Comprehensive energy system planning method considering multi-time scale uncertainty

By establishing a multi-time scale uncertainty planning method in an integrated energy system, the problems of hydrogen energy, carbon flow interaction and uncertainty optimization in traditional systems are solved, and the low-carbon operation and efficient use of thermal energy of the system are achieved.

CN119004752APending Publication Date: 2024-11-22SOUTHEAST UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410876271.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Traditional integrated energy systems have not effectively considered the interaction between hydrogen energy, carbon flow and the original energy, and the uncertainty of source, load and storage and the coordinated optimization of carbon-hydrogen flow in the system are not mature, especially Planning aspects at multiple time scales.

Method used

A comprehensive energy system planning method considering the uncertainty of multiple time scales is proposed. By establishing a low-carbon operation architecture of hydrogen-containing integrated energy systems, setting objective functions and constraints, and using random optimization and fuzzy optimization methods to deal with short time scales and long time The scale uncertainty model uses the weighted satisfaction index method to transform multi-objective optimization problems into single-objective optimization problems, and adjust the system configuration to achieve low-carbon planning.

Benefits of technology

The efficient utilization and economical and optimal operation of the hydrogen-containing comprehensive energy system are achieved. Through the synergy between short-term thermal energy storage and long-term thermal energy storage, the heat load fluctuations are effectively suppressed and the efficient utilization of thermal energy is promoted.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119004752A_ABST
    Figure CN119004752A_ABST
Patent Text Reader

Abstract

The invention discloses an integrated energy system planning method considering multi-time scale uncertainty, and relates to the technical field of integrated energy system planning, and the method comprises the steps: constructing a hydrogen-containing integrated energy system architecture, building three objective functions, and setting constraint conditions; respectively processing the model considering the short time scale uncertainty and the long time scale uncertainty by adopting a stochastic optimization method and a fuzzy optimization method, and constructing a hydrogen-containing comprehensive energy system low-carbon planning model considering the multi-time scale uncertainty; a multi-objective optimization problem is converted into a single-objective optimization problem through a weighted satisfaction index method, the single-objective optimization problem is solved, low-carbon planning is carried out on equipment in the system, the configuration scheme of the equipment can be adjusted according to a low-carbon planning result, and therefore efficient utilization and economic optimal operation of heat energy are promoted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of integrated energy system planning, and in particular to an integrated energy system planning method considering multi-time scale uncertainties. Background Art

[0002] The rapid development of the current society is accompanied by a large consumption of fossil energy. The integrated energy system couples multiple energy subsystems and comprehensively considers the interactions between various energy sources. Therefore, it can solve the problems of fossil energy depletion and the urgent need for transformation of energy utilization structure. At the same time, the increasing maturity of high-quality secondary energy technologies such as hydrogen energy and renewable energy technologies such as wind energy and solar energy provide technical guarantees and green energy options for the low-carbon development of the integrated energy system.

[0003] The interaction between hydrogen energy, carbon flow and original energy is not considered in the traditional integrated energy system, and the research on the coordinated optimization between the uncertainty of sources (wind power, photovoltaic output, etc.), loads (electricity, heat, gas network load, etc.), storage (multi-time scale energy storage, etc.) and carbon-hydrogen energy flow in the system is still immature. Most of the existing studies independently study the planning of integrated energy systems considering long-time scale uncertainty and short-time scale uncertainty. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a comprehensive energy system planning method that takes into account multi-time scale uncertainties. The present invention realizes efficient utilization of thermal energy and economically optimal operation of a hydrogen-containing comprehensive energy system.

[0005] The present invention adopts the following technical solutions to solve the above technical problems:

[0006] A comprehensive energy system planning method considering multi-time scale uncertainty is proposed according to the present invention, as follows:

[0007] Step 1: Establish a low-carbon operation framework for a hydrogen-based integrated energy system that takes into account multi-time scale uncertainties;

[0008] Step 2: Establish an objective function for low-carbon planning of a hydrogen-containing integrated energy system, which includes equipment investment cost, equipment maintenance cost, and system operation cost;

[0009] Step 3, set the constraints of low-carbon planning of hydrogen-containing integrated energy system; the constraints include power grid network constraints, heat network constraints, mixed hydrogen natural gas network constraints, electric bus power balance constraints, heat bus power balance constraints, gas bus power balance constraints, electric hydrogen production unit model constraints, hydrogen storage tank model constraints, mixed hydrogen natural gas pipeline model constraints, tiered carbon trading mechanism constraints, thermal energy storage model constraints, cogeneration unit model constraints and battery model constraints;

[0010] Step 4: Combine the planning framework, objective function and constraints of the hydrogen-containing integrated energy system, adopt stochastic optimization and fuzzy optimization methods to process the models considering short-time scale uncertainty and long-time scale uncertainty respectively, build a low-carbon planning model for the hydrogen-containing integrated energy system considering multi-time scale uncertainty, transform the multi-objective optimization problem into a single-objective optimization problem through the weighted satisfaction index method and solve the planning results; adjust the configuration plan of the hydrogen-containing integrated energy system according to the planning results.

[0011] As a further optimization scheme of a comprehensive energy system planning method considering multi-time scale uncertainties described in the present invention, the thermal energy storage model constraints include a short-time scale thermal energy storage model and a long-time scale thermal energy storage model.

[0012] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the objective function of the equipment investment cost is expressed as follows:

[0013]

[0014] Among them, f I represents the equipment investment cost, i' represents the equipment interest rate, ε represents the equipment life, C BT Represents the battery investment cost, C ED represents the investment cost of the electric hydrogen production unit, C HS represents the investment cost of hydrogen storage tank, C CHP represents the investment cost of the combined heat and power unit, C TT represents the short-time scale thermal energy storage investment cost, C STT Represents the investment cost of thermal energy storage over a long time scale.

[0015] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the objective function of equipment maintenance cost is expressed as follows:

[0016] f M =ξf I

[0017] Among them, f M represents the equipment maintenance cost, f I represents the equipment investment cost, ξ represents the equipment maintenance cost rate, which is the ratio of equipment maintenance cost to equipment investment cost.

[0018] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the objective function of the system operation cost is expressed as follows:

[0019] f O =min(C E +CH +C G +C WT +C PV +C W )

[0020] Among them, f O represents environmental cost, C E Represents the electricity purchase cost, C H represents the heat purchase cost, C G represents the gas purchase cost, C WT represents the penalty for wind curtailment, C PV Indicates the penalty for abandoning all items, C W Represents the emission cost of tiered carbon trading.

[0021] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the short-time scale thermal energy storage model is expressed as follows:

[0022]

[0023] in, represents the energy storage of the short-time-scale thermal energy storage numbered i at the next moment (t+1), represents the energy storage capacity of the short-time scale thermal energy storage numbered i at the current time t, η TT,c represents the charging efficiency of thermal energy storage in short time scale, represents the charging power of the short-time-scale thermal energy storage numbered i at the current time t, represents the energy release power of the short-time scale thermal energy storage numbered i at the current time t, η TT,d represents the energy release efficiency of thermal energy storage in a short time scale, represents the charging state of the short-time-scale thermal energy storage numbered i at the current time t, represents the maximum ratio of the charging power of the short-time-scale thermal energy storage numbered i to the maximum stored energy, represents the maximum storage energy of thermal energy storage in a short time scale, represents the energy release state of the short-time scale thermal energy storage numbered i at the current time t, It represents the maximum ratio of the energy release power of the short-time scale thermal energy storage numbered i to the maximum energy storage energy, represents the minimum storage energy of short-time-scale thermal energy storage, represents the initial storage energy of short-time-scale thermal energy storage, represents the final storage energy of short-time-scale thermal energy storage, η TT,l It represents the short-time scale thermal energy storage self-consumption rate, and Δt represents the interval period.

[0024] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the long-time scale thermal energy storage model is expressed as follows:

[0025]

[0026] in, represents the energy storage capacity of the long-term thermal energy storage at time t of the next typical day (y+1), represents the energy storage capacity of the long-term thermal energy storage at time t on the current typical day y, η STT,c represents the charging efficiency of thermal energy storage over a long time scale, represents the charging power of the long-time scale thermal energy storage at time t on the current typical day y, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, η STT,d represents the energy release efficiency of thermal energy storage over a long time scale, represents the charging state of the long-time scale thermal energy storage at time t on the current typical day y, τ STT,c represents the maximum ratio of the charging power of thermal energy storage over a long time scale to the maximum stored energy, represents the maximum storage energy of thermal energy storage over a long time scale, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, represents the energy release state of the long-term thermal energy storage at time t on the current typical day y, τ STT,d It represents the maximum ratio of the energy release power of thermal energy storage over a long time scale to the maximum energy storage capacity, represents the minimum storage energy of thermal energy storage over a long time scale, represents the initial storage energy of long-time-scale thermal energy storage, Represents the final stored energy of thermal energy storage over a long time scale.

[0027] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the model processing considering short-time scale uncertainty is as follows:

[0028] The output fluctuations of wind power and photovoltaic units and the load fluctuations of electricity, heat and gas networks are uncertain. The actual values ​​of the output of wind power and photovoltaic units and the load of electricity, heat and gas networks are expressed as predicted values ​​and predicted error values ​​as follows:

[0029]

[0030] in, represents the actual power value of number i at the current time t, represents the power prediction value of number i at the current time t, represents the power prediction error value of number i at the current time t;

[0031] According to the central limit theorem, the prediction error value follows a normal distribution with a mean of 0, and its standard deviation is expressed as:

[0032]

[0033] Among them, k N represents the installed capacity factor, k S Indicates the output coefficient, k L represents the load factor, represents the standard deviation of the output power prediction error value of number i at the current time t, represents the output power prediction error value of the current time t number i, P S,N Indicates installed capacity, represents the standard deviation of the load power forecast error value of number i at the current time t, Indicates the load power prediction error value of the load number i at the current time t;

[0034] The power balance expressions of the three energy buses of electricity, heat and gas in the integrated energy system are listed as follows:

[0035]

[0036] in, represents the actual value of the electric load number i at the current time t, represents the net electric load of number i at the current time t, Indicates the actual output value of the fan number i at the current time t, represents the abandoned wind power of number i at the current time t, Indicates the actual value of the photovoltaic output of number i at the current time t, represents the abandoned optical power of number i at the current time t, represents the charging power of the battery number i at the current time t, represents the discharge power of the battery numbered i at the current time t, represents the output power of the cogeneration unit numbered i at the current time t, It represents the actual value of heat load number i at time t on the current typical day y. represents the net heat load of number i at time t on the current typical day y, It represents the thermal power output of the cogeneration unit number i at time t on the current typical day y, represents the short-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the short-time scale thermal energy storage power released at time t number i on the current typical day y, represents the long-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the long-term thermal energy storage power released at time t number i on the current typical day y, Indicates the actual value of the gas load number i at the current time t, represents the net gas load of number i at the current time t, represents the charging power of the hydrogen storage tank numbered i at the current time t, represents the energy release power of the hydrogen storage tank numbered i at the current time t, represents the air intake of the cogeneration unit number i at the current time t, q G Indicates the calorific value of hydrogen-mixed natural gas;

[0037] The power balance expression is expressed as a chance constraint model as follows:

[0038]

[0039] in, represents the electric load prediction error value of number i at the current time t, represents the output prediction error value of the fan number i at the current time t, represents the photovoltaic output prediction error value of number i at the current time t, represents the predicted value of the electric load of number i at the current time t, represents the predicted output value of the fan number i at the current time t, represents the predicted value of photovoltaic output of number i at the current time t, It represents the heat load forecast error value of number i at time t on the current typical day y. It represents the predicted heat load value of number i at time t on the current typical day y. represents the gas load forecast error value of number i at the current time t, represents the gas load forecast value of number i at the current time t, α E , α H , α G They are the given electric bus confidence, thermal bus confidence, and gas bus confidence respectively;

[0040] set up

[0041]

[0042] Among them, Z E , Z H , Z G They are the probability parameters of the electric bus, the thermal bus, and the gas bus, respectively. According to the given confidence α E , α H , α G, obtained by the inverse function of the normal distribution probability function;

[0043] The opportunity constraint model is transformed into the following constraints:

[0044]

[0045] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the model processing considering long time scale uncertainty is as follows:

[0046] The fuzzy equation is written as follows:

[0047]

[0048] Among them, the symbol Indicates fuzzy relationships;

[0049] make

[0050]

[0051] Among them, π i,y,t The fuzzy variable representing the number i at time t on the previous typical day y;

[0052] The triangular membership function is selected to characterize the fuzzy set as follows:

[0053]

[0054] Among them, F represents the fuzzy membership function, δ i,y,t It represents the maximum allowable value of the prediction error of number i at time t on the current typical day y.

[0055] As a further optimization scheme of the integrated energy system planning method considering multi-time scale uncertainty described in the present invention, the transformation of the multi-objective optimization problem to the single-objective optimization problem is as follows:

[0056] The overall objective function of the system is expressed as a fuzzy membership function as follows:

[0057] f S =f I +f M +f O

[0058]

[0059] Among them, f F Represents the total objective function in the form of fuzzy membership function, f S,- 、f S,+ Respectively represent f S The minimum and maximum acceptable values, f Srepresents the total planning cost;

[0060] The weighted satisfaction index method is used to realize the transformation from multiple objectives to a single objective, and the new objective function is expressed as follows:

[0061]

[0062] a1+a2=1

[0063] Wherein, a1 and a2 represent the first to second weighting coefficients respectively, Represents the overall minimum membership of the two objectives.

[0064] Compared with the prior art, the present invention adopts the above technical solution and has the following technical effects:

[0065] (1) The present invention constructs a hydrogen-containing integrated energy system architecture, establishes three objective functions and sets constraints, respectively uses stochastic optimization and fuzzy optimization methods to process models that consider short-time scale uncertainty and long-time scale uncertainty, constructs a low-carbon planning model for a hydrogen-containing integrated energy system that considers multi-time scale uncertainty, transforms the multi-objective optimization problem into a single-objective optimization problem and solves it by using a weighted satisfaction index method, performs low-carbon planning on the equipment in the system, and enables each device to adjust its configuration plan according to the low-carbon planning results, thereby promoting efficient utilization of thermal energy and economically optimal operation;

[0066] (2) Compared with short-term thermal energy storage such as heat storage tanks, which can smooth out short-term heat load fluctuations in the system within a shorter scheduling cycle, long-term thermal energy storage such as underground hot water storage tanks can smooth out seasonal heat load fluctuations in the system within a longer scheduling cycle, targeting the state where the heat load in the system is low in summer and high in winter. The synergy of the two can achieve a better effect of smoothing heat load fluctuations, thereby promoting the efficient use of thermal energy;

[0067] (3) At present, the establishment of uncertainty models mainly starts from the two aspects of fuzziness and randomness. The multi-time scale uncertainty model of the present invention is composed of models considering short-time scale uncertainty and long-time scale uncertainty. The construction of the short-time scale uncertainty model is based on randomness, and the construction of the long-time scale uncertainty model is based on fuzziness. The synergy of the two can better describe uncertainty. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 This is a flow chart of the low-carbon planning method of the present invention;

[0069] Figure 2 This is a schematic diagram of the operating architecture of the hydrogen-containing integrated energy system of the present invention;

[0070] Figure 3 The following is a topology diagram of the example system. DETAILED DESCRIPTION

[0071] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0072] like Figure 1 , Figure 2 As shown, the present invention is a comprehensive energy system planning method considering multi-time scale uncertainty, and the steps include:

[0073] Step 1: Establish a low-carbon operation framework for a hydrogen-based integrated energy system that takes into account multi-time scale uncertainties; see Figure 2 The low-carbon operation architecture of the hydrogen-containing integrated energy system that considers multi-time scale uncertainties includes the upper power grid, wind turbine units, photovoltaic units, batteries, electric loads, electric hydrogen production units, hydrogen storage tanks, natural gas sources, gas loads, cogeneration units, heat sources, heat loads, thermal energy storage, and carbon trading markets.

[0074] Step 2: Establish the objective function of low-carbon planning for hydrogen-containing integrated energy systems; the objective function includes three modules, namely equipment investment cost, equipment maintenance cost and system operation cost.

[0075] The objective function of equipment investment cost is expressed as follows:

[0076]

[0077] Among them, f I represents the equipment investment cost, i' represents the equipment interest rate, ε represents the equipment life, C BT Represents the battery investment cost, C ED represents the investment cost of the electric hydrogen production unit, C HS represents the investment cost of hydrogen storage tank, C CHP represents the investment cost of the combined heat and power unit, C TT represents the short-time scale thermal energy storage investment cost, C STT Indicates the investment cost of thermal energy storage over a long time scale. The short time in the present invention refers to a dispatching cycle of one day; the long time refers to a dispatching cycle of one year.

[0078] The objective function of equipment maintenance cost is expressed as follows:

[0079] f M =ξf I

[0080] Among them, f M represents the equipment maintenance cost, f I represents the equipment investment cost, ξ represents the equipment maintenance cost rate, which is the ratio of equipment maintenance cost to equipment investment cost.

[0081] The objective function of the system operation cost is expressed as follows:

[0082] f O =min(C E +C H +C G +C WT +C PV +C W )

[0083] Among them, f O represents environmental cost, C E Represents the electricity purchase cost, C H represents the heat purchase cost, C G represents the gas purchase cost, C WT represents the penalty for wind curtailment, C PV Indicates the penalty for abandoning all items, C W Represents the emission cost of tiered carbon trading.

[0084] Step 3: Set the constraints for the low-carbon planning of the hydrogen-containing integrated energy system; the constraints include power grid network constraints, heat network constraints, mixed hydrogen natural gas network constraints, electric bus power balance constraints, heat bus power balance constraints, gas bus power balance constraints, electric hydrogen production unit model constraints, hydrogen storage tank model constraints, mixed hydrogen natural gas pipeline model constraints, step-by-step carbon trading mechanism constraints, thermal energy storage model constraints, cogeneration unit model constraints, and battery model constraints; thermal energy storage model constraints include short-time scale thermal energy storage model and long-time scale thermal energy storage model.

[0085] Short-time scale thermal energy storage such as heat storage tanks can smooth the thermal load fluctuations in the system within a shorter scheduling cycle. The short-time scale thermal energy storage model is expressed as follows:

[0086]

[0087] in, represents the energy storage of the short-time-scale thermal energy storage numbered i at the next moment (t+1), represents the energy storage capacity of the short-time scale thermal energy storage numbered i at the current time t, η TT,c represents the charging efficiency of thermal energy storage in short time scale, represents the charging power of the short-time-scale thermal energy storage numbered i at the current time t, represents the energy release power of the short-time scale thermal energy storage numbered i at the current time t, η TT,d represents the energy release efficiency of thermal energy storage in a short time scale, represents the charging state of the short-time-scale thermal energy storage numbered i at the current time t, represents the maximum ratio of the charging power of the short-time-scale thermal energy storage numbered i to the maximum stored energy, represents the maximum storage energy of thermal energy storage in a short time scale, represents the energy release state of the short-time scale thermal energy storage numbered i at the current time t, It represents the maximum ratio of the energy release power of the short-time scale thermal energy storage numbered i to the maximum energy storage energy, represents the minimum storage energy of short-time-scale thermal energy storage, represents the initial storage energy of short-time-scale thermal energy storage, represents the final storage energy of short-time-scale thermal energy storage, η TT,l It represents the short-time scale thermal energy storage self-consumption rate, and Δt represents the interval period.

[0088] Long-time-scale thermal energy storage such as underground hot water storage tanks can, within a longer scheduling cycle, target the state in which the thermal load in the system is low in summer and high in winter, and smooth out seasonal thermal load fluctuations in the system. The long-time-scale thermal energy storage proposed in the present invention is different from the short-time-scale thermal energy storage that uses one day as the scheduling cycle, but uses one year as the scheduling cycle, thereby achieving a better effect of smoothing load fluctuations. At the same time, since the charging and discharging state of long-time-scale thermal energy storage changes less than that of short-time-scale thermal energy storage, the present invention sets the charging and discharging state of long-time-scale thermal energy storage to remain unchanged within the same day. In order to facilitate statistical calculations, the same type of time periods are divided according to the charging and discharging state of long-time-scale thermal energy storage, and the time series aggregation method is used to process them. Since the charging and discharging state of long-time-scale thermal energy storage remains unchanged within the same type of time period, and the energy storage energy increases or decreases monotonically, when the initial energy storage energy of the same type of time period meets the upper and lower limit constraints, the energy storage energy at each moment in the time period meets the upper and lower limit constraints. The long-time-scale thermal energy storage model is expressed as follows:

[0089]

[0090] in, represents the energy storage capacity of the long-term thermal energy storage at time t of the next typical day (y+1), represents the energy storage capacity of the long-term thermal energy storage at time t on the current typical day y, η STT,c represents the charging efficiency of thermal energy storage over a long time scale, represents the charging power of the long-time scale thermal energy storage at time t on the current typical day y, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, η STT,d represents the energy release efficiency of thermal energy storage over a long time scale, represents the charging state of the long-time scale thermal energy storage at time t on the current typical day y, τ STT,c represents the maximum ratio of the charging power of thermal energy storage over a long time scale to the maximum stored energy, represents the maximum storage energy of thermal energy storage over a long time scale, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, represents the energy release state of the long-term thermal energy storage at time t on the current typical day y, τ STT,d It represents the maximum ratio of the energy release power of thermal energy storage over a long time scale to the maximum energy storage capacity, represents the minimum storage energy of thermal energy storage over a long time scale, represents the initial storage energy of long-time-scale thermal energy storage, Represents the final stored energy of thermal energy storage over a long time scale.

[0091] In addition, the power grid network constraints, heat network constraints, mixed hydrogen natural gas network constraints, electric bus power balance constraints, heat bus power balance constraints, gas bus power balance constraints, electric hydrogen production unit model constraints, hydrogen storage tank model constraints, mixed hydrogen natural gas pipeline model constraints, tiered carbon trading mechanism constraints, cogeneration unit model constraints, and battery model constraints are existing mature models and will not be elaborated here.

[0092] Step 4: Combine the planning framework, objective function and constraints of the hydrogen-containing integrated energy system, and use stochastic optimization and fuzzy optimization methods to process the models considering short-time scale uncertainty and long-time scale uncertainty (planning model considering short-time scale heat load uncertainty and planning model considering long-time scale heat load uncertainty), respectively, to build a low-carbon planning model for the hydrogen-containing integrated energy system considering multi-time scale uncertainty, and transform the multi-objective optimization problem into a single-objective optimization problem through the weighted satisfaction index method and solve it; adjust the configuration plan of the hydrogen-containing integrated energy system according to the planning results.

[0093] The model treatment considering short time scale uncertainties is as follows:

[0094] The output fluctuations of wind power and photovoltaic units and the load fluctuations of electricity, heat and gas networks are uncertain. Their actual values ​​can be expressed as predicted values ​​and predicted error values ​​as follows:

[0095]

[0096] in, represents the actual power value of number i at the current time t, represents the power prediction value of number i at the current time t, Represents the power prediction error value of number i at the current time t.

[0097] According to the central limit theorem, the prediction error value follows a normal distribution with a mean of 0, and its standard deviation can be expressed as:

[0098]

[0099] Among them, k N represents the installed capacity factor, k S Indicates the output coefficient, k L represents the load factor, represents the standard deviation of the output power prediction error value of number i at the current time t, represents the output power prediction error value of the current time t number i, P S,N Indicates installed capacity, represents the standard deviation of the load power forecast error value of number i at the current time t, represents the load power prediction error value of the load number i at the current time t; take k N =0.02; take k S =0.2; take k L =0.03.

[0100] The power balance expressions of the three energy buses of electricity, heat and gas in the integrated energy system are listed as follows:

[0101]

[0102] in, represents the actual value of the electric load number i at the current time t, represents the net electric load of number i at the current time t, Indicates the actual output value of the fan number i at the current time t, represents the abandoned wind power of number i at the current time t, Indicates the actual value of the photovoltaic output of number i at the current time t, represents the abandoned optical power of number i at the current time t, represents the charging power of the battery number i at the current time t, represents the discharge power of the battery numbered i at the current time t, represents the output power of the cogeneration unit numbered i at the current time t, It represents the actual value of heat load number i at time t on the current typical day y. represents the net heat load of number i at time t on the current typical day y, It represents the thermal power output of the cogeneration unit number i at time t on the current typical day y, represents the short-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the short-time scale thermal energy storage power released at time t number i on the current typical day y, represents the long-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the long-term thermal energy storage power released at time t number i on the current typical day y, Indicates the actual value of the gas load number i at the current time t, represents the net gas load of number i at the current time t, represents the charging power of the hydrogen storage tank numbered i at the current time t, represents the energy release power of the hydrogen storage tank numbered i at the current time t, represents the air intake of the cogeneration unit number i at the current time t, q G Indicates the calorific value of hydrogen-mixed natural gas.

[0103] The power balance expression is expressed as a chance constraint model as follows:

[0104]

[0105] in, represents the electric load prediction error value of number i at the current time t, represents the output prediction error value of the fan number i at the current time t, represents the photovoltaic output prediction error value of number i at the current time t, represents the predicted value of the electric load of number i at the current time t, represents the predicted output value of the fan number i at the current time t, represents the predicted value of photovoltaic output of number i at the current time t, It represents the heat load forecast error value of number i at time t on the current typical day y. It represents the predicted heat load value of number i at time t on the current typical day y. represents the gas load forecast error value of number i at the current time t, represents the gas load forecast value of number i at the current time t, α E , α H , α G They are the given electric bus confidence, thermal bus confidence, and gas bus confidence respectively.

[0106] set up

[0107]

[0108] Among them, Z E , Z H , Z G They are the probability parameters of the electric bus, the thermal bus, and the gas bus, respectively. According to the given confidence α E , α H , α G , obtained by the inverse function of the normal distribution probability function.

[0109] Then the opportunity constraint model can be transformed into the following constraints:

[0110]

[0111] The model treatment considering long time scale uncertainties is as follows:

[0112] The fuzzy equation is written as follows:

[0113]

[0114] Among them, the symbol Indicates fuzzy relationships;

[0115] make

[0116]

[0117] Among them, π i,y,t The fuzzy variable representing the number i at time t on the previous typical day y;

[0118] The triangular membership function is selected to characterize the fuzzy set as follows:

[0119]

[0120] Among them, F represents the fuzzy membership function, δ i,y,t It represents the maximum allowable value of the prediction error of number i at time t on the current typical day y.

[0121] The transformation of multi-objective optimization problem to single-objective optimization problem is as follows:

[0122] The overall objective function of the system is expressed as a fuzzy membership function as follows:

[0123] f S =f I +f M +f O

[0124]

[0125] Among them, f F Represents the total objective function in the form of fuzzy membership function, f S,- 、f S,+ Respectively represent f S The minimum and maximum acceptable values, f S represents the total planning cost;

[0126] The weighted satisfaction index method is used to realize the transformation from multiple objectives to a single objective, and the new objective function is expressed as follows:

[0127]

[0128] a1+a2=1

[0129] Among them, a1 and a2 represent the first to second weighting coefficients, respectively, indicating the importance attached to the uncertainty of short time scale and the uncertainty of long time scale. Represents the overall minimum membership of the two objectives.

[0130] The present invention attaches equal importance to the uncertainty of multiple time scales, that is, taking a1 = a2 = 0.5, so a symmetric method can be used, and

[0131]

[0132] The present invention is introduced below with an example:

[0133] Example system topology Figure 3 As shown. In the example system, the carbon flow traded in the carbon trading market comes from the power generation and heat generation of the coal-fired units and the combined heat and power units of the upper power grid; the upper power grid interacts with the E1 node of the distribution network; the natural gas source interacts with the G1 node of the gas distribution network; the heat source interacts with the T1 node of the heat distribution network; the photovoltaic station is built at the E3 node of the distribution network; the wind farm is built at the E6 node of the distribution network; the battery is installed at the E2 node of the distribution network; the electric hydrogen production equipment is installed at the E2 node of the distribution network and connected to the G1 node of the gas distribution network; the combined heat and power unit is installed at the G2 node of the gas distribution network and connected to the E2 node of the distribution network and the H1 node of the heat distribution network; the hydrogen storage tank is installed on the branch road where the electric hydrogen production equipment connects to the G1 node of the gas distribution network; the short-time scale thermal energy storage and the long-time scale thermal energy storage equipment are installed at the T1 node.

[0134] Based on the steps of the present invention, modeling and optimization are performed, and the minimum membership value is shown in Table 1:

[0135] Table 1 Minimum membership values

[0136]

[0137] The present invention constructs a hydrogen-containing integrated energy system architecture, establishes three objective functions and sets constraints, adopts stochastic optimization and fuzzy optimization methods to process the models considering short-time scale uncertainty and long-time scale uncertainty respectively, constructs a low-carbon planning model for a hydrogen-containing integrated energy system considering multi-time scale uncertainty, transforms the multi-objective optimization problem into a single-objective optimization problem and solves it through the weighted satisfaction index method, conducts low-carbon planning for the equipment in the system, and enables each device to adjust its configuration plan according to the low-carbon planning results, thereby achieving efficient utilization of thermal energy and economically optimal operation.

[0138] The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by a technician familiar with the technical field within the technical scope disclosed by the present invention should be covered by the protection scope of the present invention.

Claims

1. An integrated energy system planning approach considering multi-time scale uncertainties, It is characterized in that The details are as follows: Step 1: Establish a low-carbon operation framework for a hydrogen-based integrated energy system that takes into account multi-time scale uncertainties; Step 2: Establish an objective function for low-carbon planning of a hydrogen-containing integrated energy system, which includes equipment investment cost, equipment maintenance cost, and system operation cost; Step 3, set the constraints of low-carbon planning of hydrogen-containing integrated energy system; the constraints include power grid network constraints, heat network constraints, mixed hydrogen natural gas network constraints, electric bus power balance constraints, heat bus power balance constraints, gas bus power balance constraints, electric hydrogen production unit model constraints, hydrogen storage tank model constraints, mixed hydrogen natural gas pipeline model constraints, tiered carbon trading mechanism constraints, thermal energy storage model constraints, cogeneration unit model constraints and battery model constraints; Step 4: Combine the planning framework, objective function and constraints of the hydrogen-containing integrated energy system, adopt stochastic optimization and fuzzy optimization methods to process the models considering short-time scale uncertainty and long-time scale uncertainty respectively, build a low-carbon planning model for the hydrogen-containing integrated energy system considering multi-time scale uncertainty, transform the multi-objective optimization problem into a single-objective optimization problem through the weighted satisfaction index method and solve the planning results; adjust the configuration plan of the hydrogen-containing integrated energy system according to the planning results.

2. According to claim 1, a comprehensive energy system planning method considering multi-time scale uncertainty, It is characterized in that Thermal energy storage model constraints include short-time scale thermal energy storage model and long-time scale thermal energy storage model.

3. According to the method for comprehensive energy system planning considering multi-time scale uncertainty of claim 1, It is characterized in that The objective function of equipment investment cost is expressed as follows: Among them, f I represents the equipment investment cost, i' represents the equipment interest rate, ε represents the equipment life, C BT Represents the battery investment cost, C ED represents the investment cost of the electric hydrogen production unit, C HS represents the investment cost of hydrogen storage tank, C CHP represents the investment cost of the combined heat and power unit, C TT represents the short-time scale thermal energy storage investment cost, C STT Represents the investment cost of thermal energy storage on a long time scale.

4. According to claim 1, a comprehensive energy system planning method considering multi-time scale uncertainty, It is characterized in that The objective function of equipment maintenance cost is expressed as follows: f M =ξf I Among them, f M represents the equipment maintenance cost, f I represents the equipment investment cost, ξ represents the equipment maintenance cost rate, which is the ratio of equipment maintenance cost to equipment investment cost.

5. According to claim 1, a comprehensive energy system planning method considering multi-time scale uncertainty, It is characterized in that The objective function of the system operation cost is expressed as follows: Among them, f O represents environmental cost, C E represents the electricity purchase cost, C H represents the heat purchase cost, C G represents the gas purchase cost, C WT represents the penalty for wind curtailment, C PV Indicates the penalty for abandoning all items, C W Represents the emission cost of tiered carbon trading.

6. A comprehensive energy system planning method considering multi-time scale uncertainty according to claim 2, It is characterized in that The short-time scale thermal energy storage model is expressed as follows: in, represents the energy storage of the short-time-scale thermal energy storage numbered i at the next moment (t+1), represents the energy storage capacity of the short-time scale thermal energy storage numbered i at the current time t, η TT,c represents the charging efficiency of thermal energy storage in short time scale, represents the charging power of the short-time-scale thermal energy storage numbered i at the current time t, represents the energy release power of the short-time scale thermal energy storage numbered i at the current time t, η TT,d represents the energy release efficiency of thermal energy storage in a short time scale, represents the charging state of the short-time-scale thermal energy storage numbered i at the current time t, represents the maximum ratio of the charging power of the short-time-scale thermal energy storage numbered i to the maximum stored energy, represents the maximum storage energy of thermal energy storage in a short time scale, represents the energy release state of the short-time scale thermal energy storage numbered i at the current time t, It represents the maximum ratio of the energy release power of the short-time scale thermal energy storage numbered i to the maximum energy storage energy, represents the minimum storage energy of short-time-scale thermal energy storage, represents the initial storage energy of short-time-scale thermal energy storage, represents the final storage energy of short-time-scale thermal energy storage, η TT,l It represents the short-time scale thermal energy storage self-consumption rate, and Δt represents the interval period.

7. A comprehensive energy system planning method considering multi-time scale uncertainty according to claim 2, It is characterized in that The long-time scale thermal energy storage model is expressed as follows: in, represents the energy storage capacity of the long-term thermal energy storage at time t of the next typical day (y+1), represents the energy storage capacity of the long-term thermal energy storage at time t on the current typical day y, η STT,c represents the charging efficiency of thermal energy storage over a long time scale, represents the charging power of the long-time scale thermal energy storage at time t on the current typical day y, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, η STT,d represents the energy release efficiency of thermal energy storage over a long time scale, represents the charging state of the long-time scale thermal energy storage at time t on the current typical day y, η STT,c represents the maximum ratio of the charging power of thermal energy storage over a long time scale to the maximum stored energy, represents the maximum storage energy of thermal energy storage over a long time scale, represents the energy release power of the long-term thermal energy storage at time t on the current typical day y, represents the energy release state of the long-term thermal energy storage at time t on the current typical day y, η STT,d It represents the maximum ratio of the energy release power of thermal energy storage over a long time scale to the maximum energy storage capacity, represents the minimum storage energy of thermal energy storage over a long time scale, represents the initial storage energy of long-time-scale thermal energy storage, Represents the final stored energy of thermal energy storage over a long time scale.

8. According to claim 1, a comprehensive energy system planning method considering multi-time scale uncertainty, It is characterized in that The model treatment considering short time scale uncertainties is as follows: The output fluctuations of wind power and photovoltaic units and the load fluctuations of electricity, heat and gas networks are uncertain. The actual values ​​of the output of wind power and photovoltaic units and the load of electricity, heat and gas networks are expressed as predicted values ​​and predicted error values ​​as follows: in, represents the actual power value of number i at the current time t, represents the power prediction value of number i at the current time t, represents the power prediction error value of number i at the current time t; According to the central limit theorem, the prediction error value follows a normal distribution with a mean of 0, and its standard deviation is expressed as: Among them, k N represents the installed capacity factor, k S Indicates the output coefficient, k L represents the load factor, represents the standard deviation of the output power prediction error value of number i at the current time t, represents the output power prediction error value of the current time t number i, P S,N Indicates installed capacity, represents the standard deviation of the load power forecast error value of number i at the current time t, Indicates the load power prediction error value of the load number i at the current time t; The power balance expressions of the three energy buses of electricity, heat and gas in the integrated energy system are listed as follows: in, represents the actual value of the electric load number i at the current time t, represents the net electric load of number i at the current time t, Indicates the actual output value of the fan number i at the current time t, represents the abandoned wind power of number i at the current time t, Indicates the actual value of the photovoltaic output of number i at the current time t, represents the abandoned optical power of number i at the current time t, represents the charging power of the battery number i at the current time t, represents the discharge power of the battery numbered i at the current time t, represents the output power of the cogeneration unit numbered i at the current time t, It represents the actual value of heat load number i at time t on the current typical day y. represents the net heat load of number i at time t on the current typical day y, It represents the thermal power output of the cogeneration unit number i at time t on the current typical day y, represents the short-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the short-time scale thermal energy storage power released at time t number i on the current typical day y, represents the long-time scale thermal energy storage charging power at time t number i on the current typical day y, represents the long-term thermal energy storage power released at time t number i on the current typical day y, Indicates the actual value of the gas load number i at the current time t, represents the net gas load of number i at the current time t, represents the charging power of the hydrogen storage tank numbered i at the current time t, represents the energy release power of the hydrogen storage tank numbered i at the current time t, represents the air intake of the cogeneration unit number i at the current time t, q G Indicates the calorific value of hydrogen-mixed natural gas; The power balance expression is expressed as a chance constraint model as follows: in, represents the electric load prediction error value of number i at the current time t, represents the output prediction error value of the fan number i at the current time t, represents the photovoltaic output prediction error value of number i at the current time t, represents the predicted value of the electric load of number i at the current time t, represents the predicted output value of the fan number i at the current time t, represents the predicted value of photovoltaic output of number i at the current time t, It represents the heat load forecast error value of number i at time t on the current typical day y. It represents the predicted heat load value of number i at time t on the current typical day y. represents the gas load forecast error value of number i at the current time t, represents the gas load forecast value of number i at the current time t, α E , α H , α G They are the given electric bus confidence, thermal bus confidence, and gas bus confidence respectively; set up Among them, Z E , Z H , Z G They are the probability parameters of the electric bus, the thermal bus, and the gas bus, respectively. According to the given confidence α E , α H , α G , obtained by the inverse function of the normal distribution probability function; The opportunity constraint model is transformed into the following constraints:

9. The method for integrated energy system planning considering multi-time scale uncertainties according to claim 1, It is characterized in that The model treatment considering long time scale uncertainties is as follows: The fuzzy equation is written as follows: Among them, the symbol Indicates fuzzy relationships; make Among them, π i,y,t The fuzzy variable representing the number i at time t on the previous typical day y; The triangular membership function is selected to characterize the fuzzy set as follows: Among them, F represents the fuzzy membership function, δ i,y,t It represents the maximum allowable value of the prediction error of number i at time t on the current typical day y.

10. A method for integrated energy system planning considering multi-time scale uncertainty according to claim 1, It is characterized in that The transformation of multi-objective optimization problem to single-objective optimization problem is as follows: The overall objective function of the system is expressed as a fuzzy membership function as follows: f S =f I +f M +f O Among them, f F Represents the total objective function in the form of fuzzy membership function, f S,- 、f S,+ Respectively represent f S The minimum and maximum acceptable values, f S represents the total planning cost; The weighted satisfaction index method is used to realize the transformation from multiple objectives to a single objective, and the new objective function is expressed as follows: a 1 +a 2 =1 Among them, a 1 、a 2 Represent the first to second weighting coefficients respectively, Represents the overall minimum membership of the two objectives.