Sleeve chimney mounting kit and mounting process
By using cross-support structures and chain structures with temporary fixed support and hoisting parts in sleeve chimney installation, the installation process of sleeve chimney is simplified, the problems of high installation difficulty and safety hazards in the prior art are solved, and high efficiency is achieved , safe installation method.
Patent Information
- Application Number
- CN202411392125.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-22
AI Technical Summary
The existing sleeve chimney installation method requires lifting the inner and outer cylinders at the same time, which makes the installation positioning difficult, time-consuming and labor-intensive, and there are safety hazards during the lifting process.
The inner cylinder and outer cylinder of equal length are used, equipped with temporary fixed support and temporary hoisting parts. Four-point positioning and traction are achieved through the cross-support structure and chain structure, simplifying the installation process, and only the external cylinder operation is required to avoid impact of the inner cylinder.
It improves installation efficiency, reduces costs, ensures safety of transportation and installation processes, realizes flexible rotation and fastening of the inner and outer cylinders, and recycles temporary lifting parts.
Smart Images

Figure CN118997573A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of chimneys, and in particular to a sleeve chimney installation kit and an installation process. Background Art
[0002] In the prior art, when installing a sleeve chimney, the inner tube and the outer tube must be installed in sequence. During the process, the inner tube and the outer tube need to be lifted and installed separately at the same time, which is time-consuming and labor-intensive. Since the inner and outer tubes are lifted at the same time in this method and lowered in sequence during installation, the installation and positioning are difficult. Summary of the invention
[0003] Purpose of the invention: In order to overcome the shortcomings of the background technology, the first purpose of the present invention is to disclose a sleeve chimney installation kit; The second object is to disclose an installation process based on the above-mentioned sleeve chimney installation kit.
[0004] Technical solution: The sleeve chimney installation kit disclosed in the present invention comprises an inner cylinder and an outer cylinder of equal length, and circumferential flanges are fixed at both ends of the inner cylinder and the outer cylinder; The installation kit includes temporary fixing supports and temporary lifting parts; The temporary fixing support comprises one or more fixing rods, which are bolted and fixed to the circumferential flanges of the inner tube and the outer tube at both ends; The temporary lifting parts include a plurality of flexible connection devices, temporary lifting ears are correspondingly fixed on the circumferential flanges at the tops of the inner tube and the outer tube, and the flexible connection devices are respectively connected to the temporary lifting ears of the inner tube and the outer tube.
[0005] Furthermore, the circumferential flanges are all outer circumferential flanges.
[0006] Furthermore, the temporary fixing support comprises a cross-bracing structure formed by two intersecting fixing rods, which respectively perform four-point positioning on the circumferential flanges of the inner and outer cylinders.
[0007] Furthermore, three or more temporary lifting ears are evenly spaced circumferentially on the circumferential flange.
[0008] Furthermore, the soft connection device is a chain structure, which is detachably connected to the temporary lifting ears through locks at both ends.
[0009] A sleeve chimney installation process is implemented based on the sleeve chimney installation kit, comprising the following steps: S1. After the inner and outer cylinders are assembled, the two ends are fixed by temporary fixing supports and transported to the site; S2. After unloading, remove the temporary fixed support parts on the top and install temporary lifting parts; S3, remove the connection point between the inner tube and the fixed support, slowly and steadily lift the inner and outer tubes to a vertical position, and remove the connection point between the outer tube and the fixed support; S4. Slowly lift the outer cylinder. The inner cylinder gradually emerges as the outer cylinder rises. After being exposed to a certain distance under the traction of the temporary lifting parts, it rises together with the outer cylinder. S5. After the lifting is in place, the installed inner cylinder is connected and fastened with the installed inner cylinder, and then the outer cylinder is controlled to fall. At this time, the temporary lifting parts are connected in reverse action, and the inner and outer cylinders rotate without obstacles, and the installed outer cylinder is connected and fastened with the installed outer cylinder; S6. Remove temporary lifting parts and recover them for recycling.
[0010] Furthermore, during installation, there is a height difference between the inner and outer cylinders at the bottom layer of the chimney, and the inner cylinder is higher than the outer cylinder.
[0011] Beneficial effects: Compared with the prior art, the advantages of the present invention are: 1. The temporary fixed supports at both ends can ensure that the inner and outer cylinders do not deform during transportation; 2. During installation, the entire lifting process only requires operation on the outer cylinder, saving installation time and costs; 3. When lifting the chimney from horizontal to vertical, remove the inner tube support before lifting, and then remove the outer tube support after lifting, which can avoid the downward impact of the inner tube during the lifting process and avoid safety accidents; 4. The temporary lifting parts not only realize the embedding of the outer tube into the inner tube before installation, but also realize the pulling of the inner tube onto the outer tube after the inner tube is installed. At the same time, they can be easily dismantled and recycled after installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the hoisting of the present invention; Figure 2 It is a schematic diagram of fixing a temporary fixing support member of the present invention; Figure 3 It is a schematic diagram of the temporary lifting part of the present invention. DETAILED DESCRIPTION
[0013] like Figure 1 The sleeve chimney installation kit shown, the chimney comprises an inner cylinder 1 and an outer cylinder 2 of equal length, both ends of the inner cylinder 1 and the outer cylinder 2 are fixed with circumferential flanges 3, and the circumferential flanges 3 are all outer circumferential flanges.
[0014] The installation kit includes temporary fixing supports and temporary lifting parts; like Figure 2 As shown, the temporary fixing support comprises one or more fixing rods 4, which are bolted and fixed to the circumferential flanges 3 of the inner tube 1 and the outer tube 2 at both ends. In this embodiment, the temporary fixing support comprises a cross brace structure formed by two fixing rods 4 crossing each other, and the circumferential flanges 3 of the inner tube and the outer tube are positioned at four points respectively.
[0015] like Figure 3 As shown, the temporary lifting parts include a plurality of flexible connection devices 5, and temporary lifting ears 6 are correspondingly fixed on the circumferential flanges 3 at the top of the inner tube 1 and the outer tube 2, and the flexible connection devices 5 are respectively connected to the temporary lifting ears 6 of the inner and outer tubes. Three or more temporary lifting ears 6 are evenly spaced circumferentially on the circumferential flange 3. In this embodiment, the flexible connection device 5 is a chain structure, which is detachably connected to the temporary lifting ears 6 through the lock buckles at both ends.
[0016] A sleeve chimney installation process is implemented based on the sleeve chimney installation kit, comprising the following steps: After S1, inner tube 1 and outer tube 2 are assembled, both ends are fixed by temporary fixing supports and transported to the site, which can ensure that the inner and outer tubes are not deformed during transportation.
[0017] S2. After unloading, remove the temporary fixed support parts on the top and install temporary lifting parts.
[0018] S3. Remove the connection point between the inner tube 1 and the fixed support, slowly and steadily lift the inner and outer tubes to a vertical position, and remove the connection point between the outer tube 2 and the fixed support; in the process of lifting the chimney from a horizontal state to a vertical state, remove the inner tube support before lifting, and then remove the outer tube support after lifting, so as to avoid the downward impact of the inner tube during the lifting process and avoid safety accidents.
[0019] During installation, there is a height difference between the inner and outer tubes at the bottom layer of the chimney, and the inner tube 1 is higher than the outer tube 2.
[0020] S4, slowly lift the outer cylinder 2, the inner cylinder 1 is gradually exposed as the outer cylinder 2 rises, and after being exposed for a certain distance under the traction of the temporary lifting parts, it is raised together with the outer cylinder 2. The distance between the inner cylinder and the outer cylinder is designed to be 300-600mm.
[0021] S5. After the lifting is in place, the lifted inner cylinder 1 is connected and fastened with the installed inner cylinder, and then the outer cylinder 2 is controlled to fall. At this time, the temporary lifting parts are connected in reverse action, and the inner and outer cylinders rotate without obstacles, and the lifted outer cylinder 2 is connected and fastened with the installed outer cylinder; S6. Remove temporary lifting parts and recover them for recycling.
Claims
1. A sleeve chimney installation kit, characterized in that: The chimney comprises an inner cylinder (1) and an outer cylinder (2) of equal length, wherein both ends of the inner cylinder (1) and the outer cylinder (2) are fixed with circumferential flanges (3); The installation kit includes temporary fixing supports and temporary lifting parts; The temporary fixing support comprises one or more fixing rods (4) which are bolted and fixed to the circumferential flanges (3) of the inner tube (1) and the outer tube (2) at both ends; The temporary lifting component comprises a plurality of flexible connection devices (5), temporary lifting ears (6) are correspondingly fixed on the circumferential flanges (3) at the top of the inner tube (1) and the outer tube (2), and the flexible connection devices (5) are respectively connected to the temporary lifting ears (6) of the inner and outer tubes.
2. The sleeve chimney installation kit according to claim 1, characterized in that: The circumferential flanges (3) are all outer circumferential flanges.
3. The sleeve chimney installation kit according to claim 1, characterized in that: The temporary fixing support comprises a cross-bracing structure formed by two fixing rods (4) crossing each other, and performs four-point positioning on the circumferential flanges (3) of the inner and outer cylinders respectively.
4. The sleeve chimney installation kit according to claim 1, characterized in that: Three or more temporary lifting ears (6) are evenly spaced circumferentially arranged on the circumferential flange (3).
5. The sleeve chimney installation kit according to claim 1, characterized in that: The soft connection device (5) is a chain structure and is detachably connected to the temporary lifting lugs (6) via lock buckles at both ends.
6. A sleeve chimney installation process, characterized in that: The sleeve chimney installation kit according to claim 1 is implemented, comprising the following steps: After S1, the inner tube (1) and the outer tube (2) are assembled, the two ends are fixed by temporary fixing supports and transported to the site; S2. After unloading, remove the temporary fixed support parts on the top and install temporary lifting parts; S3, remove the connection point between the inner tube (1) and the fixed support, slowly and steadily lift the inner and outer tubes to a vertical position, and remove the connection point between the outer tube (2) and the fixed support; S4, slowly lifting the outer cylinder (2), the inner cylinder (1) gradually emerges as the outer cylinder (2) rises, and after being exposed for a certain distance under the traction of the temporary lifting parts, it rises together with the outer cylinder (2); S5. After the lifting is in place, the lifted inner cylinder (1) is connected and fastened with the installed inner cylinder, and then the outer cylinder (2) is controlled to fall. At this time, the temporary lifting parts are connected in reverse, and the inner and outer cylinders rotate without obstacles, and the lifted outer cylinder (2) is connected and fastened with the installed outer cylinder; S6. Remove temporary lifting parts and recover them for recycling.
7. The sleeve chimney installation process according to claim 6 is characterized in that: During installation, there is a height difference between the inner and outer cylinders at the bottom layer of the chimney, and the inner cylinder (1) is higher than the outer cylinder (2).
