Membrane bag concrete and bagged soil combined bank protection maintenance construction method

Through the combination method of membrane bag concrete and bagged soil, galvanized steel pipes are used to support membrane bag concrete, the displacement, deformation and pollution problems of existing bank protection maintenance methods are solved, and low-cost and efficient bank protection repair is achieved to adapt to complex terrain and deep water. The demand for slope protection improves the stability and service life of the bank protection.

CN118997060APending Publication Date: 2024-11-22CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410864301.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-30
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing bank protection maintenance construction methods have high risk of displacement, deformation, collapse, high cost and environmental pollution, making it difficult to adapt to complex terrain and deep water slope protection needs.

Method used

The combination method of membrane bag concrete and bagged soil is adopted, and the membrane bag concrete is supported by galvanized steel pipes to provide support surfaces to resist river erosion. Combined with the permeable mold bag sheet, the concrete curing is accelerated, the water-cement ratio is reduced, and pollution is reduced.

Benefits of technology

It has achieved low-cost and rapid construction, adapted to complex terrain, improved the stability and service life of the bank cover, reduced pollution, and shortened construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997060A_ABST
    Figure CN118997060A_ABST
Patent Text Reader

Abstract

The invention discloses a membrane bag concrete and bagged soil combined revetment maintenance construction method, and relates to the technical field of water conservancy project riverway repair and renovation. Galvanized steel pipes, bagged soil and membrane bag concrete are combined, and the length and the distance of the galvanized steel pipes can be designed, calculated and determined according to the scouring condition of an existing riverway; the bagged soil refers to a soil bag which is formed by filling an earthwork bag with the size of 300 * 400 * 150 mm and formed by weaving a 250 g / m < 2 > geotextile into a geotextile bag and sealing the geotextile bag with an earthwork bag sealing machine; the film bag concrete refers to a block formed by integrally manufacturing 300g / m < 2 > polypropylene filament yarn woven fabric in a factory according to design requirements, transporting the polypropylene filament yarn woven fabric to a site and filling 300mm thick concrete under water. According to the method, bagged soil sinking and film bag concrete filling with water are carried out on the normal-water-level water, collapse of the existing revetment caused by sudden drop of rainfall water pressure is prevented, the revetment is reinforced and maintained while the safety of the revetment structure is protected, damage to the revetment caused by long-term scouring of a river channel is relieved, the construction difficulty is lowered, the construction efficiency is improved, and the construction time and economic cost are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of river channel repair and reconstruction of water conservancy projects, and in particular to a bank protection repair construction method combining membrane bag concrete and bagged soil. Background Art

[0002] Bank protection projects refer to measures taken to reinforce existing bank slopes by building masonry in estuaries, rivers, lakes, and coastal areas to prevent the invasion and scouring of waves and water currents, as well as the collapse of bank slopes caused by soil pressure and groundwater seepage pressure.

[0003] As we all know, with the acceleration of urbanization, the water level of rivers has risen, and the repair and reconstruction of river bank protection has become particularly urgent, especially at the estuaries connected to some main rivers. Due to the repeated rise and fall of water levels and the influx of seasonal floods, erosion is often very serious.

[0004] However, the existing revetment maintenance construction methods have the following shortcomings:

[0005] The usual cofferdam interception or drainage repair methods may cause the revetment to shift, deform or even collapse, seriously affecting the safety of the revetment structure. The revetment reinforcement methods such as dumping blocks and interlocking blocks are costly and have poor precision, and usually cause pollution to the environment and water bodies.

[0006] Therefore, we proposed a bank protection maintenance construction method combining membrane bag concrete and bagged soil to solve the above problems. Summary of the invention

[0007] The purpose of the present invention is to provide a method for repairing and constructing a revetment combining film bag concrete and bagged soil. The film bag concrete formed on the riverbed can provide a supporting surface for the bagged soil, thereby avoiding the loss of the soil bags due to scouring and reducing the backfill cost. The constructed revetment has the advantages of large slope, strong stability and good performance, which increases the service life of the revetment. The used mold bag sheets have a certain water permeability. After pouring the concrete, excess water will penetrate into the gaps in the fabric, which will quickly reduce the water-cement ratio, accelerate the curing speed of the concrete, reduce the diffusion of mud and sand and gravel, and reduce pollution to the water body. The problems raised by the above-mentioned background technology have been solved.

[0008] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a method for repairing bank protection by combining film bag concrete and bagged soil, with galvanized steel pipe (1), bagged soil (2) and film bag concrete (3) as the main structure, and the method is carried out according to the following steps:

[0009] 1) Using barges, galvanized steel pipes (1) can be installed on water according to the designed position, elevation and spacing;

[0010] 2) After the galvanized steel pipe (1) is injected, the position of the bagged soil is measured on the water and marked, and the bagged soil (2) is filled manually or mechanically by barge, and the divers level it according to the designed slope ratio;

[0011] 3) After the bagged soil (2) has settled, it provides a support surface for the membrane bag concrete (3). The membrane bag pieces are fixed to the galvanized steel pipe (1), and concrete is poured into the membrane bag. The membrane bag pieces are connected or overlapped and fixed to each other to form an overall ballast on the bagged soil (2) to jointly resist river scouring.

[0012] Preferably, the length and spacing of the galvanized steel pipe (1) are determined through design calculations based on the existing river scouring conditions.

[0013] Preferably, the bagged soil (2) is made of 250g / ㎡ geotextile woven by machine, and the size of the geotextile is customized by the manufacturer. The size of the geotextile can be appropriately increased according to the on-site scouring conditions. The bagged soil (2) is manually filled with soil into the geotextile bag and sealed by a bag sealing machine.

[0014] Preferably, the membrane bag concrete (3), the bag cloth is made of 300g / ㎡ polypropylene filament woven cloth and is made in one piece by the manufacturer, and concrete is poured into the bag from the bag mouth to form the membrane bag concrete (3). The membrane bag concrete (3) needs to be connected and fixed to the galvanized steel pipe (1) and the membrane bag concrete (3) pieces also need to be connected to each other.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. The present invention is a low-cost and fast construction method. The galvanized steel pipe has the functions of fixing and supporting. The bagged soil backfills to scour the revetment and the river bottom and provides a supporting surface for the membrane bag concrete at the same time. The cost is lower than that of riprap and bagged sand backfill.

[0017] 2. The film bag concrete construction of the present invention adopts one-time casting and has the characteristics of simple construction and fast speed. It can adapt to various complex terrains, especially in deep water slope protection and bottom protection. It can be directly constructed underwater with a high degree of mechanization. It has the advantages of large slope, strong stability and good performance, which increases the life of the bank protection.

[0018] 3. The mold bag sheet of the present invention has a certain water permeability. After pouring concrete, excess water will penetrate into the gaps of the fabric, which will quickly reduce the water-cement ratio, accelerate the curing speed of concrete, and improve the compressive strength of concrete.

[0019] 4. In the present invention, during the construction of the slope protection project and the underwater protection bottom, the high degree of construction mechanization can shorten the construction time and speed up the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1It is a schematic diagram of the combined revetment elevation in a revetment maintenance construction method of a combined membrane bag concrete and bagged soil according to the present invention;

[0021] Figure 2 The present invention is a flowchart of the steps in a bank protection maintenance construction method combining membrane bag concrete and bagged soil.

[0022] In the figure: 1. refers to galvanized steel pipe; 2. bagged soil; 3. membrane bag concrete. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] Example 1, please refer to the attached Figure 1 -Attached Figure 2 As shown, the present invention provides a technical solution: a method for repairing bank protection by combining film bag concrete and bagged soil, with galvanized steel pipe (1), bagged soil (2) and film bag concrete (3) as the main structure, and the method is carried out according to the following steps:

[0025] 1) Using barges, galvanized steel pipes (1) can be installed on water according to the designed position, elevation and spacing.

[0026] The length and spacing of the selected galvanized steel pipes (1) can be determined based on the scouring conditions of the existing river channel and through design calculations.

[0027] 2) After the galvanized steel pipe (1) is injected, the position of the bagged soil is measured on the water and marked. The bagged soil (2) is filled manually or mechanically by barge, and the divers level it according to the designed slope ratio.

[0028] The bagged soil (2) used is a geobag made of 250g / ㎡ geotextile woven by a machine. The size of the geobag is customized by the manufacturer. The size of the geobag can be appropriately increased according to the on-site scouring conditions. The bagged soil (2) is manually filled with soil into the geobag and sealed with a bag sealing machine.

[0029] 3) After the bagged soil (2) has settled, it provides a support surface for the membrane bag concrete (3). The membrane bag pieces are fixed to the galvanized steel pipe (1), and concrete is poured into the membrane bag. The membrane bag pieces are connected or overlapped and fixed to each other to form an overall ballast on the bagged soil (2) to jointly resist river scouring.

[0030] The selected film bag concrete (3) is made of 300g / ㎡ polypropylene filament woven cloth by the manufacturer in one piece. Concrete is poured from the bag mouth to the inside to form the film bag concrete (3). The film bag concrete (3) needs to be connected and fixed with the galvanized steel pipe (1) and the pieces of the film bag concrete (3) also need to be connected to each other.

[0031] Example 2, a method for repairing bank protection combined with film bag concrete and bagged soil, according to Figure 1 and Figure 2 As shown, the specific construction steps of the galvanized steel pipe (1) are:

[0032] According to the needs of the project and the requirements of the design drawings, the number of steel pipes is determined, a construction plan for the steel pipes is formulated, and water measurements and markings are carried out, and the pipes are injected using barges for water operations.

[0033] Example 3, a method for repairing bank protection combined with film bag concrete and bagged soil, according to Figure 1 and Figure 2 As shown, the specific construction steps of bagged soil (2) are:

[0034] ① Geobag filling

[0035] After the geobags are customized and delivered to the site, they are filled with soil manually due to their small size and sealed by bag sealing machines.

[0036] ②Bag soil dumping

[0037] Underwater topographic survey should be conducted before dumping bagged soil. The key point of underwater dumping bagged soil is to reasonably divide the construction grid, calculate the thickness of each dumping area and the amount of bagged soil according to the design drawings and the results of underwater topographic survey, transport the bagged soil to the construction site by barge, and then dump it manually. Full-time construction personnel will direct the dumping and ensure safe construction. Each section should be from the center of the river to the shore, first foot and then slope, but for areas with rapid scouring and collapse, it is advisable to start from near to far, first slope and then foot, and complete the construction in a continuous assault.

[0038] Specific construction process of bagged soil:

[0039] Preparation before bagged soil filling → Underwater topography measurement → Divide the filling area → Filling test → Manual filling by barge or mechanical filling → Measurement and inspection after filling → Move to the next filling area for construction if qualified.

[0040] Example 4, a method for repairing bank protection combined with film bag concrete and bagged soil, according to Figure 1 and Figure 2 As shown, the specific construction steps of membrane bag concrete (3) are:

[0041] ① Construction preparation

[0042] Depending on the actual situation, concrete pump trucks or ground pumps can be used for pumping construction.

[0043] ②Measurement and setting out

[0044] Generally, slope leveling work must be carried out before the construction of film bag concrete to ensure the flatness of the finished film bag concrete product. Therefore, the slope shoulders and slope toes of the film bag concrete must be accurately positioned and marked according to the requirements of the design drawings.

[0045] ③Concrete film bag laying

[0046] The concrete film bag cloth is made of 300g / ㎡ polypropylene filament woven fabric by the manufacturer. In order to ensure the flatness and tension of the mold bag, the film bag needs to be rolled tightly. This is not only convenient for manual handling and laying, but also squeezes out the air sealed in the film bag roll, shortening the time it is immersed in water. During the laying process, the film bag of the roll is first opened according to the designed position, and the bag body is sewed and connected on site after the laying is completed. Then a steel pipe is inserted into the upper edge pipe sleeve of the mold bag. The steel pipe used on site is φ169. During the opening process, it should always be kept in a downward tensioned state. At the same time, it should also be noted that the overlap width of the film bag and the completed concrete mold bag is always controlled at 30cm.

[0047] ④Concrete filling

[0048] Filling the mold bag with concrete is a very critical process, and the filling effect directly affects the strength of the concrete mold bag.

[0049] The specific construction process for pouring mold bag concrete is: mixer truck enters the site → pump truck takes over → pump hose is inserted into the filling port of the mold bag → tied and fixed - pouring.

[0050] Concrete pouring method:

[0051] The concrete should be poured from top to bottom. The order of each row is to start from one side of the overlapped mold bag and pour it to the other side one by one. Several film bags are used to fill the film in turn. This order has the following advantages: the amount of concrete filled in adjacent film bags is not much different, and the length of the film bag that should be inflated and contracted is not much different, which is convenient for grasping the position of the film bag shoulder; the speed of the concrete surface rising in the film bag is reduced, and the pressure on the film bag is reduced; the lateral displacement caused by the lateral contraction of the film bag is avoided, and the tightness of the joint is ensured.

[0052] When a film bag is about to be filled, cut the bag body at the fixed steel pipe, loosen the entire film bag, and continue to pour concrete until the bag body is full. During this process, the bag body should be pierced to ensure that the air and excess water in the bag body can be discharged from the bag body to accelerate the consolidation efficiency of the concrete. Finally, the filling port filled with concrete is pierced into the bag body to ensure the flatness of the bag body.

[0053] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for repairing and constructing a bank protection system using a combination of film bag concrete and bagged soil, characterized in that: The main structure is composed of galvanized steel pipe (1), bagged soil (2) and membrane bag concrete (3), and the following steps are performed: 1) Using barges, galvanized steel pipes (1) can be installed on water according to the designed location, elevation and spacing; 2) After the galvanized steel pipe (1) is injected, the position of the bagged soil is measured on the water and marked, and the bagged soil (2) is filled manually or mechanically by barge, and the divers level it according to the designed slope ratio; 3) After the bagged soil (2) has settled, it provides a support surface for the membrane bag concrete (3). The membrane bag pieces are fixed to the galvanized steel pipe (1), and concrete is poured into the membrane bag. The membrane bag pieces are connected or overlapped and fixed to each other to form an overall ballast on the bagged soil (2) to jointly resist river scouring.

2. The method for repairing and constructing a bank protection system using a combination of film bag concrete and bagged soil according to claim 1 is characterized in that: Galvanized steel pipe (1), the length and spacing of the steel pipe are determined through design calculation according to the existing river scouring conditions.

3. The method for repairing and constructing a bank protection system using a combination of membrane bag concrete and bagged soil according to claim 1 is characterized in that: Bag-packed soil (2): geobags are made of 250g / ㎡ geotextile woven by machine. The size of the geobags is customized by the manufacturer. The size of the geobags can be appropriately increased according to the on-site scouring conditions. Bag-packed soil (2) is made by manually filling the geobags with soil and sealing them with a bag sealing machine.

4. The method for repairing and constructing a bank protection system using a combination of membrane bag concrete and bagged soil according to claim 1 is characterized in that: The film bag concrete (3) is made of 300g / ㎡ polypropylene filament woven cloth by the manufacturer. Concrete is poured from the bag mouth to the inside to form the film bag concrete (3). The film bag concrete (3) needs to be connected and fixed with the galvanized steel pipe (1). At the same time, the pieces of the film bag concrete (3) also need to be connected to each other.