Method for treating moisture and mildew of brick masonry
By filling waterproof mortar in the gaps of brick walls and filling waterproof grouting materials, the moisture and mold problems of brick walls in old houses are solved, and the moisture-proof layer is restored, avoiding the necessity of demolishing brick walls. Convenient and efficient.
Patent Information
- Application Number
- CN202411307500.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-12-17
AI Technical Summary
Since the brick walls of old houses are not moisture-proof, they are prone to moisture and mildew problems. The existing methods require the demolition of brick walls for reconstruction. The project volume is large and costly, and it is easy to damage the house structure.
By filling waterproof mortar in the indoor gaps of brick walls and filling waterproof grouting materials, the waterproof function of the moisture-proof layer is restored. The methods include filling waterproof mortar with seams and punching and filling waterproof grouting materials, and using specific filling tools to improve construction efficiency and convenience.
It solves the problem of mold caused by the existing brick wall not being waterproof and tide-proof, avoids the removal of brick walls and damage of the exterior walls, and realizes the restoration of moisture-proof layer of the walls, which is convenient to construct and efficient.
Smart Images

Figure CN119145669A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of brick wall moisture treatment, and in particular relates to a method for treating moisture and mildew of brickwork. Background Art
[0002] In the past, the walls of old house buildings were not treated with moisture-proofing when they were first built, and the surface was very damp and prone to mildew. This was mainly because the capillary water in the soil seeped upward through the gaps in the bricks. This characteristic of the bricks and the existence of pores provided a channel for the infiltration of underground capillary water, alkali, salt and other substances, causing water vapor to seep upward along the walls, resulting in dampness and mildew on the walls.
[0003] When renovating old houses, in order to prevent the walls from getting damp and mildewed, it is necessary to demolish the existing brick walls and rebuild new walls. The disadvantages of this are: not only the workload is large and the cost is high, but it is also easy to damage the house structure. There is an urgent need for a method to control the moisture and mildew of brick masonry. Summary of the invention
[0004] The purpose of the present invention is to provide a method for controlling moisture and mildew of brickwork, which can solve the problem that the existing brick wall has no waterproof moisture layer or concrete ring beam, resulting in mildew on the indoor floor and wall. There is no need to demolish the existing brick wall or damage the exterior wall. The waterproof and moisture-proof functions of the moisture-proof layer of the existing wall are restored by combining grouting and filling in the indoor brick joints.
[0005] The object of the present invention is achieved as follows: a method for treating moisture and mildew of a brickwork, comprising a wall, wherein an indoor side of the wall is provided with an indoor original floor, and an outdoor side of the wall is provided with an outdoor floor, wherein the height of the outdoor floor is lower than the height of the indoor original floor, and the method comprises the following steps: Step 1: From one side of the room, cut out the seams at the bottom of the wall that is located above the original floor of the room, and fill the cut out brick seams with waterproof mortar; Step 2: Drill several grouting holes from one side of the room at an angle to the wall located above the original floor of the room; Step 3: Pour waterproof grouting material into each grouting hole on the wall.
[0006] As a further improvement of the present invention, in the step 1, the depth of the brick joints cut out is 5.5-6.5 cm, the brick joints cut out on the wall are provided with at least two in the vertical direction, and the height of the brick joints cut out is lower than the height of the indoor decorative surface. The indoor decorative surface is a tile or a baseboard, so as to avoid affecting the beauty of the indoor decorative surface.
[0007] As a further improvement of the present invention, in step 2, the angle between the grouting holes and the horizontal plane is 45°, the grouting holes are arranged equidistantly along the length direction of the wall, the distance between two adjacent grouting holes is 20-25 cm, and the height distance between the grouting hole opening on the indoor side of the wall and the indoor original ground in the vertical direction is 18-20 cm. High-strength and high-permeability waterproof grouting material is poured into the wall through the grouting holes.
[0008] As a further improvement of the present invention, in the step 2, a filling tool is used to fill the removed brick joints with waterproof mortar; the filling tool comprises a plurality of assembly cylinders connected end to end in sequence, the ends of the front assembly cylinder and the rear assembly cylinder are connected to a closing cylinder, the bottoms of the closing cylinder and the assembly cylinder are provided with at least two left-right symmetrical lifting support feet, the bottoms of the lifting support feet are provided with universal wheels, the universal wheels of the lifting support feet of the closing cylinder are provided with brakes, a feeding cylinder is vertically provided on the upper side of any of the closing cylinders, and an openable sealing cover 1 is provided on the feeding cylinder; the sides of the closing cylinder and the assembly cylinder are both connected with a discharge pipe, the discharge pipe comprises an inclined section and a horizontal section, and the end of the discharge pipe is provided with a sealing cover 2. According to the length of the wall, a corresponding number of assembly cylinders are selected to assemble the filling tool, and the waterproof grouting material is injected into the cut brick joints through each discharge pipe to fill the waterproof mortar. During grouting, the universal wheel brake of the lifting support foot of the closed cylinder is braked to prevent the filling tool from moving; when the wall is relatively long, when the filling tool needs to be moved for mobile filling of waterproof grouting material, or when the position of the filling tool needs to be adjusted, the universal wheel brake of the lifting support foot of the closed cylinder is released.
[0009] As a further improvement of the present invention, both front and rear ends of the assembly cylinder are provided with external connection flanges, and one end of the closing cylinder close to the assembly cylinder is also provided with an external connection flange, and at least four rectangular connection holes are provided on the external connection flanges, and any two adjacent external connection flanges are connected by a plurality of bolts passing through the corresponding connection holes, and a locking nut is provided at one end of the bolt to press the corresponding external connection flange, and the outer periphery and inner wall of the closing cylinder and the assembly cylinder are both rectangular, and both front and rear ends of the assembly cylinder are open, and one end of the closing cylinder is open, and at least two rectangular sealing rings are provided at the ends of the closing cylinder and the assembly cylinder. The sealing ring improves the sealing performance of the closing cylinder and the assembly cylinder.
[0010] As a further improvement of the present invention, the lifting support foot comprises a vertical pole arranged at the lower side of the closed tube or the assembly tube, the lower end of the pole is matched and inserted into the sleeve, the cross section of the pole is rectangular, and the left and right side walls of the sleeve are provided with a plurality of positioning holes arranged vertically, and the second bolt passes through the corresponding two positioning holes in sequence in the horizontal direction, and the second end of the bolt is sleeved with a second locking nut. By adjusting the second bolt and inserting it into different positioning holes, the height position of the lifting support foot can be changed.
[0011] As a further improvement of the present invention, the embedding tool is used in the following steps: (1) First, select a number of assembly tubes according to the length of the wall, and connect the external connection flanges of each assembly tube in sequence by bolt 1 and lock nut 1; (2) A closing cylinder is connected to the ends of the head assembly cylinder and the end assembly cylinder respectively; (3) Close each cover No. 2, open cover No. 1, inject waterproof mortar into the interior of each sealing tube and assembly tube, then open cover No. 2 and insert the end of each discharge pipe into the brick joints cut out on the wall to fill with waterproof mortar.
[0012] The present invention first fills the bottom brick joints of the wall with waterproof mortar by a filling tool, which is convenient for construction and more efficient, and then the wall is drilled to inject waterproof grouting material. Compared with the prior art, the present invention has the beneficial effect of being able to solve the problem of indoor floor and wall mildew caused by the lack of waterproof moisture layer or concrete ring beam in the existing brick wall, without demolishing the existing brick wall or destroying the exterior wall, and restoring the waterproof and moisture-proof functions of the moisture-proof layer of the existing wall by combining grouting and filling in the indoor brick joints. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the present invention.
[0014] Figure 2 for Figure 1 A partial enlarged view of .
[0015] Figure 3 It is a structural schematic diagram of the filling tool.
[0016] Figure 4 for Figure 3 A partial enlarged view of .
[0017] Figure 5 A cross-sectional view of the assembled cylinder.
[0018] Among them, 1 is a wall, 2 is an indoor original floor, 3 is an outdoor floor, 4 is an indoor decorative surface, 5 is a brick joint, 6 is a grouting hole, 7 is an assembly tube, 8 is a closing tube, 9 is a lifting support foot, 10 is a universal wheel, 11 is a feed tube, 12 is a sealing cover one, 13 is a discharge pipe, 13a is a horizontal section, 13b is an inclined section, 14 is a sealing cover two, 15 is an external connecting flange, 16 is a connecting hole, 17 is a bolt one, 18 is a locking nut one, 19 is a sealing ring, 20 is a vertical pole, 21 is a sleeve, 22 is a positioning hole, 23 is a bolt two, and 24 is a locking nut two. DETAILED DESCRIPTION
[0019] like Figure 1-5As shown, a method for treating moisture and mildew of brickwork includes a wall 1, an indoor original floor 2 is provided on the indoor side of the wall 1, and an outdoor floor 3 is provided on the outdoor side of the wall 1. The height of the outdoor floor 3 is lower than the height of the indoor original floor 2. The method includes the following steps: Step 1: From one side of the room, the bottom of the wall 1 located above the original floor 2 is cut out, and the cut out brick joints 5 are filled with waterproof mortar; the depth of the cut out brick joints 5 is 5.5-6.5 cm, and at least two brick joints 5 are cut out on the wall 1 in the vertical direction, and the height of the cut out brick joints 5 is lower than the height of the indoor decorative surface 4; the indoor decorative surface 4 is a tile or a baseboard, so as not to affect the beauty of the indoor decorative surface 4; Step 2: From one side of the room, a plurality of grouting holes 6 are obliquely drilled on the wall 1 located above the original floor 2 of the room; The angle between the grouting holes 6 and the horizontal plane is 45°. The grouting holes 6 are arranged equidistantly along the length direction of the wall 1. The distance between two adjacent grouting holes 6 is 20-25 cm. The vertical height distance between the opening of the grouting hole 6 on the indoor side of the wall 1 and the indoor original floor 2 is 18-20 cm. High-strength and high-permeability waterproof grouting material is poured into the wall 1 through the grouting holes 6; A filling tool is used to fill the removed brick joints 5 with waterproof mortar; the filling tool includes a plurality of assembly tubes 7 connected end to end in sequence, the ends of the front assembly tube 7 and the rear assembly tube 7 are connected with a closing tube 8, the bottom of the closing tube 8 and the assembly tube 7 are provided with at least two left-right symmetrical lifting support feet 9, the bottom of the lifting support feet 9 is provided with a universal wheel 10, the universal wheel 10 of the lifting support feet 9 of the closing tube 8 is provided with a brake, a feed tube 11 is vertically provided on the upper side of any closing tube 8, and an openable cover 12 is provided on the feed tube 11; the sides of the closing tube 8 and the assembly tube 7 are connected with a discharge pipe 13, the discharge pipe 13 includes an inclined section 13b and a horizontal section 13a, and the end of the discharge pipe 13 is provided with a cover 2 14. According to the length of the wall 1, a corresponding number of assembly tubes 7 are selected to assemble the filling tool, and the waterproof grouting material is injected into the cut-out brick joints 5 through each discharge pipe 13 to fill the waterproof mortar. During grouting, the universal wheels 10 of the lifting support feet 9 of the closed tube 8 are braked to prevent the filling tool from moving; when the length of the wall 1 is relatively long, when the filling tool needs to be moved for mobile filling of waterproof grouting material, or when the position of the filling tool needs to be adjusted, the universal wheels 10 of the lifting support feet 9 of the closed tube 8 are braked and released.
[0020] The front and rear ends of the assembly cylinder 7 are both provided with external connection flanges 15, and the end of the closing cylinder 8 close to the assembly cylinder 7 is also provided with an external connection flange 15, and at least four connection holes 16 in a rectangular shape are provided on the external connection flange 15, and any two adjacent external connection flanges 15 are connected by a plurality of bolts 17 passing through the corresponding connection holes 16, and the ends of the bolts 17 are provided with locking nuts 18 for pressing the corresponding external connection flanges 15, and the outer periphery and inner wall of the closing cylinder 8 and the assembly cylinder 7 are both rectangular, and the front and rear ends of the assembly cylinder 7 are both open, and one end of the closing cylinder 8 is open, and the ends of the closing cylinder 8 and the assembly cylinder 7 are both provided with at least two sealing rings 19 in a rectangular shape. The sealing ring 19 improves the sealing performance of the closing cylinder 8 and the assembly cylinder 7. The lifting support foot 9 includes a vertical pole 20 arranged at the lower side of the closing tube 8 or the assembly tube 7, the lower end of the pole 20 is matched and inserted into the sleeve 21, the cross section of the pole 20 is rectangular, and the left and right side walls of the sleeve 21 are provided with a plurality of positioning holes 22 arranged vertically, and a second bolt 23 passes through the corresponding two positioning holes 22 in sequence in the horizontal direction, and a second locking nut 24 is sleeved on the end of the second bolt 23. By adjusting the second bolt 23 to insert into different positioning holes 22, the height position of the lifting support foot 9 can be changed to adapt to different brick joint height positions.
[0021] The embedding tool is used in the following steps: (1) First, select a number of assembly tubes 7 according to the length of the wall 1, and connect the external connection flanges 15 of each assembly tube 7 in sequence end to end by bolts 17 and lock nuts 18; (2) A closing tube 8 is connected to the ends of the head assembly tube 7 and the end assembly tube 7 respectively; (3) Close each of the second covers 14, open the first cover 12, inject waterproof mortar into the interior of each of the sealing tubes 8 and the assembly tube 7, then open the second cover 14 and insert the end of each of the discharge pipes 13 into the brick joints 5 cut out on the wall 1 to fill the waterproof mortar.
[0022] Step 3: inject waterproof grouting material into each grouting hole 6 on the wall 1.
[0023] The present invention first fills the bottom brick joint 5 of the wall 1 with waterproof mortar by a filling tool, which is convenient for construction and more efficient, and then the wall 1 is punched to inject waterproof grouting material. The present invention has the advantages of being able to solve the problem of indoor floor and wall mildew caused by the lack of waterproof moisture layer or concrete ring beam in the existing brick wall, without demolishing the existing brick wall or destroying the exterior wall, and restoring the waterproof and moisture-proof functions of the moisture-proof layer of the existing wall by combining grouting and filling in the indoor brick joints.
[0024] The present invention is not limited to the above-mentioned embodiments. On the basis of the technical solution disclosed in the present invention, technicians in this field can make some substitutions and deformations to some technical features therein according to the disclosed technical content without creative labor, and these substitutions and deformations are all within the protection scope of the present invention.
Claims
1. A method for treating moisture and mildew of a brickwork, comprising a wall, wherein an indoor side of the wall is provided with an indoor original floor, and an outdoor side of the wall is provided with an outdoor floor, wherein the height of the outdoor floor is lower than the height of the indoor original floor, and wherein: The method comprises the following steps: Step 1: From one side of the room, cut out the seams at the bottom of the wall that is located above the original floor of the room, and fill the cut out brick seams with waterproof mortar; Step 2: Drill several grouting holes from one side of the room at an angle to the wall located above the original floor of the room; Step 3: Pour waterproof grouting material into each grouting hole on the wall.
2. A method for treating moisture and mildew of brickwork according to claim 1, characterized in that: In the step 1, the depth of the cut brick joints is 5.5-6.5 cm, at least two brick joints are cut out on the wall in the vertical direction, and the height of the cut brick joints is lower than the height of the interior decorative surface.
3. A method for treating moisture and mildew of brickwork according to claim 1 or 2, characterized in that: In the step 2, the included angle between the grouting holes and the horizontal plane is 45°, the grouting holes are arranged equidistantly along the length direction of the wall, the distance between two adjacent grouting holes is 20-25 cm, and the height distance between the grouting hole opening on the indoor side of the wall and the indoor original ground in the vertical direction is 18-20 cm.
4. A method for treating moisture and mildew of brickwork according to claim 1 or 2, characterized in that: In the step 2, a filling tool is used to fill the removed brick joints with waterproof mortar; the filling tool includes a plurality of assembly cylinders connected end to end in sequence, the ends of the front assembly cylinder and the rear assembly cylinder are connected to a closing cylinder, the bottoms of the closing cylinder and the assembly cylinder are provided with at least two left-right symmetrical lifting support feet, the bottoms of the lifting support feet are provided with universal wheels, the universal wheels of the lifting support feet of the closing cylinder are provided with brakes, a feed cylinder is vertically provided on the upper side of any of the closing cylinders, and an openable cover 1 is provided on the feed cylinder; the sides of the closing cylinder and the assembly cylinder are both connected with a discharge pipe, the discharge pipe includes an inclined section and a horizontal section, and the end of the discharge pipe is provided with a cover 2.
5. A method for treating moisture and mildew of brickwork according to claim 4, characterized in that: External connecting flanges are provided at both the front and rear ends of the assembling cylinder, and an external connecting flange is also provided at one end of the closing cylinder close to the assembling cylinder. At least four connecting holes in a rectangular shape are provided on the external connecting flange. Any two adjacent external connecting flanges are connected by a plurality of bolts passing through the corresponding connecting holes, and a locking nut is provided at one end of the bolt for tightening the corresponding external connecting flange. The outer periphery and inner wall of the closing cylinder and the assembling cylinder are both rectangular, and the front and rear ends of the assembling cylinder are both open, and one end of the closing cylinder is open. At least two sealing rings in a rectangular shape are provided at the ends of the closing cylinder and the assembling cylinder.
6. A method for treating moisture and mildew of brickwork according to claim 5, characterized in that: The lifting support foot includes a vertical pole arranged on the lower side of the closed tube or the assembly tube, the lower end of the pole is inserted into the sleeve, the cross-section of the pole is rectangular, and a plurality of positioning holes arranged vertically are provided on the left and right side walls of the sleeve. Bolt 2 passes through the corresponding two positioning holes in turn in the horizontal direction, and locking nuts are provided on the two ends of the bolt.
7. A method for treating moisture and mildew of brickwork according to claim 6, characterized in that: The embedding tool is used in the following steps: (1) First, select a number of assembly tubes according to the length of the wall, and connect the external connection flanges of each assembly tube in sequence by bolt 1 and lock nut 1; (2) A closing cylinder is connected to the ends of the head assembly cylinder and the end assembly cylinder respectively; (3) Close each cover No. 2, open cover No. 1, inject waterproof mortar into the interior of each closed tube and assembly tube, then open cover No. 2 and insert the end of each discharge pipe into the brick joints cut out on the wall, brake the universal wheels of the lifting support feet of the closed tube, and fill with waterproof mortar.