Critical path determination method and device, computer equipment, storage medium and computer program product
By calculating the work step operation and waiting time in the beat data set of the production line stations and determining the key path, the low accuracy problem caused by traditional manual observation is solved, and the production efficiency and scientific analysis of the production line are improved.
Patent Information
- Application Number
- CN202410939799.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-19
AI Technical Summary
In the field of automotive equipment manufacturing, when traditional manual observation and labeling methods are used to determine the critical path of the production line, there are subjective factors, resulting in low accuracy and affecting production efficiency.
By obtaining the beat data set of the production line stations to be analyzed, the running time and waiting time of each step are calculated, and the activity time is determined, the key path is finally determined, the bottleneck links on the production line are found, the process flow is optimized, and the production efficiency is improved.
No manual intervention is required, which improves the accuracy of determining critical paths, optimizes the production efficiency of the production line, reduces errors, and enhances the scientificity and accuracy of the analysis.
Smart Images

Figure CN118982169A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a critical path determination method, apparatus, computer equipment, computer-readable storage medium, and computer program product. Background Art
[0002] In the field of automotive equipment manufacturing, determining the critical path of the process flow in the production line is crucial to improving production efficiency.
[0003] In traditional technology, manual observation and marking are generally used to determine the critical path; however, this method has subjective factors and is prone to errors, resulting in low accuracy in determining the critical path. Summary of the invention
[0004] Based on this, it is necessary to provide a critical path determination method, apparatus, computer device, computer-readable storage medium and computer program product that can improve the accuracy of critical path determination in order to solve the above technical problems.
[0005] In a first aspect, the present application provides a critical path determination method, comprising:
[0006] Acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps;
[0007] Determine the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps;
[0008] Determining the activity time of each of the steps according to the running time and waiting time of each of the steps;
[0009] According to the activity time of each of the work steps, a critical path in the beat data set to be analyzed is determined.
[0010] In one embodiment, determining the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps includes:
[0011] Subtracting the running start time and the running end time of each of the working steps to obtain the running time of each of the working steps;
[0012] The running start time of each of the work steps and the running end time of the preceding work step corresponding to each of the work steps are subtracted to obtain the waiting time of each of the work steps.
[0013] In one embodiment, before performing subtraction processing on the running start time of each of the work steps and the running end time of the preceding work step corresponding to each of the work steps to obtain the waiting time of each of the work steps, the method further includes:
[0014] According to the correspondence between the work steps and the process steps, the current process steps corresponding to the work steps are obtained;
[0015] From the previous process of the current process corresponding to each of the work steps, the work step with the largest corresponding operation end time is determined as the preceding process step corresponding to each of the work steps.
[0016] In one embodiment, determining the critical path in the beat data set to be analyzed according to the activity time of each of the work steps includes:
[0017] Filtering out a target work step from the work steps according to the activity time of the work steps;
[0018] According to each of the target working steps, a critical path in the beat data set to be analyzed is determined.
[0019] In one embodiment, the step of selecting a target step from the steps according to the activity time of the steps includes:
[0020] According to the activity time of each of the work steps, determine the earliest occurrence time and the latest occurrence time corresponding to each of the work steps;
[0021] From the process steps, the process steps with the same earliest occurrence time and latest occurrence time are selected as the target process steps.
[0022] In one embodiment, the step of obtaining a beat data set to be analyzed of a workstation of a production line to be analyzed includes:
[0023] Obtain each candidate beat data set of the workstation of the production line to be analyzed, as well as the number of missing steps and the total number of steps corresponding to each candidate beat data set;
[0024] Determine the proportion of missing steps corresponding to each candidate beat data set according to the number of missing steps and the total number of steps corresponding to each candidate beat data set;
[0025] From the candidate beat data sets, a candidate beat data set whose corresponding missing work step ratio meets a preset ratio condition is screened out as the beat data set to be analyzed for the workstation of the production line to be analyzed.
[0026] In one embodiment, the step of obtaining candidate beat data sets of workstations of the production line to be analyzed includes:
[0027] Obtain the workstation ID corresponding to the workstation of the production line to be analyzed and the ID of the candidate beat data set;
[0028] Acquire multiple beat data sets corresponding to the workstation identifiers as multiple beat data sets of the workstations of the production line to be analyzed;
[0029] From each of the beat data sets, the beat data sets whose corresponding beat data set identifiers are the same as the candidate beat data set identifiers are screened out as the candidate beat data sets of the production line workstations to be analyzed.
[0030] In a second aspect, the present application also provides a critical path determination device, comprising:
[0031] A data acquisition module, used to acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps;
[0032] A first determining module, used to determine the running time and waiting time of each of the working steps according to the running start time and the running end time of each of the working steps;
[0033] A second determining module is used to determine the activity time of each of the working steps according to the running time and waiting time of each of the working steps;
[0034] The path determination module is used to determine the critical path in the beat data set to be analyzed according to the activity time of each work step.
[0035] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0036] Acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps;
[0037] Determine the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps;
[0038] Determining the activity time of each of the steps according to the running time and waiting time of each of the steps;
[0039] According to the activity time of each of the work steps, a critical path in the beat data set to be analyzed is determined.
[0040] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:
[0041] Acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps;
[0042] Determine the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps;
[0043] Determining the activity time of each of the steps according to the running time and waiting time of each of the steps;
[0044] According to the activity time of each of the work steps, a critical path in the beat data set to be analyzed is determined.
[0045] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0046] Acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps;
[0047] Determine the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps;
[0048] Determining the activity time of each of the steps according to the running time and waiting time of each of the steps;
[0049] According to the activity time of each of the work steps, a critical path in the beat data set to be analyzed is determined.
[0050] The above-mentioned critical path determination method, device, computer equipment, storage medium and computer program product first obtain the beat data set to be analyzed of the workstation of the production line to be analyzed, then determine the running time and waiting time of each workstep according to the running start time and running end time of each workstep in the beat data set to be analyzed, then determine the activity time of each workstep according to the running time and waiting time of each workstep, and finally determine the critical path in the beat data set to be analyzed according to the activity time of each workstep. In this way, when determining the critical path, by determining the running time and waiting time of each workstep, the bottleneck link on the workstation of the production line to be analyzed can be found, so as to optimize and improve it, thereby improving the production efficiency of the workstation of the production line to be analyzed; moreover, the method does not require manual intervention, avoids the defects of low accuracy of critical path determination caused by subjective factors and easy errors in the method of manual observation and marking, thereby improving the accuracy of critical path determination. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments of the present application or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0052] Figure 1 A schematic diagram of a critical path determination method in one embodiment;
[0053] Figure 2 A directed acyclic graph constructed based on a data set corresponding to a beat number of a workstation in one embodiment;
[0054] Figure 3 is a schematic diagram of vertices and edges of a directed acyclic graph in one embodiment;
[0055] Figure 4 A critical path diagram constructed based on a data set corresponding to a beat number of a workstation in one embodiment;
[0056] Figure 5 A schematic flow chart of the steps of obtaining a beat data set to be analyzed of a production line workstation to be analyzed in one embodiment;
[0057] Figure 6 A schematic flow chart of a critical path determination method in another embodiment;
[0058] Figure 7 A schematic diagram of a process flow of a method for identifying a critical path of a workstation beat of an automobile welding production line in one embodiment;
[0059] Figure 8 is a structural block diagram of a critical path determination device in one embodiment;
[0060] Fig. 9 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0061] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0062] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0063] In an exemplary embodiment, Figure 1 As shown, a critical path determination method is provided. This embodiment uses the method applied to a server as an example for illustration. It is understandable that the method can also be applied to a terminal, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. Among them, the terminal can be, but is not limited to, various personal computers, laptops, smart phones, and tablet computers; the server can be implemented as an independent server or a server cluster composed of multiple servers. In this embodiment, the method includes the following steps:
[0064] Step S101, obtaining a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each work step.
[0065] Among them, the production line workstation to be analyzed refers to the workstation on the production line to be analyzed. It should be noted that a workstation refers to a single workstation or work point on the production line, and a workstation can be composed of one or more processes. A process is a division of work units under a workstation, and a process can be composed of one or more steps; in the same workstation, when there are multiple steps with the same start time, these steps are considered to belong to the same process. The step is a division of work units under the workstation and process. The production line is used to characterize a specific production process, usually including a series of processes to convert raw materials into the corresponding process of the final product. It should be noted that the total number of steps under a workstation is also called WS, and the total number of processes under a workstation is PN.
[0066] Among them, the production process data table corresponding to each step in the workstation of the production line to be analyzed (taking line number 100001 as an example) is shown in Table 1:
[0067] Table 1 Production process data of each step of line number 100001
[0068]
[0069] Among them, the process structure information table of different stations, processes and steps in the production line to be analyzed is shown in Table 2:
[0070] Table 2 Process structure information table of different stations, processes and steps of line number 100001
[0071]
[0072] The beat data set to be analyzed refers to the beat data set that needs to be analyzed. The beat data set is a data set corresponding to multiple work steps and the running start time and the running end time of each work step.
[0073] Among them, the information table corresponding to the beat data set to be analyzed can be obtained by combining Table 1 and Table 2, as shown in Table 3:
[0074] Table 3 Process structure information and production process data fusion information table of line number 100001
[0075]
[0076] The operation start time refers to the time point when the work step starts to be executed. It should be noted that the operation start time is also called st.
[0077] The operation end time refers to the time point when the work step ends execution. It should be noted that the operation end time is also called et.
[0078] Exemplarily, the server obtains multiple work steps of the production line workstation to be analyzed from the database; then, the server obtains the running start time and running end time of each work step; then, the server constructs a beat data set based on the multiple work steps and the running start time and running end time of each work step, as the beat data set to be analyzed for the production line workstation to be analyzed.
[0079] Step S102, determining the running time and waiting time of each process step according to the running start time and running end time of each process step.
[0080] The running time refers to the time required for a process step to run from the beginning to the end. It should be noted that the running time is also called RT.
[0081] The waiting time refers to the time required to wait for the operation step to start. It should be noted that the waiting time is also called WT.
[0082] Among them, the information table corresponding to the running time and the waiting time is shown in Table 4:
[0083] Table 4 Work step information table (milliseconds) for workstation number 20001 and beat C1001200011056
[0084] Step number Step number Run start time Run end time Run time RT Waiting time WT Activity DT 400001 1 0 5178 5178 0 5178 400002 2 5656 7129 1473 478 1951 400003 3 5656 7071 1415 478 1893 400004 4 5656 7129 1473 478 1951 400005 5 5656 7101 1445 478 1923 …… …… …… …… …… 400023 23 313493 313522 29 225093 225122 400024 24 316627 323671 7044 3105 10149 400025 25 323701 332579 8878 30 8908
[0085] Exemplarily, the server obtains the correspondence between the operation start time, the operation end time and the operation time as the first correspondence; then, the server determines the operation time corresponding to the operation start time and the operation end time of each work step according to the first correspondence as the operation time of each work step; then, the server obtains the correspondence between the operation start time, the operation end time and the waiting time as the second correspondence; then, the server determines the waiting time corresponding to the operation start time and the operation end time of each work step according to the second correspondence as the waiting time of each work step.
[0086] Step S103, determining the activity time of each process step according to the running time and waiting time of each process step.
[0087] Among them, activity time refers to the actual time spent on completing a work step, including running time and waiting time. Figure 2 As shown, the activity time can be used to construct a directed acyclic graph corresponding to each work step in the beat data set to be analyzed.
[0088] Exemplarily, the server obtains a preset correspondence between the running time, the waiting time, and the active time; then, the server determines the active time corresponding to the running time of each work step according to the preset correspondence, as the active time of each work step; for example, the server sums the running time and the waiting time of each work step, and obtains the summed time as the active time of each work step.
[0089] Step S104, determining the critical path in the beat data set to be analyzed according to the activity time of each work step.
[0090] Among them, the critical path is used to characterize the sequence corresponding to the longest work step in the beat data set to be analyzed.
[0091] Exemplarily, the server determines the work steps whose corresponding activity times meet preset conditions based on the activity times corresponding to the work steps; then, the server constructs a critical path based on the work steps whose corresponding activity times meet the preset conditions as the critical path in the beat data set to be analyzed.
[0092] In the above critical path determination method, the beat data set to be analyzed of the workstation of the production line to be analyzed is first obtained, and then the running time and waiting time of each workstep in the beat data set to be analyzed are determined according to the running start time and running end time of each workstep, and then the activity time of each workstep is determined according to the running time and waiting time of each workstep, and finally, the critical path in the beat data set to be analyzed is determined according to the activity time of each workstep. In this way, when determining the critical path, by determining the running time and waiting time of each workstep, the bottleneck link on the workstation of the production line to be analyzed can be found, so as to optimize and improve it, and then the production efficiency of the workstation of the production line to be analyzed can be improved; moreover, the method does not require manual intervention, and avoids the defects of low accuracy of critical path determination caused by subjective factors and easy errors in the method of manual observation and marking, thereby improving the accuracy of critical path determination.
[0093] In an exemplary embodiment, the above step S102 determines the running time and waiting time of each work step according to the running start time and running end time of each work step, and also includes: subtracting the running start time and the running end time of each work step to obtain the running time of each work step; subtracting the running start time of each work step from the running end time of the preceding work step corresponding to each work step to obtain the waiting time of each work step.
[0094] The preceding process step refers to the process step with the longest running end time in the previous process of the current process corresponding to each process step. Figure 3 As shown, the current process corresponding to the current step k is the p_kth process, and the preceding step is the step with the largest corresponding running end time in the p_k-1th process, that is, step k-1.
[0095] The current process refers to the process corresponding to the work step. Figure 3 As shown, the current process corresponding to the current step k is the p_kth process.
[0096] The previous process refers to the process before the current process. Figure 3 As shown, the previous process corresponding to the current process p_k is p_k-1.
[0097] Exemplarily, the server performs subtraction processing on the running start time and the running end time of each work step, and obtains the subtraction time as the running time of each work step; then, the server performs subtraction processing on the running start time of each work step and the running end time of the preceding work step corresponding to each work step, and obtains the subtraction time as the waiting time of each work step.
[0098] In this embodiment, by determining the running time based on the running time and waiting time of each work step, the actual time required for each work step can be clarified, providing an accurate basis for reasonably arranging the production schedule and optimizing the process; moreover, the entire process does not require human intervention, avoiding the defect of low accuracy in determining the running time and waiting time of each work step due to errors in manual processing.
[0099] In an exemplary embodiment, before performing subtraction processing on the running start time of each work step and the running end time of the preceding work step corresponding to each work step to obtain the waiting time of each work step, it also includes: obtaining the current process corresponding to each work step according to the corresponding relationship between the work step and the process; and determining the work step with the largest corresponding running end time from the previous process of the current process corresponding to each work step, as the preceding work step corresponding to each work step.
[0100] The correspondence between the work steps and the processes refers to the association information between the work steps and the processes. Figure 3As shown, the p_k-th process corresponds to steps k, k+1, and k+2, and the p_k-1-th process corresponds to steps k-1, k-2, and k-3.
[0101] Exemplarily, the server obtains the process corresponding to each work step according to the correspondence between the work step and the process as the current process corresponding to each work step; then, the server determines the previous process of the current process corresponding to each work step, and determines the work step with the largest corresponding operation end time from the previous process of the current process corresponding to each work step as the preceding work step corresponding to each work step.
[0102] In this embodiment, the current process corresponding to each work step is obtained through the correspondence between the work steps and the process steps, which is conducive to improving the accuracy and rationality of the process arrangement; moreover, by determining the previous work step corresponding to each work step, subsequent data analysis is facilitated.
[0103] In an exemplary embodiment, the above step S104 determines the critical path in the beat data set to be analyzed based on the activity time of each work step, and also includes: screening out target work steps from each work step based on the activity time of each work step; and determining the critical path in the beat data set to be analyzed based on each target work step.
[0104] The target step refers to the step whose corresponding activity time meets the preset conditions. In actual scenarios, the target step refers to the step whose corresponding earliest occurrence time and latest occurrence time are equal.
[0105] Exemplarily, the server selects the work steps whose corresponding activity time meets preset conditions from among the work steps according to the activity time of each work step, and uses them as target work steps; then, the server constructs the paths corresponding to each target work step according to each target work step, as the key paths in the beat data set to be analyzed.
[0106] In this embodiment, by accurately screening the work steps, it is possible to highlight the key work steps and increase attention to key links; by determining the critical path, it is helpful to accurately grasp the core part of the entire production or process, and provide a clear direction for subsequent process optimization and efficiency improvement.
[0107] In an exemplary embodiment, a target work step is selected from each work step according to the activity time of each work step, and the method further includes: determining the earliest occurrence time and the latest occurrence time corresponding to each work step according to the activity time of each work step; and selecting from each work step the work step whose corresponding earliest occurrence time and the latest occurrence time are equal as the target work step.
[0108] The earliest occurrence time refers to the earliest possible time point at which each work step can start. In actual scenarios, the earliest occurrence time specifically refers to the earliest occurrence time of the activities of each work step. It should be noted that the earliest occurrence time of the activities of each work step can be determined by the earliest occurrence time of the events of each work step.
[0109] The latest occurrence time refers to the latest possible time point at which each work step can start. In actual scenarios, the latest occurrence time specifically refers to the latest occurrence time of the activities of each work step. It should be noted that the latest occurrence time of the activities of each work step can be determined by the latest occurrence time of the events of each work step.
[0110] Among them, the earliest occurrence time and the latest occurrence time of the event in each process step can be calculated by the following method. Figure 3 As shown, based on the directed acyclic graph, the vertex (event) sequence of the graph is initialized: NodeSqe = [0, 1, ..., node, ..., WS-1]; the earliest occurrence time and the latest occurrence time of each event are calculated: (1) Calculate the earliest occurrence time of event node, VE node =MAX{VE x +<x,node>, where x, node∈NodeSqe and x is any previous step of node, VE0=0, i.e., the maximum path length from event 0 to event node; (2) Reverse the vertex sequence NodeSqe to obtain NodeSqe_rev=[WS-1,...node,...,1,0]; Calculate the latest occurrence time of event node without delay, VL node =MIN{VL x -<node,x> edge weight, where x, node∈NodeSqe and x is any subsequent step of node, VL WS-1 =0, that is, the latest occurrence time from event node to event 0.
[0111] The earliest occurrence time and the latest occurrence time of the activity in each work step can be calculated in the following way. (1) Calculate the earliest occurrence time ES of the activity. The earliest occurrence time of the activity (edge) is equal to the earliest occurrence time of the event (vertex) issued by the activity, that is, ES = VE; (2) Calculate the latest occurrence time LS of the activity. LS = VL x - <DT i,j,k,p_k , the edge weight of x>, that is, the latest occurrence time of an activity is the latest occurrence time of the activity start event minus the duration of the activity.
[0112] Among them, the earliest occurrence time and the latest occurrence time of the events in each process step are shown in Table 5:
[0113] Table 5 The earliest and latest occurrence time of each event based on the workstation 2001 beat data set
[0114]
[0115] Among them, the earliest and latest occurrence time of the activities of each work step are shown in Table 6:
[0116] Table 6 The earliest and latest occurrence time of each activity based on the workstation 2001 beat data set
[0117]
[0118] Among them, based on Table 6, Figure 2 In the directed acyclic graph corresponding to each process step shown in the figure, select the process steps whose earliest occurrence time and latest occurrence time are equal, such as Figure 4 shown.
[0119] Exemplarily, the server determines the earliest occurrence time corresponding to each work step based on the activity time of each work step and the corresponding relationship between the activity time and the earliest occurrence time, and determines the latest occurrence time corresponding to each work step based on the activity time of each work step and the corresponding relationship between the activity time and the latest occurrence time; then, the server selects the work steps whose corresponding earliest occurrence time and latest occurrence time are equal from each work step as the target work step.
[0120] In this embodiment, by screening out corresponding work steps with equal earliest occurrence time and latest occurrence time as target work steps, work steps with specific time characteristics can be quickly identified, which is conducive to highlighting the work steps that need to be focused on and facilitating subsequent analysis and processing.
[0121] In an exemplary embodiment, the above step S101, obtaining a beat data set to be analyzed of a workstation of a production line to be analyzed, specifically includes the following steps:
[0122] Step S501 , obtaining each candidate beat data set of the workstation of the production line to be analyzed, and the number of missing steps and the total number of steps corresponding to each candidate beat data set.
[0123] Step S502 : determining the missing step ratio corresponding to each candidate beat data set according to the number of missing steps corresponding to each candidate beat data set and the total number of steps.
[0124] Step S503 , selecting a candidate beat data set whose corresponding missing work step ratio meets a preset ratio condition from each candidate beat data set as the beat data set to be analyzed for the workstation of the production line to be analyzed.
[0125] The candidate beat data set refers to the beat data set to be selected.
[0126] The number of missing steps refers to the number of steps with missing data in the candidate beat data set. It should be noted that the step with missing data specifically refers to the step with missing data at the start time or the end time of the step.
[0127] The total number of work steps refers to the number of all work steps in the candidate beat data set.
[0128] Among them, the missing step ratio is used to represent the proportion of the number of missing steps to the total number of steps.
[0129] The preset ratio condition refers to a preset ratio condition used to judge the missing step ratio. When the missing step ratio is greater than the preset ratio condition, the candidate beat data set corresponding to the missing step ratio will be identified as an abnormal beat data set; when the missing step ratio is less than or equal to the preset ratio condition, the candidate beat data set corresponding to the missing step ratio will not be identified as an abnormal beat data set.
[0130] Exemplarily, the server obtains each candidate beat data set of the workstation of the production line to be analyzed from the database; then, the server takes the work step corresponding to the missing data of the work step start time or the work step end time in each candidate beat data set as the missing work step in each candidate beat data set; then, the server determines the number of missing work steps corresponding to each candidate beat data set based on the missing work steps; then, the server determines the proportion of missing work steps corresponding to each candidate beat data set based on the number of missing work steps corresponding to each candidate beat data set and the total number of work steps; for example, the server divides the number of missing work steps corresponding to each candidate beat data set by the total number of work steps to obtain the proportion of missing work steps corresponding to each candidate beat data set; then, the server Obtain a preset ratio condition, and judge the missing step ratio corresponding to each candidate beat data set according to the preset ratio condition: then, the server selects the candidate beat data set whose corresponding missing step ratio meets the preset ratio condition from each candidate beat data set as the abnormal beat data set of the production line workstation to be analyzed; for example, the server selects the candidate beat data set whose corresponding missing step ratio is greater than the preset ratio condition from each candidate beat data set, as the abnormal beat data set of the production line workstation to be analyzed; then, the server deletes the abnormal beat data set of the production line workstation to be analyzed from each candidate beat data set of the production line workstation to be analyzed, and obtains the beat data set to be analyzed of the production line workstation to be analyzed.
[0131] In this embodiment, by screening out candidate beat data sets whose missing step ratios satisfy preset ratio conditions, abnormal beat data sets existing in the workstations of the production line to be analyzed can be identified, which is beneficial to ensure that the data used for the analysis has high completeness and accuracy, thereby improving the reliability and credibility of subsequent analysis results.
[0132] In an exemplary embodiment, the above-mentioned step S501, obtaining each candidate beat data set of the production line station to be analyzed, also includes: obtaining the workstation identification corresponding to the production line station to be analyzed, and the candidate beat data set identification; obtaining multiple beat data sets corresponding to the workstation identification as multiple beat data sets of the production line station to be analyzed; from each beat data set, screening out the beat data sets whose corresponding beat data set identification is the same as the candidate beat data set identification as each candidate beat data set of the production line station to be analyzed.
[0133] The workstation identification refers to the unique identification information corresponding to the workstation of the production line to be analyzed, such as the workstation number of the production line to be analyzed.
[0134] The candidate beat data set identifier refers to unique identification information corresponding to the candidate beat data set, such as the beat number corresponding to the candidate beat data set.
[0135] Exemplarily, the server obtains the workstation identification corresponding to the production line workstation to be analyzed and the candidate beat data set identification from the database; then, the server obtains multiple beat data sets corresponding to the workstation identification according to the production line workstation to be analyzed, as multiple beat data sets of the production line workstation to be analyzed; then, the server filters out the beat data sets whose corresponding beat data set identification is the same as the candidate beat data set identification from each beat data set according to the candidate beat data set identification, as each candidate beat data set of the production line workstation to be analyzed.
[0136] In this embodiment, by obtaining the workstation identification and candidate beat data set identification corresponding to the workstation of the production line to be analyzed, and filtering out the beat data set corresponding to the workstation identification, it can be ensured that the data used for the analysis accurately matches the workstation of the production line to be analyzed, thereby improving the accuracy of the data and facilitating subsequent analysis and processing.
[0137] In an exemplary embodiment, Figure 6 As shown, another critical path determination method is provided, and the method is applied to a server as an example, including the following steps:
[0138] Step S601, obtain the workstation identification corresponding to the workstation of the production line to be analyzed, and the candidate beat data set identification; obtain multiple beat data sets corresponding to the workstation identification as multiple beat data sets of the production line workstation to be analyzed; from each beat data set, filter out the beat data set whose corresponding beat data set identification is the same as the candidate beat data set identification as each candidate beat data set of the production line workstation to be analyzed.
[0139] Step S602, obtaining the number of missing work steps and the total number of work steps corresponding to each candidate beat data set; determining the missing work step ratio corresponding to each candidate beat data set according to the number of missing work steps and the total number of work steps corresponding to each candidate beat data set; screening out from each candidate beat data set the candidate beat data set whose corresponding missing work step ratio meets the preset ratio condition as the beat data set to be analyzed for the production line workstation to be analyzed; the beat data set to be analyzed includes at least multiple work steps and the running start time and running end time of each work step.
[0140] Step S603, performing subtraction processing on the operation start time and the operation end time of each process step to obtain the operation time of each process step.
[0141] Step S604, based on the correspondence between the work steps and the process, obtain the current process corresponding to each work step; determine the work step with the largest corresponding operation end time from the previous process of the current process corresponding to each work step, as the previous work step corresponding to each work step; perform the difference processing on the operation start time of each work step and the operation end time of the previous work step corresponding to each work step, and obtain the waiting time of each work step.
[0142] Step S605, determining the activity time of each process step according to the running time and waiting time of each process step.
[0143] Step S606, determine the earliest occurrence time and the latest occurrence time corresponding to each work step according to the activity time of each work step; select the work steps with the same earliest occurrence time and the latest occurrence time from each work step as the target work step; and determine the critical path in the beat data set to be analyzed according to each target work step.
[0144] In the above-mentioned critical path determination method, when determining the critical path, by determining the running time and waiting time of each work step, the bottleneck link on the production line station to be analyzed can be found, so as to optimize and improve it, thereby improving the production efficiency of the production line station to be analyzed; moreover, this method does not require human intervention, avoiding the subjective factors and prone to errors in manual observation and marking, resulting in the defect of low accuracy in determining the critical path, thereby improving the accuracy of determining the critical path.
[0145] In an exemplary embodiment, in order to more clearly illustrate the critical path determination method provided in the embodiment of the present application, the critical path determination method is specifically described below with a specific embodiment. Figure 7 As shown, the present application also provides a method for identifying the critical path of the beat of a workstation of an automobile welding production line. When determining the critical path, first obtain the beat data set to be analyzed of the workstation of the production line to be analyzed, then determine the running time and waiting time of each workstep according to the running start time and running end time of each workstep in the beat data set to be analyzed, then determine the activity time of each workstep according to the running time and waiting time of each workstep, and finally determine the critical path in the beat data set to be analyzed according to the activity time of each workstep. Specifically including the following contents:
[0146] 1. Data extraction module:
[0147] S1, extract the production process data of production line L from the data service platform, including line number, workstation number, work step number, work step action start time, work step action end time, etc.
[0148] S2, extracting the process structure tree data of production line L from the data service platform, including line number, workstation number, workstation sequence number, workstep number and workstep sequence number.
[0149] 2. Data processing module:
[0150] S3, group the data according to the station number, and then divide each group of station number data according to the beat number, integrate the process structure tree data, and obtain the data set X of different stations and different beats i,j , including workstation number, workstation sequence number, process number, process sequence number, workstep number, workstep sequence number, workstep start time, and workstep end time; where i is the workstation sequence number, i=1, 2, ..., M; j represents the jth beat when the workstation sequence number is i, j=1, 2, ..., NM; M is the number of workstations in production line L, and NM is the total number of beats at workstation M.
[0151] S4, for the j-th beat data set X of station i i,j , calculate the number of missing steps LN i,j The number of all work steps LA in this station i i ratio i,j , ratio i,j =LN i,j / LA i .
[0152] S5, if ratio i,j , indicating that there are many missing steps in the beat data set, and it will be deleted as an abnormal beat; if ratioi,j ≤θ, S6 will be executed.
[0153] 3. Critical path generation module:
[0154] S6, based on dataset X i,j , get the information Y of the kth step under the jth beat of station i i,j,k,st_k,et_k,p+k , where st_k and et_k represent the start and end time of the kth step, k = 1, 2, ..., WS, WS is the total number of steps in station i; p_k means that the kth step belongs to the p_kth process, p_k = 1, 2, ..., PN, PN is the total number of processes in station i; calculate the running time RT of the kth step i,j,k,p_k and waiting time WT i,j,k,p_k , where the running time RT i,j,k,p_k is the time difference between the end time et_k and the start time st_k of the kth process step, WT i,j,k,p_k It is the time difference between the start time st_k of the step corresponding to the p_kth process and the end time (et_k-1) of the step corresponding to the previous process (p_k-1).
[0155] S7, construct the directed acyclic graph G of the jth beat of station i through the AOE network method i,j , where i = 1, 2, ..., M, j = 1, 2, ..., NM. The structure of the graph is as follows <k-1,k,DT i,j,k,p_k >, where k-1 and k represent the vertices (i.e. events) of the graph; DT i,j,k,p_k Represents the directed edge (i.e., activity) of the graph, i.e., the running time RT of step k i,j,k,p_k and waiting time WT i,j,k,p_k sum.
[0156] S8, based on the directed acyclic graph G i,j , initialize the vertex (event) sequence of the graph: NodeSqe = [0, 1, ..., node, ..., WS-1]; calculate the earliest and latest occurrence time of each event: (1) calculate the earliest occurrence time of event node, VE node =MAX{VE x +<x,node> edge weight}, where x, node∈NodeSqe and x is any previous step of node, VE0=0, i.e., the maximum path length from event 0 to event node; (2) Reverse the vertex sequence NodeSqe to obtain NodeSqe_rev=[WS-1,...node,...,1,0]; Calculate the latest occurrence time of event node without delay, VL node =MIN{VLx -<node,x> edge weight}, where x, node∈NodeSqe and x is any subsequent step of node, VL WS-1 =0, that is, the latest occurrence time from event node to event 0.
[0157] S9, calculate the earliest occurrence time and the latest occurrence time of each activity: (1) Calculate the earliest occurrence time ES of the activity. The earliest occurrence time of an activity (edge) is equal to the earliest occurrence time of the event (vertex) emitted by the activity, that is, ES = VE; (2) Calculate the latest occurrence time LS of the activity, LS = VL x - <D i,j,k,p_k , the edge weight of x>, that is, the latest occurrence time of an activity is the latest occurrence time of the activity start event minus the duration of the activity.
[0158] S10, setting the maximum number of iterations Iteration to the number WS of all work steps in the j-th cycle of workstation i, that is, Iteration=WS; setting the initialization number of iterations q=0.
[0159] S11, determine the activity DT i,j,k Are the earliest occurrence time ES and the latest occurrence time LS equal and q≤Iteration? If they are equal, then the activity DT i,j,k is the critical path; q=q+1.
[0160] S12, repeat S11 until the iteration ends; obtain all critical paths under the j-th beat of workstation i, and then output the numbers, start times and end times of all work steps in the critical path.
[0161] In order to better explain the technical content of the present invention, the embodiments of the present invention take a certain automobile welding process data as a specific embodiment to further explain the present invention in detail. The schematic implementation mode of the present invention and its description are only used to explain the present invention and are not intended to limit the present invention.
[0162] A method for identifying a critical path of a workstation beat of an automobile welding production line according to an embodiment of the present invention comprises the following steps:
[0163] Step 1: extract the production process data of a production line from the data service platform, including the line number, workstation number, work step number, work step action start time, work step action end time, etc.
[0164] Step 2, extract the process structure tree data of the production line numbered 100001 from the data service platform, including the line number, workstation number, workstation sequence number, process number, process sequence number, workstep number and workstep sequence number; wherein the line numbered 100001 includes 13 workstations and 192 worksteps, different workstations include one or more processes, and different processes include one or more worksteps.
[0165] Step 3: Group the data according to the station number, and then divide each group of station number data according to the beat number, integrate the process structure tree data, and obtain the data set X of different stations and different beats i,j , including line number, workstation number, workstation sequence number, beat number, process number, process sequence number, workstep number, workstep sequence number, workstep start time, and workstep end time; where i is the workstation sequence number, i=1, 2, ..., 13; j represents the jth beat when the workstation sequence number is i, j=1, 2, ..., NM; NM is the total number of beats for workstation M.
[0166] Step 4: For the j-th beat data set X of station i i,j , calculate the number of missing steps LN i,j The number of all work steps LA in this station i i ratio i,j , ratio i,j =LN i,j / LA i .
[0167] Step 5: In this embodiment, select ratio 1,2 =0 when the data set X 1,1 , that is, there is no missing work step in the first beat data set of workstation number 1. Next, the complete beat data of workstation number 2001 is used as an example to illustrate the critical path extraction.
[0168] Step 6, calculate the running time of each work step and the waiting time of the corresponding work step under the complete beat of work station number 2001 (beat number is C1001200011056).
[0169] Step 7: Construct a directed acyclic graph.
[0170] Step 8, calculate the earliest occurrence time and the latest occurrence time of each event.
[0171] Step 9, calculate the earliest and latest occurrence time of each activity; extract the activities with ES equal to LS in the table as the critical path, that is, the output critical paths are (1,6), (6,8), (8,10), (10,12), (12,13), (13,18), (18,23), (23,24) and (24,25).
[0172] Step 10, draw a critical path diagram.
[0173] In the above-mentioned embodiment, when determining the critical path, by determining the running time and waiting time of each work step, the bottleneck link on the workstation of the production line to be analyzed can be found, so as to be optimized and improved, thereby improving the production efficiency of the workstation of the production line to be analyzed; moreover, the method does not require human intervention, thus avoiding the defect of low accuracy in determining the critical path due to subjective factors and prone to errors caused by manual observation and marking, thereby improving the accuracy of determining the critical path. At the same time, the method of constructing a directed acyclic graph based on the workstation beat data set takes into account the waiting time of each work step in the workstation, and the solution to the critical path is closer to the actual production process; the automatic calculation and identification method of the workstation beat critical path based on the fusion of the process structure tree and the production process data reduces the cost of manual analysis and avoids the subjectivity and inconsistency of analysis based on manual experience, thereby improving the efficiency and scientificity of the critical path analysis; this method is driven by data, integrates the process structure tree data and the production process data, and can automatically calculate and identify the critical path information from the beat data of each workstation, saving labor costs and improving the efficiency and scientificity of data analysis; in the analysis process, the waiting time between the preceding step and the succeeding step is taken into account, making the analysis of the critical path closer to the actual process flow.
[0174] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0175] Based on the same inventive concept, the embodiment of the present application also provides a critical path determination device for implementing the critical path determination method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more critical path determination device embodiments provided below can refer to the limitations of the critical path determination method above, and will not be repeated here.
[0176] In an exemplary embodiment, Figure 8As shown, a critical path determination device is provided, including: a data acquisition module 801, a first determination module 802, a second determination module 803 and a path determination module 804, wherein:
[0177] The data acquisition module 801 is used to acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each work step.
[0178] The first determining module 802 is used to determine the running time and waiting time of each process step according to the running start time and the running end time of each process step.
[0179] The second determining module 803 is used to determine the activity time of each process step according to the running time and waiting time of each process step.
[0180] The path determination module 804 is used to determine the critical path in the beat data set to be analyzed according to the activity time of each work step.
[0181] In an exemplary embodiment, the first determination module 802 is also used to perform a subtraction process on the operation start time and the operation end time of each work step to obtain the operation time of each work step; and perform a subtraction process on the operation start time of each work step and the operation end time of the corresponding preceding work step to obtain the waiting time of each work step.
[0182] In an exemplary embodiment, the first determination module 802 is also used to obtain the current process corresponding to each work step according to the correspondence between the work step and the process; and determine the work step with the largest corresponding operation end time from the previous process of the current process corresponding to each work step as the preceding work step corresponding to each work step.
[0183] In an exemplary embodiment, the path determination module 804 is further used to select target steps from the various steps according to the activity time of each step; and determine the critical path in the beat data set to be analyzed according to each target step.
[0184] In an exemplary embodiment, the path determination module 804 is also used to determine the earliest occurrence time and the latest occurrence time corresponding to each work step according to the activity time of each work step; from each work step, the work step with the same corresponding earliest occurrence time and latest occurrence time is selected as the target work step.
[0185] In an exemplary embodiment, the data acquisition module 801 is also used to obtain each candidate beat data set of the production line workstation to be analyzed, as well as the number of missing work steps and the total number of work steps corresponding to each candidate beat data set; determine the missing step ratio corresponding to each candidate beat data set based on the number of missing work steps and the total number of work steps corresponding to each candidate beat data set; and screen out from each candidate beat data set the candidate beat data set whose corresponding missing step ratio meets the preset ratio condition as the beat data set to be analyzed for the production line workstation to be analyzed.
[0186] In an exemplary embodiment, the data acquisition module 801 is also used to obtain the workstation identification corresponding to the production line workstation to be analyzed, and the candidate beat data set identification; obtain multiple beat data sets corresponding to the workstation identification as multiple beat data sets of the production line workstation to be analyzed; and filter out the beat data sets whose corresponding beat data set identification is the same as the candidate beat data set identification from each beat data set as each candidate beat data set of the production line workstation to be analyzed.
[0187] Each module in the above critical path determination device can be implemented in whole or in part by software, hardware, or a combination thereof. Each module can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each module.
[0188] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Fig. 9 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as the start time of the operation and the end time of the operation. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a critical path determination method is implemented.
[0189] Those skilled in the art will understand that Fig. 9The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0190] In an exemplary embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.
[0191] In an exemplary embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0192] In an exemplary embodiment, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps in the above method embodiments are implemented.
[0193] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0194] The technical features of the above embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0195] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for determining a critical path, characterized in that: The method comprises: Acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps; Determine the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps; Determining the activity time of each of the steps according to the running time and waiting time of each of the steps; According to the activity time of each of the work steps, a critical path in the beat data set to be analyzed is determined.
2. The method according to claim 1, characterized in that Determining the running time and waiting time of each of the steps according to the running start time and the running end time of each of the steps includes: Subtracting the running start time and the running end time of each of the working steps to obtain the running time of each of the working steps; The running start time of each of the work steps and the running end time of the preceding work step corresponding to each of the work steps are subtracted to obtain the waiting time of each of the work steps.
3. The method according to claim 2, characterized in that Before performing a subtraction process on the running start time of each of the work steps and the running end time of the preceding work step corresponding to each of the work steps to obtain the waiting time of each of the work steps, the method further includes: According to the correspondence between the work steps and the process steps, the current process steps corresponding to the work steps are obtained; From the previous process of the current process corresponding to each of the work steps, the work step with the largest corresponding operation end time is determined as the preceding process step corresponding to each of the work steps.
4. The method according to claim 1, characterized in that Determining the critical path in the beat data set to be analyzed according to the activity time of each of the work steps includes: Filtering out a target work step from the work steps according to the activity time of the work steps; According to each of the target working steps, a critical path in the beat data set to be analyzed is determined.
5. The method according to claim 4, characterized in that The step of selecting a target step from the steps according to the activity time of the steps comprises: According to the activity time of each of the work steps, determine the earliest occurrence time and the latest occurrence time corresponding to each of the work steps; From the process steps, the process steps with the same earliest occurrence time and latest occurrence time are selected as the target process steps.
6. The method according to any one of claims 1 to 5, characterized in that The step of obtaining a beat data set to be analyzed of a workstation of a production line to be analyzed includes: Obtain each candidate beat data set of the workstation of the production line to be analyzed, as well as the number of missing steps and the total number of steps corresponding to each candidate beat data set; Determine the proportion of missing steps corresponding to each candidate beat data set according to the number of missing steps and the total number of steps corresponding to each candidate beat data set; From the candidate beat data sets, a candidate beat data set whose corresponding missing work step ratio meets a preset ratio condition is screened out as the beat data set to be analyzed for the workstation of the production line to be analyzed.
7. The method according to claim 6, characterized in that The step of obtaining candidate beat data sets of the workstations of the production line to be analyzed includes: Obtain the workstation ID corresponding to the workstation of the production line to be analyzed and the ID of the candidate beat data set; Acquire multiple beat data sets corresponding to the workstation identifiers as multiple beat data sets of the workstations of the production line to be analyzed; From each of the beat data sets, the beat data sets whose corresponding beat data set identifiers are the same as the candidate beat data set identifiers are screened out as the candidate beat data sets of the production line workstations to be analyzed.
8. A critical path determination device, characterized in that: The device comprises: A data acquisition module, used to acquire a beat data set to be analyzed of a workstation of a production line to be analyzed; the beat data set to be analyzed includes at least a plurality of work steps and an operation start time and an operation end time of each of the work steps; A first determining module, used to determine the running time and waiting time of each of the working steps according to the running start time and the running end time of each of the working steps; A second determining module is used to determine the activity time of each of the working steps according to the running time and waiting time of each of the working steps; The path determination module is used to determine the critical path in the beat data set to be analyzed according to the activity time of each work step.
9. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
11. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Fault time calculation method, device and equipment and readable storage medium
CN120910462A
Equipment operation effective time calculation method and device, storage medium and related equipment
CN120910463A
Device operation effective time calculation method, device, storage medium and related device
CN120910463B