Pressure load control system and method for deep geotechnical engineering disturbance simulation facility

By designing the pressure load control system of deep geotechnical engineering disturbance simulation facilities, using thermal oil and electric liquid booster and hydraulic booster, precise control of ultra-high pressure environments in large-size structures is achieved, and the current solution is solved There is technology that cannot simulate the problem of the geotechnical environment at a depth of 5,000 meters, providing a stable pressure test environment.

CN119045551AActive Publication Date: 2024-11-29INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411133550.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-29
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The existing geotechnical engineering disturbance simulation facilities cannot apply ultra-high pressure to large-sized structures, especially long-term and stable pressure environments, making it difficult to simulate a geotechnical environment at a depth of 5,000 meters and cannot accurately control the pressure.

Method used

A pressure load control system for deep geotechnical engineering disturbance simulation facilities is designed, including the main chamber pressurized pressure relief unit and the pressure stabilization unit, using thermal oil as the working medium, and using an electric liquid pressurized pressure relief pump and a hydraulic booster. Combining manual and remote operation pressure relief branches, precise pressure control of the main compartment and actuator is achieved, and closed-loop control is achieved through monitoring modules and control modules.

Benefits of technology

Accurate control of ultra-high pressure environments with large-size structures, provides a stable pressure test environment, provides a basis for subsequent rock test evaluation, reduces the risk of ultra-high pressure working conditions, improves the accuracy of pressure control and Security.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119045551A_ABST
    Figure CN119045551A_ABST
Patent Text Reader

Abstract

The invention discloses a pressure load control system and method for a deep geotechnical engineering disturbance simulation facility, and the system is used for providing a pressure test environment for a main cabin, and comprises a main cabin pressurization and pressure relief unit and a pressure stabilization unit which take heat conduction oil as a working medium; the main cabin pressurization and decompression unit is used for pressurizing and decompressing a main cabin to apply or unload confining pressure according to the working condition that the flow change is large. The pressure stabilizing unit is used for stabilizing the pressure of a main cabin and pressurizing, stabilizing and releasing the pressure of an actuator according to the working condition of small flow so as to meet the pressure test requirement, and the control module can control the corresponding hydraulic pressurizer to act through a servo valve in a closed-loop mode according to a target command and feedback of the monitoring module. The characteristics of deep geotechnical engineering disturbance simulation facilities are fully considered, the pressure of the main cabin and the actuator can be accurately controlled, and a basis is provided for subsequent evaluation such as rock tests.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to geotechnical engineering tests, and in particular to a pressure load control system and method for a deep geotechnical engineering disturbance simulation facility. Background Art

[0002] The deep rock mass environment has the characteristics of high ground stress, high geothermal temperature and high karst water pressure. Especially with the increase of underground depth, the high stress field in the deep rock mass accumulates, which makes the implementation of deep geotechnical engineering extremely difficult, so experimental research is needed.

[0003] In order to simulate the deep multi-field coupling environment and engineering disturbance conditions, and to accurately observe and control the evolution of the internal discontinuous structure and external nonlinear behavior of the rock mass, many geotechnical engineering disturbance simulation facilities have been developed for experimental research. However, in the field of geotechnical engineering, it is usually followed that lower pressure is applied to large-scale structures and higher pressure is applied to small-scale structures. The current simulation facilities are generally unable to apply ultra-high pressure to large-scale structures, and cannot accurately and stably control the pressure, especially unable to apply a long-term stable pressure environment to large-scale structures (e.g., simulating a 5,000-meter deep geotechnical environment for weeks or even a whole month). Summary of the invention

[0004] The purpose of the present invention is to provide a pressure load control system and method for a deep geotechnical engineering disturbance simulation facility. The present application fully considers the characteristics of the deep geotechnical engineering disturbance simulation facility, can accurately control the pressure of the main cabin and the actuator, and provides a basis for subsequent rock tests and other evaluations.

[0005] The technical solution adopted by the present invention is: A pressure load control system for a deep geotechnical engineering disturbance simulation facility is used to provide a pressure test environment for the main cabin, including a main cabin pressurization and pressure relief unit and a pressure stabilizing unit using heat transfer oil as the working medium; the main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin for conditions with large flow changes, thereby applying or unloading confining pressure, including an electric liquid booster pump driven by a constant torque variable frequency motor for pressurization, a clean oil tank for oil supply, and a low-level oil tank for storing return oil. The pipeline between the electric liquid booster pump and the main cabin is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, and an emergency Emergency remote pressure relief branch, emergency manual pressure relief branch; the pressure stabilizing unit is used for stabilizing the pressure of the main cabin and pressurizing, stabilizing and releasing the pressure of the actuator to meet the pressure test requirements under conditions with small flow rates, including a hydraulic booster corresponding to the main cabin and each actuator, a servo valve corresponding to each hydraulic booster, a hydraulic pump for supplying pressure to the hydraulic booster, a clean oil tank 2 for oil supply, a pressure relief oil tank for storing pressure relief oil, a monitoring module and a control module. The monitoring module is used to monitor the status of the hydraulic booster and the test specimen, and the control module can control the corresponding hydraulic booster action through the servo valve closed-loop according to the target command and the feedback from the monitoring module.

[0006] Preferably, a manual or electric ball valve and a filter are provided near the upstream of the electric liquid booster pump, and an ultra-high pressure one-way valve, an ultra-high pressure manual needle valve, an ultra-high pressure pneumatic needle valve, and a pressure monitoring component are provided near the downstream of the electric liquid booster pump.

[0007] Preferably, two electric liquid booster pumps connected in parallel are used; one is a large-flow booster pump, which works when pressurization is required at a boosting rate of more than 2MPa / min; the other is a small-flow booster pump, which works when pressurization is required at a boosting rate of less than 2MPa / min; the two shall not work at the same time.

[0008] Preferably, an ultra-high pressure manual pressure relief valve is provided on the manual pressure relief branch, and two remote pressure relief branches are provided with two parallel ultra-high pressure electric regulating valves and one ultra-high pressure pneumatic needle valve. The ultra-high pressure electric regulating valve adjusts the valve opening through PID to accurately control the pressure relief rate of the main cabin. The two remote pressure relief branches are used individually or in combination according to the required pressure relief rate.

[0009] Preferably, ultra-high pressure filters are provided on both the manual pressure relief branch and the remote pressure relief branch, an ultra-high pressure cooler is provided on the pipeline between the electric liquid booster pump and the main cabin, and a cooling coil is provided in the low-level oil tank.

[0010] Preferably, a bursting disc is provided on the safety protection branch, an ultra-high pressure pneumatic needle valve is provided on the emergency remote pressure relief branch, and an ultra-high pressure manual needle valve is provided on the emergency manual pressure relief branch.

[0011] Preferably, an electric heating device is provided near the main cabin on the pipeline between the electric liquid booster pump and the main cabin.

[0012] Preferably, the pipeline between the electric liquid booster pump and the main cabin, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system for supplying air to each pneumatic valve in the main cabin pressurization and pressure relief unit are all equipped with pressure monitoring components, and interlocking protection is achieved through feedback from the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump and the main cabin is not opened, the electric liquid booster pump cannot be started and operated; When the cooling coil in the low-level oil tank is not opened, the remote pressure relief valve on any remote-operated pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the remaining pressure monitoring devices is greater than 10MPa, there will be an alarm indication; when the electric heating device near the main cabin on the pipeline between the electric liquid booster pump and the main cabin is not working, pressurization and pressure relief operations cannot be performed; when the liquid level in the clean oil tank is low, pressurization and pressure relief operations cannot be performed; when the pressure on the air source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there will be an alarm indication.

[0013] Preferably, the monitoring module includes a pressure monitoring device for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster, a displacement monitoring device for monitoring the displacement of the hydraulic booster piston, and a deformation monitoring device for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster through a servo valve closed-loop according to the target pressure and the feedback of the pressure monitoring device, can calculate the volume and flow of the medium injected into the actuator or the main cabin according to the feedback of the displacement monitoring device, can control the corresponding hydraulic booster through a servo valve closed-loop according to the required volume and flow of the medium injected into the actuator or the main cabin and the feedback of the displacement monitoring device, and can control the corresponding hydraulic booster through a servo valve closed-loop according to the target deformation of the sample and the feedback of the deformation monitoring device.

[0014] Preferably, a filter is provided near the upstream of the hydraulic pump, a high-pressure fine oil filter, a one-way valve and a proportional relief valve are provided near the downstream of the hydraulic pump, an ultra-high-pressure cooling filter and an ultra-high-pressure manual needle valve are provided on the output pipeline of each hydraulic booster, and the output pipeline of the hydraulic booster corresponding to the actuator is connected to the pressure relief tank through a branch with a bursting disc.

[0015] A method for controlling a pressure load of a deep geotechnical engineering disturbance simulation facility is based on the above-mentioned pressure load control system of the deep geotechnical engineering disturbance simulation facility. When conducting a test, the internal pressure of the actuator is first slowly increased through a pressure stabilizing unit, and then the main cabin is pressurized to the required confining pressure at a required pressurization rate through the main cabin pressurization and pressure relief unit, and the main cabin is pressure-stabilized through the pressure stabilizing unit, and then the internal pressure of the actuator is increased at the required pressurization rate through the pressure stabilizing unit, and the sample is applied to a certain pressure and then stabilized, and then the actuator is precisely controlled by the pressure stabilizing unit according to the test requirements to test the sample; after the test, the internal pressure of the actuator is first synchronously unloaded to the confining pressure at a required rate through the pressure stabilizing unit, and then the main cabin confining pressure is unloaded at a required rate through the main cabin pressurization and pressure relief unit, and the internal pressure of the actuator is unloaded to atmospheric pressure through the pressure stabilizing unit.

[0016] The beneficial effects of the present invention are: This application fully considers the characteristics of deep geotechnical engineering disturbance simulation facilities: due to the large volume of the main cabin, the required flow rate change is also relatively large, and the pressure boost and pressure relief are achieved by an electric liquid booster pump in conjunction with the valves on each pressure relief branch, so the main cabin pressurization and pressure relief unit is used; at the same time, the flow rate required for the pressure stabilization of the main cabin and the pressure boost, pressure stabilization, and pressure relief of each actuator is relatively small, and the pressure control accuracy is high, which is achieved by an electro-hydraulic servo-controlled hydraulic booster, so a pressure stabilization unit is used. In the main cabin pressurization and pressure relief unit, the danger of ultra-high pressure conditions is fully taken into consideration. Each pressure relief branch can perform functions such as slow pressure relief, rapid pressure relief, manual pressure relief and manual pressure relief in emergency situations. In the pressure stabilizing unit, the hydraulic booster can convert a smaller pressure into a larger pressure, reducing the danger of ultra-high pressure conditions. In addition, the control module and the monitoring module are used to achieve closed-loop control, making the adjustment more precise and rapid. The main cabin pressurization and pressure relief unit and the pressure stabilizing unit are independent of each other but can be used in conjunction with each other. They can accurately control the pressure of the main cabin and the actuator, thereby providing a pressure test environment and laying a foundation for subsequent rock tests and other evaluations. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 Schematic diagram of the main cabin pressurization and relief unit in an embodiment of the present invention.

[0019] Figure 2 It is a schematic diagram of the air source system of the main cabin pressurization and relief unit in an embodiment of the present invention.

[0020] Figure 3Schematic diagram of a voltage stabilizing unit in an embodiment of the present invention.

[0021] Figure 4 It is a schematic diagram of the pressure closed-loop control in an embodiment of the present invention.

[0022] Figure 5 1 is a schematic diagram of the displacement closed-loop control principle in an embodiment of the present invention.

[0023] In the figure: 1.1a~1.3a, ball valve; 2a, clean oil tank 1; 3a, electric ball valve; 4.1a~4.2a, filter; 5.1a~5.2a, electric liquid booster pump; 6.1a~6.2a, ultra-high pressure check valve; 7.1a~7.3a, ultra-high pressure manual needle valve; 8.1a~8.6a, ultra-high pressure pneumatic needle valve; 9a, ultra-high pressure manual regulating valve; 10.1a~10.3a, ultra-high pressure filter; 11.1a~11.4a, ultra-high pressure electric regulating valve; 12a, bursting disc; 13a, ultra-high pressure cooler; 14a, electric heating device; 15, main cabin; 16a, low-level oil box; 17a, cooling coil; 18a, integrated air compressor; 19a, clean oil tank 2; 20a, manual ball valve; 21.1a~21.2a, filter; 22a, hydraulic pump; 23a, high-pressure fine oil filter; 24a, one-way valve; 25a, pressure gauge stop valve; 26a, proportional relief valve; 27.1a~27.5a, electro-hydraulic servo valve; 28.1a~28.5a, hydraulic booster; 29.1a~29.4a, bursting disc; 30.1a~30.5a, ultra-high pressure cooling filter; 31.1a~31.5a, ultra-high pressure manual needle valve; 32.1~32.4, actuator. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.

[0025] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for which protection is sought, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.

[0026] The features and performance of the present application are further described in detail below in conjunction with the embodiments.

[0027] Embodiment 1 A certain project needs to simulate the stress conditions at 5000m underground and perform ultra-high pressure loading on large-size rock samples of 800mm*800mm*800mm, of which: the total volume of the main cabin 15 is 3.3m 3 The maximum working pressure is 130MPa, and the ultra-high pressure needs to be maintained for 1 month; 4 actuators (32.1~32.4) are used, which are placed in the y and z directions respectively. The maximum working pressure is 150MPa, the pressure control accuracy is ±1%FS, the pressure increase rate is 1~10MPa / min (adjustable), and the ultra-high pressure needs to be maintained for 1 month.

[0028] In order to provide a pressure test environment for the above-mentioned deep geotechnical engineering disturbance simulation facility, this embodiment provides a deep geotechnical engineering disturbance simulation facility pressure load control system, including a main cabin pressurization and pressure relief unit and a pressure stabilizing unit using heat transfer oil as the working medium; the specific contents are as follows.

[0029] 1. Main cabin pressurization and relief unit The main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin 15 to apply or unload the surrounding pressure in the working condition with large flow changes, such as Figure 1 As shown, it mainly includes an electric liquid booster pump (5.1a, 5.2a) for pressurization and driven by a constant torque variable frequency motor, a clean oil tank 12a for oil supply, and a low-level oil tank 16a for storing return oil. The pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, an emergency remote pressure relief branch, and an emergency manual pressure relief branch.

[0030] In order to ensure stable and reliable operation, in this embodiment, preferably: Figure 1 As shown, a manual ball valve 1.2a or an electric ball valve 3a and a filter (4.1a, 4.2a) are provided near the upstream of the electric liquid booster pump (5.1a, 5.2a), and an ultra-high pressure one-way valve (6.1a, 6.2a), an ultra-high pressure manual needle valve (7.1a, 7.2a), an ultra-high pressure pneumatic needle valve (8.1a, 8.2a) and a pressure monitoring component are provided near the downstream of the electric liquid booster pump (5.1a, 5.2a).

[0031] In order to ensure reliable pressure boosting and convenient adjustment, in this embodiment, preferably: Figure 1As shown, two parallel electric liquid booster pumps (5.1a, 5.2a) are used; one is a large-flow booster pump, which works when the boost rate is required to be above 2MPa / min; the other is a small-flow booster pump, which works when the boost rate is required to be below 2MPa / min; the two pumps cannot work at the same time. The rated output flow of the large-flow booster pump is 28L / min, with an adjustment range of 10%-100%; the rated output flow of the small-flow booster pump is 8L / min, with an adjustment range of 10%-100%; the output flow is changed by adjusting the frequency of the constant-torque variable-frequency motor to achieve arbitrary adjustment of the boost rate of 1 to 10MPa / min.

[0032] In order to ensure reliable pressure relief, in this embodiment, preferably: Figure 1 As shown, a manual pressure relief branch is provided with an ultra-high pressure manual pressure relief valve 9a, one remote pressure relief branch is provided with two parallel ultra-high pressure electric regulating valves (11.1a, 11.2a) and one ultra-high pressure pneumatic needle valve 8.3a, and another remote pressure relief branch is also provided with two parallel ultra-high pressure electric regulating valves (11.3a, 11.4a) and one ultra-high pressure pneumatic needle valve 8.4a. The ultra-high pressure electric regulating valves (11.1a~11.4a) adjust the valve opening through PID to accurately control the pressure relief rate of the main cabin 15. The two remote pressure relief branches are used separately or in combination according to the required pressure relief rate.

[0033] In this embodiment, preferably: Figure 1 As shown, both the manual pressure relief branch and the remote pressure relief branch are provided with ultra-high pressure filters (10.1a~10.3a), the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is provided with an ultra-high pressure cooler 13a, and the low-level oil tank 16a is provided with a cooling coil 17a. The medium flowing out of the main cabin 15 contains foreign matter and impurities and is high temperature. The ultra-high pressure filter (10.1a~10.3a) can filter the leaked medium to protect the downstream equipment. The ultra-high pressure cooler 13a is used to cool the high-temperature heat transfer oil during pressure relief. Since the leaked medium cannot be discharged directly, it needs to be discharged to the low-level oil tank 16a for storage. The cooling coil 17a can further cool the medium to room temperature.

[0034] In this embodiment, preferably: Figure 1 As shown, a bursting disc 12a is provided on the safety protection branch, an ultra-high pressure pneumatic needle valve 8.5a is provided on the emergency remote pressure relief branch, and an ultra-high pressure manual needle valve 7.3a is provided on the emergency manual pressure relief branch to ensure reliable emergency pressure relief.

[0035] In this embodiment, preferably: Figure 1As shown, an electric heating device 14a is provided near the main cabin 15 on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15. The electric heating device can heat the medium pressed into the main cabin 15 to ensure that the environment in the main cabin 15 and the temperature field of the test piece will not change.

[0036] In this embodiment, preferably, each pneumatic valve in the main cabin pressurization and pressure relief unit is supplied with air by the air source system. Figure 2 As shown, the air source system adopts an integrated air compressor 18a (including a screw air compressor, a refrigerated dryer, a precision filter, an air storage tank, etc.), the main line of which is provided with components such as a pressure sensor and a pressure reducing valve, and each branch line is provided with an electric control valve and a one-way throttle valve.

[0037] In this embodiment, preferably, Figure 1 and Figure 2 As shown, the pipelines between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system for supplying air to each pneumatic valve in the main cabin pressurization and pressure relief unit are all equipped with pressure monitoring components, and interlocking protection is achieved through the feedback of the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump (5.1a, 5.2a) cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is not opened, the electric liquid booster pump (5.1a, 5.2a) cannot be started and operated. 2a) cannot be started and operated; when the cooling coil 17a in the low-level oil tank 16a is not opened, the remote pressure relief valve on any remote pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the other pressure monitoring devices is greater than 10MPa, there is an alarm indication; when the electric heating device 14a near the main cabin 15 on the pipeline between the electric liquid booster pump (5.1a, 5.2a) and the main cabin 15 is not working, the pressurization and pressure relief operation cannot be performed; when the liquid level of the clean oil tank 2a is low, the pressurization and pressure relief operation cannot be performed; when the pressure on the gas source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there is an alarm indication. Interlocking protection to avoid misoperation.

[0038] 2. Voltage stabilization unit The pressure stabilizing unit is used for stabilizing the pressure of the main chamber 15 (e.g., for 1 month) and pressurizing, stabilizing (e.g., for 1 month) and relieving the pressure of the actuator (32.1~32.4) to meet the pressure test requirements, such as Figure 3As shown, it mainly includes hydraulic boosters (28.1a~28.5a) corresponding to the main cabin 14 and each actuator (32.1~32.4), servo valves corresponding to each hydraulic booster (28.1a~28.5a), a hydraulic pump 22a for supplying pressure to the hydraulic booster (28.1a~28.5a), a clean oil tank 219a for oil supply, a pressure relief oil tank for storing pressure relief oil, a monitoring module, and a control module. The monitoring module is used to monitor the status of the hydraulic booster (28.1a~28.5a) and the sample, and the control module can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed-loop control according to the target command and the feedback of the monitoring module.

[0039] Among them, the working process of the hydraulic booster (28.1a~28.5a) is as follows: low-pressure filling to achieve rapid oil supply; in the boosting stage, high-frequency action is achieved and high-pressure oil is continuously output; automatic pressure maintenance, after reaching mechanical balance, the piston will stop moving, when the pressure on the high-pressure side decreases due to load reduction or leakage and other factors, the high and low pressure pistons will lose mechanical balance and automatically circulate to replenish pressure; unloading.

[0040] In this embodiment, preferably: the monitoring module includes a pressure monitoring component for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster (28.1a~28.5a), a displacement monitoring component for monitoring the piston displacement of the hydraulic booster (28.1a~28.5a), and a deformation monitoring component for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster (28.1a~28.5a) through a servo valve closed loop according to the target pressure and the feedback of the pressure monitoring component, see Figure 4 , can calculate the volume and flow rate of the medium injected into the actuator (32.1~32.4) or the main cabin 15 according to the feedback of the displacement monitoring part, can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed loop according to the required volume and flow rate of the medium injected into the actuator (32.1~32.4) or the main cabin 15 and the feedback of the displacement monitoring part, see Figure 5 , can control the corresponding hydraulic booster (28.1a~28.5a) through the servo valve closed-loop control according to the target deformation of the specimen and the feedback from the deformation monitoring part; this setting can not only achieve high-precision control during the test, but also dual closed-loop control of pressure and displacement, which is safer and more reliable.

[0041] In this embodiment, the low-pressure chamber of the hydraulic booster (28.1a~28.5a) uses a pressure sensor with a range of 20MPa, and the high-pressure chamber uses a pressure sensor with a range of 160MPa; the piston rod of the hydraulic booster (28.1a~28.5a) is installed with a magnetostrictive displacement sensor (LVDT), which can accurately measure the displacement data of the piston, and then convert the volume and flow of the medium injected into the actuator and the main cabin; a total of 14 deformation sensors are installed in the sample.

[0042] Among them: the control module processes the data fed back by the monitoring module in real time (data amplification, feedback comparison, difference adjustment, PID operation, etc.) to complete the adjustment of the servo valve drive signal (that is, the adjustment of the target value). The time of such an adjustment cycle is only 20ms at most. Through continuous adjustment, the target can be achieved in a few cycles, so that the system can accurately and quickly respond to the changes in stress and strain of the test piece, ensuring that the control accuracy of the entire system reaches ±1%FS.

[0043] In this embodiment, preferably: Figure 3 As shown, a filter 21.2a is provided near the upstream of the hydraulic pump 22a, and a high-pressure fine oil filter 23a, a one-way valve 24a and a proportional relief valve 26a are provided near the downstream of the hydraulic pump 22a to ensure reliable operation.

[0044] In this embodiment, preferably: Figure 3 As shown, an ultra-high pressure cooling filter (30.1a~30.5a) and an ultra-high pressure manual needle valve (31.1a~31.5a) are provided on the output pipeline of each hydraulic booster (28.1a~28.5a), and the output pipeline of the hydraulic booster (28.2a~28.5a) corresponding to the actuator (32.1~32.4) is connected to the pressure relief tank through a branch with a bursting disc (29.1a~29.4a).

[0045] This application fully considers the characteristics of deep geotechnical engineering disturbance simulation facilities, and the overall pressure control scheme is: Since the main cabin 15 has a large internal volume (approximately 3.3m 3 ), the required flow rate change is also relatively large, and the pressure increase and pressure relief are achieved by using an electric liquid booster pump (5.1a, 5.2a) in conjunction with the valves on each pressure relief branch, so the main cabin pressurization and pressure relief unit is used; At the same time, the pressure stabilization of the main cabin 15 and the pressure boost, stabilization and pressure relief of each actuator require a relatively small flow rate, and require high pressure control accuracy, which is achieved by using an electro-hydraulic servo-controlled hydraulic booster (28.1a~28.5a), so a pressure stabilization unit is used.

[0046] For the main cabin 15, its volume is relatively large. It needs to inject about 170L of medium from 0 to 100MPa (the initial condition is that the main cabin is already filled with medium before pressurization). At this stage, electric liquid booster pumps (5.1a, 5.2a) are selected for pressurization. The electric liquid booster pumps (5.1a, 5.2a) are equipped with constant torque variable frequency motors. The output flow can be changed by adjusting the motor frequency, and the boosting rate of 1 to 10MPa / min can be adjusted arbitrarily. The hydraulic booster 28.1a only intervenes in the work during its pressure maintenance stage; for each actuator (32.1~32.4), its capacity The volume is very small, and the amount of oil required for oil replenishment is not large. The 0-150MPa pressurization stage and the subsequent pressure maintenance stage and pressure relief stage are all completed by the hydraulic booster (28.2a~28.5a); the main cabin 15 has different requirements for pressure stabilization and the requirements for pressurization and pressure maintenance of each actuator (32.1~32.4), and different types of hydraulic boosters need to be selected. The hydraulic booster (28.2a~28.5a) corresponding to the actuator (32.1~32.4) has a designed pressure ratio of 1:10. When the low-pressure chamber input is 15MPa, the high-pressure chamber output pressure is 150MPa.

[0047] In the main cabin pressurization and pressure relief unit, the danger of ultra-high pressure working conditions is fully taken into consideration, and each pressure relief branch can perform functions such as slow pressure relief, rapid pressure relief, manual pressure relief, and manual pressure relief in emergency situations; in the pressure stabilizing unit, the hydraulic booster (28.1a~28.5a) can convert a smaller pressure into a larger pressure, reducing the danger of ultra-high pressure working conditions, and the control module and the monitoring module are used to achieve closed-loop control, making the adjustment more precise and rapid; the main cabin pressurization and pressure relief unit and the pressure stabilizing unit are independent of each other but can be used in conjunction, and can accurately control the pressure of the main cabin 15 and the actuator (32.1~32.4), thereby providing a pressure test environment and laying a foundation for subsequent rock test and other evaluations.

[0048] Embodiment 2 The present embodiment discloses a method for controlling a pressure load of a deep geotechnical engineering disturbance simulation facility, based on the above-mentioned deep geotechnical engineering disturbance simulation facility pressure load control system; when conducting a test, firstly, the internal pressure of the actuator (32.1-32.4) is slowly increased through a pressure stabilizing unit, then the main cabin 15 is pressurized to a required confining pressure at a required pressurization rate through a main cabin pressurization and pressure relief unit, and the main cabin 15 is pressure stabilized through a pressure stabilizing unit, then the internal pressure of the actuator (32.1-32.4) is increased through a pressure stabilizing unit at a required pressurization rate, a certain pressure is applied to a sample and then the pressure is stabilized, and then the actuator is precisely controlled by the pressure stabilizing unit according to the test requirements to test the sample; after the test, firstly, the internal pressure of the actuator (32.1-32.4) is synchronously unloaded to the confining pressure at a required rate through a pressure stabilizing unit, then the confining pressure of the main cabin 15 is unloaded at a required rate through a main cabin pressurization and pressure relief unit, and the internal pressure of the actuator (32.1-32.4) is unloaded to atmospheric pressure through a pressure stabilizing unit.

[0049] The system can complete a series of geotechnical engineering tests, including three-way pressure synchronous loading test, three-way pressure asynchronous loading test, three-way stress gradient loading test, main cabin constant pressure control test, constant velocity displacement loading test, displacement gradient loading test, deformation closed-loop control test, stress and strain coupling loading test, multi-terminal control loading test, PLC external data test, pressure unloading test, etc. It can observe and control the evolution of internal structure or external behavior of large-scale rock samples in detail, and provide support and guarantee for the development of new theories and methods of deep geotechnical engineering, performance testing of deep geotechnical engineering materials and equipment, and exploration of new processes for deep geotechnical engineering design and construction. Two tests are listed below.

[0050] Test 1, taking the constant minimum principal strain rate control test as an example, for the rock sample without pore pressure: Step S1, slowly increasing the internal pressure of the actuator (32.1-32.4) through a voltage stabilizing unit and making the actuator (32.1-32.4) contact the sample, and controlling the output pressure of the actuator (32.1-32.4) to prevent the sample from being eccentric and the contact force from being too large; Step S2: The main cabin 15 is pressurized to the required ambient pressure ( X = y = Z ) and stabilize the main cabin pressure through the pressure stabilizing unit; Step S3: Increase the internal pressure of the actuator (in the Y direction and the Z direction) at a constant rate through the pressure stabilizing unit to apply a certain pressure (s y =s z ) after voltage stabilization; Step S4, increasing the internal pressure (z) of a pair of actuators to a set value and stabilizing the pressure (the time can be set) at a constant minimum principal strain rate (i.e., expansion rate, strain in the direction perpendicular to the free surface) through a voltage stabilizing unit, and then repeating loading-unloading-stabilizing or unloading-loading-stabilizing until the sample is destroyed; the whole process is set in advance to limit the stress on the sample and the deformation of the actuator (32.1~32.4), and if it exceeds the set value, it will be automatically terminated, or it will be manually terminated according to the test situation; Step S5, unloading the internal pressure of the actuator (Y direction and Z direction) to the confining pressure synchronously at a constant contraction rate through the pressure stabilizing unit; Step S6: unload the surrounding pressure of the main cabin 15 at a constant pressure reduction rate through the main cabin pressurization and pressure relief unit, and unload the internal pressure of the actuator (32.1-32.4) to atmospheric pressure through the pressure stabilizing unit.

[0051] Test 2, taking the three-axis constant stress control test as an example, for the rock sample without pore pressure: Step S1, slowly increase the internal pressure of the actuator (32.1-32.4) to 2-5 MPa through a pressure stabilizing unit and stabilize the pressure; Step S2: pressurize the main cabin 15 to the required ambient pressure (s) at a constant pressurization rate through the main cabin pressurization and pressure relief unit. X =s y =s Z ) and stabilizing the pressure of the main cabin 15 through the pressure stabilizing unit; synchronously increasing the internal pressure of the actuator (32.1~32.4) and stabilizing the pressure at the same constant pressure increasing rate through the pressure stabilizing unit; Step S3: Increase the internal pressure of the actuator (in the Y direction and the Z direction) at a constant pressure increasing rate through the pressure stabilizing unit, and apply a certain pressure (s y =s z ) after voltage stabilization; Step S4, increasing the internal pressure (Z direction) of a pair of actuators to a set value at a constant pressure increasing rate through a voltage stabilizing unit and stabilizing the pressure (the time can be set); the stress of the specimen and the deformation limit of the actuator (32.1~32.4) are set in advance during the whole process, and if the set value is exceeded, the test is automatically terminated, or manually terminated according to the test situation; Step S5, unloading the internal pressure of the actuator (Y direction and Z direction) to the confining pressure synchronously at a constant contraction rate through the pressure stabilizing unit; Step S6, unloading the surrounding pressure of the main cabin 15 at a constant pressure reduction rate through the main cabin pressurization and pressure relief unit, and unloading the internal pressure of the actuator (32.1-32.4) to atmospheric pressure through the pressure stabilizing unit.

[0052] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

Claims

1. A pressure load control system for a deep geotechnical engineering disturbance simulation facility, characterized in that: It is used to provide a pressure test environment for the main cabin, including a main cabin pressurization and pressure relief unit and a pressure stabilizing unit using heat transfer oil as the working medium; the main cabin pressurization and pressure relief unit is used to pressurize and relieve the main cabin to apply or unload the surrounding pressure under conditions with large flow changes, including an electric liquid booster pump driven by a constant torque variable frequency motor for pressurization, a clean oil tank for oil supply, and a low-level oil tank for storing return oil. The pipeline between the electric liquid booster pump and the main cabin is provided with a manual pressure relief branch, a remote pressure relief branch with different pressure relief rates, a safety protection branch, an emergency remote pressure relief branch, and an emergency manual pressure relief branch. Pressure relief branch; the pressure stabilizing unit is used for stabilizing the pressure of the main cabin and pressurizing, stabilizing and releasing the pressure of the actuator to meet the pressure test requirements under the working conditions of small flow rate, including a hydraulic booster corresponding to the main cabin and each actuator, a servo valve corresponding to each hydraulic booster, a hydraulic pump for supplying pressure to the hydraulic booster, a clean oil tank 2 for oil supply, a pressure relief oil tank for storing pressure relief oil, a monitoring module and a control module. The monitoring module is used to monitor the status of the hydraulic booster and the test sample, and the control module can control the corresponding hydraulic booster action through the servo valve closed-loop according to the target command and the feedback of the monitoring module.

2. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: A manual or electric ball valve and a filter are arranged near the upstream of the electric liquid booster pump, and an ultra-high pressure one-way valve, an ultra-high pressure manual needle valve, an ultra-high pressure pneumatic needle valve and a pressure monitoring component are arranged near the downstream of the electric liquid booster pump.

3. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: Two parallel electric liquid booster pumps are used; one is a large-flow booster pump, which works when pressurization is required at a boost rate of more than 2MPa / min; the other is a small-flow booster pump, which works when pressurization is required at a boost rate of less than 2MPa / min; the two pumps shall not work at the same time.

4. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: An ultra-high pressure manual pressure relief valve is installed on the manual pressure relief branch. Two ultra-high pressure electric regulating valves and one ultra-high pressure pneumatic needle valve are installed on the two remote pressure relief branches. The ultra-high pressure electric regulating valve adjusts the valve opening through PID to accurately control the pressure relief rate of the main cabin. The two remote pressure relief branches are used individually or in combination according to the required pressure relief rate.

5. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: Ultra-high pressure filters are installed on the manual pressure relief branch and the remote pressure relief branch, an ultra-high pressure cooler is installed on the pipeline between the electric liquid booster pump and the main cabin, and a cooling coil is installed in the low-level oil tank.

6. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: A bursting disc is provided on the safety protection branch, an ultra-high pressure pneumatic needle valve is provided on the emergency remote pressure relief branch, and an ultra-high pressure manual needle valve is provided on the emergency manual pressure relief branch.

7. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: An electric heating device is provided near the main cabin on the pipeline between the electric liquid booster pump and the main cabin.

8. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: The pipelines between the electric liquid booster pump and the main cabin, the manual pressure relief branch, the remote pressure relief branch with different pressure relief rates, and the air source system that supplies air to each pneumatic valve in the main cabin pressurization and pressure relief unit are all equipped with pressure monitoring components. Interlocking protection is achieved through the feedback of the pressure monitoring components: when the remote pressure relief valve on any remote pressure relief branch is opened and the air control valve is closed, the electric liquid booster pump cannot be started and operated; when the valve on the pipeline between the electric liquid booster pump and the main cabin is not opened, the electric liquid booster pump cannot be started and operated; when the low When the cooling coil in the oil tank is not opened, the remote pressure relief valve on any remote pressure relief branch cannot be opened; when the difference between any pressure monitoring device and the other pressure monitoring devices is greater than 10MPa, there will be an alarm indication; when the electric heating device near the main cabin on the pipeline between the electric liquid booster pump and the main cabin is not working, pressurization and pressure relief operations cannot be performed; when the liquid level in the clean oil tank is low, pressurization and pressure relief operations cannot be performed; when the pressure on the air source system is lower than 0.6MPa, the main cabin pressurization and pressure relief unit shall not work, and there will be an alarm indication.

9. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: The monitoring module includes a pressure monitoring component for monitoring the pressure at the low-pressure end and the high-pressure end of the hydraulic booster, a displacement monitoring component for monitoring the displacement of the hydraulic booster piston, and a deformation monitoring component for monitoring the deformation of the sample. The control module can control the corresponding hydraulic booster through a servo valve closed-loop according to the target pressure and the feedback of the pressure monitoring component, can calculate the volume and flow of the medium injected into the actuator or the main cabin according to the feedback of the displacement monitoring component, can control the corresponding hydraulic booster through a servo valve closed-loop according to the required volume and flow of the medium injected into the actuator or the main cabin and the feedback of the displacement monitoring component, and can control the corresponding hydraulic booster through a servo valve closed-loop according to the target deformation of the sample and the feedback of the deformation monitoring component.

10. The pressure load control system for deep geotechnical engineering disturbance simulation facility according to claim 1, characterized in that: A filter is provided near the upstream of the hydraulic pump, a high-pressure fine oil filter, a one-way valve and a proportional relief valve are provided near the downstream of the hydraulic pump, an ultra-high-pressure cooling filter and an ultra-high-pressure manual needle valve are provided on the output pipeline of each hydraulic booster, and the output pipeline of the hydraulic booster corresponding to the actuator is connected to the pressure relief tank through a branch with a bursting disc.

11. A method for controlling pressure load of a deep geotechnical engineering disturbance simulation facility, characterized in that: Based on the deep geotechnical engineering disturbance simulation facility pressure load control system as described in any one of claims 1 to 10; when conducting a test, first slowly increase the internal pressure of the actuator through a pressure stabilizing unit, then pressurize the main cabin to the required confining pressure at a required pressurization rate through the main cabin pressurization and pressure relief unit, and stabilize the main cabin through the pressure stabilizing unit, then increase the internal pressure of the actuator at a required pressurization rate through the pressure stabilizing unit, apply a certain pressure to the sample and then stabilize the pressure, and then accurately control the actuator through the pressure stabilizing unit according to the test requirements to test the sample; after the test, first synchronously unload the internal pressure of the actuator to the confining pressure at a required rate through the pressure stabilizing unit, then unload the main cabin confining pressure at a required rate through the main cabin pressurization and pressure relief unit, and unload the internal pressure of the actuator to atmospheric pressure through the pressure stabilizing unit.

Citation Information

Patent Citations

  • Large multifunctional rock-soil structure model test platform multi-point servo loading system

    CN105240350A

  • Ultrahigh-pressure hydraulic pressurization system controlled by low-pressure servo source

    CN105508319A

  • Automatic confining pressure control system of Hopkinson pressure bar for deep rock mass engineering

    CN108169006A

  • Large-size deep cavern group three-dimensional physical model test system and method

    CN108375665A

  • Deep geotechnical engineering disturbance simulation facility environment load control system and method

    CN118655941A