Fluidized bed flotation device and method for separating and recycling coarse mineral

By using multi-dimensional multi-scale filling media and native ore slurry in fluidized flotation equipment, the problems of water distribution plates and high water consumption are solved, and the stability and sorting efficiency of fluidized sorting are improved.

CN119076237AActive Publication Date: 2024-12-06CHINA UNIV OF MINING & TECH

Patent Information

Application Number
CN202411253009.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-12-06
Estimated Expiration
2044-09-09

AI Technical Summary

Technical Problem

The water distribution plates in existing fluidized flotation equipment are prone to clogging and the sorting process consumes a lot of water, which limits the application of fluidized flotation technology and the ore dressing efficiency.

Method used

Multi-various multi-scale filling medium is used to replace the water-coating plate, combined with native ore slurry as the fluidization medium, and optimize fluid distribution and bubble generation through multi-layer particle structure and stirring components, dynamically adjust the fluid velocity and particle position, avoid blockage and reduce water consumption.

Benefits of technology

It improves the stability and sorting accuracy of the fluidized sorting environment, reduces the risk of equipment blockage and water consumption, and enhances the reliability and sorting efficiency of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119076237A_ABST
    Figure CN119076237A_ABST
Patent Text Reader

Abstract

The invention relates to a fluidized bed flotation device and method for coarse mineral separation and recovery, belongs to the technical field of mineral processing and resource recovery, and solves the problems that in the prior art, a fluidized bed water distribution plate of existing flotation equipment is prone to hole blocking, and the water consumption in the separation process is large. The device comprises a flotation cylinder and filling media, the flotation cylinder comprises a flotation cylinder and a conical baffle, the conical baffle is arranged at the lower end of the interior of the flotation cylinder, the filling media are arranged on the conical baffle, the multiple layers of filling media are arranged in the flotation cylinder, and the particle diameters of the filling media are increased layer by layer from bottom to top. A water distribution plate is not arranged in the flotation cylinder, namely, the water distribution plate is replaced by the filling medium, the multi-element and multi-scale filling medium is adopted to replace the water distribution plate to dynamically regulate and control fluid distribution, water distribution is uniform and stable, and the separation water consumption is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mineral processing and resource recovery, and in particular to a fluidized bed flotation device and method for separating and recovering coarse-grained minerals. Background Art

[0002] Against the backdrop of increasingly fierce global resource competition, the efficient development and utilization of coal and mineral resources is crucial to ensuring national energy security and promoting the prosperity of emerging industries. However, faced with challenges such as declining ore quality, rising mining costs, and complex process flows, traditional flotation technology has been unable to meet modern mineral processing needs. In particular, with the advancement of the dual carbon goals, energy conservation and emission reduction in mineral processing plants have become an urgent task, and the pre-selection and discarding technology of coarse particles (coal with a diameter of more than 0.5 mm and other mines with a diameter of more than 0.1 mm) is gradually becoming a research hotspot in the industry with its significant energy consumption reduction potential and tailings resource advantages. Compared with the traditional method of relying on photoelectric beneficiation and gravity separation to process large ores, the emergence of dense phase fluidized bed flotation technology has achieved efficient sorting of millimeter-level materials, opening up a new way for deep pre-selection and discarding of low-grade mineral resources.

[0003] Fluidized flotation is a composite force field sorting technology based on gravity-flotation coupling. The mineral particles to be sorted form a fluidized bed under the action of rising water flow, and complete the sorting process according to the Archimedean principle by interfering with the sedimentation motion according to the density. The introduced bubbles will adhere to the surface of the hydrophobic particles to increase the density difference between them and the gangue particles, thereby improving the sorting accuracy. However, limited by the complexity of the process, the development of existing fluidized flotation equipment is relatively slow, which greatly hinders the application and promotion of fluidized flotation technology. Among them, the water distribution plate is the core of the fluidized flotation equipment, which is used to disperse the fluid to form a fluidized bed. However, in the actual sorting process, the openings on the surface of the water distribution plate are easily blocked due to particle sedimentation, which deteriorates the fluid dispersion effect and causes problems such as bed mixing and sorting density fluctuations. In addition, the existing fluidized sorting equipment often uses clean water as fluidizing water, and the water consumption is large during the sorting process. On the one hand, it aggravates the working pressure of the subsequent coal slime water treatment link, and on the other hand, it limits the technical upgrading of mineral processing (coal) plants and the use of mineral processing (coal) plants in water-scarce areas. Summary of the invention

[0004] In view of the above analysis, the embodiments of the present invention aim to provide a fluidized bed flotation device and method for sorting and recovering coarse-grained minerals, so as to solve the problems of easy blockage of holes in the water distribution plate of the fluidized bed of the existing flotation equipment and high water consumption in the sorting process.

[0005] On the one hand, the present invention provides a fluidized bed flotation device for sorting and recovering coarse-grained minerals, comprising a flotation cylinder and a filling medium, wherein the flotation cylinder comprises a flotation cylinder and a conical baffle, wherein the conical baffle is arranged at the inner lower end of the flotation cylinder, and the filling medium is arranged on the conical baffle, wherein the filling medium has multiple layers in the flotation cylinder, and the particle diameter of the filling medium increases layer by layer from bottom to top.

[0006] Furthermore, the flotation cylinder body also includes an overflow weir and a tailings cone, and the overflow weir and the tailings cone are respectively arranged at the upper and lower ends of the flotation cylinder.

[0007] Furthermore, a concentrate outlet is provided on the overflow weir, and an accident discharge pipe and a tailings pipe are provided at the bottom of the tailings cone.

[0008] Furthermore, the accident discharge pipe is provided with a first solenoid valve for controlling the on-off of the accident discharge pipe, and the tailings pipe is provided with a second solenoid valve for controlling the on-off of the tailings pipe.

[0009] Furthermore, the flotation cylinder also includes a plurality of pressure sensors.

[0010] Furthermore, a plurality of the pressure sensors are arranged on the flotation cylinder at equal intervals from top to bottom.

[0011] Furthermore, the conical baffle is arranged concentrically with the flotation cylinder, and the diameter of the conical baffle is 7 / 10-9 / 10 of the inner diameter of the flotation cylinder.

[0012] Furthermore, the flotation cylinder is provided with a filling port for filling the filling medium.

[0013] Furthermore, the cone angle of the conical baffle is 5°-20°, and the cone angle of the tailings cone is 10°-30°.

[0014] On the other hand, the present invention provides a flotation method, which uses the above-mentioned fluidized bed flotation device to separate and recover coarse-grained minerals.

[0015] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:

[0016] (1) The filling medium of the present invention is arranged in the flotation cylinder. The volume of the filling medium in the flotation cylinder increases from bottom to top in layers, and at least two filling media of different materials are arranged. No water distribution plate is arranged in the flotation cylinder, that is, the filling medium replaces the water distribution plate. The multi-element and multi-scale filling medium is used to replace the water distribution plate to dynamically regulate the fluid distribution, thereby strengthening the stability of the fluidized sorting environment, and facilitating the high-precision recovery of coarse-grained minerals. The filling medium disperses the fluid and assists fluidization, effectively avoiding the blockage problem of the water distribution plate caused by the sedimentation of mineral particles, and enhancing the reliability and durability of the equipment. Compared with the traditional water distribution plate structure, the pores formed between the high-density coarse-grained filling medium are conducive to the further dispersion of bubbles, slowing down the rising rate of bubbles, increasing the chance of contact between particles and bubbles, and facilitating the attachment of bubbles to the surface of hydrophobic particles, enhancing the density difference between them and hydrophilic gangue, and improving the sorting effect; the low-density fine-grained filling medium can respond to the change of fluid velocity, dynamically adjust its own position, eliminate the negative impact of uneven radial velocity distribution, and ensure the balance and stability of the flow velocity of the entire column section.

[0017] (2) The bottom layer in the flotation cylinder of the present invention is a filling medium of high-density large particles, the middle layer is a filling medium of intermediate particles, and the top layer is a filling medium of low-density fine particles. The high-density coarse particles are located at the bottom layer. These particles are generally not completely fluidized, but the pores formed between them help to further disperse the bubbles, slow down the rising rate of the bubbles, increase the chance of contact between the particles and the bubbles, and facilitate the bubbles to adhere to the surface of the hydrophobic particles, thereby enhancing the density difference between them and the hydrophilic gangue, and improving the sorting effect; the low-density fine particles are located in the upper layer, in a critical fluidization state, and can respond to changes in fluid velocity and dynamically adjust their own position, eliminating the negative impact of uneven radial velocity distribution, and ensuring the balance and stability of the flow velocity of the entire column section. The intermediate-sized particles of the two densities form a transition from bottom to top. This gradual transition is conducive to improving the stability of the entire system and avoiding the decrease in sorting efficiency due to sudden changes in the fluidization state. This arrangement makes full use of the natural stratification effect of the particles, improves the sorting efficiency and the stability of the fluidized bed.

[0018] (3) The present invention pre-uses clean water in the water-added stirring barrel to initialize the filling medium to the equilibrium position, and fills the flotation cylinder with fluidized medium. When the pressure signal in the system is stable, the primary slurry is used as the fluidized medium for formal sorting. The use of primary slurry instead of clean water as the fluidized medium significantly reduces the water consumption in the sorting process, simplifies the subsequent coal slurry water treatment pressure, and generates a cavitation effect through the Venturi tube principle to form micro-nano bubbles. The rough cracks on the surface of the particles in the slurry provide a large number of cavitation sites for the formation of bubbles, thereby significantly improving the cavitation efficiency; the slurry carrying bubbles then enters the fluidized bed and co-fluidizes with the filling medium. During the fluidization process, the hydrophobic particles and bubbles complete the downstream mineralization extension, and finally the useful minerals and gangue particles are separated according to the difference in particle density.

[0019] In the present invention, the above-mentioned technical solutions can also be combined with each other to achieve more preferred combination solutions. Other features and advantages of the present invention will be described in the subsequent description, and some advantages can become obvious from the description, or can be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained through the contents particularly pointed out in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.

[0021] Figure 1 It is a structural schematic diagram of a fluidized bed flotation device of specific embodiment 1;

[0022] Figure 2 It is a schematic structural diagram of the flotation cylinder of the fluidized bed flotation device of specific embodiment 2.

[0023] Reference numerals:

[0024] 100-flotation cylinder; 101-flotation cylinder; 102-filling port; 103-overflow weir; 104-concentrate port; 105-tailing cone; 106-accident discharge pipe; 107-tailing pipe; 108-first solenoid valve; 109-second solenoid valve; 110-conical baffle; 111-pressure sensor; 112-stirring assembly; 113-drive motor; 114-stirring shaft; 115-stirring impeller; 116-isolation net cylinder; 200-filling medium; 300-addition water stirring barrel; 400-feed stirring barrel; 500-delivery pipeline; 501-first delivery pipe; 502-second delivery pipe; 503-slurry pump; 504-third solenoid valve; 505-fourth solenoid valve; 506-third delivery pipe; 507-bubble generator. DETAILED DESCRIPTION

[0025] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used together with the embodiments of the present invention to illustrate the principles of the present invention, but are not used to limit the scope of the present invention.

[0026] Example 1

[0027] A specific embodiment of the present invention, as Figure 1As shown, a fluidized bed flotation device for sorting and recovering coarse-grained minerals is disclosed, including a flotation cylinder 100 and a filling medium 200. The filling medium 200 is arranged in the inner cavity of the flotation cylinder 100. The volume of the filling medium 200 in the flotation cylinder 100 increases layer by layer from bottom to top. No water distribution plate is arranged in the flotation cylinder 100, that is, the filling medium 200 replaces the water distribution plate.

[0028] Compared with the prior art, the fluidized bed flotation device provided in this embodiment adopts a multi-element multi-scale filling medium 200 to replace the water distribution plate to dynamically control the fluid distribution, strengthen the stability of the fluidized sorting environment, and help to achieve high-precision recovery of coarse-grained minerals. The filling medium 200 disperses the fluid and assists fluidization, effectively avoiding the blockage problem of the water distribution plate caused by the sedimentation of mineral particles, and enhancing the reliability and durability of the equipment. Compared with the traditional water distribution plate structure, the pores formed between the high-density coarse-grained filling medium 200 help to further disperse the bubbles, slow down the rising rate of the bubbles, increase the chance of contact between the particles and the bubbles, and facilitate the bubbles to adhere to the surface of the hydrophobic particles, enhance the density difference between them and the hydrophilic gangue, and improve the sorting effect; the low-density fine-grained filling medium 200 can respond to the change of fluid velocity, dynamically adjust its own position, eliminate the negative impact of uneven radial velocity distribution, and ensure the balance and stability of the flow velocity of the entire column section.

[0029] like Figure 1 As shown, the flotation cylinder body 100 includes a flotation cylinder 101, preferably, the flotation cylinder 101 is a cylindrical cylinder. A filling medium 200 is arranged in the flotation cylinder 101. In order to add the filling medium 200 into the flotation cylinder 101, a filling port 102 is arranged on the flotation cylinder 101, and at least one filling port 102 is provided, preferably a plurality of filling ports 102 are provided, and the plurality of filling ports 102 are arranged along the height of the flotation cylinder 101.

[0030] When only one filling port 102 is provided, the filling port 102 should be higher than the top of the flotation cylinder 101 where the filling medium 200 is located, so as to avoid the filling port 102 being too low and causing the filling medium 200 at a high position to be unable to be filled into the flotation cylinder 101. When multiple filling ports 102 are provided, preferably, the height of the lower filling port 102 is higher than the height of the filling medium 200 of the lowest particle size, and so on, so as to facilitate the filling of filling media 200 of different particle sizes.

[0031] It is worth noting that since the filling port 102 is opened on the flotation cylinder 101, there is ore pulp in the flotation cylinder 101. In order to prevent liquid from flowing out of the filling port 102, a sealing cover should be provided at the filling port 102. When the filling medium 200 needs to be filled, the sealing cover is directly opened, and the sealing cover is covered after the filling medium 200 is filled.

[0032] Considering the collection of concentrates, e.g. Figure 1As shown, the flotation cylinder 100 further includes an overflow weir 103 , which is disposed at the top of the flotation cylinder 101 . A concentrate port 104 is disposed on the overflow weir 103 . After flotation, the concentrate enters the overflow weir 103 at the top of the flotation cylinder 101 and is finally discharged from the concentrate port 104 .

[0033] In order to facilitate the collection and discharge of tailings, Figure 1 As shown, the flotation cylinder 100 further includes a tailing cone 105, which is disposed at the bottom of the flotation cylinder 101. Preferably, the tailing cone 105 is an inverted cone structure, and the cone angle of the tailing cone 105 is 10°-30°, preferably, the cone angle of the tailing cone 105 is 15°.

[0034] Furthermore, if Figure 1 As shown, an accident discharge pipe 106 and a tailing pipe 107 are provided at the bottom of the tailing cone 105. The accident discharge pipe 106 is provided at the bottom of the tailing cone 105 and communicates with the inner cavity of the tailing cone 105. Preferably, the accident discharge pipe 106 and the tailing cone 105 are arranged concentrically. The tailing pipe 107 is provided at one side of the accident discharge pipe 106 and communicates with the inner cavity of the tailing cone 105. Preferably, the tailing pipe 107 is provided close to the accident discharge pipe 106. The tailings formed in the flotation cylinder 101 are enriched toward the tailing cone 105. When the tailing pipe 107 is opened, the tailings are discharged from the tailing pipe 107. When an accident occurs in the flotation cylinder 100, the accident discharge pipe 106 can be opened to discharge the minerals in the flotation cylinder 101 from the accident discharge pipe 106.

[0035] In order to control the opening and closing of the accident discharge pipe 106 and the tailings pipe 107, Figure 1 As shown, the flotation cylinder 100 further includes a first solenoid valve 108 and a second solenoid valve 109. The first solenoid valve 108 is arranged on the accident discharge pipe 106, and the second solenoid valve 109 is arranged on the tailing pipe 107. The first solenoid valve 108 and the second solenoid valve 109 control the opening and closing of the accident discharge pipe 106 and the tailing pipe 107 respectively.

[0036] In order to carry the filling medium 200 in the flotation cylinder 101, as Figure 1 As shown, the flotation cylinder 100 further includes a conical baffle 110, which is arranged at the lower end of the inside of the flotation cylinder 101 and is located above the tailing cone 105. The middle part of the conical baffle 110 is convex upward, and the edge is downward, so that the tailings falling on the conical baffle 110 can slide from the middle part to the edge of the conical baffle 110, and finally fall into the tailing cone 105 from the gap between the conical baffle 110 and the inner wall of the flotation cylinder 101. The cone angle of the conical baffle 110 is generally 5°-20°, preferably 5°.

[0037] The diameter of the conical baffle 110 is 7 / 10-9 / 10 of the inner diameter of the flotation cylinder 101. Preferably, the diameter of the conical baffle 110 is 4 / 5 of the inner diameter of the flotation cylinder 101. In this embodiment, a gap is provided between the edge of the conical baffle 110 and the inner wall of the flotation cylinder 101, and the gap can accommodate the flotation tailings to pass through, so that the tailings fall into the tailing cone 105. The diameter of the filling medium 200 at the bottom layer is larger than the gap, and the filling medium 200 will not fall.

[0038] In order to monitor the pressure distribution in the flotation cylinder 101 during the separation process to determine whether it is necessary to discharge ore or adjust equipment parameters, such as Figure 1 As shown, the flotation cylinder 100 further includes a pressure sensor 111, and a plurality of pressure sensors 111 are provided. The plurality of pressure sensors 111 are installed on the flotation cylinder 101 at equal intervals from top to bottom. The number of pressure sensors 111 is generally 3-8, preferably 4. It is worth noting that a pressure sensor 111 is also provided on the accident discharge pipe 106.

[0039] In this embodiment, by arranging a plurality of pressure sensors 111 on the flotation cylinder 101 and the accident discharge pipe 106 connected to the flotation cylinder 101, the pressure distribution in the flotation cylinder 101 during the mineral separation process can be monitored to determine whether discharge is required or equipment parameters need to be adjusted.

[0040] It should be noted that the fluidized sorting process is to set the rising water flow velocity (i.e., fluidized water flow velocity) according to the final settling velocity of the mineral particles to be sorted. The intermediate density particles with the same final settling velocity as the rising water flow velocity are suspended in the flotation cylinder 101 to form a fluidized bed. The low-density particles with a final settling velocity lower than the rising water flow velocity float up as concentrates and are discharged from the flotation cylinder 101 through the overflow weir 103. The high-density particles with a final settling velocity greater than the rising water flow velocity sink to the tailings cone 105 as tailings and are discharged. Bed stability control during the sorting process is the core of fluidized flotation. Bed stability is usually characterized by bed pressure, and the pressure is positively correlated with bed thickness (i.e., the degree of material accumulation). In order to improve the monitoring accuracy, the flotation cylinder 101 is evenly spaced from top to bottom with pressure sensors 111. During the fluidized sorting process, the bed stability is controlled by monitoring the pressure distribution in the bed. When the pressure detected by the pressure sensor 111 is higher than the preset threshold, it indicates that the tailings are too accumulated and it is necessary to open the discharge valve to discharge (i.e., open the tailings pipe 107 through the second solenoid valve 109 to discharge); when the pressure is lower than the preset threshold, it means that the tailings are discharged too quickly and it is necessary to close the valve to stop the discharge (i.e., close the tailings pipe 107 through the second solenoid valve 109) to avoid bed fluctuations. In addition, the sorting effect and bed stability can be optimized by adjusting equipment parameters such as water flow rate, feed rate, etc.

[0041] The filling medium 200 is usually spherical particles, and its type can be flexibly adjusted according to the actual sorting minerals and sorting density. It is generally resin (density about 1.2g / cm 3 ), quartz (density about 2.5g / cm 3 ), stainless steel (density about 7.8g / cm 3 ), copper (density about 8.96g / cm 3 ), etc., preferably resin and quartz form a multi-component auxiliary fluidization; the size (diameter) of the filling medium 200 is generally between 1-10 mm, preferably 3, 5 and 8 mm three sizes to form a multi-gradient particle group for coordinated regulation. It should be noted that at least two different density particles are selected for the filling medium 200.

[0042] In this embodiment, the bottom layer of the flotation cylinder 101 is a filling medium 200 of high-density large particles, the middle layer is a filling medium 200 of intermediate particles, and the top layer is a filling medium 200 of low-density fine particles. The high-density coarse particles are located at the bottom layer. These particles are generally not completely fluidized, but the pores formed between them help to further disperse the bubbles, slow down the rising rate of the bubbles, increase the chance of contact between the particles and the bubbles, and facilitate the bubbles to adhere to the surface of the hydrophobic particles, thereby enhancing the density difference between them and the hydrophilic gangue, and improving the sorting effect; the low-density fine particles are located in the upper layer, in a critical fluidization state, and can respond to changes in fluid velocity and dynamically adjust their own positions, eliminating the negative impact of uneven radial velocity distribution, and ensuring the balance and stability of the flow velocity of the entire column section. The intermediate-sized particles of the two densities form a transition from bottom to top. This gradual transition is conducive to improving the stability of the entire system and avoiding the decrease in sorting efficiency due to sudden changes in the fluidization state. This arrangement makes full use of the natural stratification effect of the particles, improves the sorting efficiency and the stability of the fluidized bed.

[0043] like Figure 1 As shown, the fluidized bed flotation device further includes a water-adding stirring barrel 300, a material-feeding stirring barrel 400 and a conveying pipeline 500. The water-adding stirring barrel 300 and the material-feeding stirring barrel 400 are connected to the flotation cylinder 101 through the conveying pipeline 500. The conveying pipeline 500 includes a first conveying pipe 501, a second conveying pipe 502 and a slurry pump 503. One end of the first conveying pipe 501 is connected to the water-adding stirring barrel 300, and the other end is connected to the inlet of the slurry pump 503. One end of the second conveying pipe 502 is connected to the material-feeding stirring barrel 400, and the other end is connected to the inlet of the slurry pump 503. It should be noted that the first conveying pipe 501 and the second conveying pipe 502 can be replaced by a tee pipe, and the three interfaces of the tee pipe are distributed to connect the water-adding stirring barrel 300, the material-feeding stirring barrel 400 and the slurry pump 503.

[0044] In order to control the on-off of the first delivery pipe 501 and the second delivery pipe 502, as Figure 1As shown, the delivery pipeline 500 further includes a third solenoid valve 504 and a fourth solenoid valve 505 . The third solenoid valve 504 is disposed on the first delivery pipe 501 , and the fourth solenoid valve 505 is disposed on the second delivery pipe 502 .

[0045] like Figure 1 As shown, the conveying pipeline 500 also includes a third conveying pipe 506 and a bubble generator 507. One end of the third conveying pipe 506 is connected to the outlet of the slurry pump 503, and the other end passes through the flotation cylinder 101 and is connected to the conical baffle 110. A through hole is provided in the center of the conical baffle 110, and one end of the third conveying pipe 506 is connected to the through hole of the conical baffle 110.

[0046] In this embodiment, the clean water in the water-added stirring barrel 300 is used in advance to initialize the equilibrium position of the filling medium 200, and the flotation cylinder 101 is filled with fluidized medium. When the pressure signal in the system is stable, the primary slurry is used as the fluidized medium for formal sorting. The use of primary slurry instead of clean water as the fluidized medium significantly reduces the water consumption in the sorting process, simplifies the subsequent coal slurry water treatment pressure, and generates cavitation effect through the Venturi tube principle to form micro-nano bubbles. The rough cracks on the surface of the particles in the slurry provide a large number of cavitation sites for the formation of bubbles, thereby significantly improving the cavitation efficiency; then the slurry carrying bubbles enters the fluidized bed and fluidizes with the filling medium 200. During the fluidization process, the hydrophobic particles and bubbles complete the downstream mineralization extension, and finally the useful minerals and gangue particles are separated according to the difference in particle density.

[0047] Example 2

[0048] Another specific embodiment of the present invention, as Figure 2 As shown, a fluidized bed flotation device for sorting and recovering coarse-grained minerals is disclosed. The difference from Example 1 is that the flotation cylinder 100 also includes a stirring assembly 112, and the stirring assembly 112 includes a driving motor 113, a stirring shaft 114, a stirring impeller 115 and an isolation net tube 116. The isolation net tube 116 is arranged inside the flotation cylinder 101, and the filling medium 200 is arranged in the isolation net tube 116. The side wall of the isolation net tube 116 and the contact part of the pressure sensor 111 are reserved with a groove to avoid the filling medium 200 and the pressure sensor 111 from colliding with each other under the rotation of the stirring impeller 115. The stirring impeller 115 is installed on the stirring shaft 114, and the lower end of the stirring shaft 114 is located in the isolation net tube 116, and the upper end passes through the overflow weir 103 and is connected to the driving motor 113. The blades of the stirring impeller 115 are a right-angled trapezoidal frame structure. It should be noted that the mesh on the isolation net tube 116 can allow mineral particles to pass through. Since the isolation mesh tube 116 needs to be filled with a filling medium 200 , an opening is provided at a position corresponding to the filling port 102 , and the opening can be closed by a perforated mesh door.

[0049] In this embodiment, the stirring impeller 115 is driven to rotate by the driving motor 113, so that the filling medium 200 can realize low-speed stable rotation (speed range is 10-20rad / min) inside the isolation net tube 116. This low-speed rotation ensures the uniform distribution of the filling medium 200, thereby effectively avoiding the "dead zone" phenomenon in the sorting process caused by uneven accumulation of the filling medium 200, that is, the area where mineral particles and bubbles cannot effectively contact due to inactive fluid flow; at the same time, this also prevents the flow field "short circuit" phenomenon, that is, the material is taken out of the system prematurely without being fully sorted.

[0050] In addition, the low-speed rotation of the isolation net cylinder 116 also plays a positive auxiliary role, promoting the interaction between mineral particles and bubbles. Specifically, this rotation method increases the chance of collision between mineral particles and bubbles, increases the probability of mineral particles adhering to bubbles, and thus accelerates the process of mineral particles floating up with bubbles. The faster floating of mineral particles means that they can be separated from the suspension more quickly, which not only shortens the time of the entire sorting process, but also significantly improves the recovery rate of minerals.

[0051] In summary, this embodiment not only optimizes the operating conditions of the system and reduces unnecessary energy consumption, but also improves the sorting efficiency, so that mineral resources are more effectively utilized, thereby bringing significant advantages in both technology and economy.

[0052] Example 3

[0053] Another specific embodiment of the present invention discloses a fluidized bed flotation method for separating and recovering coarse-grained minerals, using the fluidized bed flotation device of embodiment 1 or embodiment 2, comprising the following steps:

[0054] Step 1: close the accident discharge pipe 106 and the tailings pipe 107 , and inject the filling medium 200 into the flotation cylinder 101 .

[0055] Specifically, the first solenoid valve 108 and the second solenoid valve 109 are used to close the accident discharge pipe 106 and the tailing pipe 107 respectively to prevent accidental leakage of the mineral particles to be separated. The filling medium 200 is filled through the filling port 102 or the filling port 102 and the isolation net tube 116 .

[0056] The filling medium 200 is added in sequence, following the principle of "high density first, low density second, coarse particles first, fine particles second". After completion, the filling port 102 or the opening of the filling port 102 and the isolation mesh tube 116 are closed. In the fluidized sorting process, two densities of filling medium 200 particles are used to assist fluidization, and each density particle is of three sizes: large, medium and small. The filling principle follows "high density first, low density second, coarse particles first, fine particles second". High-density coarse particles are located at the bottom layer. These particles are generally not completely fluidized. The pores formed between them help to further disperse the bubbles, slow down the rising rate of the bubbles, increase the chance of contact between the particles and the bubbles, and facilitate the bubbles to adhere to the surface of the hydrophobic particles, thereby enhancing the density difference between them and the hydrophilic gangue, and improving the sorting effect. Low-density fine particles are located at the top layer and are in a critical fluidized state. They can respond to changes in fluid velocity and dynamically adjust their own positions to eliminate the negative impact of uneven radial velocity distribution and ensure the balance and stability of the flow velocity of the entire column section. The intermediate-sized particles of the two densities transition from bottom to top, which is conducive to improving the stability of the overall system. This arrangement makes full use of the natural stratification effect of particles, improving the sorting efficiency and the stability of the fluidized bed.

[0057] Step 2: Supply clean water into the flotation cylinder 101 until the fluidization state of the filling medium 200 is stable.

[0058] Specifically, the third solenoid valve 504 is opened, and the clean water in the water-added stirring barrel 300 is pressurized by the slurry pump 503, and then passes through the third delivery pipe 506 and the bubble generator 507 to enter the flotation tube 101 as a fluidizing medium, pushing the filling medium 200 on the conical baffle 110 to perform preliminary fluidization to adjust its spatial layout (i.e., natural stratification according to the difference in properties of the filling medium 200), until the fluidization state of the filling medium 200 is stable (i.e., there is no obvious fluctuation in the indication of the pressure sensor 111 in the flotation tube 101), and then the third solenoid valve 504 is closed.

[0059] Step 3: injecting primary ore pulp into the flotation cylinder 101 for flotation. When a stirring assembly 112 is provided, the stirring assembly 112 is turned on synchronously.

[0060] Specifically, the fourth solenoid valve 505 is opened, and the primary slurry in the feed mixing barrel 400 is pressurized by the slurry pump 503, and then enters the flotation cylinder 101 through the third conveying pipe 506 and the bubble generator 507. In this process, the high-speed flowing primary slurry generates micro-nano-sized bubbles due to cavitation. The surface roughness and cracks of the particles in the slurry provide abundant cavitation sites, which significantly improves the bubble generation efficiency.

[0061] It should be noted that during the sorting process, the flow rate of the fluidized medium (the flow rate range is between 20-70m 3 / h) to adjust the speed of the rising water flow (generally between 1.0-4.0m / s). When the fluidized medium passes through pipes of different diameters, different flow rates will be generated. When the slurry passes through the bubble generator 507 (i.e., the Venturi tube), due to the narrowing of the pipe diameter, the fluid velocity will increase significantly, and the fast-flowing fluid will generate negative pressure, thereby triggering hydraulic cavitation and generating micro-nano-sized bubbles. In the Venturi tube, in order to achieve the hydraulic cavitation effect, the flow rate in the throat usually needs to reach 10-20m / s or higher. The negative pressure generated when this high-speed fluid passes through a narrow area can promote the occurrence of hydraulic cavitation, thereby generating micro-nano-sized bubbles.

[0062] The ore slurry with micro-nano bubbles is used as a fluidizing medium to form a fluidized bed together with the filling medium 200. The particles to be sorted complete the sorting process by interfering with the sedimentation motion according to the density according to the Archimedean principle. The introduced bubbles will adhere to the surface of the hydrophobic particles to increase the density difference between them and the gangue particles. Among them, the pores formed between the high-density coarse-grained filling medium 200 are conducive to the further dispersion of the bubbles, slowing down the rising rate of the bubbles, increasing the chance of contact between the particles and the bubbles, and facilitating the attachment of the bubbles to the surface of the hydrophobic particles, enhancing the density difference between them and the hydrophilic gangue, and improving the sorting effect; the low-density fine-grained filling medium 200 can respond to the change of fluid velocity, dynamically adjust its own position, eliminate the negative impact of uneven radial velocity distribution, and ensure the balance and stability of the flow velocity of the entire column section.

[0063] The selected concentrate particles float up and are collected through the overflow weir 103 to the concentrate outlet 104 for discharge and sent to the next stage of dehydration. The tailings particles sink to the bottom of the fluidized bed, and the tailings accumulation state is monitored in real time by the pressure sensor 111. When the pressure reaches the preset upper limit, the tailings pipe 107 is automatically opened to discharge the tailings; when the pressure drops to the preset lower limit, the valve is closed to prevent excessive discharge from causing a sudden change in the fluidized bed pressure and ensure the stability of the fluidized bed.

[0064] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.

Claims

1. A fluidized bed flotation device for separation and recovery of coarse-grained minerals, characterized in that: The invention comprises a flotation cylinder (100) and a filling medium (200), wherein the flotation cylinder (100) comprises a flotation cylinder (101) and a conical baffle (110), wherein the conical baffle (110) is arranged at the lower end of the inside of the flotation cylinder (101), and the filling medium (200) is arranged on the conical baffle (110), and the filling medium (200) is provided with multiple layers in the flotation cylinder (101), and the particle diameter of the filling medium (200) increases layer by layer from bottom to top.

2. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to claim 1, characterized in that: The flotation cylinder (100) further comprises an overflow weir (103) and a tailings cone (105), wherein the overflow weir (103) and the tailings cone (105) are respectively arranged at the upper and lower ends of the flotation cylinder (101).

3. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to claim 2, characterized in that: The overflow weir (103) is provided with a concentrate port (104), and the bottom of the tailings cone (105) is provided with an accident discharge pipe (106) and a tailings pipe (107).

4. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to claim 3, characterized in that: The accident discharge pipe (106) is provided with a first electromagnetic valve (108) for controlling the on-off of the accident discharge pipe (106), and the tailings pipe (107) is provided with a second electromagnetic valve (109) for controlling the on-off of the tailings pipe (107).

5. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to any one of claims 1 to 4, characterized in that: The flotation cylinder (100) further comprises a plurality of pressure sensors (111).

6. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to claim 5, characterized in that: The plurality of pressure sensors (111) are arranged on the flotation cylinder (101) at equal intervals from top to bottom.

7. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to any one of claims 1 to 4 and 6, characterized in that: The conical baffle (110) is arranged concentrically with the flotation cylinder (101), and the diameter of the conical baffle (110) is 7 / 10-9 / 10 of the inner diameter of the flotation cylinder (101).

8. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to any one of claims 1 to 4 and 6, characterized in that: The flotation cylinder (101) is provided with a filling port (102) for filling the filling medium (200).

9. The fluidized bed flotation device for separation and recovery of coarse-grained minerals according to claim 2, characterized in that: The cone angle of the conical baffle (110) is 5°-20°, and the cone angle of the tailings cone (105) is 10°-30°.

10. A flotation method, characterized in that: The fluidized bed flotation device according to any one of claims 1 to 9 is used to separate and recover coarse-grained minerals.

Citation Information

Patent Citations

  • Flotation column

    CN117339770A

  • Flotation column for promoting recovery of coarse-grained minerals

    CN118594786A

  • Procedure and apparatus for the concentration of hydrophilic materials through flotation devices

    US20070295668A1

  • Method and apparatus for flotation in a fluidized bed

    US20100193408A1

Cited By

  • Mine solid waste rare earth element carrier ore fluidization separation and enrichment method

    CN119525009A

  • Short-edge-arranged coarse grain fluidization flotation device for underground operation and coal dressing method

    CN119951675A