Tail clamp modularization heat vulcanization mold adapting to cable diameter matching and manufacturing method of tail clamp modularization heat vulcanization mold
Through the combination of modular design and monitoring units, the stability of the thermal vulcanized mold in cable diameter matching and high-temperature and high-pressure environments is solved, and the cable diameter flexibility and temperature uniformity are achieved, and the production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202411588344.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-08
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Due to the mismatch between the fixed vulcanization package size and different cable diameters, existing thermal vulcanization molds have poor versatility and interchangeability, which makes it difficult to adapt to the production needs of different cable diameters. The shape and size are unstable in high temperature and high pressure environments, which affects the product. quality.
A modular thermal vulcanization mold is designed, including the mold body, the living block and the monitoring unit. The cable diameter matching is achieved through a modular design and locking structure. The living block cavity is funnel-shaped to adapt to the cable diameter of a variety of sizes, and The mold inner wall is coated with a release agent to reduce adhesions, and the monitoring unit monitors and adjusts the temperature in real time to ensure uniform heat conduction.
Improve the flexibility and production efficiency of the mold, ensure the accuracy of shape and size in high temperature and high pressure environments, reduce labor costs, improve the overall strength and durability of the product, simplify the operation and maintenance process, and adapt to different specifications. Live blocks enhance the scope of application of molds.
Smart Images

Figure CN119078048A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a mold design technology, and more specifically, to a tail clamp modular hot vulcanization mold adapted to cable diameter matching and a manufacturing method thereof. Background Art
[0002] Usually, the hot vulcanization mold is a whole, the size of the vulcanization package is fixed, but the size of the cable is often different. The size of the mold clamping cable must be adapted to the diameter of the cable, so the mold must be customized according to the diameter of the cable, which has poor versatility and interchangeability, and is not conducive to product serialization. Summary of the invention
[0003] In view of the deficiencies in the prior art, the object of the present invention is to provide a modular hot vulcanization mold for a tail clip adapted to cable diameter matching and a manufacturing method thereof.
[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a modular hot vulcanization mold for a tail clip adapted to cable diameter matching, comprising a mold body, the mold body comprising:
[0005] Mold: The basic structure of the entire hot vulcanization process, providing the shape and support for the hot vulcanized product, ensuring the shape and size of the product are accurate during the hot vulcanization process;
[0006] Loose block: Interchangeable connection with the mold through modular design to ensure adaptability to different cable diameters;
[0007] The mold body also includes a monitoring unit to monitor and adjust the temperature in real time during the hot vulcanization process to ensure the uniformity of heat conduction in each process.
[0008] The present invention is further configured as follows: the mold is composed of a first mold and a second mold combined through a locking structure, a live block installation cavity for installing a live block is provided at one end of the mold, and a connector installation cavity for installing a connector wrapped with rubber is provided at the other end, and the live block installation cavity and the connector installation cavity are connected.
[0009] The present invention is further configured such that: the movable block has various specifications and can be freely combined according to the cable diameter of the connector.
[0010] The present invention is further configured such that: the movable blocks have uniform outer dimensions, the inner cavity is funnel-shaped and is designed to accommodate a structure of cable diameters of various sizes, so as to provide good sealing and pressure resistance during the hot vulcanization process.
[0011] The present invention is further configured as follows: the mold and the inner wall of the movable block are coated with a release agent to reduce adhesion after hot vulcanization.
[0012] A method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching, characterized in that it comprises the following steps:
[0013] S1. Material preparation: Select high temperature resistant and wear resistant materials for making molds and loose blocks;
[0014] S2. Mold manufacturing: First, CAD modeling of the mold is carried out. After the design is completed, the thermal performance of the mold is simulated by thermal analysis software to ensure that the mold can work stably within the working temperature range. Then, CNC processing of the mold body is carried out according to the design drawings to ensure the accuracy and consistency of the mold size;
[0015] S3. Loose block manufacturing: Design the loose block according to the requirements of different cable diameters, and use the corresponding mold for injection molding to ensure that the outer dimensions of the loose block meet the design requirements and that its inner cavity dimensions are accurately matched to the connector cable diameter;
[0016] S4. Pre-assembly inspection: Pre-inspect the mold and the live block to ensure that each component has no defects and the size meets the requirements;
[0017] S5. Surface treatment: Surface treatment is performed on all parts, spraying or polishing is used to improve wear resistance and corrosion resistance, extend the service life of the mold, and a release agent is applied to the inner wall of the mold and the loose block;
[0018] S6, assembly: place the rubber-wrapped connector in the connector installation cavity of the mold, then select an appropriate loose block to pass the cable through and place the loose block in the loose block installation cavity of the mold, and finally merge the molds and achieve stable locking through the locking structure;
[0019] S7. Hot vulcanization test: Conduct hot vulcanization test to verify the actual performance of the mold;
[0020] S8. Final product testing: Carry out necessary performance tests on the mold to ensure that the product meets the technical specifications.
[0021] The present invention is further configured as follows: in S7, the method of the hot vulcanization test comprises:
[0022] S71, placing the assembled mold into a vulcanization furnace for hot vulcanization, and controlling it through a monitoring unit;
[0023] S72, after the hot vulcanization is completed, the mold is taken out, and after cooling to room temperature, the mold is demoulded and the connector is taken out;
[0024] S73. Test the waterproofness of the vulcanized package by soaking the connector in water for 48 hours to check whether there is water seepage and measure the water permeability. The calculation formula is:
[0025]
[0026] Where R is the permeability, V is the amount of permeated water, A is the area of the connector in contact with water, and T is the immersion time;
[0027] S74. Perform a pressure test on the vulcanization package. Place the connector in a pressure test device and apply a preset internal pressure. Maintain the pressure for 1 hour and observe whether there is any deformation, crack or rupture.
[0028] The present invention is further configured as follows: in said S8, the necessary performance tests include:
[0029] S81. Appearance inspection: Visually inspect the mold surface to observe the surface smoothness and integrity, and then use a magnifying glass to observe carefully to ensure there are no minor defects;
[0030] S82, Dimensional accuracy measurement: Use precision measuring tools to measure the mold and check whether the key parts of the mold are within the tolerance range;
[0031] S83, Compression resistance test: Use a material testing machine to apply gradually increasing pressure to the mold until the mold is damaged or deformed, and record the maximum pressure the mold can withstand to evaluate its compression resistance;
[0032] S84, Corrosion resistance test: Immerse the mold in corrosive liquid for 24 hours, observe whether there is corrosion, discoloration or other damage on the mold surface, and record it;
[0033] S85, Service life test: Perform multiple cycles in a vulcanizing furnace, record the state and dimensional changes of the mold after each cycle, and compare the initial performance with the final performance to evaluate the durability and reliability of the mold;
[0034] S86, demoulding effect test: after completing hot vulcanization, perform demoulding operation, observe the adhesion between rubber and mold, record the force required for demoulding, and evaluate the effectiveness of the release agent and the rationality of mold design.
[0035] The present invention is further configured as follows: in S71, the monitoring unit includes a temperature sensing module for real-time monitoring of the temperature in the mold, a data acquisition module for transmitting data collected by the temperature sensing module to the control module, a control module for processing data and controlling the heating process of the vulcanizing furnace, an alarm module for issuing an alarm when the temperature exceeds a set range, and a display module for displaying temperature data and the status of the monitoring unit, and the control method thereof includes:
[0036] S711. Before starting, the system self-checks all modules to ensure that they are working properly, then sets the target temperature and time, and inputs the hot vulcanization process parameters;
[0037] S712, the temperature sensing module collects temperature data in the mold once a second, and then the data acquisition module transmits the temperature data to the control module in real time;
[0038] S713, the control module analyzes the received temperature data, compares the current temperature with the set target temperature, and determines whether heating needs to be adjusted;
[0039] S714: If the current temperature is lower than the target temperature, the control module issues a heating instruction to increase the heat of the vulcanizing furnace;
[0040] If the current temperature is higher than the target temperature, the control module issues a cooling command to reduce the heat of the vulcanization furnace;
[0041] Continuously adjust to ensure that the temperature inside the mold remains within the set range;
[0042] S715. Once the temperature exceeds the set safety range, the control module immediately triggers the alarm module and automatically cuts off the heating source of the vulcanizing furnace to prevent equipment damage, and records the over-temperature event and duration for subsequent analysis;
[0043] S716. The monitoring unit regularly records temperature data and heating status, stores them in the system database, provides data feedback to the operator, and displays the temperature change curve and system status through the display module for easy observation and analysis;
[0044] S717: After the hot vulcanization is completed, the control module sends an end signal and turns off all heating equipment.
[0045] The beneficial effects of the present invention are:
[0046] 1. Compared with the prior art, the modular hot vulcanization mold of the tail clip adapted to cable diameter matching of the present invention has integrity and stability, which enables the mold to maintain the accuracy of shape and size under high temperature and high pressure environment. The modular design of the movable block allows for quick replacement to meet the production requirements of different cable diameters, greatly improving the flexibility and efficiency of production. At the same time, the real-time monitoring and adjustment function of the monitoring unit ensures the temperature uniformity of the hot vulcanization process and avoids product quality problems caused by temperature fluctuations. This design makes the production process more intelligent and automated, thereby reducing labor costs and improving the efficiency and capacity of the production line.
[0047] 2. The modular hot vulcanization mold of the tail clip adapted to cable diameter matching of the present invention can effectively improve the sealing and stability of the mold by dividing the mold into a first mold and a second mold and merging them with a locking structure. This design not only simplifies the operation and maintenance process of the mold, but also ensures that the shape of the mold cavity remains unchanged, avoiding product defects caused by mold deformation. At the same time, the connection design of the movable block installation cavity and the connector installation cavity makes the installation and replacement of the movable block easier, thereby improving production efficiency. In addition, the flexibility of the structure can adapt to movable blocks of different specifications, further enhancing the scope of application of the mold.
[0048] 3. In the present invention, the flexibility of the design of the movable block enables manufacturers to quickly adjust production strategies when facing changes in market demand, thereby reducing costs and shortening delivery time. The inner cavity of the movable block is designed to be funnel-shaped, and various cable diameters can be accommodated by simply changing the size of the inner cavity of the movable block. This not only improves the adaptability of the movable block, but also provides better sealing performance during the hot vulcanization process. This design ensures the uniform distribution of the vulcanized material by optimizing fluid dynamics, thereby improving the overall strength and durability of the product. In addition, the consistency of the outer dimensions of the movable block standardizes the production process, facilitates mass production and quality control, and further reduces production errors caused by human factors.
[0049] 4. The present invention has a simple and reasonable structure, is easy to manufacture, and is easy to operate. It avoids the defects of the prior art and is suitable for popularization and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a cross-sectional structural diagram of the mold body of the present invention.
[0051] Figure 2 It is a cross-sectional structural diagram of the mold of the present invention.
[0052] Figure 3 It is a cross-sectional structural diagram of the movable block of the present invention.
[0053] Figure 1-3 Figure numerals: 1. mold; 2. loose block; 3. loose block mounting cavity; 4. connector mounting cavity. DETAILED DESCRIPTION
[0054] Reference Figure 1-3 The modular hot vulcanization mold of the tail clip adapted to cable diameter matching and the manufacturing method thereof are further described in an embodiment of the present invention.
[0055] For ease of explanation, spatial relative terms such as "upper", "lower", "left", "right" and the like are used in the embodiments to illustrate the relationship of one element or feature shown in the figure relative to another element or feature. It should be understood that, in addition to the orientation shown in the figure, the spatial terms are intended to include different orientations of the device in use or operation. For example, if the device in the figure is inverted, the element described as being "under" other elements or features will be positioned "on" other elements or features. Therefore, the exemplary term "under" can include both upper and lower orientations. The device can be positioned in other ways (rotated 90 degrees or in other orientations), and the spatial relative descriptions used here can be interpreted accordingly.
[0056] Furthermore, relational terms such as “first” and “second” and the like are merely used to distinguish one component from another having the same name, but do not necessarily require or imply any such actual relationship or order between these components.
[0057] Figures 1 to 3 A modular hot vulcanization mold for a tail clip adapted to cable diameter matching is shown, comprising a mold body, the mold body comprising:
[0058] Mold 1: The basic structure of the entire hot vulcanization process, providing the shape and support for forming the hot vulcanized product, ensuring the shape and size of the product are accurate during the hot vulcanization process;
[0059] Active block 2: can be connected interchangeably with mold 1 through modular design to ensure adaptability to different cable diameters;
[0060] The mold body also includes a monitoring unit to monitor and adjust the temperature in real time during the hot vulcanization process to ensure uniform heat conduction in each process;
[0061] Its integrity and stability enable the mold 1 to maintain the accuracy of shape and size under high temperature and high pressure environments. The modular design of the movable block 2 allows for quick replacement to meet the production requirements of different cable diameters, greatly improving the flexibility and efficiency of production. At the same time, the real-time monitoring and adjustment functions of the monitoring unit ensure the temperature uniformity of the hot vulcanization process and avoid product quality problems caused by temperature fluctuations. This design makes the production process more intelligent and automated, thereby reducing labor costs and improving the efficiency and capacity of the production line.
[0062] The mold 1 is composed of a first mold and a second mold combined by a locking structure. A movable block installation cavity 3 for installing a movable block 2 is provided at one end of the mold 1, and a connector installation cavity 4 for installing a connector wrapped with rubber is provided at the other end. The movable block installation cavity 3 and the connector installation cavity 4 are connected.
[0063] By dividing the mold 1 into a first mold and a second mold and merging them with a locking structure, the sealing and stability of the mold 1 can be effectively improved. This design not only simplifies the operation and maintenance process of the mold 1, but also ensures that the shape of the inner cavity of the mold 1 remains unchanged, avoiding product defects caused by deformation of the mold 1. At the same time, the connection design of the movable block installation cavity 3 and the connector installation cavity 4 makes the installation and replacement of the movable block 2 easier, thereby improving production efficiency. In addition, the flexibility of the structure can adapt to movable blocks 2 of different specifications, further enhancing the scope of application of the mold 1.
[0064] The movable block 2 has various specifications and can be freely combined according to the cable diameter of the connector; the movable block 2 has consistent external dimensions, and the inner cavity is funnel-shaped and designed to accommodate a structure with various cable diameters, so as to provide good sealing and pressure resistance during the hot vulcanization process;
[0065] This flexibility enables manufacturers to quickly adjust production strategies in the face of changing market demands, thereby reducing costs and shortening delivery times. The inner cavity of the movable block 2 is designed to be funnel-shaped, and cable diameters of various sizes can be accommodated by simply changing the size of the inner cavity of the movable block 2. The inner shell of the movable block 2 can be changed to make vulcanization packages of different sizes and shapes, which not only improves the adaptability of the movable block 2, but also provides better sealing performance during the hot vulcanization process. This design ensures the uniform distribution of the vulcanized material by optimizing fluid dynamics, thereby improving the overall strength and durability of the product. In addition, the consistency of the outer dimensions of the movable block 2 standardizes the production process, facilitates mass production and quality control, and further reduces production errors caused by human factors.
[0066] The inner walls of the mold 1 and the movable block 2 are coated with a release agent to reduce adhesion after hot vulcanization;
[0067] The adhesion between the rubber and the mold 1 after hot vulcanization is effectively reduced, ensuring the multiple service life of the mold 1. This design not only improves the production efficiency of the product, shortens the demoulding time, but also reduces the loss of the mold 1 and saves maintenance costs. By reducing adhesion, the labor intensity of the operator during demoulding is also significantly reduced, further improving the safety and comfort of operation. In addition, the use of the release agent makes the appearance of the final product smoother.
[0068] A method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching, characterized in that it comprises the following steps:
[0069] S1. Material preparation: Select high temperature resistant and wear resistant materials for manufacturing the mold 1 and the movable block 2;
[0070] S2. Manufacturing of mold 1: First, CAD modeling of mold 1 is performed. After the design is completed, the thermal performance of mold 1 is simulated by thermal analysis software to ensure that mold 1 can work stably within the working temperature range. Then, CNC processing of mold 1 is performed according to the design drawings to ensure the accuracy and consistency of the size of mold 1.
[0071] S3, manufacturing of the loose piece 2: design the loose piece 2 according to the requirements of different cable diameters, and use the corresponding mold for injection molding to ensure that the outer dimensions of the loose piece 2 meet the design requirements and ensure that its inner cavity size is accurately matched with the connector cable diameter;
[0072] S4, pre-assembly inspection: pre-inspect the mold 1 and the loose piece 2 to ensure that each component has no defects and the size meets the requirements;
[0073] S5. Surface treatment: Surface treatment is performed on all parts, and spraying or polishing process is used to improve wear resistance and corrosion resistance, extend the service life of the mold 1, and a release agent is applied to the inner wall of the mold 1 and the movable block 2;
[0074] S6, assembly: place the rubber-wrapped connector in the connector installation cavity 4 of the mold 1, then select an adapted loose block 2 to pass the cable through and place the loose block 2 in the loose block installation cavity 3 of the mold 1, and finally merge the mold 1 and achieve stable locking through the locking structure;
[0075] S7, hot vulcanization test: perform a hot vulcanization test to verify the actual performance of the mold 1;
[0076] S8, Final product testing: Perform necessary performance tests on mold 1 to ensure that the product meets technical specifications;
[0077] This manufacturing method covers the complete process from material preparation to final product testing, ensuring quality control at every link. This systematic approach not only improves the production efficiency of the mold 1 and the live block 2, but also ensures their reliability and consistency during use. Through advanced CAD modeling and thermal analysis technology, the performance of the mold 1 can be predicted and optimized before manufacturing, avoiding quality problems in the later stage. At the same time, strict surface treatment and pre-assembly inspection steps effectively improve the wear resistance and corrosion resistance of the mold 1, ensuring the long-term use of the product in various environments.
[0078] In S7, the method of the hot vulcanization test includes:
[0079] S71, placing the assembled mold 1 into a vulcanization furnace for hot vulcanization, and controlling it through a monitoring unit;
[0080] S72, after the hot vulcanization is completed, the mold 1 is taken out, and after cooling to room temperature, the mold is demoulded and the connector is taken out;
[0081] S73. Test the waterproofness of the vulcanized package by soaking the connector in water for 48 hours to check whether there is water seepage and measure the water permeability. The calculation formula is:
[0082]
[0083] Where R is the permeability, V is the amount of permeated water, A is the area of the connector in contact with water, and T is the immersion time;
[0084] S74. Perform a pressure test on the vulcanization package. Place the connector in a pressure test device and apply a preset internal pressure for 1 hour to observe whether there is deformation, cracks or ruptures.
[0085] The hot vulcanization test procedure not only verifies the actual performance of the mold 1, but also ensures the quality and safety of the final product through a series of tests. By testing the waterproofness and pressure resistance of the vulcanization package, potential problems can be effectively identified, thereby ensuring that the mold 1 meets the usage standards before it is put on the market. At the same time, the data recording and analysis in the hot vulcanization test provides a reference for subsequent product improvements and helps to continuously optimize the production process.
[0086] In S8, the necessary performance tests include:
[0087] S81. Appearance inspection: Visually inspect the appearance of mold 1 to observe the surface smoothness and integrity, and then use a magnifying glass to observe carefully to ensure that there are no minor defects;
[0088] S82, dimensional accuracy measurement: Use precision measuring tools to measure the mold 1 and check whether the key parts of the mold 1 are within the tolerance range;
[0089] S83, compression resistance test: use a material testing machine to apply gradually increasing pressure to the mold 1 until the mold 1 is damaged or deformed, and record the maximum pressure that the mold 1 withstands to evaluate its compression resistance;
[0090] S84, corrosion resistance test: immerse the mold 1 in a corrosive liquid for 24 hours, observe whether corrosion, discoloration or other damage occurs on the surface of the mold 1, and record the results;
[0091] S85. Service life test: Perform multiple cycles in the vulcanization furnace, record the state and dimensional changes of the mold 1 after each cycle, and compare the initial performance and the final performance to evaluate the durability and reliability of the mold 1;
[0092] S86, demoulding effect test: after completing the hot vulcanization, perform demoulding operation, observe the adhesion between the rubber and the mold 1, record the force required for demoulding, and evaluate the effectiveness of the release agent and the rationality of the design of the mold 1;
[0093] It can comprehensively evaluate the various performance indicators of mold 1 to ensure that it meets the design requirements. Through detailed appearance and size inspection, it can timely discover and correct minor defects that may occur in the production process to avoid unqualified products from entering the market. The compression resistance test provides a basis for the safety of mold 1 and ensures that it will not fail or be damaged prematurely under actual working conditions. In addition, through corrosion resistance and service life tests, the adaptability of mold 1 in different environments can be evaluated, thereby providing a reference basis for subsequent production and design, and further improving product quality and market competitiveness.
[0094] In S71, the monitoring unit includes a temperature sensing module for real-time monitoring of the temperature in the mold 1, a data acquisition module for transmitting data collected by the temperature sensing module to the control module, a control module for processing data and controlling the heating process of the vulcanizing furnace, an alarm module for issuing an alarm when the temperature exceeds a set range, and a display module for displaying temperature data and the status of the monitoring unit. The control method includes:
[0095] S711. Before starting, the system self-checks all modules to ensure that they are working properly, then sets the target temperature and time, and inputs the hot vulcanization process parameters;
[0096] S712, the temperature sensing module collects temperature data in the mold 1 once a second, and then the data acquisition module transmits the temperature data to the control module in real time;
[0097] S713, the control module analyzes the received temperature data, compares the current temperature with the set target temperature, and determines whether heating needs to be adjusted;
[0098] S714: If the current temperature is lower than the target temperature, the control module issues a heating instruction to increase the heat of the vulcanizing furnace;
[0099] If the current temperature is higher than the target temperature, the control module issues a cooling command to reduce the heat of the vulcanization furnace;
[0100] Continue to adjust to ensure that the temperature in mold 1 remains within the set range;
[0101] S715. Once the temperature exceeds the set safety range, the control module immediately triggers the alarm module and automatically cuts off the heating source of the vulcanizing furnace to prevent equipment damage, and records the over-temperature event and duration for subsequent analysis;
[0102] S716. The monitoring unit regularly records temperature data and heating status, stores them in the system database, provides data feedback to the operator, and displays the temperature change curve and system status through the display module for easy observation and analysis;
[0103] S717, after the hot vulcanization is completed, the control module sends an end signal and turns off all heating equipment;
[0104] The monitoring unit ensures accurate and reliable temperature control during the hot vulcanization process by monitoring the temperature inside the mold 1 in real time. Through continuous data collection and feedback from the temperature sensing module, it can quickly respond to temperature fluctuations and automatically adjust to ensure that the temperature inside the mold 1 always remains within the set range. This intelligent control system not only improves the safety of the production process and prevents equipment damage due to abnormal temperature, but also provides operators with more intuitive data monitoring and analysis tools, which helps to optimize the operating process. In addition, the recorded temperature data can provide an important reference for subsequent process improvements, enhancing traceability and efficiency.
[0105] The present invention shortens the product development cycle, reduces manufacturing costs, reduces assembly difficulty, and is conducive to the serialization of connector products and improves their versatility; it has a simple and reasonable structure, is easy to manufacture, avoids the defects of the prior art, and is suitable for popularization and implementation.
[0106] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Common changes and substitutions made by those skilled in the art within the scope of the technical solution of the present invention should be included in the protection scope of the present invention.
Claims
1. A modular hot vulcanization mold for a tail clip adapted to cable diameter matching, characterized in that: The invention comprises a mold body, wherein the mold body comprises: Mold (1): The basic structure of the entire hot vulcanization process, providing the shape and support for the hot vulcanized product, ensuring the shape and size of the product are accurate during the hot vulcanization process; The movable block (2) is interchangeably connected with the mold (1) through modular design to ensure adaptability to different cable diameters; The mold body also includes a monitoring unit to monitor and adjust the temperature in real time during the hot vulcanization process to ensure the uniformity of heat conduction in each process.
2. A modular hot vulcanization mold for tail clips adapted to cable diameter matching according to claim 1, characterized in that: The mold (1) is composed of a first mold and a second mold combined through a locking structure. A movable block installation cavity (3) for installing a movable block (2) is provided at one end of the mold (1), and a connector installation cavity (4) for installing a connector wrapped with rubber is provided at the other end. The movable block installation cavity (3) and the connector installation cavity (4) are connected.
3. The modular hot vulcanization mold for tail clip adapted to cable diameter matching according to claim 1, characterized in that: The movable block (2) has various specifications and can be freely combined according to the cable diameter of the connector.
4. The modular hot vulcanization mold for tail clip adapted to cable diameter matching according to claim 3, characterized in that: The movable block (2) has uniform external dimensions, an inner cavity shape that is funnel-shaped and is designed to accommodate cables of various sizes, so as to provide good sealing and pressure resistance during the hot vulcanization process.
5. The modular hot vulcanization mold for tail clip adapted to cable diameter matching according to claim 1, characterized in that: The inner walls of the mold (1) and the movable block (2) are coated with a mold release agent to reduce adhesion after hot vulcanization.
6. A method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching as described in any one of claims 1 to 5, characterized in that: The following steps are involved: S1. Material preparation: selecting high temperature resistant and wear resistant materials for manufacturing the mold (1) and the loose block (2); S2. Manufacturing of the mold (1): First, CAD modeling of the mold (1) is performed. After the design is completed, the thermal performance of the mold (1) is simulated by thermal analysis software to ensure that the mold (1) can work stably within the working temperature range. Then, the main body of the mold (1) is CNC machined according to the design drawings to ensure the accuracy and consistency of the size of the mold (1); S3, manufacturing of the movable block (2): designing the movable block (2) according to the requirements of different cable diameters, and using corresponding molds for injection molding to ensure that the outer dimensions of the movable block (2) meet the design requirements, and to ensure that the inner cavity dimensions are accurately matched to the connector cable diameter; S4. Pre-assembly inspection: Pre-inspect the mold (1) and the loose piece (2) to ensure that all parts are free of defects and the dimensions meet the requirements; S5. Surface treatment: Surface treatment is performed on all parts by using spraying or polishing process to improve wear resistance and corrosion resistance, extend the service life of the mold (1), and a release agent is applied to the inner wall of the mold (1) and the loose block (2); S6, assembly: placing the rubber-wrapped connector in the connector mounting cavity (4) of the mold (1), then selecting an appropriate loose block (2) to pass the cable through and placing the loose block (2) in the loose block mounting cavity (3) of the mold (1), and finally merging the mold (1) and achieving stable locking through the locking structure; S7. Hot vulcanization test: Perform a hot vulcanization test to verify the actual performance of the mold (1); S8. Final product testing: Conduct necessary performance tests on the mold (1) to ensure that the product meets the technical specifications.
7. The method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching according to claim 6, characterized in that: In S7, the method of the hot vulcanization test includes: S71, placing the assembled mold (1) into a vulcanization furnace for hot vulcanization, and controlling it through a monitoring unit; S72, after the hot vulcanization is completed, the mold (1) is removed, and after cooling to room temperature, the mold is demoulded and the connector is removed; S73. Test the waterproofness of the vulcanized package by soaking the connector in water for 48 hours to check whether there is water seepage and measure the water permeability. The calculation formula is: Where R is the permeability, V is the amount of permeated water, A is the area of the connector in contact with water, and T is the immersion time; S74. Perform a pressure test on the vulcanization package. Place the connector in a pressure test device and apply a preset internal pressure. Maintain the pressure for 1 hour and observe whether there is any deformation, crack or rupture.
8. The method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching according to claim 6, characterized in that: In S8, the necessary performance tests include: S81. Appearance inspection: Visually inspect the mold (1) to observe the surface smoothness and integrity, and then use a magnifying glass to carefully observe to ensure that there are no minor defects; S82, dimensional accuracy measurement: using a precision measuring tool to measure the mold (1) to check whether each key part of the mold (1) is within the tolerance range; S83, compression resistance test: using a material testing machine to apply gradually increasing pressure to the mold (1) until the mold (1) is damaged or deformed, and recording the maximum pressure borne by the mold (1) to evaluate its compression resistance; S84, corrosion resistance test: immerse the mold (1) in a corrosive liquid for 24 hours, observe whether corrosion, discoloration or other damage occurs on the surface of the mold (1), and record the results; S85. Service life test: multiple cycles are performed in a vulcanizing furnace, the state and dimensional changes of the mold (1) after each cycle are recorded, and the initial performance and final performance are compared to evaluate the durability and reliability of the mold (1); S86. Demolding effect test: After the hot vulcanization is completed, the demoulding operation is performed to observe the adhesion between the rubber and the mold (1), record the force required for demoulding, and evaluate the effectiveness of the release agent and the rationality of the mold (1) design.
9. The method for manufacturing a modular hot vulcanization mold for a tail clip adapted to cable diameter matching according to claim 7, characterized in that: In S71, the monitoring unit comprises a temperature sensing module for real-time monitoring of the temperature in the mold (1), a data acquisition module for transmitting data collected by the temperature sensing module to the control module, a control module for processing the data and controlling the heating process of the vulcanizing furnace, an alarm module for issuing an alarm when the temperature exceeds a set range, and a display module for displaying temperature data and the status of the monitoring unit, and the control method comprises: S711. Before starting, the system self-checks all modules to ensure that they are working properly, then sets the target temperature and time, and inputs the hot vulcanization process parameters; S712, the temperature sensing module collects temperature data in the mold (1) once per second, and then the data acquisition module transmits the temperature data to the control module in real time; S713, the control module analyzes the received temperature data, compares the current temperature with the set target temperature, and determines whether heating needs to be adjusted; S714: If the current temperature is lower than the target temperature, the control module issues a heating instruction to increase the heat of the vulcanizing furnace; If the current temperature is higher than the target temperature, the control module issues a cooling command to reduce the heat of the vulcanization furnace; Continuously adjust to ensure that the temperature inside the mold (1) remains within a set range; S715. Once the temperature exceeds the set safety range, the control module immediately triggers the alarm module and automatically cuts off the heating source of the vulcanizing furnace to prevent equipment damage, and records the over-temperature event and duration for subsequent analysis; S716. The monitoring unit regularly records temperature data and heating status, stores them in the system database, provides data feedback to the operator, and displays the temperature change curve and system status through the display module for easy observation and analysis; S717: After the hot vulcanization is completed, the control module sends an end signal and turns off all heating equipment.
Citation Information
Patent Citations
Method and equipment for rubber vulcanization
CN101653974A
Vulcanizing machine automatic control system based on programmable logic controller (PLC)
CN102981443A
Steel wire rope core conveyer belt joint vulcanization temperature and pressure detection and control system
CN111381621A
Submarine cable factory joint vulcanization system and vulcanization method
CN116100713A
Vulcanizing machine capable of adjusting temperature
CN202264342U
Cited By
Watertight connector branch structure forming mold and intelligent vulcanization control method thereof
CN120792046A