Grid-forming type photovoltaic energy storage control system

By setting multiple energy storage submodules and connection submodules in the grid-type photovoltaic energy storage system, dynamically adjusting the grid-connected power parameters, and performing charging and discharging operations in different time intervals, the grid stability and energy efficiency problems are solved, and the power grid is realized. The system is efficiently operated and responded quickly.

CN119051118AInactive Publication Date: 2024-11-29华能康保风能利用有限责任公司 +9

Patent Information

Application Number
CN202410974750.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing grid-type energy storage system cannot effectively support the grid frequency and voltage when the high proportion of new energy power generation systems are connected to the grid, resulting in a decrease in grid stability. The energy efficiency and response speed of the energy storage system are insufficient, so it is impossible to stabilize the grid in a timely manner. fluctuation.

Method used

By setting multiple energy storage submodules and connection submodules, dynamically adjust the grid-connected power parameters of grid-type photovoltaics, establish multiple time intervals for charging and discharging operations, and quickly start the backup energy storage submodule when power fluctuates. , the central control unit is used for comprehensive evaluation and selection of the optimal energy storage submodule for control, to achieve system energy balance and rapid response.

Benefits of technology

The operation efficiency and grid-connected stability of the grid-type photovoltaic energy storage system are improved, the service life of the energy storage unit is extended, and the rapid switching of the energy storage unit and the optimization of the operating state are achieved through the power difference prediction curve.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119051118A_ABST
    Figure CN119051118A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of photovoltaic energy storage, in particular to a network construction type photovoltaic energy storage control system. Comprising a central control unit used for establishing a photovoltaic power prediction model and a power grid power prediction model; the energy storage unit comprises a plurality of energy storage sub-modules, and the energy storage unit is used for adjusting the output power of the photovoltaic module; the connecting unit is used for connecting the photovoltaic module and the energy storage unit, and the connecting unit is used for controlling the charging and discharging state of the energy storage unit; the connecting unit comprises a plurality of connecting sub-modules; the central control unit is used for setting control parameters of the connection unit and the energy storage unit. A plurality of energy storage sub-modules and a plurality of connection sub-modules are set, grid-connected power parameters of a grid-forming photovoltaic system are dynamically adjusted, a plurality of time intervals are established, corresponding target energy storage sub-modules are selected in different time periods to perform charging and discharging operation, and when relatively large power fluctuation occurs, the grid-connected power parameters of the grid-forming photovoltaic system are dynamically adjusted. And the standby energy storage sub-module is quickly started to perform quick adjustment, so that the operation efficiency and the grid-connected stability of the network construction type photovoltaic system are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of photovoltaic energy storage technology, and in particular to a grid-type photovoltaic energy storage control system. Background Art

[0002] In recent years, the scale of photovoltaic installed capacity in my country has grown rapidly. Photovoltaic new energy power generation uses flexible, efficient and energy-saving power electronic inverters for grid-connected operation. However, power electronic devices do not have inertia and damping, and cannot provide support for grid frequency and voltage. When a high proportion of new energy power generation systems are connected to the grid, the stability of the grid will be greatly reduced, posing severe challenges to the safe and stable operation of the grid.

[0003] Grid-connected energy storage systems can play multiple roles, such as improving power supply reliability, balancing supply and demand differences, and supporting the integration of renewable energy. They are of great significance for achieving a sustainable and efficient power system. However, existing grid-connected energy storage systems mainly face the following problems: First, how to achieve stable support for the power grid; second, how to improve the energy efficiency of the energy storage system; and third, how to achieve rapid response and efficient control. Due to the limitation of battery capacity and the different loads of the power grid at different times, sometimes excessive grid fluctuations will cause traditional battery energy storage systems to be unable to stabilize the power grid in time. Even if the control equipment of the battery energy storage system can respond, the battery pack cannot provide large amounts of electrical energy storage in time, reducing the accuracy of the stabilization process. Summary of the invention

[0004] The purpose of this application is: to solve the above-mentioned technical problems, this application provides a grid-type photovoltaic energy storage control system, which aims to improve the operating efficiency and grid-connected stability of grid-type photovoltaics and increase the service life of the energy storage unit.

[0005] In some embodiments of the present application, by setting multiple energy storage sub-modules and connection sub-modules, the grid-connected power parameters of the grid-connected photovoltaic system are dynamically adjusted to maintain the energy balance in the dynamic interaction of the system. By establishing multiple time intervals, corresponding target energy storage sub-modules are selected in different time periods for charging and discharging operations. At the same time, when large power fluctuations occur, the backup energy storage sub-module can be quickly started and quickly adjusted to improve the operating efficiency and grid-connected stability of the grid-connected photovoltaic energy storage system.

[0006] In some embodiments of the present application, each energy storage sub-module is comprehensively evaluated at the starting nodes of different time intervals, and the optimal energy storage sub-module is selected for control, thereby improving the service life of each energy storage sub-module. At the same time, since each energy storage sub-module is independent of each other, the lead time of each switching point is set by the power difference prediction curve, so as to achieve rapid switching of the operating state of the energy storage unit when the power changes, thereby ensuring the overall operating efficiency.

[0007] In some embodiments of the present application, a grid-type photovoltaic energy storage control system is provided, comprising:

[0008] Central control unit, used to establish photovoltaic power prediction model and grid power prediction model;

[0009] An energy storage unit, comprising a plurality of energy storage submodules, wherein the energy storage unit is used to adjust the output power of the photovoltaic module;

[0010] A connection unit, used to connect the photovoltaic module and the energy storage unit, and the connection unit is used to control the charge and discharge state of the energy storage unit;

[0011] The connection unit includes a plurality of connection submodules;

[0012] The central control unit is used to set control parameters of the connection unit and the energy storage unit.

[0013] In some embodiments of the present application, the central control unit includes:

[0014] A first processing module, used to generate a photovoltaic power prediction curve according to a photovoltaic prediction model;

[0015] The second processing module is used to generate a power grid power prediction curve according to the power grid power prediction model;

[0016] A third processing module is used to establish a regulation cycle, and generate a power difference prediction curve within a single regulation cycle according to the photovoltaic power prediction curve and the grid power prediction curve;

[0017] The third processing module is further used to set the control parameters of the energy storage unit according to the power difference prediction curve in the current adjustment cycle.

[0018] In some embodiments of the present application, the central control unit further includes:

[0019] A control module is used to establish an energy storage submodule sequence A, where A = (a1, a2 ... an), where ai is the i-th energy storage submodule and n is the number of energy storage submodules;

[0020] The control module is also used to generate a mapping relationship between the energy storage submodule and the connection submodule, and establish a connection submodule sequence B, B = (b1, b2...bn), where bi is the connection submodule corresponding to the i-th energy storage submodule;

[0021] The control module is also used to set circuit parameters of each connection submodule.

[0022] In some embodiments of the present application, the third processing module is further used to:

[0023] Obtain a power difference prediction curve within the current regulation period and generate multiple time intervals;

[0024] Establish a time interval sequence T, T = (t1, t2 ... tm), where ti is the i-th time interval in the current adjustment cycle, and m is the number of time intervals in the current adjustment cycle;

[0025] Establish a discharge evaluation model and an energy storage evaluation model for the energy storage submodule;

[0026] Based on the time interval sequence T, select the target time interval in sequence;

[0027] The predicted power difference g within the target time interval is obtained, and the control mode within the target time interval is generated.

[0028] In some embodiments of the present application, when generating a control mode within a target time interval, the process includes:

[0029] Preset the first predicted power difference threshold △ G;

[0030] If the predicted power difference g is less than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the first-level control mode;

[0031] Calling the discharge evaluation model according to the first-level control mode, and setting the control parameters of the energy storage submodule according to the discharge evaluation model;

[0032] If the predicted power difference g is greater than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the secondary control mode,

[0033] The energy storage evaluation model is called according to the secondary control mode, and the control parameters of the energy storage submodule are set according to the energy storage evaluation model.

[0034] In some embodiments of the present application, when setting the control parameters of the energy storage submodule according to the discharge evaluation model, it includes:

[0035] Select the target energy storage submodules in turn;

[0036] Generate a discharge evaluation value c of the target energy storage submodule within a target time interval according to the discharge evaluation model;

[0037]

[0038] Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; r1 is the number of discharge evaluation indicators; αi is the influencing factor of the i-th discharge evaluation indicator; ki is the reference value of the i-th discharge evaluation indicator at the start time node of the current adjustment cycle; P1 is the discharge evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval;

[0039] Generate discharge evaluation values ​​of each energy storage submodule in sequence;

[0040] Establish a discharge evaluation value sequence C, C = (c1, c2...cn), where ci is the discharge evaluation value of the i-th energy storage submodule in the current time interval;

[0041] The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence C, and the expected discharge plan for the target time interval is set.

[0042] In some embodiments of the present application, when setting the control parameters of the energy storage submodule according to the energy storage evaluation model, it includes:

[0043] Select the target energy storage submodules in turn;

[0044] Generate an energy storage evaluation value d of the target energy storage submodule within the target time interval according to the energy storage evaluation model;

[0045]

[0046] Among them, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Q3 is the preset third fixed coefficient; Q4 is the preset fourth fixed coefficient; r2 is the number of energy storage evaluation indicators; βi is the influencing factor of the i-th energy storage evaluation indicator; fi is the reference value of the i-th energy storage evaluation indicator at the start time node of the current adjustment cycle; P2 is the energy storage evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval;

[0047] Generate energy storage evaluation values ​​for each energy storage submodule in sequence;

[0048] Establish an energy storage evaluation value sequence D, D = (d1, d2...dn), where di is the energy storage evaluation value of the i-th energy storage submodule in the current time interval;

[0049] The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence D, and the expected energy storage plan for the target time interval is set.

[0050] In some embodiments of the present application, the central control unit further includes:

[0051] A correction module, used for generating a real-time power difference value;

[0052] The correction module is also used to generate a real-time prediction deviation value j according to the real-time power difference and the power difference prediction curve;

[0053] The correction module is further used to preset a first deviation value threshold J1 and a second deviation value threshold J2, and J1<J2;

[0054] If j<J1, no correction instruction is generated;

[0055] If J1≤j<J2, a first-level correction instruction is generated, and the control parameters of the target energy storage submodule in the current time interval are corrected according to the first-level correction instruction;

[0056] If j≥J2, a secondary correction instruction is generated, and a backup energy storage submodule within the current time interval is selected according to the secondary correction instruction, and control parameters of the backup energy storage submodule are set.

[0057] In some embodiments of the present application, the central control unit further includes:

[0058] A correction module, used to establish multiple correction time nodes according to the time interval sequence T in the current adjustment cycle;

[0059] The correction module is also used to obtain the power cumulative difference at each correction time node, and determine whether to correct the photovoltaic power prediction model and the power grid power prediction model according to the power cumulative difference.

[0060] Compared with the prior art, the grid-type photovoltaic energy storage control system of the present application has the following beneficial effects:

[0061] By setting multiple energy storage submodules and connection submodules, the grid-connected power parameters of the grid-connected photovoltaic system are dynamically adjusted to maintain the energy balance in the dynamic interaction of the system. By establishing multiple time intervals, the corresponding target energy storage submodules are selected in different time periods for charging and discharging operations. At the same time, when large power fluctuations occur, the backup energy storage submodule can be quickly started and adjusted quickly to improve the operating efficiency and grid-connected stability of the grid-connected photovoltaic energy storage system.

[0062] At the starting nodes of different time intervals, each energy storage sub-module is comprehensively evaluated, and the optimal energy storage sub-module is selected for control, thereby improving the service life of each energy storage sub-module. At the same time, since each energy storage sub-module is independent of each other, the lead time of each switching point is set through the power difference prediction curve to achieve rapid switching of the operating state of the energy storage unit when the power changes, thereby ensuring the overall operating efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Figure 1 It is a structural schematic diagram of a grid-type photovoltaic energy storage control system in the preferred embodiment of the present application. DETAILED DESCRIPTION

[0064] The specific implementation methods of the present application are further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but are not intended to limit the scope of the present application.

[0065] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0066] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0067] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0068] like Figure 1 As shown, a grid-type photovoltaic energy storage control system according to a preferred embodiment of the present application is characterized in that it includes:

[0069] Central control unit, used to establish photovoltaic power prediction model and grid power prediction model;

[0070] An energy storage unit, including a plurality of energy storage submodules, the energy storage unit is used to adjust the output power of the photovoltaic module;

[0071] A connection unit, used to connect the photovoltaic module and the energy storage unit, and the connection unit is used to control the charging and discharging state of the energy storage unit;

[0072] The connection unit includes a plurality of connection submodules;

[0073] The central control unit is used to set the control parameters of the connection unit and the energy storage unit.

[0074] Specifically, the central control unit includes:

[0075] A first processing module, used to generate a photovoltaic power prediction curve according to a photovoltaic prediction model;

[0076] The second processing module is used to generate a power grid power prediction curve according to the power grid power prediction model;

[0077] The third processing module is used to establish a regulation cycle and generate a power difference prediction curve within a single regulation cycle according to the photovoltaic power prediction curve and the grid power prediction curve;

[0078] The third processing module is also used to set the control parameters of the energy storage unit according to the power difference prediction curve in the current adjustment cycle;

[0079] A control module is used to establish an energy storage submodule sequence A, where A = (a1, a2 ... an), where ai is the i-th energy storage submodule and n is the number of energy storage submodules;

[0080] The control module is also used to generate a mapping relationship between the energy storage submodule and the connection submodule, and establish a connection submodule sequence B, B = (b1, b2...bn), where bi is the connection submodule corresponding to the i-th energy storage submodule;

[0081] The control module is also used to set the circuit parameters of each connection submodule.

[0082] Specifically, the connection submodule is preferably a bidirectional DC-DC converter. When the output power of the photovoltaic panel is greater than the output power of the grid side, the bidirectional DC-DC converter is transformed into a BUCK circuit, and the excess electric energy is transmitted to the battery, and the battery is charged at this time; and when the output power of the photovoltaic panel is less than the output power of the grid side, the bidirectional DC-DC converter is transformed into a BOOST circuit, and the battery is discharged at this time.

[0083] Specifically, the charging and discharging operations of the corresponding energy storage submodules are completed by adjusting the operating status of the connection submodules.

[0084] It can be understood that in the above embodiment, by setting multiple energy storage sub-modules and connection sub-modules, the grid-connected power parameters of the grid-connected photovoltaic are dynamically adjusted to maintain the energy balance in the dynamic interaction of the system. At the same time, by setting multiple energy storage sub-modules, greater energy storage needs can be met, the charging and discharging frequency of a single energy storage sub-module can be reduced, and the overall service life can be improved.

[0085] In a preferred embodiment of the present application, the third processing module is also used for:

[0086] Obtain a power difference prediction curve within the current regulation period and generate multiple time intervals;

[0087] Establish a time interval sequence T, T = (t1, t2 ... tm), where ti is the i-th time interval in the current adjustment cycle, and m is the number of time intervals in the current adjustment cycle;

[0088] Establish a discharge evaluation model and an energy storage evaluation model for the energy storage submodule;

[0089] Based on the time interval sequence T, select the target time interval in sequence;

[0090] The predicted power difference g within the target time interval is obtained, and the control mode within the target time interval is generated.

[0091] Specifically, when generating a control mode within a target time interval, it includes:

[0092] Preset the first predicted power difference threshold △ G;

[0093] If the predicted power difference g is less than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the first-level control mode;

[0094] Calling the discharge evaluation model according to the first-level control mode, and setting the control parameters of the energy storage submodule according to the discharge evaluation model;

[0095] If the predicted power difference g is greater than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the secondary control mode,

[0096] The energy storage evaluation model is called according to the secondary control mode, and the control parameters of the energy storage submodule are set according to the energy storage evaluation model.

[0097] Specifically, a power difference prediction curve within the current adjustment period is generated according to a preset model, and a power difference prediction curve is calculated based on the power difference prediction curve and the first power difference threshold. △ G, establish multiple time intervals, whose predicted power difference is the predicted photovoltaic power minus the predicted grid power. When the predicted power difference g is less than the preset first predicted power difference threshold △ G, the photovoltaic output power at this time is lower than the output power on the grid side. The energy storage unit adjusts the photovoltaic output power by discharging to ensure the stability of the system. When the predicted power difference g is greater than the preset first predicted power difference threshold △ G, the photovoltaic output power at this time is higher than the output power on the grid side. The energy storage unit absorbs the excess photovoltaic output power through charging to ensure the stability of the system.

[0098] Specifically, each energy storage sub-module is comprehensively evaluated at the starting nodes of different time intervals, and the optimal energy storage sub-module is selected for control, thereby improving the service life of each energy storage sub-module. At the same time, since each energy storage sub-module is independent of each other, the lead time of each switching point is set through the power difference prediction curve to achieve rapid switching of the operating state of the energy storage unit when the power changes, thereby ensuring the overall operating efficiency.

[0099] In a preferred embodiment of the present application, when setting the control parameters of the energy storage submodule according to the discharge evaluation model, it includes:

[0100] Select the target energy storage submodules in turn;

[0101] Generate a discharge evaluation value c of the target energy storage submodule within a target time interval according to the discharge evaluation model;

[0102]

[0103] Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; r1 is the number of discharge evaluation indicators; αi is the influencing factor of the i-th discharge evaluation indicator; ki is the reference value of the i-th discharge evaluation indicator at the start time node of the current adjustment cycle; P1 is the discharge evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval;

[0104] Generate discharge evaluation values ​​of each energy storage submodule in sequence;

[0105] Establish a discharge evaluation value sequence C, C = (c1, c2...cn), where ci is the discharge evaluation value of the i-th energy storage submodule in the current time interval;

[0106] The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence C, and the expected discharge plan for the target time interval is set.

[0107] Specifically, the discharge evaluation indicators include but are not limited to the internal remaining power, failure frequency, historical operating time, duration of the current time interval, device response time, remaining life of the device, and expected power supply.

[0108] Specifically, the model is normalized by presetting the first fixed coefficient and the second fixed coefficient. At the same time, by introducing the discharge evaluation value adjustment amount, the discharge evaluation value of each energy storage sub-module is updated in real time based on the overall iterative control process, so as to perform optimal screening in each time interval.

[0109] Specifically, according to the expected amount of power provided and the discharge evaluation value series, one or more energy storage submodules are selected in sequence as target energy storage submodules, and the connection submodules corresponding to each target energy storage submodule are controlled to complete the discharge operation.

[0110] Specifically, when setting the control parameters of the energy storage submodule according to the energy storage evaluation model, it includes:

[0111] Select the target energy storage submodules in turn;

[0112] Generate an energy storage evaluation value d of the target energy storage submodule within the target time interval according to the energy storage evaluation model;

[0113]

[0114] Among them, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Q3 is the preset third fixed coefficient; Q4 is the preset fourth fixed coefficient; r2 is the number of energy storage evaluation indicators; βi is the influencing factor of the i-th energy storage evaluation indicator; fi is the reference value of the i-th energy storage evaluation indicator at the start time node of the current adjustment cycle; P2 is the energy storage evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval;

[0115] Generate energy storage evaluation values ​​for each energy storage submodule in sequence;

[0116] Establish an energy storage evaluation value sequence D, D = (d1, d2...dn), where di is the energy storage evaluation value of the i-th energy storage submodule in the current time interval;

[0117] The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence D, and the expected energy storage plan for the target time interval is set.

[0118] Specifically, charging evaluation indicators include but are not limited to internal remaining power, failure frequency, historical operating time, duration of the current time interval, device response time, remaining device life, and expected absorbed power.

[0119] Specifically, the model is normalized by presetting the third fixed coefficient and the fourth fixed coefficient. At the same time, by introducing the energy storage evaluation value adjustment amount, the energy storage evaluation value of each energy storage sub-module is updated in real time based on the overall iterative control process, so as to perform optimal screening in each time interval.

[0120] Specifically, according to the expected absorbed power and the energy storage evaluation value series, one or more energy storage submodules are selected in sequence as the target energy storage submodules, and the connection submodules corresponding to each target energy storage submodule are controlled to complete the energy storage operation.

[0121] It is understandable that in the above embodiment, each energy storage submodule is comprehensively evaluated at the start nodes of different time intervals, and the optimal energy storage submodule is selected for control, thereby improving the service life of each energy storage submodule.

[0122] In a preferred embodiment of the present application, the central control unit further includes:

[0123] A correction module, used for generating a real-time power difference value;

[0124] The correction module is also used to generate a real-time prediction deviation value j according to the real-time power difference and the power difference prediction curve;

[0125] The correction module is further used to preset a first deviation value threshold J1 and a second deviation value threshold J2, and J1<J2;

[0126] If j<J1, no correction instruction is generated;

[0127] If J1≤j<J2, a first-level correction instruction is generated, and the control parameters of the target energy storage submodule in the current time interval are corrected according to the first-level correction instruction;

[0128] If j≥J2, a secondary correction instruction is generated, and a backup energy storage submodule within the current time interval is selected according to the secondary correction instruction, and control parameters of the backup energy storage submodule are set.

[0129] Specifically, when the prediction deviation is small, the target energy storage submodule currently in operation is dynamically adjusted by generating a first-level correction instruction to ensure the stability of the system. When the prediction deviation is large, the backup energy storage submodule can be quickly started and adjusted by generating a second-level correction instruction to improve the operating efficiency and grid-connected stability of the grid-connected photovoltaic system.

[0130] At the same time, since each energy storage sub-module is independent of each other, the lead time of each switching point is set through the power difference prediction curve, so that the operating state of the energy storage unit can be quickly switched when the power changes, ensuring the overall operating efficiency.

[0131] Specifically, the central control unit also includes:

[0132] A correction module, used to establish multiple correction time nodes according to the time interval sequence T in the current adjustment cycle;

[0133] The correction module is also used to obtain the power cumulative difference at each correction time node, and determine whether to correct the photovoltaic power prediction model and the power grid power prediction model according to the power cumulative difference.

[0134] Specifically, when the power cumulative error at the preset correction time node is greater than the threshold, the prediction model needs to be corrected in time to improve the prediction accuracy of the power difference. This provides data support for the adjustment and control parameters of the subsequent storage units and improves the operating efficiency and grid-connected stability of the grid-connected photovoltaic energy storage system.

[0135] According to the first concept of the present application, by setting multiple energy storage sub-modules and connection sub-modules, the grid-connected power parameters of the grid-connected photovoltaic system are dynamically adjusted to maintain the energy balance in the dynamic interaction of the system. By establishing multiple time intervals, corresponding target energy storage sub-modules are selected in different time periods for charging and discharging operations. At the same time, when large power fluctuations occur, the backup energy storage sub-module can be quickly started and quickly adjusted to improve the operating efficiency and grid-connected stability of the grid-connected photovoltaic energy storage system.

[0136] According to the second concept of the present application, each energy storage sub-module is comprehensively evaluated at the starting nodes of different time intervals, and the optimal energy storage sub-module is selected for control, thereby improving the service life of each energy storage sub-module. At the same time, since each energy storage sub-module is independent of each other, the lead time of each switching point is set by the power difference prediction curve, so as to achieve rapid switching of the operating state of the energy storage unit when the power changes, thereby ensuring the overall operating efficiency.

[0137] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present application. These improvements and substitutions should also be regarded as the scope of protection of the present application.

Claims

1. A grid-type photovoltaic energy storage control system, characterized in that: include: Central control unit, used to establish photovoltaic power prediction model and grid power prediction model; An energy storage unit, comprising a plurality of energy storage submodules, wherein the energy storage unit is used to adjust the output power of the photovoltaic module; A connection unit, used to connect the photovoltaic module and the energy storage unit, and the connection unit is used to control the charge and discharge state of the energy storage unit; The connection unit includes a plurality of connection submodules; The central control unit is used to set control parameters of the connection unit and the energy storage unit.

2. The grid-type photovoltaic energy storage control system according to claim 1, characterized in that: The central control unit comprises: A first processing module, used to generate a photovoltaic power prediction curve according to a photovoltaic prediction model; The second processing module is used to generate a power grid power prediction curve according to the power grid power prediction model; A third processing module is used to establish a regulation cycle, and generate a power difference prediction curve within a single regulation cycle according to the photovoltaic power prediction curve and the grid power prediction curve; The third processing module is further used to set the control parameters of the energy storage unit according to the power difference prediction curve in the current adjustment cycle.

3. The grid-type photovoltaic energy storage control system according to claim 2, characterized in that: The central control unit also includes: A control module is used to establish an energy storage submodule sequence A, where A = (a1, a2 ... an), where ai is the i-th energy storage submodule and n is the number of energy storage submodules; The control module is also used to generate a mapping relationship between the energy storage submodule and the connection submodule, and establish a connection submodule sequence B, B = (b1, b2...bn), where bi is the connection submodule corresponding to the i-th energy storage submodule; The control module is also used to set circuit parameters of each connection submodule.

4. The grid-type photovoltaic energy storage control system according to claim 3, characterized in that: The third processing module is also used for: Obtain a power difference prediction curve within the current regulation period and generate multiple time intervals; Establish a time interval sequence T, T = (t1, t2 ... tm), where ti is the i-th time interval in the current adjustment cycle, and m is the number of time intervals in the current adjustment cycle; Establish a discharge evaluation model and an energy storage evaluation model for the energy storage submodule; Based on the time interval sequence T, select the target time interval in sequence; The predicted power difference g within the target time interval is obtained, and the control mode within the target time interval is generated.

5. The grid-type photovoltaic energy storage control system according to claim 4, characterized in that: When generating a control mode within a target time interval, include: Preset the first predicted power difference threshold △ G; If the predicted power difference g is less than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the first-level control mode; Calling the discharge evaluation model according to the first-level control mode, and setting the control parameters of the energy storage submodule according to the discharge evaluation model; If the predicted power difference g is greater than the preset first predicted power difference threshold △ G, set the control mode within the target time interval to the secondary control mode, The energy storage evaluation model is called according to the secondary control mode, and the control parameters of the energy storage submodule are set according to the energy storage evaluation model.

6. The grid-type photovoltaic energy storage control system according to claim 5, characterized in that: When setting the control parameters of the energy storage submodule according to the discharge evaluation model, it includes: Select the target energy storage submodules in turn; Generate a discharge evaluation value c of the target energy storage submodule within a target time interval according to the discharge evaluation model; Among them, e1 is the preset first weight coefficient; e2 is the preset second weight coefficient; Q1 is the preset first fixed coefficient; Q2 is the preset second fixed coefficient; r1 is the number of discharge evaluation indicators; αi is the influencing factor of the i-th discharge evaluation indicator; ki is the reference value of the i-th discharge evaluation indicator at the start time node of the current adjustment cycle; P1 is the discharge evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval; Generate discharge evaluation values ​​of each energy storage submodule in sequence; Establish a discharge evaluation value sequence C, C = (c1, c2...cn), where ci is the discharge evaluation value of the i-th energy storage submodule in the current time interval; The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence C, and the expected discharge plan for the target time interval is set.

7. The grid-type photovoltaic energy storage control system according to claim 5, characterized in that: When setting the control parameters of the energy storage submodule according to the energy storage evaluation model, it includes: Select the target energy storage submodules in turn; Generate an energy storage evaluation value d of the target energy storage submodule within the target time interval according to the energy storage evaluation model; Among them, e3 is the preset third weight coefficient; e4 is the preset fourth weight coefficient; Q3 is the preset third fixed coefficient; Q4 is the preset fourth fixed coefficient; r2 is the number of energy storage evaluation indicators; βi is the influencing factor of the i-th energy storage evaluation indicator; fi is the reference value of the i-th energy storage evaluation indicator at the start time node of the current adjustment cycle; P2 is the energy storage evaluation value adjustment amount generated based on the expected control parameters of all time intervals before the target time interval; Generate energy storage evaluation values ​​for each energy storage submodule in sequence; Establish an energy storage evaluation value sequence D, D = (d1, d2...dn), where di is the energy storage evaluation value of the i-th energy storage submodule in the current time interval; The target energy storage submodule within the target time interval is selected according to the discharge evaluation value sequence D, and the expected energy storage plan for the target time interval is set.

8. A grid-type photovoltaic energy storage control system according to any one of claims 6 to 7, characterized in that: The central control unit also includes: A correction module, used for generating a real-time power difference value; The correction module is also used to generate a real-time prediction deviation value j according to the real-time power difference and the power difference prediction curve; The correction module is further used to preset a first deviation value threshold J1 and a second deviation value threshold J2, and J1<J2; If j<J1, no correction instruction is generated; If J1≤j<J2, a first-level correction instruction is generated, and the control parameters of the target energy storage submodule in the current time interval are corrected according to the first-level correction instruction; If j≥J2, a secondary correction instruction is generated, and a backup energy storage submodule within the current time interval is selected according to the secondary correction instruction, and control parameters of the backup energy storage submodule are set.

9. The grid-type photovoltaic energy storage control system according to claim 8, characterized in that: The central control unit also includes: A correction module, used to establish multiple correction time nodes according to the time interval sequence T in the current adjustment cycle; The correction module is also used to obtain the power cumulative difference at each correction time node, and determine whether to correct the photovoltaic power prediction model and the power grid power prediction model according to the power cumulative difference.

Citation Information

Patent Citations

  • Multi-energy microgrid energy prediction and optimization scheduling method based on communication network

    CN108808743A

  • Ultra-large capacity regional micro-grid system and operation method thereof

    CN113285479A

  • Optical storage power distribution network voltage control method and system considering battery energy storage power compensation

    CN116505532A

  • Self-adaptive control method and system for network construction type energy storage system

    CN117833291A

  • New energy station control method and device based on network construction technology

    CN118232365A

Cited By

  • New energy power system power flow optimization method based on carbon emission

    CN119787367A

  • A carbon emission-based new energy power system power flow optimization method

    CN119787367B