Steel structure assembly type formwork assembly structure and assembly method thereof
By designing the assembled formwork structure of steel structures, using abutment, formwork and automated propulsion mechanism, the problems of single specifications and low efficiency of existing formwork are solved, and efficient production and quality control of multi-specified components are achieved.
Patent Information
- Application Number
- CN202311819561.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Most of the existing prefabricated templates are single specifications, which cannot meet the production needs of components of multiple specifications. In addition, assembly relies on manual operation, is inefficient and cannot effectively control product quality.
A steel structure assembled formwork structure is designed, including a base, symmetrical first and second formwork, matching horizontal propulsion mechanism, sealing member and sealing mechanism. Through flexible splicing and automated propulsion of these components, the Production of multi-spec components and reduce manual operation.
It realizes flexible production of various specification components, improves work efficiency and product standards, reduces manual operation processes, and improves work efficiency and product quality.
Smart Images

Figure CN119036610A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of template assembly, and in particular to a steel structure assembled template assembly structure and an assembly method thereof. Background Art
[0002] Prefabricated structure is the abbreviation of prefabricated concrete structure, which is a concrete structure formed by assembling and connecting prefabricated components as the main load-bearing components. Prefabricated reinforced concrete structure is one of the important directions of building structure development. It is conducive to the development of building industrialization, improving production efficiency and saving energy, developing green and environmentally friendly buildings, and is conducive to improving and ensuring the quality of construction projects. Compared with cast-in-place construction methods, prefabricated structures are more in line with the requirements of green construction such as land saving, energy saving, material saving, water saving and environmental protection, and reduce the negative impact on the environment, including reducing noise, preventing dust, reducing environmental pollution, clean transportation, reducing site interference, saving water, electricity, materials and other resources and energy.
[0003] Currently, components are produced by prefabricated formwork, but most of the existing formwork is of a single specification and cannot meet the production needs of components of various specifications. In addition, the assembly of existing formwork relies heavily on manual operation, which is inefficient and cannot effectively control product quality.
[0004] Therefore, in order to solve such problems, we proposed a steel structure prefabricated formwork assembly structure and an assembly method thereof. Summary of the invention
[0005] The purpose of the present invention is to solve the shortcomings existing in the prior art and to propose a steel structure assembled formwork assembly structure and an assembly method thereof.
[0006] In order to achieve the above object, the present invention adopts the following technical solutions:
[0007] The steel structure prefabricated formwork assembly structure comprises a base, wherein two first formworks are symmetrically arranged on the upper side of the base, and two second formworks are symmetrically arranged on the upper side of the base, and a horizontal propulsion mechanism matching the first formwork is arranged on the side of the base, and a plurality of first notches are equidistantly arranged on the top of the first formwork, and a plurality of second notches are equidistantly arranged on the top of the second formwork, and a plurality of openings are also equidistantly arranged on the bottom of the second formwork, and the plurality of openings and the plurality of second notches are staggered, and the second formwork is embedded and assembled with the first notches of the first formwork through the openings, and the two second formworks can be assembled and enclosed with the two first formworks and leave a gap for injecting concrete, and the plurality of first notches and the plurality of second notches are used for matching and erecting steel meshes;
[0008] The first template is matched with a sealing piece for sealing a plurality of first slots, and the second template is provided with a sealing mechanism for sealing a plurality of second slots and a plurality of openings. Two extendable and lowerable trusses are symmetrically provided above the base, and a rectangular frame is slidingly matched between the two trusses. Two cross bars are symmetrically slidably provided on the rectangular frame, and a plurality of mounting mechanisms are detachably provided on the cross bars.
[0009] Preferably, a base plate is horizontally provided at the bottom of the base, a plurality of telescopic springs are installed between the base plate and the base, and a plurality of vibration motors for vibrating the base plate are matched and installed between the base plate.
[0010] Preferably, the horizontal propulsion mechanism comprises a first horizontal electric push rod fixed to the side of the base through a first bracket, and the telescopic end of the first horizontal electric push rod is detachably fixedly connected to the corresponding first template.
[0011] Preferably, the sealing member comprises a rectangular bar which is of the same length as the first template and can be abutted and plugged to match, and a plurality of first sealing blocks are detachably fixed to the bottom of the rectangular bar, and the plurality of first sealing blocks can be respectively inserted into and sealed with a plurality of first slots, and a notch matching the steel bar of the steel mesh is provided at the bottom of the first sealing block.
[0012] Preferably, the sealing mechanism includes a pressure plate strip and a second horizontal electric push rod for horizontally pushing the pressure plate strip to move; a plurality of second sealing blocks are detachably fixed to the bottom of the pressure plate strip, and a notch matching the steel bars of the steel mesh is also provided at the bottom of the second sealing block; the plurality of second sealing blocks can be respectively inserted into the plurality of second slots for sealing and matching; a plurality of third sealing blocks are detachably fixed to the bottom of the pressure plate strip, and the plurality of third sealing blocks can be horizontally inserted into the plurality of openings; a lifting electric rod for controlling the lifting and lowering of the second horizontal electric push rod is vertically provided below the second horizontal electric push rod.
[0013] Preferably, both ends of the truss are respectively provided with vertically arranged oil cylinders, and the telescopic ends of the oil cylinders are fixedly connected to the truss.
[0014] Preferably, driving motors for driving movement are installed on both sides of the rectangular frame.
[0015] Preferably, bidirectional screws are horizontally rotatably installed on both sides of the upper side of the rectangular frame, and a servo motor for controlling the rotation of the bidirectional screw is fixedly installed on the rectangular frame, and the two ends of the two cross bars are respectively matched with the two bidirectional screw spiral sleeves.
[0016] Preferably, the mounting mechanism comprises a steel plate, the cross bar is provided with a T-shaped slot, the steel plate is fixedly mounted with the T-shaped slot of the cross bar by means of a T-shaped block and a butterfly nut, the steel plate is provided with a vertical section, and a number of hook holes are equidistantly provided on the vertical section, the hook holes can be fitted with a fixing block, the fixing block and the steel plate are fixed by bolts, a U-shaped frame is fixed to one side of the fixing block, screws are threaded through both ends of the U-shaped frame, and arc-shaped clamping blocks are fixed to the opposite ends of the two screws.
[0017] A method for assembling a steel structure assembled formwork, the method comprising the following steps:
[0018] Step 1: Synchronously start the two first horizontal electric push rods to push the two first templates to a set distance respectively, and then splice the second template onto the two first templates according to the set specifications;
[0019] Step 2: placing the steel mesh into the gap enclosed by the two second templates and the two first templates, and setting the steel bars around the steel mesh in the first slots and the second slots respectively;
[0020] Step three: insert the two sealing pieces into the two first templates respectively to seal the first slots, and then start the two second horizontal electric push rods synchronously so that the second sealing blocks are matched with the second slots respectively, and the third sealing blocks are matched with the openings respectively, and the assembly is completed.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] 1: In the present invention, by providing two first templates and two second templates that can be flexibly spliced, and providing a blocking piece for blocking a plurality of first notches of the first template, and a blocking mechanism for blocking a plurality of second notches and a plurality of openings of the second template, and providing a horizontal pushing mechanism for pushing the two first templates, the effect of flexible splicing can be effectively achieved, and the production requirements for components of various specifications can be effectively met. At the same time, the manual operation process can be effectively reduced, and the work efficiency and product standards can be effectively improved.
[0023] 2: The present invention can conveniently disassemble the two first templates and the two second templates, effectively improving work efficiency.
[0024] 3: In the present invention, by providing two trusses, a rectangular frame and two cross bars, a variety of flexible carrying operations as well as sorting and cleaning operations can be achieved, thereby effectively improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 is an axonometric view of the present invention;
[0026] Figure 2 for Figure 1 A partial enlarged view of the middle A;
[0027] Figure 3 It is a schematic diagram of the structure after the two pressing strips of the present invention are moved to the side;
[0028] Figure 4 It is a schematic diagram of the structure after two rectangular strips of the present invention are separated;
[0029] Figure 5 for Figure 4 A partial enlarged view of point B in the middle;
[0030] Figure 6 It is a front view of the present invention;
[0031] Figure 7 It is a schematic structural diagram of two trusses of the present invention;
[0032] Figure 8 It is a structural schematic diagram of a rectangular frame of the present invention;
[0033] Fig. 9 It is a schematic structural diagram of the steel plate of the present invention.
[0034] In the figure: 1. base; 2. first template; 3. second template; 4. first notch; 5. second notch; 6. opening; 7. steel mesh; 8. truss; 9. rectangular frame; 10. cross bar; 11. first horizontal electric push rod; 12. rectangular bar; 13. first blocking block; 14. pressure plate bar; 15. second horizontal electric push rod; 16. second blocking block; 17. third blocking block; 18. lifting electric rod; 19. oil cylinder; 20. steel plate; 21. hook hole; 22. fixing block; 23. U-shaped frame; 24. bidirectional screw rod. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0036] Reference Figure 1-9The steel structure prefabricated template assembly structure includes a base 1, two first templates 2 are symmetrically arranged on the upper side of the base 1, two second templates 3 are symmetrically arranged on the upper side of the base 1, and a horizontal propulsion mechanism matching the first template 2 is arranged on the side of the base 1, that is, each of the two first templates 2 is provided with a corresponding horizontal propulsion mechanism. The two first templates 2 are arranged relatively to each other, and the corresponding horizontal propulsion mechanisms can accurately drive the two first templates 2 to move respectively, so as to realize the approach and separation movement of the two first templates 2, and the staff can flexibly set the spacing according to the production specification requirements. The bottoms of the two first templates 2 are in contact with the surface of the base 1. A plurality of first notches 4 are equidistantly arranged on the top of the first template 2, and a plurality of second notches 5 are equidistantly arranged on the top of the second template 3, and the bottom of the second template 3 is in contact with the surface of the base 1. The openings of the first notch 4 and the second notch 5 are both facing upward. A plurality of openings 6 are also equidistantly arranged on the bottom of the second template 3, and the openings of the plurality of openings 6 are facing downward. The plurality of openings 6 and the plurality of second notches 5 are staggered, the second template 3 is embedded and assembled with the first notch 4 of the first template 2 through the opening 6, the two second templates 3 can be assembled and enclosed with the two first templates 2 and leave a gap for injecting concrete, the plurality of first notches 4 and the plurality of second notches 5 are used to match and set up the steel mesh 7, and the production of the component is completed after the concrete and the steel mesh 7 are combined and solidified, and the component is a common building floor or wall;
[0037] The first template 2 is matched with a plugging piece for plugging a plurality of first slots 4, and the second template 3 is provided with a plugging mechanism for plugging a plurality of second slots 5 and a plurality of openings 6. Two trusses 8 that can be extended and lowered are symmetrically provided above the base 1, and a rectangular frame 9 is slidably matched between the two trusses 8. A plurality of existing infrared position sensors can be installed around the rectangular frame 9, which can be used to measure the size standards of the production components. Two cross bars 10 are symmetrically slidably provided on the rectangular frame 9, and a plurality of installation mechanisms can be detachably provided on the cross bars 10. A plurality of installation mechanisms can be provided, and the installation mechanisms can be installed with existing vacuum pipes, existing spray pipes, existing concrete delivery pipes, etc.
[0038] As a technical optimization solution of the present invention, a base plate is horizontally provided at the bottom of the base 1, a plurality of telescopic springs are installed between the base plate and the base 1, and a plurality of vibration motors for vibrating the base 1 are matched and installed between the base 1 and the base plate, and the base 1 can be vibrated by the vibration motor.
[0039] As a technical optimization solution of the present invention, the horizontal propulsion mechanism includes a first horizontal electric push rod 11 fixed to the side of the base 1 through a first bracket, and the first bracket is fixed to the ground.
[0040] The telescopic end of the first horizontal electric push rod 11 is detachably fixedly connected to the corresponding first template 2 .
[0041] The first horizontal electric push rod 11 can accurately control the horizontal movement of the first template 2.
[0042] As a technical optimization solution of the present invention, the plugging member includes a rectangular bar 12 that is equal in length to the first template 2 and can be plugged in and matched. A plurality of first plugging blocks 13 are detachably fixed at the bottom of the rectangular bar 12. The first plugging blocks 13 are made of rubber or silicone. The first plugging blocks 13 are fixed to the rectangular bar 12 by screws, and the rectangular bar 12 is provided with screw holes. A plurality of first plugging blocks 13 can be respectively inserted into and plugged with a plurality of first slots 4, and a notch matching the steel bars of the steel mesh 7 is provided at the bottom of the first plugging block 13. The specifications of the first plugging block 13 are completely matched with the bottom of the first slot 4, and the notch can ensure effective plugging of the steel bars, so that the gap is smaller.
[0043] As a technical optimization solution of the present invention, the blocking mechanism includes a pressure plate strip 14 and a second horizontal electric push rod 15 for horizontally pushing the pressure plate strip 14 to move. A plurality of second blocking blocks 16 are detachably fixed at the bottom of the pressure plate strip 14, and a notch matching the steel bars of the steel mesh 7 is also provided at the bottom of the second blocking block 16. The second blocking block 16 is made of rubber or silicone, and the second blocking block 16 is fixed by screws. A plurality of second blocking blocks 16 can be respectively inserted into and blocked with a plurality of second slots 5, and the specifications of the second blocking blocks 16 are completely matched and fitted with the bottom of the second slots 5, and the notch can ensure effective fitting of the steel bars to make the gap smaller. A plurality of third blocking blocks 17 are detachably fixed at the bottom of the pressure plate strip 14, and the third blocking blocks 17 are fixed by screws. A plurality of third blocking blocks 17 can be horizontally inserted into a plurality of openings 6, and a lifting electric rod 18 for controlling the lifting of the second horizontal electric push rod 15 is vertically provided below the second horizontal electric push rod 15, and the lifting electric rod 18 is fixed to the ground through a second bracket. The two lifting electric rods 18 can respectively drive the two second horizontal electric push rods 15 to perform precise lifting.
[0044] As a technical optimization solution of the present invention, vertically arranged oil cylinders 19 are provided at both ends of the truss 8, and the telescopic ends of the oil cylinders 19 are fixedly connected to the truss 8. Synchronously starting the four oil cylinders 19 can accurately control the synchronous lifting and moving of the two trusses 8.
[0045] As a technical optimization solution of the present invention, driving motors for driving movement are installed on both sides of the rectangular frame 9. That is, racks are fixed on the sides of the two trusses 8, and the two driving motors fixed on the sides of the rectangular frame 9 are coaxially driven with gears, and the two gears are meshed with the two racks. The rectangular frame 9 can move accurately.
[0046] As a technical optimization solution of the present invention, both sides of the upper side of the rectangular frame 9 are horizontally rotatably installed with bidirectional screws 24, and a servo motor for controlling the rotation of the bidirectional screws 24 is fixedly installed on the rectangular frame 9, that is, each of the two bidirectional screws 24 corresponds to a servo motor, and the servo motor can perform precise control operations. The two ends of the two cross bars 10 are respectively matched with the spiral sleeves of the two bidirectional screws 24. The bidirectional screw 24 is made on a screw with two sections of threads with different rotation directions, that is, one section of right-handed thread and one section of left-handed thread. The two cross bars 10 screwed on the two bidirectional screws 24 can move towards or away from each other when the two bidirectional screws 24 rotate.
[0047] As a technical optimization solution of the present invention, the installation mechanism includes a steel plate 20, and the cross bar 10 is provided with a T-shaped slot. The steel plate 20 is fixedly installed with the T-shaped slot of the cross bar 10 through a T-shaped block and a butterfly nut, that is, the steel plate 20 is rotatably connected with the T-shaped block, and the T-shaped block can be inserted into the T-shaped slide and rotate and slide to fit. The T-shaped slide is provided with a screw threaded with a butterfly nut. By tightening the butterfly nut, the T-shaped block can be clamped and fixed on the T-shaped slot, that is, the steel plate 20 is fixed to the cross bar 10. The steel plate 20 is provided with a vertical section, and a plurality of hook holes 21 are equidistantly provided on the vertical section. The hook holes 21 can be fitted with a fixed block 22. The fixed block 22 is fixed to the steel plate 20 by bolts. The setting of a plurality of hook holes 21 facilitates the hook setting at multiple heights, or the fixed setting of the fixed block 22 at multiple heights. A U-shaped frame 23 is fixed to one side of the fixing block 22, and screws are threaded through both ends of the U-shaped frame 23. Arc-shaped clamping blocks are fixed to the opposite ends of the two screws. Through the self-locking effect of the movement of the screws, the two arc-shaped clamping blocks can clamp and fix objects between them, that is, clamp and fix existing vacuum pipes, existing spray pipes, existing concrete conveying pipes, etc.
[0048] The steel structure prefabricated formwork assembly method comprises the following steps:
[0049] Step 1: Synchronously start the two first horizontal electric push rods 11 to push the two first templates 2 to a set distance respectively, and then splice the second template 3 onto the two first templates 2 according to the set specifications;
[0050] Step 2: Place the steel mesh 7 into the gap enclosed by the two second templates 3 and the two first templates 2, and the steel bars around the steel mesh 7 are respectively arranged in the first slots 4 and the second slots 5;
[0051] Step three: insert two sealing pieces into the two first templates 2 respectively to seal the first slots 4, and then synchronously start the two second horizontal electric push rods 15, so that the second sealing blocks 16 are respectively sealed and matched with the second slots 5, and the third sealing blocks 17 are respectively sealed and matched with the openings 6, and the assembly is completed.
[0052] When the present invention is in use, two first horizontal electric push rods 11 are started synchronously to push the two first templates 2 to the set distance respectively, and the bottoms of the two first templates 2 are effectively fitted with the surface of the base 1. Then, according to the set specifications, the second template 3 is spliced and set on the two first templates 2, that is, the corresponding opening 6 of the second template 3 is embedded in the first notch 4 of the first template 2. At this time, the top height of the first template 2 is flush with the top height of the second template 3, and the bottom of the second template 3 is fitted with the surface of the base 1. The steel mesh 7 is placed in the gap surrounded by the two second templates 3 and the two first templates 2. The steel bars around the steel mesh 7 are respectively set in a plurality of first notches 4 and a plurality of second notches 5. The specifications of the steel bars are completely matched and fitted with the bottoms of the first notches 4 and the second notches 5, and the gap is small. Two rectangular bars 12 are plugged and set on the two first templates 2, so that a plurality of first blocking blocks 13 are respectively inserted and blocked with a plurality of first notches 4, and the two first blocking blocks 13 corresponding to the positions of the two second templates 3 can be disassembled and removed in advance. Then, the two second horizontal electric push rods 15 are started synchronously, the bottom of the pressure plate strip 14 is fitted with the top of the rectangular strip 12, and the second horizontal electric push rods 15 push and drive a number of second blocking blocks 16 to match with a number of second notches 5 respectively, and a number of third blocking blocks 17 to match with a number of openings 6 respectively, and the third blocking blocks 17 are horizontally inserted into the openings 6 for blocking. Finally, the assembly of the template is completed. During the assembly process, the manual operation process is effectively reduced, and the staff can flexibly set the spacing between the two first templates 2 and the spacing between the two second templates 3 according to the production specification requirements, so as to achieve the effect of flexible splicing, and finally meet the production of components of various specifications, and effectively improve work efficiency.
[0053] In the above operation, after the third blocking block 17 is inserted into the opening 6, it can cooperate with the second blocking block 16 to effectively clamp and fix the corresponding second template 3, that is, the two pressure strips 14 effectively fix the two second templates 3, and then effectively fix the two first templates 2, which can ensure that the two second templates 3 and the two first templates 2 are tightly fitted with the surface of the base 1. At the same time, when disassembling the second template 3, the two lifting electric rods 18 can be started synchronously, and the two lifting electric rods 18 respectively drive the two second horizontal electric push rods 15 to rise in height, thereby driving the two pressure strips 14 to rise. When the two pressure strips 14 rise, due to the insertion of several third blocking blocks 17 into the opening 6, the pressure strip 14 can rise and be hooked up by the third blocking block 17 and bring up the second template 3, and at the same time, the rectangular strip 12 between the second template 3 and the pressure strip 14 is lifted up. At this time, the two first templates 2 remain stationary, and finally the two second templates 3 are disassembled and separated from the two first templates 2. After the solidification and forming of the component is completed, the two second templates 3 can be lifted and disassembled first, and the two second horizontal electric push rods 15 are retracted to move the two second templates 3 to the edge of the base 1, and then the two first horizontal electric push rods 11 drive the two first templates 2 to move to the edge of the base 1. At this time, the component is in the middle of the base 1 and can be moved.
[0054] When placing the steel mesh 7, the four corners of the steel mesh 7 can be hooked by four hook locks, and then the hook locks are hooked and fixed to the four hook holes 21, that is, the hook holes 21 on the four steel plates 20 that are pre-installed. The two cross bars 10 can be adjusted in spacing according to the size to ensure the best hook lock lifting angle. Then the four cylinders 19 are started synchronously, so that the two trusses 8 rise synchronously to lift the steel mesh 7. Then the rectangular frame 9 drives the steel mesh 7 to move precisely above the base 1 through the action of the driving motor. At this time, the two trusses 8 are controlled to descend synchronously, and the staff can adjust and correctly place the steel mesh 7.
[0055] When pouring concrete, the concrete delivery pipe used for concrete pouring can be first fixed to the U-shaped frame 23 of the installation mechanism, that is, the concrete delivery pipe is clamped by two arc-shaped clamps on the U-shaped frame 23. Two concrete delivery pipes can be set and clamped on two cross bars 10, that is, two installation mechanisms on the two cross bars 10. During the concrete pouring process, two servo motors can be started to drive the two bidirectional screws 24 to rotate synchronously, so that the two cross bars 10 continuously move toward and away from each other. Before this, the rectangular frame 9 moves the two concrete delivery pipes to the edge of the gap enclosed by the two second templates 3 and the two first templates 2, that is, the leftmost side. After that, when pouring concrete, the rectangular frame 9 is controlled to move at a uniform speed from left to right, so as to achieve uniform pouring of concrete and uniform distribution of feed. After pouring, the base 1 is vibrated by a vibration motor to quickly discharge bubbles in the concrete.
[0056] At the same time, after the casting of the component is completed, the component can also be sorted and maintained, that is, a spray head is installed on the mounting mechanism of the two cross bars 10 to spray water, and then the rectangular frame 9 and the two cross bars 10 are moved to achieve the effect of uniform water spraying. At the same time, before pouring concrete, a spray head can be installed on the mounting mechanism of the two cross bars 10 to spray the water-based release agent, that is, the rectangular frame 9 and the two cross bars 10 are moved to achieve the effect of uniform spraying. And when the base 1 vibrates to discharge bubbles, a stick can be installed on the mounting mechanism of the two cross bars 10, and then the rectangular frame 9 and the two cross bars 10 are moved, and the lifting of the two trusses 8 can be used to stir and tamp the concrete to accelerate the discharge of bubbles. After the production of the component is completed, after the component is transported out of the base 1, a dust suction pipe or a brush can be installed on the mounting mechanism of the two cross bars 10, and the surface of the base 1 can be cleaned by moving the rectangular frame 9 and the two cross bars 10. The above operation effectively reduces labor and effectively improves work efficiency.
[0057] At the same time, in the transportation of components, four hook locks can be used to hook the four corners of the component, that is, the part of the steel mesh 7 that extends out of the component, and then the hook locks are hooked and fixed to the four hook holes 21 respectively, that is, the hook holes 21 on the four steel plates 20 that are pre-installed. The two cross bars 10 can be adjusted according to the size to ensure the best hook lock lifting angle. Then the four cylinders 19 are started synchronously, so that the two trusses 8 rise synchronously to lift the component. After that, the rectangular frame 9 drives the component to move accurately to the side of the base 1 through the action of the driving motor, and finally put it down on the pallet, completing the transportation of the component. The setting of the truss 8, the rectangular frame 9 and the cross bar 10 can achieve rich and flexible operating effects and effectively improve work efficiency.
[0058] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A steel structure prefabricated formwork assembly structure, comprising a base (1), characterized in that: Two first templates (2) are symmetrically arranged on the upper side of the base (1), and two second templates (3) are symmetrically arranged on the upper side of the base (1). A horizontal propulsion mechanism matching the first template (2) is arranged on the side of the base (1). A plurality of first notches (4) are equidistantly arranged on the top of the first template (2), and a plurality of second notches (5) are equidistantly arranged on the top of the second template (3). A plurality of openings (6) are also equidistantly arranged on the bottom of the second template (3). The plurality of openings (6) and the plurality of second notches (5) are staggered. The second template (3) is embedded and assembled with the first notches (4) of the first template (2) through the openings (6). The two second templates (3) can be assembled and enclosed with the two first templates (2) and leave a gap for injecting concrete. The plurality of first notches (4) and the plurality of second notches (5) are used to match and set up a steel mesh (7). The first template (2) is matched with a sealing member for sealing a plurality of first slots (4), the second template (3) is provided with a sealing mechanism for sealing a plurality of second slots (5) and a plurality of openings (6), two trusses (8) that can be extended and lowered are symmetrically provided above the base (1), a rectangular frame (9) is slidably matched between the two trusses (8), two cross bars (10) are symmetrically slidably provided on the rectangular frame (9), and a plurality of mounting mechanisms are detachably provided on the cross bars (10).
2. The steel structure prefabricated formwork assembly structure according to claim 1 is characterized in that: A base plate is horizontally arranged at the bottom of the base (1), a plurality of telescopic springs are installed between the base plate and the base (1), and a plurality of vibration motors for vibrating the base (1) are matched and installed between the base (1) and the base plate.
3. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: The horizontal propulsion mechanism comprises a first horizontal electric push rod (11) fixed to the side of the base (1) via a first bracket, and the telescopic end of the first horizontal electric push rod (11) is detachably fixedly connected to the corresponding first template (2).
4. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: The blocking member comprises a rectangular bar (12) of equal length to the first template (2) and capable of being plugged in and matched with each other; a plurality of first blocking blocks (13) are detachably fixed at the bottom of the rectangular bar (12); the plurality of first blocking blocks (13) can be respectively inserted into and blocked with a plurality of first slots (4); and a notch matching the steel bars of the steel mesh (7) is provided at the bottom of the first blocking block (13).
5. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: The blocking mechanism comprises a pressure plate strip (14) and a second horizontal electric push rod (15) for horizontally pushing the pressure plate strip (14). A plurality of second blocking blocks (16) are detachably fixed at the bottom of the pressure plate strip (14), and a notch matching the steel bars of the steel mesh (7) is also provided at the bottom of the second blocking block (16). The plurality of second blocking blocks (16) can be respectively inserted into the plurality of second slots (5) for blocking. A plurality of third blocking blocks (17) are detachably fixed at the bottom of the pressure plate strip (14), and the plurality of third blocking blocks (17) can be horizontally inserted into the plurality of openings (6). A lifting electric rod (18) for controlling the lifting of the second horizontal electric push rod (15) is vertically provided below the second horizontal electric push rod (15).
6. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: Both ends of the truss (8) are correspondingly provided with a vertically arranged oil cylinder (19), and the telescopic end of the oil cylinder (19) is fixedly connected to the truss (8).
7. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: Driving motors for driving movement are installed on both sides of the rectangular frame (9).
8. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: Both sides of the upper side of the rectangular frame (9) are horizontally rotatably mounted with bidirectional screw rods (24), and a servo motor for controlling the rotation of the bidirectional screw rods (24) is fixedly mounted on the rectangular frame (9), and the two ends of the two cross bars (10) are respectively matched with the two bidirectional screw rods (24) in a spiral sleeve arrangement.
9. The steel structure prefabricated formwork assembly structure according to claim 1, characterized in that: The installation mechanism comprises a steel plate (20), a cross bar (10) provided with a T-shaped slot, the steel plate (20) being fixedly installed by cooperating with the T-shaped slot of the cross bar (10) through a T-shaped block and a butterfly nut, the steel plate (20) being provided with a vertical section, and a plurality of hook holes (21) being equidistantly provided on the vertical section, the hook holes (21) being capable of being fitted with a fixed block (22), the fixed block (22) being fixed to the steel plate (20) by bolts, a U-shaped frame (23) being fixed on one side of the fixed block (22), screw rods being threaded through both ends of the U-shaped frame (23), and arc-shaped clamping blocks being fixed on opposite ends of the two screw rods.
10. A method for assembling a steel structure prefabricated formwork, comprising the steel structure prefabricated formwork assembly structure as claimed in any one of claims 1 to 9, characterized in that: The assembly method comprises the following steps: Step 1: Synchronously start the two first horizontal electric push rods (11) to push the two first templates (2) to a set distance respectively, and then splice the second template (3) onto the two first templates (2) according to the set specifications; Step 2: placing the steel mesh (7) in the gap enclosed by the two second templates (3) and the two first templates (2), and the steel bars around the steel mesh (7) are respectively arranged in the first notches (4) and the second notches (5); Step three: insert two sealing parts into the two first templates (2) respectively to seal the first slots (4), and then synchronously start the two second horizontal electric push rods (15) so that the second sealing blocks (16) are respectively sealed and matched with the second slots (5), and the third sealing blocks (17) are respectively sealed and matched with the openings (6), thus completing the assembly.
Citation Information
Patent Citations
Automatic production line for track plates for railway
CN111186012A
Intelligent production line and method for preparing temporary road bearing plate from recycled concrete
CN116533374A
Hanging regulation support for lifting hoist
CN204201415U
Adjustable prefabricated part mold
CN213499892U
Prefabricated part manufacturing mold
CN215790614U
