Rapid roadway tunneling method based on shield type tunneling machine
By using a shield-type excavator machine in tunnel excavation combined with a permanent support system and a shield-type temporary support system, parallel excavation, support and anchor operations are realized in the excavation work surface, and the slow excavation speed and geological in the existing technology are solved. The high requirements for conditions have significantly improved the efficiency and safety of excavation.
Patent Information
- Application Number
- CN202411154110.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing tunnel excavation equipment cannot effectively solve the problems of slow excavation speed and high geological conditions, especially the inability to achieve parallel excavation, support and anchor operations on the excavation work surface, resulting in unsatisfactory excavation efficiency.
The shield-type excavator is combined with the permanent support system and the shield-type temporary support system. Through the organic combination of the excavator, drilling anchor unit and shield unit transfer device, the excavation, support and anchor parallel operation of the excavation working face is realized. , using retractable top beam, hydraulic pillar, side support drive mechanism and support resistance warning unit, dynamically adjust the spacing between shield units and the scope of temporary support areas to ensure stability and reliability.
It significantly improves the tunnel excavation speed, improves the excavation efficiency, ensures the safety of excavation operations and production reliability, adapts to different geological conditions, reduces the operation process, and improves construction efficiency.
Smart Images

Figure CN119041922A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel excavation, and in particular relates to a tunnel rapid excavation method based on a shield type tunnel boring machine. Background Art
[0002] The production process of coal in my country is mainly underground mining. With the promotion and popularization of comprehensive mechanized mining technology, comprehensive mechanized coal mining has become the main coal mining method at present. The annual tunnel excavation length of my country's coal mines exceeds 13,000 km, ranking first in the world, but it still cannot meet the production and construction requirements. The development of comprehensive mining technology and equipment has led to an exponential increase in the intensity of mine mining and a continuous increase in production capacity, resulting in coal mines facing the problem of tight mining and excavation succession. Therefore, improving the efficiency of tunnel excavation is of great significance to the production of coal mines.
[0003] At present, there are three types of mechanized tunneling processes mainly based on tunneling machines: ① cantilever tunneling machine and single anchor drilling rig supporting operation line; ② continuous coal mining machine and anchor drilling vehicle supporting operation line; ③ integrated tunneling of digging and anchoring by digging and anchoring unit. The supporting operation line of cantilever tunneling machine and single anchor drilling rig is the most widely used due to its good adaptability, but the tunneling speed is slow. The supporting operation line of continuous coal mining machine and anchor drilling vehicle requires cross-transfer construction, which has high requirements for geological conditions. It has only been promoted and applied to a limited extent in some mining areas of Shendong and Yulin in my country. The integrated tunneling of digging and anchoring by digging and anchoring unit can realize synchronous digging and anchoring operations, which can significantly improve the tunneling efficiency in areas with suitable conditions, but it also has relatively high requirements for geological conditions, and its promotion is also subject to certain restrictions.
[0004] Combined with a large number of engineering practices, from the perspective of field use, the effect of existing rapid excavation equipment is not ideal. Except for some progress in some mines with good geological conditions, the excavation efficiency in most cases still cannot meet expectations. The core problem is still the inability to solve the problem of parallel operation of excavation, support and anchoring. For this reason, it is urgent to provide a fast tunneling method based on a shield tunneling machine, which can significantly improve the tunneling speed by realizing the parallel operation of excavation, support and anchoring at the tunnel excavation working face. Summary of the invention
[0005] In view of the problems existing in the above-mentioned prior art, the present invention provides a method for rapid tunnel excavation based on a shield tunneling machine. The method organically combines the tunneling machine, the drilling and anchoring unit and the shield unit transfer device, which can realize parallel operations of excavation, support and anchoring on the tunneling working face, and can significantly improve the tunneling speed.
[0006] In order to achieve the above-mentioned object, the present invention provides a tunnel rapid excavation method based on a shield type tunnel boring machine, which adopts a shield type excavation support anchor parallel operation system, wherein the shield type excavation support anchor parallel operation system comprises a tunnel boring machine, a permanent support system with excavation, and a shield type temporary support system;
[0007] The tunneling machine is arranged in the tunnel;
[0008] The permanent support system for excavation is composed of multiple anchor drilling vehicles or multiple anchor drilling arms, and the multiple anchor drilling arms are distributed in one or more sections to simultaneously carry out the construction of top plate and side anchors and anchor cables;
[0009] The shield type temporary support system is composed of a plurality of shield units distributed in sequence along the length direction of the tunnel and a shield unit transfer device 3, and the outer contour of the top of the shield unit is rectangular or semicircular arch or three-center arch or trapezoidal;
[0010] The shield unit includes a retractable top beam, a hydraulic support, a transition connection plate, a side support plate, a side support drive mechanism and a support resistance warning unit;
[0011] The retractable top beam comprises a fixed support plate and a retractable support plate; the two fixed support plates are relatively distributed at the tops of both ends of the tunnel width direction, the shape of the fixed support plates is adapted to the tunnel top contour, and a slide groove is provided inside; the two retractable support plates are relatively distributed in the central area of the tunnel width direction, the shape of the retractable support plates is adapted to the shape of the slide groove, the two retractable support plates are respectively slidably inserted into the slide groove at a section away from each other, and the two retractable support plates are relatively fixedly connected to the two ends of the top limit block at a section close to each other;
[0012] Two hydraulic props are relatively distributed at both ends of the tunnel width direction, and the piston rod ends of the two props are respectively hinged to the lower ends of the two fixed support plates, and the bottoms of the two cylinders are hingedly connected to the support base;
[0013] The two transition connection plates are relatively distributed on the outsides of the two hydraulic supports, and the upper ends of the two transition connection plates are movably connected to the lower ends of the two fixed support plates respectively;
[0014] The two side support plates are relatively distributed on the outsides of the two hydraulic supports, and the upper ends of the two side support plates are movably connected to the lower ends of the two transition connection plates respectively;
[0015] The side support driving mechanism is a hydraulic cylinder; the two side support driving mechanisms are relatively distributed below the two fixed support plates, and the side support driving mechanism is a telescopic driving mechanism; the ends of the two side support driving mechanisms that are close to each other are respectively hinged to the lower ends of the two transition connecting plates, and the ends that are far away are respectively hinged to the inner ends of the two side support plates;
[0016] The support resistance early warning unit includes a pressure sensor, an alarm, a display and a controller; the pressure sensor is connected to the hydraulic pillars and the side support drive mechanism of each shield unit, and is used to collect the vertical support resistance data of the hydraulic pillars in the shield unit and the lateral support resistance data of the side support drive mechanism respectively; the alarm is installed on the shield unit, or installed in the rear control center, and the display and the controller are installed in the rear control center. The controller is connected to the alarm, the display and the pressure sensors corresponding to each shield unit at the same time, and is used to integrate the two vertical support resistance data corresponding to the two hydraulic pillars to obtain the top plate support resistance data, and is used to obtain the support resistance data of the two sides according to the two lateral support resistance data corresponding to the two side support drive mechanisms, and display them in real time on the display. At the same time, the controller is used to control the shield unit transfer device to act based on the calculated support resistance data, so as to timely adjust the shield unit spacing and the temporary support area range, and at the same time, when any support resistance value exceeds the resistance threshold, the alarm is controlled to perform an alarm action;
[0017] The shield unit transfer device is installed at the upper end of the tunnel boring machine and is used to transport the shield unit at the rear of the tunnel boring machine to the front of the tunnel boring machine;
[0018] The following steps are involved:
[0019] Step 1: Assembly of the permanent support system and shield unit moving device during excavation;
[0020] The permanent support system is connected to the tail of the tunnel boring machine; the shield unit moving device is installed on the top of the tunnel boring machine;
[0021] Step 2: Install shield-type temporary support system;
[0022] First, according to the shape of the tunnel section, determine whether the outer contour of the top of the shield unit is rectangular, semicircular, three-center arch or trapezoidal, and set up the shield units in sequence along the direction of the tunnel, and ensure that the minimum temporary support area composed of the shield units should cover the length of the tunneling equipment, and the empty top distance with the rear permanent support should not exceed 1m;
[0023] Step 3: Adjust the shield type temporary support system;
[0024] The support resistance of each shield unit corresponding to two hydraulic pillars is observed in real time through the display, and the distance between the shield units is dynamically adjusted according to the support resistance value. At the same time, the scope of the temporary support area is adjusted to ensure the stability and reliability of the temporary support;
[0025] Step 4: construct permanent support and adjust shield units as excavation progresses;
[0026] As the tunneling machine advances, according to the spacing between different shield units, the construction of anchor rods and anchor cables on the roof and sides is carried out using the excavation-based permanent support system between two adjacent shield units or behind the temporary support area; then, the construction of drilling holes and installation of anchor rods is carried out using the excavation-based permanent support system, followed by the construction of permanent support to complete the support work of the tunnel roof and both sides;
[0027] Synchronously, as the tunneling operation of the TBM proceeds, the shield unit located at the tail is retracted according to the change of the position of the TBM, and the retracted shield unit is transferred to the head of the TBM through the shield unit transfer device above the TBM. The shield unit is then adjusted to an expanded state, and the edge of the shield unit is made close to the rock wall of the tunnel, so as to realize the adjustment of the shield unit during excavation.
[0028] Furthermore, in order to ensure the safety and reliability of temporary support, in step 2, the spacing between adjacent shield units is determined based on the size and support force of the actual shield units, and the spacing between adjacent shield units ranges from 0.3 to 2 m.
[0029] Furthermore, in order to effectively ensure the excavation efficiency while effectively reducing the operation process, in step four, the shield unit located at the rear is adjusted during each excavation cycle of the tunnel boring machine.
[0030] Furthermore, in order to ensure the safety of the tunneling operation, in step five, while adjusting the shield unit during tunneling, while the temporary support area is reduced, ensure that the minimum temporary support area meets the length requirement of covering the tunneling machine.
[0031] Furthermore, in order to improve the construction efficiency, in step 4, during the construction of the anchor rods and cables, permanent support construction operations are performed through multiple anchor rod drill arms with multiple sections to reduce the time of single-row anchor rod and cable support operations.
[0032] Furthermore, in order to ensure the support effect of permanent support and to improve the overall operating efficiency, in step four, the excavation speed of the tunnel boring machine is adjusted according to the actual situation on site. At the same time, it is ensured that the top plate behind the temporary support area has basic support strength, and then the remaining support is completed manually to optimize the operating efficiency.
[0033] Furthermore, in order to ensure the supporting effect of the tunnel roof, the top of the top limit block is fixedly connected to a strip support plate, the length of the strip support plate is the same as the width of the fixed support plate, and when the telescopic support plate is fully retracted into the fixed support plate on the corresponding side, there is a smooth transition between the strip support plate and the fixed support plate.
[0034] In the present invention, the telescopic top beam is composed of a fixed support plate and a telescopic support plate slidably inserted in the fixed support plate, so that the top beam can adapt to the needs of different tunnel widths, thereby significantly improving the versatility of the operation system. A support base is hinged at the bottom of the two hydraulic support cylinders, and a plurality of anchors are fixedly installed at the lower end of the support base. The support base can be firmly supported on the bottom plate of the tunnel by using the plurality of anchors, thereby ensuring the stability and reliability of the support of the entire shield unit. Two side support plates are movably connected to the lower ends of the two fixed support plates by using two transition connecting plates, so that the two transition connecting plates have a larger range of movement. Two side support driving mechanisms are set corresponding to the two side support plates, and the two ends of the side support driving mechanism are movably connected to the fixed support beam and the side support plate respectively. The swing amplitude of the side support plate can be controlled by the telescopic side support driving mechanism, and the side support plate can be supported in the direction of the gang during the support process, thereby improving the support effect by actively supporting the household. Since the shield unit not only has the ability of active top support, but also has the ability of active lateral support, this can further improve the support effect of the temporary support area and more effectively ensure the safe production of the coal mine. By connecting pressure sensors in the hydraulic support and the side support drive mechanism, it is convenient to collect two vertical support resistance signals corresponding to the two hydraulic supports and two lateral support resistance signals corresponding to the two side support drive mechanisms in real time, so that the controller can integrate the two vertical support resistance data to obtain the top plate support resistance data, obtain the support resistance data of the two sides according to the two lateral support resistance data, and then control the action of the shield unit transfer device according to the calculated support resistance data, so that the spacing of the shield units can be dynamically adjusted according to the support resistance state, so as to achieve the purpose of scientifically and reasonably arranging the shield units, and effectively ensure the stability and reliability of the support on the basis of saving manpower and material resources; through the setting of the display, it is convenient for the controller to intuitively display the support resistance data through the display after obtaining the support resistance data, so that it is convenient for relevant personnel to know the support resistance situation in time, which is conducive to dynamically adjusting the spacing of the shield units according to the support resistance, so as to ensure the safety of the excavation operation. Through the setting of the alarm, when any support resistance exceeds the resistance threshold, the alarm can be controlled to perform an alarm action, so that the management personnel can be reminded in time and effectively, so as to take emergency measures in time.
[0035] The present invention uses a modular temporary support system and organically combines a tunnel boring machine, a drilling and anchoring unit, and a shield unit transfer device to achieve parallel operations of digging, supporting, and anchoring on the tunneling working face, thereby significantly improving the tunneling speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0037] Figure 2 It is a distribution diagram of the temporary support area in the present invention;
[0038] Figure 3 It is a structural schematic diagram of the shield unit in the present invention.
[0039] In the figure: 1. Tunnel boring machine; 2. Shield unit; 3. Shield unit transfer device; 4. Permanent support system for excavation; 5. Retractable top beam; 6. Fixed support plate; 7. Retractable support plate; 8. Top limit block; 9. Hydraulic support; 10. Support base; 11. Anchor nail; 12. Transition connecting plate; 13. Side support plate; 14. Side support drive mechanism; 15. Strip support plate. DETAILED DESCRIPTION
[0040] The present invention will be further described below in conjunction with the accompanying drawings.
[0041] like Figures 1 to 3 As shown, the present invention provides a tunnel rapid excavation method based on a shield type tunnel boring machine, which adopts a shield type excavation support anchor parallel operation system, and the shield type excavation support anchor parallel operation system includes a tunnel boring machine 1, a permanent support system 4, and a shield type temporary support system;
[0042] The tunnel boring machine 1 is arranged in the tunnel;
[0043] The permanent support system 4 is composed of multiple anchor drilling vehicles or multiple anchor drilling arms. When multiple anchor drilling arms are used, the anchor drilling arms are distributed in one or more sections to synchronously carry out the construction of top plate and side anchors and anchor cables;
[0044] The shield type temporary support system is composed of a plurality of shield units 2 and a shield unit transfer device 3 distributed in sequence along the length direction of the tunnel. The outer contour of the top of the shield unit 2 is generally a rectangular or semicircular arch or a three-center arch or a trapezoidal shape;
[0045] The shield unit 2 includes a retractable top beam 5, a hydraulic support 9, a transition connection plate 12, a side support plate 13, a side support drive mechanism 14 and a support resistance warning unit;
[0046] The retractable top beam 5 includes a fixed support plate 6 and a retractable support plate 7; the two fixed support plates 6 are relatively distributed at the tops of both ends in the width direction of the laneway, the shape of the fixed support plate 6 is adapted to the contour of the top of the laneway, and can be a straight plate, or of course, an arc-shaped plate, and a slide groove is provided inside, the slide groove can be a straight groove, or an arc-shaped groove, specifically adapted to the fixed support plate 6, when the fixed support plate 6 is a straight plate, the slide groove is a straight groove, and when the fixed support plate 6 is an arc-shaped plate, the slide groove is an arc-shaped groove; the two retractable support plates 7 are relatively distributed in the central area in the width direction of the laneway, the shape of the retractable support plates 7 is adapted to the shape of the slide groove, a section of the two retractable support plates 7 that is far away from each other is respectively slidably inserted into the slide groove, and the ends of the two retractable support plates 7 that are close to each other are relatively fixedly connected to the two ends of the top limit block 8;
[0047] Two hydraulic pillars 9 are relatively distributed at both ends of the tunnel width direction, and the piston rod ends of the two are respectively hinged to the lower ends of the two fixed support plates 6, and the bottoms of the cylinders of the two are hingedly connected to the support base 10; the lower end of the support base 10 is fixedly connected to a plurality of anchor nails 11;
[0048] The two transition connecting plates 12 are relatively distributed on the outside of the two hydraulic supports 9, and the upper ends of the two transition connecting plates 12 are movably connected to the lower ends of the two fixed support plates 6 respectively;
[0049] The two side support plates 13 are relatively distributed on the outside of the two hydraulic pillars 9, and the upper ends of the two side support plates 13 are movably connected to the lower ends of the two transition connection plates 12 respectively;
[0050] The side support driving mechanism 14 is a hydraulic cylinder; the two side support driving mechanisms 14 are relatively distributed below the two fixed support plates 6, and the side support driving mechanism 14 is a telescopic driving mechanism; the ends of the two side support driving mechanisms 14 that are close to each other are respectively hinged to the lower ends of the two transition connecting plates 12, and the ends that are far away are respectively hinged to the inner ends of the two side support plates 13;
[0051] The support resistance early warning unit includes a pressure sensor, an alarm, a display and a controller; the pressure sensor is connected to the hydraulic pillar 9 and the side support drive mechanism 14 of each shield unit 2, respectively, and is used to collect the vertical support resistance data of the hydraulic pillar 9 in the shield unit 2 and the lateral support resistance data of the side support drive mechanism 14; the alarm is installed on the shield unit 2, or installed in the rear control center, the display and the controller are installed in the rear control center, and the controller is connected to the alarm, the display and the pressure sensor corresponding to each shield unit 2 at the same time, and is used to integrate the two vertical support resistance data corresponding to the two hydraulic pillars 9 to obtain the top plate support resistance data, and is used to obtain the support resistance data of the two sides according to the two lateral support resistance data corresponding to the two side support drive mechanisms 14, and display them in real time on the display. At the same time, the controller is used to control the shield unit transfer device 3 to act based on the calculated support resistance data, so as to timely adjust the distance between the shield units 2 and the range of the temporary support area, and at the same time, when any support resistance value exceeds the resistance threshold, the alarm is controlled to perform an alarm action;
[0052] The shield unit transfer device 3 is installed at the upper end of the tunnel boring machine 1 and is used to transport the shield unit 2 at the rear of the tunnel boring machine 1 to the front of the tunnel boring machine 1;
[0053] The following steps are involved:
[0054] Step 1: Assembly of the excavation-based permanent support system 4 and the shield unit moving device 3;
[0055] The permanent support system 4 is connected to the tail of the tunnel boring machine 1; the shield unit moving device 3 is installed on the top of the tunnel boring machine 1;
[0056] Step 2: Install shield-type temporary support system;
[0057] First, according to the shape of the tunnel section, determine that the outer contour of the top of the shield unit 2 used is rectangular, semicircular, three-center arch or trapezoidal, set up the shield units in sequence along the direction of the tunnel, and determine that the minimum temporary support area composed of the shield units should cover the length of the tunneling equipment, and the distance from the top of the Yongle support room behind should not exceed 1m;
[0058] Step 3: Adjust the shield type temporary support system;
[0059] The support resistance of each shield unit corresponding to two hydraulic pillars is observed in real time through the display, and the distance between the shield units is dynamically adjusted according to the support resistance value. At the same time, the scope of the temporary support area is adjusted to ensure the stability and reliability of the temporary support;
[0060] Step 4: construct permanent support and adjust shield unit 2 during excavation;
[0061] As the tunneling operation of the tunnel boring machine 1 proceeds, according to the spacing between different shield units 2, between two adjacent shield units 2 or behind the temporary support area, the construction of anchor rods and anchor cables of the roof and sides is carried out using the permanent support system 4 while excavating; then, the construction of drilling holes and installation of anchor rods are carried out using the permanent support system 4 while excavating, and then the construction of permanent support is carried out to complete the support operation of the tunnel roof and both sides;
[0062] Synchronously, as the tunneling operation of the tunnel boring machine 1 proceeds, the shield unit 2 located at the tail is retracted according to the change in the position of the tunnel boring machine 1, and the retracted shield unit 2 is transferred to the head of the tunnel boring machine 1 by the shield unit transfer device 3 above the tunnel boring machine 1. The shield unit 2 is then adjusted to an expanded state, and the edge of the shield unit 2 is made to cling to the rock wall of the tunnel, thereby realizing the adjustment of the shield unit 2 as it is excavated.
[0063] In order to ensure the safety and reliability of temporary support, in step 2, the spacing between adjacent shield units 2 is determined according to the actual size and support force of the shield units 2, and the spacing between adjacent shield units 2 ranges from 0.3 to 2 m.
[0064] In order to effectively ensure the excavation efficiency and effectively reduce the operation procedures, in step 4, the shield unit 2 located at the rear is adjusted during each excavation cycle of the tunnel boring machine 1.
[0065] In order to ensure the safety of the excavation operation, in step five, while adjusting the shield unit 2 during excavation, while the temporary support area is reduced, it is ensured that the minimum temporary support area meets the length requirement of covering the tunnel boring machine 1.
[0066] In order to improve the construction efficiency, in step 4, during the construction of anchor rods and cables, permanent support construction operations are performed through multiple anchor rod drill arms with multiple sections to reduce the time of single-row anchor rod and cable support operations.
[0067] In order to ensure the support effect of permanent support and to improve the overall operating efficiency, in step four, the excavation speed of the tunnel boring machine 1 is adjusted according to the actual situation on site. At the same time, it is ensured that the top plate behind the temporary support area has basic support strength, and then the remaining support is completed manually to optimize the operating efficiency.
[0068] In order to ensure the supporting effect of the tunnel roof, the top of the top limit block 8 is fixedly connected to the strip support plate 15, the length of the strip support plate 15 is the same as the width of the fixed support plate 6, and when the telescopic support plate 7 is fully retracted into the fixed support plate 6 on the corresponding side, there is a smooth transition between the strip support plate 15 and the fixed support plate 6.
[0069] In the present invention, the telescopic top beam is composed of a fixed support plate and a telescopic support plate slidably inserted in the fixed support plate, so that the top beam can adapt to the needs of different tunnel widths, thereby significantly improving the versatility of the operation system. A support base is hinged at the bottom of the two hydraulic support cylinders, and a plurality of anchors are fixedly installed at the lower end of the support base. The support base can be firmly supported on the bottom plate of the tunnel by using the plurality of anchors, thereby ensuring the stability and reliability of the support of the entire shield unit. Two side support plates are movably connected to the lower ends of the two fixed support plates by using two transition connecting plates, so that the two transition connecting plates have a larger range of movement. Two side support driving mechanisms are set corresponding to the two side support plates, and the two ends of the side support driving mechanism are movably connected to the fixed support beam and the side support plate respectively. The swing amplitude of the side support plate can be controlled by the telescopic side support driving mechanism, and the side support plate can be supported in the direction of the gang during the support process, thereby improving the support effect by actively supporting the household. Since the shield unit not only has the ability of active top support, but also has the ability of active lateral support, this can further improve the support effect of the temporary support area and more effectively ensure the safe production of the coal mine. By connecting pressure sensors in the hydraulic support and the side support drive mechanism, it is convenient to collect two vertical support resistance signals corresponding to the two hydraulic supports and two lateral support resistance signals corresponding to the two side support drive mechanisms in real time, so that the controller can integrate the two vertical support resistance data to obtain the top plate support resistance data, obtain the support resistance data of the two sides according to the two lateral support resistance data, and then control the action of the shield unit transfer device according to the calculated support resistance data, so that the spacing of the shield units can be dynamically adjusted according to the support resistance state, so as to achieve the purpose of scientifically and reasonably arranging the shield units, and effectively ensure the stability and reliability of the support on the basis of saving manpower and material resources; through the setting of the display, it is convenient for the controller to intuitively display the support resistance data through the display after obtaining the support resistance data, so that it is convenient for relevant personnel to know the support resistance situation in time, which is conducive to dynamically adjusting the spacing of the shield units according to the support resistance, so as to ensure the safety of the excavation operation. Through the setting of the alarm, when any support resistance exceeds the resistance threshold, the alarm can be controlled to perform an alarm action, so that the management personnel can be reminded in time and effectively, so as to take emergency measures in time.
[0070] The present invention uses a modular temporary support system and organically combines a tunnel boring machine, a drilling and anchoring unit, and a shield unit transfer device to achieve parallel operations of digging, supporting, and anchoring on the tunneling working face, thereby significantly improving the tunneling speed.
Claims
1. A tunnel rapid excavation method based on a shield type tunnel boring machine, using a shield type excavation support anchor parallel operation system, the shield type excavation support anchor parallel operation system comprising a tunnel boring machine (1), a permanent support system (4) during excavation, and a shield type temporary support system; The tunnel boring machine (1) is arranged in a tunnel; The excavation-concurrent permanent support system (4) is composed of a plurality of anchor drilling vehicles or a plurality of anchor drilling arms, wherein the plurality of anchor drilling arms are distributed in one or more sections, and the construction of top plate and side anchors and anchor cables is carried out simultaneously; The shield type temporary support system is composed of a plurality of shield units (2) distributed in sequence along the direction of the tunnel and a shield unit transfer device (3), wherein the outer contour of the top of the shield unit (2) is rectangular, semicircular, three-center, or trapezoidal; The shield unit (2) comprises a retractable top beam (5), a hydraulic support (9), a transition connection plate (12), a side support plate (13), a side support drive mechanism (14) and a support resistance early warning unit; The telescopic top beam (5) comprises a fixed support plate (6) and a telescopic support plate (7); the two fixed support plates (6) are relatively distributed at the top of the two ends of the tunnel in the width direction, the shape of the fixed support plates (6) is adapted to the contour of the tunnel top, and a slide groove is provided inside; the two telescopic support plates (7) are relatively distributed in the central area of the tunnel in the width direction, the shape of the telescopic support plates (7) is adapted to the shape of the slide groove, the two telescopic support plates (7) are slidably inserted into the slide groove at the ends away from each other, and the ends of the two telescopic support plates (7) that are close to each other are relatively fixedly connected to the two ends of the top limit block (8); Two hydraulic pillars (9) are relatively distributed at both ends of the tunnel width direction, and the piston rod ends of the two are respectively hinged to the lower ends of the two fixed support plates (6), and the bottoms of the cylinders of the two are hingedly connected to the support base (10); Two transition connection plates (12) are relatively distributed on the outsides of the two hydraulic supports (9), and the upper ends of the two transition connection plates (12) are movably connected to the lower ends of the two fixed support plates (6) respectively; The two side support plates (13) are relatively distributed on the outsides of the two hydraulic pillars (9), and the upper ends of the two side support plates (13) are movably connected to the lower ends of the two transition connection plates (12) respectively; The side support driving mechanism (14) is a hydraulic cylinder; the two side support driving mechanisms (14) are relatively distributed below the two fixed support plates (6), and the side support driving mechanism (14) is a telescopic driving mechanism; the ends of the two side support driving mechanisms (14) that are close to each other are respectively hinged to the lower ends of the two transition connecting plates (12), and the ends that are far away are respectively hinged to the inner ends of the two side support plates (13); The support resistance early warning unit comprises a pressure sensor, an alarm, a display and a controller; the pressure sensor is connected to the hydraulic support (9) and the side support drive mechanism (14) of each shield unit (2) respectively, and is used to collect the vertical support resistance data of the hydraulic support (9) in the shield unit (2) and the lateral support resistance data of the side support drive mechanism (14); the alarm is installed on the shield unit (2) or installed in the rear centralized control center, the display and the controller are installed in the rear centralized control center, and the controller is simultaneously connected to the alarm, the display and the pressure corresponding to each shield unit (2). The sensors are connected to the shield unit (2) and are used to integrate two vertical support resistance data corresponding to the two hydraulic pillars (9) to obtain the top plate support resistance data, and to obtain the support resistance data of the two sides according to the two lateral support resistance data corresponding to the two side support driving mechanisms (14), and to display them in real time on the display. At the same time, the controller is used to control the shield unit transfer device (3) to act based on the calculated support resistance data, so as to timely adjust the shield unit (2) spacing and the temporary support area range, and at the same time, control the alarm to perform an alarm action when any support resistance value exceeds the resistance threshold; The shield unit transfer device (3) is installed at the upper end of the tunnel boring machine (1) and is used to transport the shield unit (2) at the rear of the tunnel boring machine (1) to the front of the tunnel boring machine (1); It is characterized in that The following steps are involved: Step 1: Assembly of the excavation-based permanent support system (4) and the shield unit moving device (3); The permanent support system (4) is connected to the tail of the tunnel boring machine (1); the shield unit moving device (3) is installed on the top of the tunnel boring machine (1); Step 2: Install shield-type temporary support system; First, according to the shape of the tunnel section, determine that the outer contour of the top of the shield unit (2) to be used is rectangular, semicircular, tricentric or trapezoidal, and set up the shield units (2) in sequence along the direction of the tunnel, and ensure that the minimum temporary support area formed by the shield units (2) should cover the length of the tunneling equipment, and the empty top distance with the rear permanent support is no more than 1m; Step 3: Adjust the shield type temporary support system; The support resistance of two hydraulic supports (9) corresponding to each shield unit (2) is observed in real time through a display, and the spacing of the shield units (2) is dynamically adjusted according to the support resistance value, and the range of the temporary support area is adjusted to ensure the stability and reliability of the temporary support; Step 4: construct permanent support and adjust shield units during excavation (2); As the tunneling operation of the tunnel boring machine (1) proceeds, according to the spacing between different shield units (2), between two adjacent shield units (2) or behind the temporary support area, the construction of anchor rods and anchor cables on the roof and sides is carried out using the tunneling permanent support system (4); then, the construction of drilling holes and installation of anchor rods are carried out using the tunneling permanent support system (4), and then the construction of permanent support is carried out to complete the support operation of the tunnel roof and both sides; Synchronously, as the tunneling operation of the tunnel boring machine (1) proceeds, the shield unit (2) located at the rear is retracted according to the change in the position of the tunnel boring machine (1), and the retracted shield unit (2) is transferred to the head of the tunnel boring machine (1) by the shield unit transfer device (3) above the tunnel boring machine (1), and then the shield unit (2) is adjusted to an expanded state, and the edge of the shield unit (2) is made to be in close contact with the rock wall of the tunnel, so as to achieve the adjustment of the shield unit (2) during tunneling.
2. A tunnel rapid excavation method based on a shield tunneling machine according to claim 1, characterized in that: In step 2, the spacing between adjacent shield units (2) is determined based on the actual size and support force of the shield units (2), and the spacing between adjacent shield units (2) ranges from 0.3 to 2 m.
3. The method for rapid tunnel excavation based on a shield tunneling machine according to claim 1, characterized in that: In step 4, each time the tunnel boring machine (1) makes one tunneling cycle, the shield unit (2) located at the rear is adjusted during tunneling.
4. The method for rapid tunnel excavation based on a shield tunneling machine according to claim 1, characterized in that: In step five, during the process of adjusting the shield unit (2) during excavation, while the scope of the temporary support area is reduced, it is ensured that the minimum scope of the temporary support area meets the length requirement of covering the tunnel boring machine (1).
5. The method for rapid tunnel excavation based on a shield tunneling machine according to claim 1, characterized in that: In step 4, during the construction of anchor rods and cables, multiple anchor drill arms of multiple sections are used to synchronously perform permanent support construction operations to reduce the time of single-row anchor rod and cable support operations.
6. The method for rapid tunnel excavation based on a shield tunneling machine according to claim 1, characterized in that: In step 4, the excavation speed of the tunnel boring machine (1) is adjusted according to the actual situation on site. At the same time, it is ensured that the top plate behind the temporary support area has basic support strength, and then the remaining support is completed manually to optimize the operation efficiency.
7. The method for rapid tunneling based on a shield tunneling machine according to claim 1, characterized in that: The top of the top limit block (8) is fixedly connected to a strip support plate (15), the length of the strip support plate (15) is the same as the width of the fixed support plate (6), and when the telescopic support plate (7) is fully retracted into the fixed support plate (6) on the corresponding side, a smooth transition occurs between the strip support plate (15) and the fixed support plate (6).
Citation Information
Patent Citations
Process method and equipment for heading and anchoring parallel operation construction
CN104564050A
Shield type digging and anchoring machine
CN105386771A
Contractible temporary support for tunneling tunnel
CN105697013A
Temporary supporting method for tunneled roadway
CN105971628A
Fully-mechanized excavating tunnel multi-shelf self-moving type supporting anchoring combined unit system
CN106837334A