Load distribution method and system considering dynamic characteristics of high back pressure transformation unit
By constructing the Ebsilon simulation model and dynamic electric heating feasible domain model, real-time monitoring data optimizes the load distribution of wet and cold high backpressure units, solving the problem of insufficient research on the operating characteristics of wet and cold high backpressure units, achieving the lowest total coal consumption and the best economy The benefits improve the operation efficiency and flexibility of cogeneration units.
Patent Information
- Application Number
- CN202410849943.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-11-15
AI Technical Summary
The prior art has not fully studied the operating characteristics of wet-cool high backpressure heating transformed units, especially when the heating grid adjustment method changes, the impact of dynamic changes in the electric heating operation interval on the unit has affected the plant-level optimization of the heating unit.
Build an Ebsilon simulation model, collect the actual operating parameters of the unit, establish a dynamic electric heating feasible domain model for the high-back pressure heating transformed unit, and monitor data in real time through the dispersed control system to optimize load distribution to achieve minimum total coal consumption and optimal economic benefits.
It significantly improves the operating efficiency and flexibility of cogeneration units, and improves the operating economy and environmental friendliness of the power plant.
Smart Images

Figure CN118970970A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy and power system optimization, and in particular to a load distribution method and system taking into account the dynamic characteristics of a high back pressure transformation unit. Background Art
[0002] Under the background of "dual carbon", my country is currently in an important period of development of new energy industry. The high proportion of renewable energy grid connection has put forward high flexibility requirements for cogeneration units in heating areas. High back pressure heating transformation is an important way to improve the operation flexibility of traditional extraction condensing thermal power units. It uses exhaust waste heat to heat the unit, which improves the heating capacity of the unit and changes the electric heating characteristics.
[0003] High back pressure heating reconstruction units (hereinafter referred to as high back pressure units) can be divided into air cooling units (dry cooling units) and wet cooling units according to different cooling systems. The former has attracted widespread attention due to its significant reduction in water consumption, and the research on its operating characteristics is relatively mature. However, the high investment cost, low thermal economy and great environmental impact of air cooling high back pressure heating reconstruction units have limited their promotion in practical applications. Wet cooling is still the most commonly used cooling method in power plants.
[0004] At present, the research on the operating characteristics of wet cooling high back pressure units is still insufficient, and only a few literatures have discussed the impact of the operating parameters on the heat network side from the perspective of unit performance. Some scholars have obtained the linear strong coupling relationship between the power generation power and heating power of wet cooling high back pressure units by changing the steam inlet flow rate and the extraction steam flow rate. In the Ebsilon variable condition simulation of 330MW and 200MW wet cooling units, the existing literature found that when the circulating water return temperature changes or when the circulating water flow rate changes, it will affect the thermal characteristics of the unit. Considering that the heat network regulation methods include quality regulation, quantity regulation and quality-quantity regulation, that is, the circulating water flow rate and the circulating water inlet temperature may change, whether the wet cooling unit will still maintain the linear strong coupling relationship between electricity and heat at this time, whether the electric heating operation range will change dynamically, and then affect the plant-level optimization of the heating unit, there is no quantitative research.
[0005] This paper takes a 350MW wet-cooled high back-pressure unit in a thermal power plant in Northeast China as the research object and constructs its Ebsilon simulation model. Under the heat network quality-quantity adjustment mode, the influence of changes in parameters such as main steam flow, extraction flow / pressure, circulating water flow, and circulating water inlet temperature on the unit's electric and thermal operation characteristics is quantitatively analyzed, and a dynamic electric and thermal characteristic model of the wet-cooled high back-pressure unit is established and applied to the optimized operation of the thermal power plant. The accuracy of the model is verified by the power plant operation data, and the coal-saving effect of the dynamic electric and thermal characteristics in the plant-level load distribution is quantitatively analyzed. Summary of the invention
[0006] In view of the above-mentioned problems, the present invention is proposed.
[0007] Therefore, the technical problem solved by the present invention is: how to optimize the load distribution of each unit in a thermal power plant based on a dynamic electric-thermal coupling model and real-time monitoring data during the operation of a high back-pressure heating conversion unit to achieve the lowest total coal consumption and the best economic benefits, thereby improving the operating efficiency and flexibility of the cogeneration unit.
[0008] In order to solve the above technical problems, the present invention provides the following technical solutions: a load distribution method taking into account the dynamic characteristics of high back pressure transformation units, comprising: collecting actual operating parameters of the units, constructing an Ebsilon simulation model of the high back pressure heating transformation units, and modeling the high back pressure units;
[0009] Under different working conditions, analyze the influence of various operating parameters on the electrical and thermal characteristics of the unit;
[0010] A dynamic electric-heat feasible domain model of the high back-pressure heating transformation unit is established to describe the dynamic coupling relationship between power generation and heating power;
[0011] The distributed control system monitors the unit operating parameters in real time, and inputs the real-time monitoring data into the dynamic electric and thermal feasible domain model to calculate and optimize the plant-level load distribution plan.
[0012] As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, the actual operating parameters of the unit include main steam flow, circulating water flow, circulating water inlet temperature, circulating water outlet temperature, extraction steam flow and extraction steam pressure;
[0013] The construction of the Ebsilon simulation model of the high back pressure heating transformation unit includes: according to the actual operating parameters of the unit, modeling is performed through the Ebsilon simulation software, an electric and thermal characteristic model of the unit is established, and the power generation power and heating power of the unit under different working conditions are simulated.
[0014] As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, the modeling of the high back pressure unit includes: the total heating power Q of the high back pressure unit B Heating power Q provided by exhaust waste heat from low pressure cylinder B1 And the medium and low pressure cylinder extraction steam heating power Q B2 Composition, where Q B1 It is directly related to the circulating water flow rate M, the circulating water inlet temperature T0 and the circulating water outlet temperature T. The calculation formula is:
[0015]
[0016] Where c represents the specific heat capacity of circulating water, in units of The unit of heating power is MW.
[0017] As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, wherein: the different working conditions include pure back pressure working conditions and back pressure extraction working conditions;
[0018] The analysis of the influence of various operating parameters on the electrothermal characteristics of the unit includes, under the pure back pressure condition:
[0019] The heating power of the unit comes entirely from the exhaust heat of the high, medium and low pressure cylinders after work. As the main steam flow increases, the heating power will increase with the increase of power generation, showing a linear relationship. When the heat network is regulated in parallel by quality and quantity, the fluctuation of the circulating water flow and the circulating water inlet temperature will cause the slope of the linear relationship to change dynamically.
[0020] Under the described back-drawing condition:
[0021] On the basis of maintaining the waste heat heating, the unit extracts steam for heating in the medium and low pressure cylinders to secondary heat the circulating water in the heat network; if the current extraction condition is maximum, the power generation power and heating power will increase monotonically with the main steam flow, but not in a linear relationship; when the load is too low, the exhaust temperature of the low pressure cylinder will rise. In order to ensure sufficient low pressure cylinder flow to prevent temperature exceeding the limit, the extraction flow will be reduced, and thus the heating power will be reduced; if the current main steam flow condition is maximum, when the extraction volume increases from zero to maximum, the power generation power will decrease and the heating power will increase, and the change will not be linear.
[0022] As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, wherein: the establishment of a dynamic electric-thermal feasible domain model of the high back pressure heating transformation unit includes comprehensively considering the influence of the main steam flow rate, circulating water flow rate and circulating water inlet temperature on the electric-thermal relationship of the high back pressure unit, establishing a dynamic electric-thermal feasible domain model, and the unit power generation power P B and heating power Q B The linear coupling relationship is:
[0023]
[0024] Where M represents the circulating water flow rate, T0 represents the circulating water inlet temperature, K(M,T0) represents the slope function, B(M,T0) represents the intercept function, Q B,max (M,T0) represents the maximum heating power function, Q B,min represents the minimum heating power function;
[0025] Substituting equation (1) into equation (2), we can obtain the power generation P B Linear relationship with circulating water outlet temperature T:
[0026] P B(M, T0) = k(M, T0)T + b(M, T0) (3)
[0027] in:
[0028]
[0029] Substituting k(M, T0) and b(M, T0) into equation (2), the relationship between power generation and heating power is:
[0030]
[0031] From formula (1), it can be seen that when the circulating water flow rate M and the inlet temperature T0 are constant, the extreme value of the heating power is determined by the minimum circulating water outlet temperature T min (M,T0), maximum value T max (M,T0) decision;
[0032] Among them, T min (M,T0) is related to the minimum main steam flow rate of the unit; T max (M,T0) is related to the maximum main steam flow rate and is subject to the maximum limit of circulating water outlet temperature T max1 The constraint is expressed as:
[0033] T max (M,T0)=min{T max1 ,T max2 (M,T0)}(6)
[0034] Among them, T max2 (M,T0) represents the circulating water outlet temperature at the maximum main steam flow rate;
[0035] T min (M,T0) and T max (M, T0) is applied to equation (1) to obtain the heating boundary:
[0036]
[0037] As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, wherein: the calculation and optimization of the plant-level load distribution plan includes taking the minimum total coal consumption of the units in the plant as the objective function of the equipment scheduling strategy, and the formula is:
[0038]
[0039] Where n1 and n2 represent the number of high back pressure units and condensing units in the plant respectively; F B,i,t and F Ex,j,t They represent the operating coal consumption of the i-th high back pressure unit and the j-th condensing unit in period t, which can be specifically expressed as:
[0040]
[0041] F Ex,j,t =a j (P Ex,j,t +c ν,j Q Ex,j,t ) 2 +b j (P Ex,j,t +c ν,j QE x,j,t )+c j (10)
[0042] Among them, P B,i,t , Q B,i,t and P Ex,j,t , Q Ex,j,t Respectively represent the power generation and heating power of the high back pressure unit and the condensing unit in period t; a i , b i 、c i and a j , b j 、c j are the coal consumption coefficients of the i-th high back pressure unit and the j-th extraction condensing unit respectively; c ν,j is the electrical-to-heat slope of the jth condensing unit.
[0043] 8. As a preferred solution of the load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit described in the present invention, wherein: the calculation and optimization of the plant-level load distribution plan also includes high back pressure unit constraints, extraction condensing unit constraints and electric heat balance constraints;
[0044] The back pressure unit constraint is: the dynamic feasible region constraint and the ramp rate of the high back pressure unit are as shown in equations (11) and (12):
[0045]
[0046] Among them, M i,t-1 and T 0,i,t-1 are the circulating water flow and circulating water inlet temperature of the i-th high back pressure unit in the current period (t-1), k(M i,t-1 ,T 0,i,t-1 ) and b(M i,t-1 ,T 0,i,t-1 ) represents the slope and intercept of the linear relationship between the power generation and circulating water outlet temperature of the i-th high back pressure unit in the current (t-1) period; P B,i,up and P B,i,down They represent the maximum up and down ramp rates of the i-th high back pressure unit respectively;
[0047] The constraints of the condensing unit are as follows: The feasible domain constraints and ramp rate of the condensing unit are as shown in equations (13) and (14) respectively:
[0048]
[0049] Among them, P Ex,j,max and P Ex,j,min They represent the maximum and minimum power generation of the jth condensing unit under pure condensing conditions; Q Ex,j,max represents the maximum heating power of the jth condensing unit; c m,j represents the thermal-electric ratio of the jth condensing unit, P Ex,j,0 represents the intercept; P Ex,j,up and P Ex,j,down They represent the maximum up and down ramp rates of the jth condensing unit respectively;
[0050] The electrothermal balance constraint is expressed as:
[0051]
[0052]
[0053] Among them, P plart,t and Q plant,t They represent the total power generation load and total heating load of the plant in period t respectively.
[0054] A load distribution system taking into account the dynamic characteristics of high back pressure transformation units, characterized in that it includes:
[0055] Data collection and simulation modeling module: collect the actual operating parameters of the unit, build the Ebsilon simulation model of the high back pressure heating transformation unit, and model the high back pressure unit;
[0056] Operating condition analysis module: Analyze the impact of various operating parameters on the electrical and thermal characteristics of the unit under different operating conditions;
[0057] Dynamic electric-heat feasible domain model building module: Establish a dynamic electric-heat feasible domain model for high back-pressure heating transformation units to describe the dynamic coupling relationship between power generation and heating power;
[0058] Real-time monitoring and load distribution module: monitors the unit operating parameters in real time through a distributed control system, inputs the real-time monitoring data into the dynamic electric and thermal feasible domain model, and calculates the plant-level load distribution plan.
[0059] Beneficial effects of the invention: The invention optimizes the load distribution of the high back-pressure heating transformation unit through a dynamic electric-thermal coupling model and real-time monitoring data, achieves the lowest total coal consumption and the best economic benefits, significantly improves the operating efficiency and flexibility of the cogeneration unit, and improves the overall operating economy and environmental friendliness of the power plant. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0061] Figure 1 An overall flow chart of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the first embodiment of the present invention;
[0062] Figure 2 A schematic diagram of a high back pressure unit according to a load distribution method taking into account the dynamic characteristics of a high back pressure modified unit provided in the first embodiment of the present invention;
[0063] Figure 3 A typical operating condition electrical-thermal relationship diagram of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the first embodiment of the present invention;
[0064] Figure 4 The electric-thermal relationship diagram of a pure back pressure condition (non-extraction) of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided by the first embodiment of the present invention, wherein Figure (a) is a relationship diagram of changing the circulating water flow rate, and Figure (b) is a relationship diagram of changing (b) changing the circulating water inlet temperature;
[0065] Figure 5 A slope and intercept diagram of the linear relationship between power generation and circulating water outlet temperature of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the first embodiment of the present invention, wherein Figure (a) is a slope diagram and Figure (b) is an intercept diagram;
[0066] Figure 6 A schematic diagram of the maximum and minimum values of the circulating water outlet temperature of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the first embodiment of the present invention;
[0067] Figure 7 A daily electric and thermal load curve diagram of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in a second embodiment of the present invention;
[0068] Figure 8 A graph of circulating water flow and circulating water inlet temperature at each time period during the day for a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in a second embodiment of the present invention;
[0069] Fig. 9A comparison diagram between Model 1 and Model 2 and the actual power generation of a load distribution method taking into account the dynamic characteristics of a high back pressure modified unit provided in a second embodiment of the present invention;
[0070] Fig.10 A load distribution scheme diagram of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in a second embodiment of the present invention, wherein Figure (a) is a schematic diagram of Scheme 1, and Figure (b) is a schematic diagram of Scheme 2;
[0071] Fig.11 A comparison diagram of the electric and thermal power of a high back pressure unit under two schemes of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the second embodiment of the present invention, wherein (a) is a comparison diagram of power generation, and (b) is a comparison diagram of heating efficiency;
[0072] Fig.12 A comparison chart of total coal consumption of a plant under two schemes in each time period of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in a second embodiment of the present invention;
[0073] Fig.13 A comparison diagram of electric and thermal loads under different scenarios of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in a second embodiment of the present invention, wherein Figure (a) is a comparison diagram of heating loads, and Figure (b) is a comparison diagram of power generation loads;
[0074] Fig.14 A comparison chart of plant daily coal consumption under two schemes of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the second embodiment of the present invention;
[0075] Fig.15 A comparison chart of daily coal saving in a plant under various scenarios of a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit provided in the second embodiment of the present invention. DETAILED DESCRIPTION
[0076] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.
[0077] Example 1
[0078] Reference Figures 1 to 6 , which is an embodiment of the present invention, provides a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit, comprising:
[0079] S1: Collect the actual operating parameters of the unit, build the Ebsilon simulation model of the high back pressure heating transformation unit, and model the high back pressure unit.
[0080] The actual operating parameters of the unit include main steam flow, circulating water flow, circulating water inlet temperature, circulating water outlet temperature, extraction steam flow and extraction steam pressure;
[0081] The construction of the Ebsilon simulation model of the high back pressure heating transformation unit includes: according to the actual operating parameters of the unit, modeling is performed through the Ebsilon simulation software, an electric and thermal characteristic model of the unit is established, and the power generation power and heating power of the unit under different working conditions are simulated.
[0082] The modeling of high back pressure units includes the total heating power Q of the high back pressure units. B Heating power Q provided by exhaust waste heat from low pressure cylinder B1 And the medium and low pressure cylinder extraction steam heating power Q B2 Composition, where Q B1 It is directly related to the circulating water flow rate M, the circulating water inlet temperature T0 and the circulating water outlet temperature T. The calculation formula is:
[0083]
[0084] Where c represents the specific heat capacity of circulating water, in units of The unit of heating power is MW.
[0085] The heat network adopts a quality-quantity adjustment method, the circulating water flow rate fluctuates within a certain range, and the circulating water inlet temperature varies within a certain range.
[0086] It should be noted that the high back pressure heating reconstruction scheme is aimed at solving the problem of waste heat loss of low pressure cylinder exhaust steam in traditional extraction condensing units. It increases the exhaust steam pressure and temperature by increasing the condenser back pressure of the unit and replacing the low pressure rotor, thereby increasing the temperature of the heat network circulating water passing through the condenser, achieving the purpose of direct heating or heating after secondary heating of heating extraction steam. Figure 2 shown.
[0087] S2: Under different operating conditions, analyze the impact of various operating parameters on the unit's electrical and thermal characteristics.
[0088] According to different heating modes, high back pressure units can be divided into pure back pressure (no extraction steam) and extraction (pure back pressure + extraction steam) conditions. Among them, the main steam flow and extraction steam flow are the main factors affecting the power-heat relationship of high back pressure units.
[0089] Different working conditions include pure back pressure condition and back extraction condition;
[0090] (1) Pure back pressure condition: In this case, the heating power of the unit comes entirely from the exhaust heat after the high, medium and low pressure cylinders have done work. Obviously, as the main steam flow increases, the heating power will increase with the increase in power generation. The relationship between the two obtained by simulation is as follows: Figure 3 As shown in the AB section, the power generation and heating power present an approximate linear relationship. However, when the heat network is regulated in parallel with quality and quantity, the fluctuations of the two operating parameters, circulating water flow and circulating water inlet temperature, will cause the slope of the linear relationship to change dynamically.
[0091] (2) Extraction condition: At this time, the unit extracts steam from the medium and low pressure cylinders for heating while maintaining the residual heat supply, so as to reheat the circulating water in the heat network. Part of the steam that was originally used for power generation and exhaust heat supply in the low pressure cylinder is now completely used for heating. Obviously, the heating power increases and the power generation power decreases. The simulation shows the power-heat relationship as follows: Figure 3 As shown in the interval included by ABD.
[0092] ① Maximum steam extraction condition
[0093] At this time, the unit's power generation and heating power both increase monotonically with the main steam flow rate, but not in a linear relationship: when the load is too low, that is, when the main steam flow rate is small, the exhaust temperature of the low-pressure cylinder rises
[22] . In order to ensure sufficient low-pressure cylinder flow to prevent temperature over-limit, the extraction steam flow rate will be reduced, so the heating power is reduced. The electric-thermal relationship curve of the unit under the maximum extraction condition obtained by simulation is shown in the AED section.
[0094] ② Maximum main steam flow condition
[0095] At this time, the unit is at its maximum output. When the steam extraction volume increases from zero to maximum, it is obvious that the power generation capacity decreases and the heating capacity increases. However, the two do not change linearly. Figure 3 The reason is that there is a critical value (point C) for the reduction of the exhaust pressure of the intermediate pressure cylinder, and the unit needs to hold the pressure (adjust the pressure limiting valve on the connecting pipe of the intermediate and low pressure cylinders) to make the exhaust pressure of the intermediate pressure cylinder not lower than the extraction pressure, so as to continue to increase the extraction flow. The throttling loss caused by the pressure regulation makes the electric-heat relationship change in a piecewise linear manner, and the slope of the CD section is steeper.
[0096] When the heat network is operated in parallel with quality and quantity adjustment, the circulating water flow rate and circulating water inlet temperature of the unit will change, thus affecting the power-heat relationship of the high back pressure unit. Considering that in actual operation, the high back pressure unit in the thermal power plant only works in pure back pressure conditions (AB section).
[0097] It should be noted that, under the same main steam flow rate, reducing the circulating water flow rate or increasing the circulating water inlet temperature will, on the one hand, make the waste heat more fully utilized and slightly increase the heating power, and on the other hand, affect the condenser back pressure and slightly reduce the power generation, that is, the slope of the unit's electric-thermal linear relationship shows a slightly decreasing trend. The simulation results are shown in Figure 4 (a) and 4(b).
[0098] It is worth noting that when the circulating water flow rate is small (M <M r ) or the inlet temperature is high (T0>T r ), the main steam flow rate shall not be too large, otherwise the circulating water outlet temperature will exceed the maximum limit (T max1 ), so the maximum power generation and heating power of the unit will decrease due to the reduction of main steam flow, such as Figure 4 As the circulating water flow rate further decreases or the circulating water inlet temperature continues to increase, the maximum output reduction of the unit will become more obvious (such as Figure 4 as indicated by the arrow).
[0099] It can be seen from this that the unit's electrical-thermal linear relationship will change in slope, intercept and even boundary when the circulating water flow rate M and the circulating water inlet temperature T0 change.
[0100] S3: Establish a dynamic electric-thermal feasible domain model for the high back-pressure heating transformation unit to describe the dynamic coupling relationship between power generation and heating power.
[0101] Considering the influence of main steam flow, circulating water flow and circulating water inlet temperature on the electric-thermal relationship of high back pressure unit, a dynamic electric-thermal feasible domain model is established. B and heating power Q B The linear coupling relationship is:
[0102]
[0103] Where M represents the circulating water flow rate, T0 represents the circulating water inlet temperature, K(M,T0) represents the slope function, B(M,T0) represents the intercept function, Q B,max (M,T0) represents the maximum heating power function, Q B,min represents the minimum heating power function;
[0104] Substituting equation (1) into equation (2), we can obtain the power generation P B Linear relationship with circulating water outlet temperature T:
[0105] P B (M, T0) = k(M, T0)T + b(M, T0) (3)
[0106] in:
[0107]
[0108] According to Ebsilon simulation fitting, the functional relationship between the two and M and T0 can be obtained. The changing trends of the two with different circulating water flow rates and inlet temperatures are as follows: Figure 5 shown.
[0109] Substituting k(M, T0) and b(M, T0) into equation (2), the relationship between power generation and heating power is:
[0110]
[0111] From formula (1), it can be seen that when the circulating water flow rate M and the inlet temperature T0 are constant, the extreme value of the heating power is determined by the minimum circulating water outlet temperature T min (M,T0), maximum value T max (M,T0) decision;
[0112] Among them, T min (M,T0) is related to the minimum main steam flow rate of the unit; T max (M,T0) is related to the maximum main steam flow rate and is subject to the maximum limit of circulating water outlet temperature T max1 The constraint is expressed as:
[0113] T max (M,T0)=min{T max1 ,T max2 (M,T0)}(6)
[0114] Among them, T max2 (M,T0) represents the circulating water outlet temperature at the maximum main steam flow rate;
[0115] The extreme value changes of circulating water outlet temperature obtained by Ebsilon simulation are as follows: Figure 6 As shown in the figure, the red ball surface and the blue ball surface represent T max (M,T0) and T min (M, T0) changes with the circulating water flow rate and inlet temperature. Applying the two to formula (1) shows that the heating boundary is:
[0116]
[0117] S4: Monitor the unit operating parameters in real time through the distributed control system, input the real-time monitoring data into the dynamic electric and thermal feasible domain model, and calculate and optimize the plant-level load distribution plan.
[0118] In view of the coordinated operation of high back pressure supply units and condensing units, from the perspective of economic operation of thermal power plants, the minimum total coal consumption of units in the plant is taken as the objective function of the equipment scheduling strategy. The formula is:
[0119]
[0120] Where n1 and n2 represent the number of high back pressure units and condensing units in the plant respectively; F B,i,t and FEx,j,t They represent the operating coal consumption of the i-th high back pressure unit and the j-th condensing unit in period t, which can be specifically expressed as:
[0121]
[0122] F Ex,j,t =a j (P Ex,j,t +c ν,j Q Ex,j,t ) 2 +b j (P Ex,j,t +c ν,j Q Ex,j,t )+c j (10)
[0123] Among them, P B,i,t , Q B,i,t and P Ex,j,t , Q Ex,j,t Respectively represent the power generation and heating power of the high back pressure unit and the condensing unit in period t; a i , b i 、c i and a j , b j 、c j are the coal consumption coefficients of the i-th high back pressure unit and the j-th extraction condensing unit respectively; c ν,j is the electrical-to-heat slope of the jth condensing unit.
[0124] Its constraints include high back pressure unit constraints, extraction condensing unit constraints and electric heat balance constraints;
[0125] The back pressure unit constraint is, and the dynamic feasible region constraint and ramp rate of the high back pressure unit are shown in equations (11) and (12):
[0126]
[0127] Among them, M i,t-1 and T 0,i,t-1 are the circulating water flow and circulating water inlet temperature of the i-th high back pressure unit in the current period (t-1), k(M i,t-1 ,T 0,i,t-1 ) and b(M i,t-1 ,T 0,i,t-1 ) represents the slope and intercept of the linear relationship between the power generation and circulating water outlet temperature of the i-th high back pressure unit in the current (t-1) period; P B,i,up and P B,i,down They represent the maximum up and down ramp rates of the i-th high back pressure unit respectively;
[0128] The constraints of the condensing unit are as follows: The feasible domain constraints and ramp rate of the condensing unit are as shown in equations (13) and (14) respectively:
[0129]
[0130] Among them, P Ex,j,max and P Ex,j,min They represent the maximum and minimum power generation of the jth condensing unit under pure condensing conditions; Q Ex,j,max represents the maximum heating power of the jth condensing unit; c m,j represents the thermal-electric ratio of the jth condensing unit, P Ex,j,0 represents the intercept; P Ex,j,up and P Ex,j,down They represent the maximum up and down ramp rates of the jth condensing unit respectively;
[0131] The electrothermal balance constraint is expressed as:
[0132]
[0133] Among them, P plart,t and Q plant,t They represent the total power generation load and total heating load of the plant in period t respectively.
[0134] It should be noted that the above model is solved using Matlab+Yalmip+Cplex.
[0135] The above embodiments also include a load distribution system that takes into account the dynamic characteristics of the high back pressure transformation unit, specifically:
[0136] Data collection and simulation modeling module: collect the actual operating parameters of the unit, build the Ebsilon simulation model of the high back pressure heating transformation unit, and model the high back pressure unit;
[0137] Operating condition analysis module: Analyze the impact of various operating parameters on the electrical and thermal characteristics of the unit under different operating conditions;
[0138] Dynamic electric-heat feasible domain model building module: Establish a dynamic electric-heat feasible domain model for high back-pressure heating transformation units to describe the dynamic coupling relationship between power generation and heating power;
[0139] Real-time monitoring and load distribution module: monitors the unit operating parameters in real time through a distributed control system, inputs the real-time monitoring data into the dynamic electric and thermal feasible domain model, and calculates the plant-level load distribution plan.
[0140] The computer device may be a server. The computer device includes a processor, a memory, an input / output interface (I / O for short) and a communication interface. The processor, the memory and the input / output interface are connected via a system bus, and the communication interface is connected to the system bus via the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data cluster data of the power monitoring system. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a load distribution method taking into account the dynamic characteristics of a high back pressure transformation unit is implemented.
[0141] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory may include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory may include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0142] Example 2
[0143] refer to Figures 7 to 15 , which is an embodiment of the present invention, provides a load distribution method taking into account the dynamic characteristics of high back pressure transformation units. In order to verify the beneficial effects of the present invention, scientific demonstration is carried out through economic benefit calculation and simulation / comparative experiments.
[0144] Taking a thermal power plant in Northeast China as an example, the influence of the traditional linear model (model 1) and the dynamic feasible region model (model 2) of high back pressure units on plant-level load distribution is compared.
[0145] The power plant has four 350MW coal-fired generating units, of which Unit 1 is a wet-cooled high back-pressure heating unit, and Units 2, 3 and 4 are extraction condensing heating units. The coal consumption coefficients of the units are shown in Table 1.
[0146] Table 1 Coal consumption coefficient of the unit
[0147] Serial number <![CDATA[a / (t·(MW 2 ·h) -1 )]]> <![CDATA[b / (t·(MW 2 ·h) -1 )]]> <![CDATA[c / (t·h -1 )]]> <![CDATA[c m ]]> <![CDATA[c v ]]> No. 1 0.000098 0.2996 11.807 - - 2-4 0.000077 0.2389 11.616 0.4196 0.248
[0148] The two feasible domain models of the No. 1 high back pressure unit were simulated by Ebsilon simulation, and the simulation parameters and accuracy of the high back pressure unit were verified. The operating parameters of each unit are as follows:
[0149] Table 2 Unit operating parameters
[0150]
[0151] Fitting function of high back pressure unit 1 (model 2):
[0152] k(M,T0)=-0.1494+0.9013M-0.02749T0. (17)
[0153] b(M,T0)=451.3-43.05M-8.591T0. (18)
[0154] T max (M,T0)=min{57.04-2.011M+1.041T0,83.5} (19)
[0155] T min (M,T0)=48.46-4.576M+1.074T0+0.1353M 2 -0.003398MT0.(20)
[0156] The power generation load and heating load required by the thermal power plant at different times of the day are as follows: Figure 7 As shown in the figure, the circulating water flow rate and circulating water inlet temperature of the high back pressure unit monitored online at each time period are as follows: Figure 8 shown.
[0157] In order to verify that the feasible domain model of the high back pressure unit is more accurate after considering the dynamic characteristics, the actual historical data of the high back pressure unit on a certain day is selected to verify the accuracy of the electric-heat relationship. Taking five minutes as the unit time, the circulating water flow, circulating water inlet temperature and heating power of the high back pressure unit in each time period are input into model 1 and model 2 for rolling calculation, and the power generation of model 1 and model 2 is output and compared with the actual power generation of the unit. Fig. 9 As shown in the figure. From the comparison of the absolute values of the relative errors, it can be seen that the calculation results of model 2 are generally better than those of model 1, and can more accurately reflect the actual power generation of the unit. This also shows that compared with the traditional feasible domain model, the dynamic feasible domain model can more accurately reflect the dynamic change characteristics of the slope and intercept of the electric-heat relationship of the actual high back pressure unit heat network quality-quantity parallel regulation in the power plant.
[0158] Model 1 and Model 2 are used to distribute the load of the units in the plant. The results are as follows: Fig.10 It can be observed that both allocation schemes give priority to high back pressure units for power generation and heating, but the power generation and heating loads that can be shared by high back pressure units in scheme 2 are larger, as shown in Fig.11 The reason is that the dynamic influence of circulating water flow and circulating water inlet temperature on the electric heating operation boundary is considered, which expands the electric heating operation range of the unit. From the perspective of giving priority to power generation and heating by high-efficiency units, dynamic characteristics will inevitably affect the load distribution results.
[0159] In this case, further study the impact of the two load distribution schemes on coal consumption ( Fig.12 ), it can be seen that the allocation scheme 2 which takes into account the dynamic characteristics of the units in the whole period is more coal-saving than scheme 1, and the total daily coal saving in the plant is about 29.62 tons.
[0160] Taking into account the changes in heating load during the heating period and the possible impact of wind power and photovoltaic grid connection on the net load of the power plant, the high, medium and low heat loads ( Fig.13 (a)) and no light and no wind, light and no wind, no light and wind ( Fig.13 (b)) compares the coal saving effect of the dynamic characteristic model with the traditional linear model under nine scenarios, such as Fig.14 , 15 shown.
[0161] It can be seen that the daily coal consumption of the dynamic feasible domain model in the nine scenarios is lower, especially when the heat load is high (high heat, medium heat load) and the power generation load is large (no light and no wind, light and no wind), the coal saving effect is obvious ( Fig.15 ). In the wind-free scenario with anti-peak regulation characteristics, the high back-pressure units cannot be fully powered due to the reduced power output, and the coal-saving effect is obviously inferior to other scenarios.
[0162] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A load distribution method taking into account the dynamic characteristics of high back pressure transformation units, It is characterized in that include: Collect the actual operating parameters of the unit, build the Ebsilon simulation model of the high back-pressure heating transformation unit, and model the high back-pressure unit; Under different working conditions, analyze the influence of various operating parameters on the electrical and thermal characteristics of the unit; A dynamic electric-heat feasible domain model of the high back-pressure heating transformation unit is established to describe the dynamic coupling relationship between power generation and heating power; The distributed control system monitors the unit operating parameters in real time, and inputs the real-time monitoring data into the dynamic electric and thermal feasible domain model to calculate and optimize the plant-level load distribution plan.
2. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 1, Features: The actual operating parameters of the unit include main steam flow, circulating water flow, circulating water inlet temperature, circulating water outlet temperature, extraction steam flow and extraction steam pressure; The construction of the Ebsilon simulation model of the high back pressure heating transformation unit includes: according to the actual operating parameters of the unit, modeling is performed through the Ebsilon simulation software, an electric and thermal characteristic model of the unit is established, and the power generation power and heating power of the unit under different working conditions are simulated.
3. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 2, Features: The modeling of the high back pressure unit includes: the total heating power Q of the high back pressure unit B Heating power Q provided by exhaust waste heat from low pressure cylinder B1 And the medium and low pressure cylinder extraction steam heating power Q B2 Composition, where Q B1 The circulating water flow rate M and the circulating water inlet temperature T 0 It is directly related to the circulating water outlet temperature T, and the calculation formula is: Where c represents the specific heat capacity of circulating water, in units of The unit of heating power is MW.
4. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 3, Features: The different working conditions include pure back pressure working condition and back pressure pumping working condition; The analysis of the influence of various operating parameters on the electrothermal characteristics of the unit includes, under the pure back pressure condition: The heating power of the unit comes entirely from the exhaust heat of the high, medium and low pressure cylinders after work. As the main steam flow increases, the heating power will increase with the increase of power generation, showing a linear relationship. When the heat network is regulated in parallel by quality and quantity, the fluctuation of the circulating water flow and the circulating water inlet temperature will cause the slope of the linear relationship to change dynamically. Under the back-drawing condition: On the basis of maintaining the waste heat heating, the unit extracts steam for heating in the medium and low pressure cylinders to secondary heat the circulating water in the heat network; if the current extraction condition is maximum, the power generation power and heating power will increase monotonically with the main steam flow, but not in a linear relationship; when the load is too low, the exhaust temperature of the low pressure cylinder will rise. In order to ensure sufficient low pressure cylinder flow to prevent temperature exceeding the limit, the extraction flow will be reduced, and thus the heating power will be reduced; if the current main steam flow condition is maximum, when the extraction volume increases from zero to maximum, the power generation power will decrease and the heating power will increase, and the change will not be linear.
5. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 4, Features: The dynamic electric-heat feasible domain model of the high back-pressure heating transformation unit is established by comprehensively considering the influence of the main steam flow, circulating water flow and circulating water inlet temperature on the electric-heat relationship of the high back-pressure unit, establishing the dynamic electric-heat feasible domain model, and the unit power generation power P B and heating power Q B The linear coupling relationship is: Where M represents the circulating water flow rate, T 0 Indicates the circulating water inlet temperature, K(M,T 0 ) represents the slope function, B(M,T 0 ) represents the intercept function, Q B,max (M,T 0 ) represents the maximum heating power function, Q B,min represents the minimum heating power function; Substituting equation (1) into equation (2), we can obtain the power generation P B Linear relationship with circulating water outlet temperature T: P B (M,T 0 )=k(M,T 0 )T+b(M,T 0 ) (3) in: k(M,T 0 )、b(M,T 0 ) into formula (2), the relationship between power generation and heating power is: From formula (1), we can see that when the circulating water flow rate M and the inlet temperature T 0 When the temperature is constant, the maximum value of heating power is determined by the minimum value of circulating water outlet temperature T min (M,T 0 ), maximum value T max (M,T 0 )Decide; Among them, T min (M,T 0 ) is related to the minimum main steam flow rate of the unit; T max (M,T 0 ) is related to the maximum main steam flow rate and is subject to the maximum limit of circulating water outlet temperature T max1 The constraint is expressed as: T max (M,T 0 )=min{T max1 ,T max2 (M,T 0 )}(6) Among them, T max2 (M,T 0 ) represents the circulating water outlet temperature at the maximum main steam flow rate; T min (M,T 0 ) and T max (M,T 0 ) is applied to formula (1) to obtain the heating boundary:
6. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 5, Features: The calculation and optimization of the plant-level load distribution plan includes taking the minimum total coal consumption of the units in the plant as the objective function of the equipment scheduling strategy, and the formula is: Among them, n 1 and n 2 Respectively represent the number of high back pressure units and condensing units in the plant; F B,i,t and F Ex,j,t They represent the operating coal consumption of the i-th high back pressure unit and the j-th condensing unit in period t, which can be specifically expressed as: F Ex,j,t =a j (P Ex,j,t +c ν,j Q Ex,j,t ) 2 +b j (P Ex,j,t +c ν,j Q Ex,j,t )+c j (10) Among them, P B,i,t , Q B,i,t and P Ex,j,t , Q Ex,j,t Respectively represent the power generation and heating power of the high back pressure unit and the condensing unit in period t; a i 、b i 、c i and a j 、b j 、c j are the coal consumption coefficients of the i-th high back pressure unit and the j-th extraction condensing unit respectively; c ν,j is the electrical-to-heat slope of the jth condensing unit.
7. The load distribution method taking into account the dynamic characteristics of the high back pressure transformation unit as claimed in claim 6, Features: The calculation and optimization of the plant-level load distribution plan also includes high back pressure unit constraints, extraction condensing unit constraints and electric heat balance constraints; The back pressure unit constraint is: the dynamic feasible region constraint and the ramp rate of the high back pressure unit are as shown in equations (11) and (12): Among them, M i,t-1 and T 0,i,t-1 are the circulating water flow and circulating water inlet temperature of the i-th high back pressure unit in the current period (t-1), k(M i,t-1 ,T 0,i,t-1 ) and b(M i,t-1 ,T 0,i,t-1 ) represents the slope and intercept of the linear relationship between the power generation and circulating water outlet temperature of the i-th high back pressure unit in the current (t-1) period; P B,i,up and P B,i,down They represent the maximum up and down ramp rates of the i-th high back pressure unit respectively; The constraints of the condensing unit are as follows: The feasible domain constraints and ramp rate of the condensing unit are as shown in equations (13) and (14) respectively: Among them, P Ex,j,max and P Ex,j,min They represent the maximum and minimum power generation of the jth condensing unit under pure condensing conditions; Q Ex,j,max represents the maximum heating power of the jth condensing unit; c m,j represents the thermal-electric ratio of the jth condensing unit, P Ex,j,0 represents the intercept; P Ex,j,up and P Ex,j,down They represent the maximum up and down ramp rates of the jth condensing unit respectively; The electrothermal balance constraint is expressed as: Among them, P plart,t and Q plant,t They represent the total power generation load and total heating load of the plant in period t respectively.
8. A load distribution system taking into account the dynamic characteristics of high back pressure transformation units using the method as claimed in any one of claims 1 to 7, Features: Data collection and simulation modeling module: collect the actual operating parameters of the unit, build the Ebsilon simulation model of the high back pressure heating transformation unit, and model the high back pressure unit; Operating condition analysis module: Analyze the impact of various operating parameters on the electrical and thermal characteristics of the unit under different operating conditions; Dynamic electric-heat feasible domain model building module: Establish a dynamic electric-heat feasible domain model for high back-pressure heating transformation units to describe the dynamic coupling relationship between power generation and heating power; Real-time monitoring and load distribution module: monitors the unit operating parameters in real time through a distributed control system, inputs the real-time monitoring data into the dynamic electric and thermal feasible domain model, and calculates the plant-level load distribution plan.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program. It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Self-adaptive dynamic energy testing method based on combined heat and power generation
CN120822120A
Heat supply unit thermoelectricity feasible region calculation and optimization operation method and system
CN121638750A