Pressure steel pipe butt joint device
By designing structures such as sliding plates, cone covers and hydraulic rods, the precise alignment and stable connection of pressure steel pipes are achieved, solving the problems of inaccurate alignment and poor sealing in traditional docking methods, and improving construction efficiency and structural stability.
Patent Information
- Application Number
- CN202411524165.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional pressure steel pipe docking method has problems such as inaccurate alignment, poor sealing, time-consuming and labor-intensive, resulting in leakage and structural instability.
A pressure steel pipe docking device including a base, butt centering component and docking stable component is designed, and the docking device is achieved by using structures such as sliding plates, cone covers, hydraulic rods, fixed cones, pull plates, wedge blocks and locking cones. The precise alignment and firm connection ensure horizontal and vertical alignment and sealing effect during docking.
It improves the accuracy and efficiency of butt, reduces the risk of poor sealing and leakage, ensures the uniform stress and structural stability of the pressure tube, and extends the service life of the connection.
Smart Images

Figure CN119036367A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tabletop equipment, in particular to a pressure steel pipe docking device. Background Art
[0002] Penstock, also known as hydraulic pipe, is a steel pipe used to transport water at extremely high pressure. The inside of the steel pipe is a closed environment, and the intensity of the water flow can be controlled by switching on or off sluice gates or fences. In the construction of water conservancy projects, penstock is an important water supply and drainage facility, and its connection quality is directly related to the safe operation and service life of the water conservancy project.
[0003] At present, the traditional method of docking pressure steel pipes has shortcomings. When docking pressure steel pipes, due to the heavy pipe body, it is necessary to manually lift and carry out docking, which is time-consuming and labor-intensive. It may be necessary to adjust the position of the pipeline docking interface multiple times, which is time-consuming and labor-intensive. As a result, when the two pipe bodies are docked, it is difficult to accurately align the two steel pipes to be docked in the horizontal and vertical directions, which can easily lead to misalignment at the docking point and leakage at the docking point. Summary of the invention
[0004] The technical problem to be solved by the present invention is: to provide a pressure steel pipe docking device, which can make the two pressure pipes to be docked more accurately aligned in the horizontal and vertical directions, reduce the problem of poor sealing caused by misalignment, and the construction personnel can quickly adjust the pressure pipe to a suitable docking position by moving the centering structure, saving the time of repeated measurement and adjustment in traditional methods, and improving the adaptability and efficiency of construction. Good centering can make the pressure pipe after docking more uniformly stressed, reduce local stress concentration, improve the stability of the entire structure, ensure the sealing effect of the connection between the two pressure pipes, and avoid leakage. Track-guided docking is used during docking, which can provide a clear moving path for the pressure pipe, ensuring that the two pressure pipes can accurately move along the established direction during the docking process, thereby achieving high-precision alignment.
[0005] The technical solution adopted by the present invention to solve the technical problem is: a pressure steel pipe docking device, comprising a base and a pressure pipe arranged on the surface of the base; It also includes a docking centering component installed on the surface of the base, which includes a sliding plate symmetrically arranged on the surface of the base, a cone cover fixedly installed on the surface of the sliding plate, and a fixed cone fixedly installed on the surface of the pressure pipe.
[0006] Furthermore, an L-shaped connecting slide plate is fixedly installed on the bottom surface of the sliding plate of the present invention, a strip groove matching the L-shaped connecting slide plate is provided on the surface of the base, an inclined hole is provided on one end of the L-shaped connecting slide plate extending to the bottom of the base, a U-shaped mounting frame is fixedly installed on the bottom of the base, a hydraulic rod is installed on the surface of the U-shaped mounting frame, a lifting plate is fixed to the piston end of the hydraulic rod, an inclined rod is fixed on the bottom surface of the lifting plate, and the inclined rod is slidably connected in the inclined hole.
[0007] Furthermore, a square rod is fixed to the bottom surface of the sliding plate of the present invention, a slide rail matching the square rod is provided on the surface of the base, and the sliding plate is slidably connected to the surface of the base through the square rod and the slide rail.
[0008] Furthermore, the present invention also includes a docking and stabilizing assembly installed at the end of the pressure pipe, the docking and stabilizing assembly includes a fixed cone sleeve fixedly installed on the outside of one end of the pressure pipe and a plurality of L-shaped fixing plates fixedly installed in a ring-shaped distribution on the outside of the other end of the pressure pipe, the surface of the L-shaped fixing plate is threadedly connected with a locking bolt, one end of the locking bolt is rotatably connected to a U-shaped connecting frame, one end of the U-shaped connecting frame is fixedly installed with a wedge block, a pull plate is fixedly installed on one side of the fixed cone sleeve, and the surface of the pull plate is provided with a locking wedge groove compatible with the wedge block.
[0009] Furthermore, the surface of the flange at one end of the pressure tube of the present invention is provided with a through groove compatible with multiple pull plates, and the surface of the U-shaped connecting frame is integrally formed with a guide rod, which is slidably connected to the surface of the L-shaped fixing plate.
[0010] Furthermore, a sealing gasket is embedded in the annular groove formed on one side of the fixed cone sleeve of the present invention.
[0011] Furthermore, a locking cone ring matched with the fixed cone sleeve is fixedly installed at one end of the U-shaped connecting frame of the present invention.
[0012] The beneficial effects of the present invention are that the defects existing in the background technology are solved. 1. By setting up the coordinated use of structures such as the jacking plate, the inclined rod, the sliding plate, the slide rail and the fixed cone, during the pre-docking, on the one hand, the two pressure pipes to be docked can be driven to move to the side close to each other, which is convenient for the subsequent docking. On the other hand, the fixed cone can slide in the cone cover, so that the docking surfaces of the two pressure pipes to be docked can be aligned when in contact, so that the two pressure pipes to be docked can be more accurately aligned in the horizontal and vertical directions, reducing the problem of poor sealing caused by misalignment. The construction personnel can quickly adjust the pressure pipe to the appropriate docking position by moving the centering structure, saving the time of repeated measurement and adjustment in the traditional method, improving the adaptability and efficiency of the construction, and good centering can make the pressure pipe after docking more evenly stressed, reduce local stress concentration, and improve the stability of the entire structure; The use of track-guided docking during docking can provide a clear moving path for the pressure pipe, ensuring that the two pressure pipes can accurately move along the predetermined direction during the docking process, thereby achieving high-precision alignment.
[0013] 2. By setting up the coordinated use of structures such as the fixed cone sleeve, the pull plate, the U-shaped connecting frame, the wedge block, the locking wedge groove and the locking cone ring, when docking, the wedge block can slide into the locking wedge groove provided on the surface of the pull plate, and then the docked pressure pipe can be always pulled against each other, ensuring that the two pressure pipes are flush with each other without misalignment during docking, and always applying tension to the pull plate on one side of the docked pressure pipe to ensure that the connection between the two pressure pipes is stable and reliable, and when docking, the sealing gasket can also be squeezed and deformed to ensure the sealing effect of the connection between the two pressure pipes and avoid leakage; The locking cone ring simultaneously applies pressure to the fixed cone sleeve to ensure the relative tension of the two pressure pipes when they are butt-jointed, which can further improve the stability and reliability of the connection between the two pressure pipes. The relative tension can make the butt-jointed end faces of the two pressure pipes fit more closely together, reducing the butt-jointed gap, thereby improving the butt-jointed accuracy and reducing the risk of leakage during the use of the pipeline. The tension can help the pipeline to be better aligned in the horizontal and vertical directions to avoid misalignment, reduce error accumulation, and ensure the connection quality of the entire pipeline system. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 It is a schematic diagram of the structure of the fixed cone, the slide rail, the inclined rod and the inclined hole in the present invention; Figure 3 It is a schematic diagram of the structure of the L-shaped fixing plate and the fixing cone sleeve in the present invention; Figure 4 It is a schematic diagram of the structure of the fixed cone sleeve, the pull plate and the sealing gasket in the present invention; Figure 5It is a schematic diagram of the structure of the sealing gasket and the fixed cone sleeve in the present invention; Figure 6 For the present invention Figure 5 A schematic diagram of the structure enlargement at point A; In the figure: 1. Base; 11. Pressure pipe; 2. Docking centering assembly; 21. U-shaped mounting frame; 22. Hydraulic rod; 23. Lifting plate; 24. Diagonal rod; 25. L-shaped connecting slide plate; 26. Diagonal hole; 27. Sliding plate; 28. Slide rail; 29. Cone cover; 210. Fixed cone; 211. Square rod; 3. Docking and stabilizing components; 31. Fixing cone sleeve; 32. Pull plate; 33. Sealing gasket; 34. L-shaped fixing plate; 35. Locking bolt; 36. U-shaped connecting frame; 37. Guide rod; 38. Wedge block; 39. Locking wedge groove; 310. Locking cone ring. DETAILED DESCRIPTION
[0015] The present invention will now be described in further detail in conjunction with the accompanying drawings and preferred embodiments. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0016] like Figure 1-Figure 6 As shown; A pressure steel pipe docking device comprises a base 1 and a pressure pipe 11 arranged on the surface of the base 1; Specifically, Figure 1 and Figure 2 As shown: It also includes a docking centering component 2 mounted on the surface of the base 1; The docking centering assembly 2 includes a sliding plate 27 symmetrically arranged on the surface of the base 1 , a cone cover 29 fixedly mounted on the surface of the sliding plate 27 , and a fixed cone 210 fixedly mounted on the surface of the pressure pipe 11 .
[0017] To be more specific: a square rod 211 is fixed to the bottom surface of the sliding plate 27, a slide rail 28 matching the square rod 211 is provided on the surface of the base 1, the sliding plate 27 is slidably connected to the surface of the base 1 through the square rod 211 and the slide rail 28, an L-shaped connecting slide plate 25 is fixedly installed on the bottom surface of the sliding plate 27, a strip groove matching the L-shaped connecting slide plate 25 is provided on the surface of the base 1, an inclined hole 26 is provided at one end of the L-shaped connecting slide plate 25 extending to the bottom of the base 1, a U-shaped mounting frame 21 is fixedly installed on the bottom of the base 1, a hydraulic rod 22 is installed on the surface of the U-shaped mounting frame 21, a lifting plate 23 is fixed to the piston end of the hydraulic rod 22, an inclined rod 24 is fixed to the bottom surface of the lifting plate 23, and the inclined rod 24 is slidably connected in the inclined hole 26.
[0018] In this embodiment: when using this kind of pressure steel pipe docking device for water conservancy projects, first, the two pressure pipes 11 to be docked are placed in the cone cover 29 respectively, so that the two pressure pipes 11 can be pre-aligned, and then the hydraulic rod 22 is controlled to extend, and then the lifting plate 23 installed at the piston end of the hydraulic rod 22 can drive the inclined rod 24 to move up synchronously. At this time, the inclined rod 24 can slide in the inclined hole 26 opened on the surface of the L-shaped connecting slide plate 25, and then the two L-shaped connecting slide plates 25 can be prompted to move to the side close to each other in the strip groove opened on the surface of the base 1 at the same time, and then the sliding plate 27 together with the cone cover 29 can follow the movement. When the cone cover 29 is connected with the fixed cone 210 fixedly installed on the surface of the pressure pipe 11, one side The surface can drive the two pressure pipes 11 to be connected to each other to move toward the side close to each other, which is convenient for subsequent connection. On the other hand, the fixed cone 210 can slide in the cone cover 29, so that the connection surfaces of the two pressure pipes 11 to be connected can be in an aligned state when in contact, so that the two pressure pipes 11 to be connected can be more accurately aligned in the horizontal and vertical directions, reducing the problem of poor sealing caused by misalignment. The construction personnel can quickly adjust the pressure pipe 11 to a suitable connection position by moving the centering structure, saving the time of repeated measurement and adjustment in the traditional method, improving the adaptability and efficiency of the construction, and good centering can make the pressure pipe 11 after connection more uniformly stressed, reduce local stress concentration, and improve the stability of the entire structure. The track-guided docking is used during docking, which can provide a clear moving path for the pressure pipe 11, ensuring that the two pressure pipes 11 can accurately move along a predetermined direction during the docking process, thereby achieving high-precision alignment; More specifically: Figure 1 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown: This embodiment is an improvement made on the basis of the previous embodiment, specifically: It also includes a docking and stabilizing component 3 installed at the end of the pressure pipe 11, the docking and stabilizing component 3 includes a fixed cone sleeve 31 fixedly installed on the outside of one end of the pressure pipe 11 and a plurality of L-shaped fixing plates 34 distributed in a ring and fixedly installed on the outside of the other end of the pressure pipe 11, the surface of the L-shaped fixing plate 34 is threadedly connected with a locking bolt 35, one end of the locking bolt 35 is rotatably connected to a U-shaped connecting frame 36, one end of the U-shaped connecting frame 36 is fixedly installed with a wedge block 38, a pull plate 32 is fixedly installed on one side of the fixed cone sleeve 31, and a locking wedge groove 39 adapted to the wedge block 38 is opened on the surface of the pull plate 32.
[0019] To go further: the surface of the flange at one end of the pressure tube 11 is provided with through grooves compatible with multiple pull plates 32, the surface of the U-shaped connecting frame 36 is integrally formed with a guide rod 37, the guide rod 37 is slidably connected to the surface of the L-shaped fixed plate 34, a sealing gasket 33 is embedded in the annular groove opened on one side of the fixed cone sleeve 31, and one end of the U-shaped connecting frame 36 is fixedly installed with a locking cone ring 310 compatible with the fixed cone sleeve 31.
[0020] In this embodiment: based on the above-mentioned embodiment, when the two pressure tubes 11 are moving and docking, the pull plate 32 fixedly installed on one side of the fixed cone sleeve 31 can slide out from the through groove on the flange surface of one end of the other pressure tube 11, and the locking bolts 35 are rotated in sequence, so that the locking bolts 35 push the corresponding U-shaped connecting frame 36 to drive the wedge block 38 to move to one side. As the wedge block 38 moves, the wedge block 38 can slide into the locking wedge groove 39 provided on the surface of the pull plate 32, and then the docked pressure tubes 11 can be always pulled against each other, ensuring that the two pressure tubes 11 are flush with each other without misalignment during docking, and always applying tension to the pull plate 32 on one side of the docked pressure tube 11, ensuring that the connection between the two pressure tubes 11 is stable and reliable, and when docking, the sealing gasket 33 can also be squeezed and deformed to ensure the sealing effect of the connection between the two pressure tubes 11; At the same time, a locking cone ring 310 is provided so that during the above-mentioned docking and locking, the U-shaped connecting frame 36 can also drive the locking cone ring 310 to move downward synchronously, so that the locking cone ring 310 can simultaneously apply pressure to the fixed cone sleeve 31, thereby ensuring the relative tension of the two pressure pipes 11 when docking, which can further improve the stability and reliability of the connection between the two pressure pipes 11. The relative tension can make the docking end faces of the two pressure pipes 11 fit more closely together, reducing the docking gap, thereby improving the docking accuracy and reducing the risk of leakage in the pipeline during use. The tension can help the pipeline to be better aligning in the horizontal and vertical directions to avoid misalignment, reduce error accumulation, and ensure the connection quality of the entire pipeline system.
[0021] The working principle and use process of the present invention are as follows: when using the pressure steel pipe docking device for water conservancy projects, firstly, the two pressure pipes 11 to be docked are placed in the cone cover 29 respectively, so that the two pressure pipes 11 can be pre-selected and pre-aligned, and then the hydraulic rod 22 is controlled to extend, and then the lifting plate 23 installed at the piston end of the hydraulic rod 22 can drive the inclined rod 24 to move up synchronously, at this time, the inclined rod 24 can slide in the inclined hole 26 opened on the surface of the L-shaped connecting slide plate 25, and then the two L-shaped connecting slide plates 25 can be simultaneously moved toward each other in the strip groove opened on the surface of the base 1. The sliding plate 27 and the cone cover 29 can move to the side close to each other, and then the sliding plate 27 and the cone cover 29 can follow the movement. When the cone cover 29 is connected with the fixed cone 210 fixedly installed on the surface of the pressure pipe 11, on the one hand, the two pressure pipes 11 to be connected can be driven to move to the side close to each other, which is convenient for subsequent connection. On the other hand, the fixed cone 210 can slide in the cone cover 29, so that the connection surfaces of the two pressure pipes 11 to be connected can be aligned when in contact, so that the two pressure pipes 11 to be connected can be more accurately aligned in the horizontal and vertical directions, reducing the damage caused by misalignment. In order to solve the problem of poor sealing, the construction personnel can quickly adjust the pressure pipe 11 to a suitable docking position by moving the centering structure, saving the time of repeated measurement and adjustment in the traditional method, improving the adaptability and efficiency of the construction, and good centering can make the pressure pipe 11 after docking more uniform, reduce local stress concentration, and improve the stability of the entire structure. When the two pressure pipes 11 are moving and docking, the pull plate 32 fixedly installed on one side of the fixed cone sleeve 31 can slide out of the through groove on the flange surface of one end of the other pressure pipe 11, and at the same time, the locking bolts 35 are rotated in sequence to make the locking bolts 35 tighten. The corresponding U-shaped connecting frame 36 is pushed to drive the wedge block 38 to move to one side. As the wedge block 38 moves, the wedge block 38 can slide into the locking wedge groove 39 provided on the surface of the pull plate 32, and then the pressure tube 11 to be connected can be always pulled against each other, ensuring that the two pressure tubes 11 are flush with each other without misalignment during connection, and always applying tension to the pull plate 32 on one side of the connected pressure tube 11, ensuring that the connection between the two pressure tubes 11 is stable and reliable, and when connecting, the sealing gasket 33 can be squeezed and deformed to ensure the sealing effect of the connection between the two pressure tubes 11; At the same time, a locking cone ring 310 is provided so that during the above-mentioned docking and locking, the U-shaped connecting frame 36 can also drive the locking cone ring 310 to move downward synchronously, so that the locking cone ring 310 can simultaneously apply pressure to the fixed cone sleeve 31, thereby ensuring the relative tension of the two pressure pipes 11 when docking, which can further improve the stability and reliability of the connection between the two pressure pipes 11. The relative tension can make the docking end faces of the two pressure pipes 11 fit more closely together, reducing the docking gap, thereby improving the docking accuracy and reducing the risk of leakage in the pipeline during use. The tension can help the pipeline to be better aligning in the horizontal and vertical directions to avoid misalignment, reduce error accumulation, and ensure the connection quality of the entire pipeline system.
[0022] The above description only describes the specific implementation mode of the present invention. Various examples do not limit the essential content of the present invention. After reading the description, ordinary technicians in the relevant technical field can modify or deform the specific implementation modes described above without departing from the essence and scope of the invention.
Claims
1. A pressure steel pipe docking device, comprising a base (1) and a pressure pipe (11) arranged on a surface of the base (1); Features: It also includes a docking centering component (2) mounted on the surface of the base (1), the docking centering component (2) including a sliding plate (27) symmetrically arranged on the surface of the base (1), a cone cover (29) fixedly mounted on the surface of the sliding plate (27), and a fixed cone (210) fixedly mounted on the surface of the pressure pipe (11); An L-shaped connecting slide plate (25) is fixedly mounted on the bottom surface of the sliding plate (27); a strip groove matching the L-shaped connecting slide plate (25) is provided on the surface of the base (1); an inclined hole (26) is provided at one end of the L-shaped connecting slide plate (25) extending to the bottom of the base (1); a U-shaped mounting frame (21) is fixedly mounted on the bottom of the base (1); a hydraulic rod (22) is mounted on the surface of the U-shaped mounting frame (21); a lifting plate (23) is fixedly mounted on the piston end of the hydraulic rod (22); an inclined rod (24) is fixedly mounted on the bottom surface of the lifting plate (23); and the inclined rod (24) is slidably connected in the inclined hole (26).
2. A pressure steel pipe docking device according to claim 1, Features: A square rod (211) is fixed to the bottom surface of the sliding plate (27), a sliding rail (28) matching the square rod (211) is provided on the surface of the base (1), and the sliding plate (27) is slidably connected to the surface of the base (1) via the square rod (211) and the sliding rail (28).
3. A pressure steel pipe docking device according to claim 1, Features: The device also comprises a docking and stabilizing assembly (3) mounted at the end of the pressure pipe (11), the docking and stabilizing assembly (3) comprising a fixed cone sleeve (31) fixedly mounted on the outside of one end of the pressure pipe (11) and a plurality of L-shaped fixing plates (34) fixedly mounted in an annular arrangement on the outside of the other end of the pressure pipe (11), a locking bolt (35) being threadedly connected to the surface of the L-shaped fixing plate (34), one end of the locking bolt (35) being rotatably connected to a U-shaped connecting frame (36), one end of the U-shaped connecting frame (36) being fixedly mounted with a wedge block (38), a pull plate (32) being fixedly mounted on one side of the fixed cone sleeve (31), and a locking wedge groove (39) matching the wedge block (38) being provided on the surface of the pull plate (32).
4. A pressure steel pipe docking device according to claim 3, Features: A through groove adapted to fit the plurality of pull plates (32) is formed on the surface of a flange at one end of the pressure pipe (11), and a guide rod (37) is integrally formed on the surface of the U-shaped connecting frame (36), wherein the guide rod (37) is slidably connected to the surface of the L-shaped fixing plate (34).
5. A pressure steel pipe butt joint device according to claim 3, Features: A sealing gasket (33) is embedded in an annular groove formed on one side of the fixed cone sleeve (31).
6. A pressure steel pipe docking device according to claim 3, Features: A locking cone ring (310) adapted to the fixed cone sleeve (31) is fixedly mounted on one end of the U-shaped connecting frame (36).
Citation Information
Patent Citations
Quick connect coupling
CA3077457A1
Support hanger with synchronous clamping function and using method
CN114198571A
Steel pipe column butt joint positioning device
CN116591487A
Water conservancy pipeline connecting device for water conservancy project
CN215522384U
Micro-jet composite PE pipe
CN215635670U
