that: A data acquisition module is used to acquire new energy and load historical data, obtain new energy and load historical prediction error data based on the acquired historical data, and cluster the new energy and load historical prediction error data to obtain a typical prediction error scenario set; The gas turbine mathematical model building module is used to establish the mathematical model of the gas turbine equipped with a flexible carbon capture device, and to perform convex relaxation processing on the non-convex problem of the model when the flue gas split ratio of the carbon capture device is adjustable; The demand response mathematical model construction module is used to construct a thermal storage type industrial load demand response mathematical model that takes into account the daily regulation capacity and daily regulation number constraints, and to perform piecewise linearization processing on the nonlinear constraints of its daily production tasks; A prediction error scenario set acquisition module is used to acquire a typical prediction error scenario set based on new energy and load historical prediction error data; The optimization dispatching model building module is used to build a distribution network source-grid-load-storage coordinated optimization dispatching model containing thermal storage type industrial loads based on the day-ahead forecast curves of new energy and load power provided by the distribution network dispatching center and the typical forecast error scenario set obtained.

12. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-10.

13. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 10 are implemented.

Citation Information

Patent Citations

  • Control method of post-combustion carbon capture generating station based on different flexible operation modes

    CN102502631A

  • Interval optimization low-carbon scheduling method considering carbon capture power plant

    CN115081733A

  • Dynamic electricity price-based source load coordinated scheduling method for wind and light absorption of heat accumulating type electric heating

    CN115081838A

  • Power system source-load-storage planning and operation method based on VCG low-carbon demand response

    CN117374912A

  • Comprehensive energy system optimization scheduling method and device and storage medium

    CN118278664A

Cited By

  • Operation reserve capacity demand evaluation method and system considering uncertainty of new energy

    CN120494451A